PHOTO GALLERY

Unit 2 Demolition

 

May 2014
(click on pictures to enlarge)

Crews installing form work for SN016-2573 North Abutment tunnel over WB Ontario to WB I-90/94 (Kennedy Expressway).

Reinforcement installation for WB Ontario to EB I-90/94 (Kennedy Expressway) west moment slab.

Pile driving for footing extension of SN016-2573 North Abutment tunnel over WB Ontario to WB I-90/94 (Kennedy Expressway).

Crews placing sub-base for new WB Ontario to EB I-90/94 (Kennedy Expressway) Ramp pavement.

Concrete placement for extension of SN016-2573 North Abutment tunnel over WB Ontario to WB I-90/94 (Kennedy Expressway).

Concrete placement for WB Ontario to EB I-90/94 (Kennedy Expressway) approach pavement.

Reinforcement installation for WB Ontario to EB I-90/94 (Kennedy Expressway) approach pavement.

Concrete box beam installation for SN016-2573 over WB Ontario to WB I-90/94 (Kennedy Expressway).

Grout installation on SN016-2573 deck beams over WB Ontario to EB I-90/94 (Kennedy Expressway).

Reinforcement installation for SN016-2573 wearing surface over WB Ontario to WB I-90/94 (Kennedy Expressway).

Concrete placement for SN016-2573 wearing surface over WB Ontario to WB I-90/94 (Kennedy Expressway).

Concrete placement for SN016-2573 wearing surface over WB Ontario to WB I-90/94 (Kennedy Expressway).

Waterproofing System installation on SN016-2573 over WB Ontario to WB I-90/94 (Kennedy Expressway).

Waterproofing System installation on SN016-2573 over WB Ontario to WB I-90/94 (Kennedy Expressway).

 

April 2014
(click on pictures to enlarge)

Reinforcement installation on WB Ontario to EB I-90/94 entrance ramp over Kennedy Expressway.

Drilling shafts for soldier pile retaining wall along WB Ontario to EB I-90/94 entrance ramp.

Placing concrete at the East abutment for the WB Ontario to EB I-90/94 entrance ramp over Kennedy Expressway.

Reinforcement installation on WB Ontario to EB I-90/94 entrance ramp over Kennedy Expressway.

Pouring bridge deck for WB Ontario to EB I-90/94 entrance ramp over Kennedy Expressway.

Pouring bridge deck for WB Ontario to EB I-90/94 entrance ramp over EB I-90/94 to EB Ohio exit ramp.

Pouring WB Ontario to WB I-90/94 entrance ramp pavement.

Reinforcement installation at west approach slab for WB Ontario to EB I-90/94 entrance ramp over EB I-90/94 to EB Ohio St exit ramp.

Structural steel installation for WB Ontario to EB I-90/94 entrance ramp over WB Kennedy Expressway.

Structural steel installation for WB Ontario to EB I-90/94 entrance ramp over Kennedy Expressway reversible lanes.

Structural steel installation for WB Ontario to EB I-90/94 entrance ramp over EB Kennedy Expressway.

 

March 2014
(click on pictures to enlarge)

Installation of soldier piles for new retaining wall along WB Ontario to EB I-90/94 entrance ramp

Concrete removal on south abutment for WB Ontario to WB I-90/94 entrance ramp

Concrete placement for WB Ontario to EB I-90/94 abutment

Reinforcement bar installation for WB Ontario to EB I-90/94 entrance ramp pier 1

Excavation for new pavement on WB Ontario to WB I-90/94 entrance ramp

MSE Wall panel installation for WB Ontario to EB I-90/94 entrance ramp east abutment

Soldier pile shaft drilling for retaining wall on WB Ontario to EB I-90/94 entrance ramp

Beam installation for WB Ontario to EB I-90/94 entrance ramp over EB I-90/94 to EB Ohio St exit ramp

Structural Steel in place for WB Ontario to EB I-90/94 entrance ramp over EB I-90/94 to EB Ohio St exit ramp

 

January 2014
(click on pictures to enlarge)

Retaining wall removal on the WB Ontario to WB I-90/94 ramp for the proposed tunnel south abutment reconstruction

Pavement removal on the WB Ontario to WB I-90/94 ramp.

Existing structure removal on the WB Ontario to WB I-90/94 ramp for the proposed tunnel south abutment reconstruction

Installation of bracing for the temporary soil retention system at the south abutment of the WB Ontario to WB I-90/94 ramp

Installation of bracing for the temporary soil retention system and structure excavation at the south abutment of the WB Ontario to WB I-90/94 ramp

Installation of bracing for the temporary soil retention system and structure excavation at the south abutment of the WB Ontario to WB I-90/94 ramp

 

October 2013
(click on pictures to enlarge)

Demolition of WB Ontario ramp tunnel to WB I-90/94

Demolition of concrete box beams on WB Ontario ramp tunnel to WB I-90/94

Equipment used to demo the WB Ontario ramp to I-90/94 structure

Drilling shafts for WB Ontario ramp to EB I-90/94 abutment foundation

Installing steel casing for WB Ontario ramp to EB I-90/94 abutment foundation

Installing steel casing for WB Ontario to EB I-90/94 ramp abutment foundation

Installing caisson rebar cage for WB Ontario to EB I-90/94 ramp abutment foundation

 

September 2013
(click on pictures to enlarge)

Removing barrier wall on WB Ontario entrance ramp to EB I-90/94

Performing Earth Excavation for the temporary WB Ontario Ramp to EB I-90/94

Installation of erosion control and earth excavation for the temporary WB Ontario ramp to EB I-90/94

Framing for temporary pavement for the temporary WB Ontario ramp to EB I-90/94

Removing existing protective slab and pavement over the WB Ontario ramp tunnel to WB I-90/94

Paving temporary WB Ontario ramp to EB I-90/94

Paving temporary WB Ontario ramp to EB I-90/94

Installing base for temporary WB Ontario ramp to EB I-90/94

Installing temporary PCC pavement for temporary WB Ontario ramp to EB I-90/94

Probing for existing water tunnel located near the proposed abutment for WB Ontario ramp to EB I-90/94

Removal of protective slab over WB Ontario to WB I-90/94 tunnel

Installation of temporary drainage and earth excavation for temporary WB Ontario ramp to EB I-90/94

Existing Conditions – Summer 2013
(click on pictures to enlarge)
 

Looking East at SN 016-1003: Showing single column pier constructed integral with superstructure

Looking East at SN 016-1003: Showing deterioration of hinge locations.

Looking Northwest at SN 016-2573: Showing tunnel. Tunnel extension proposed on departure side of tunnel.

 