|
Project Exhibits
Some of the following exhibits were on display at the Public Informational Open House held at the Cherry Valley Village Hall on October 25, 2007
(Due to
the large file size, some of the images may take a few minutes to load)
I-39/US 20 Interchange Alternatives
Preferred I-39/US 20 Interchange Alternative Sheet 1
Preferred I-39/US 20 Interchange Alternative Sheet
2
Harrison Avenue Interchange Alternatives
Harrison Preferred Alternative
Harrison Preferred Alternative showing Traffic Lanes
Existing Typical
Sections
Proposed
Typical Sections
Existing Traffic Data
Projected Construction Year Traffic (2015)
Projected
Design Year Traffic (2035)
Crash Data 2002-2004
Aerial
Photos of Existing Conditions – Board 1
Aerial Photos
of Existing Conditions – Board 2
Noise Study Process
Noise Receptor Locations – sheet 1
Noise
Receptor Locations – sheet 2
|