Project Schedule
The I-55 at Weber Road Environmental Assessment is in Phase I of the IDOT process (Planning), with completion anticipated in late 2012. Phase I is often referred to as the Preliminary Engineering and Environmental Study Phase. Phase I involves the analysis of existing and future conditions, defining the Purpose and Need for an improvement, and developing and analyzing improvement alternatives. The culmination of the Phase I Study concludes with the selection of the preferred alternative.
Phase II is the design and land acquisition stage in the project process. After a preferred alternative is approved, plans are developed and required right of way is acquired. Phase II typically takes 2 years to complete.
Phase III is the construction phase for the improvement.
IDOT’s share of funding exists for all three phases. The project is currently included in the Illinois Department of Transportation’s 2010-2015 multi-year program for design and construction. For more information about the highway construction process from start to finish, a link is available to an informative pamphlet published by IDOT entitled “It Takes Time...”
Where Are We Now?
The study of the interchange at I-55 and Weber Road is currently in Phase I. The project team has developed a Purpose and Need (link to study documents) statement and conducted analyses of existing and future conditions.
An initial range of alternatives has also been developed. Alternatives have incorporated input from the public, agencies, and the project team. Alternatives have been organized into three categories, including:
1. Improvements or Reconfigurations at the Interchange
2. Improvements or Modifications to Weber Road
3. Potential Accommodations for Other Modes in the Project Study Area
A “No-Build” alternative is also being studied and serves as a basis of comparison to other alternatives.
Study Schedule
The two public meetings and five Community Advisory Group meetings that have been held thus far are described below.
Public Meetings
2nd Public Information
Meeting (PIM #2) – May 12, 2011
A public meeting was held at
Romeoville Village Hall on
Thursday, May 12, 2011 from 4:00
– 7:00 p.m. The purpose of the
meeting was to update the public
on the project status, present
the project problem statement,
present the Purpose and need,
review the Initial range of
alternative, introduce the
alternative evaluation process
and screening criteria, and to
explain next steps in the
project process. Comments and
new ideas provided by the
attendees were collected by the
project team. An agenda and
additional documents from this
meeting can be found on the
Study Documents page.
1st Public Information Meeting (PIM #1) - April 7, 2010
The first Public Meeting for the
study was held on April 7, 2010,
from 4:00 to 7:00 p.m. at the
Bolingbrook Golf Club in
Bolingbrook. The purpose of the meeting
was to provide information on
the project, including the study
team, process, and schedule,
gather input on the project’s
community context, and describe
the next steps of the study. The
meeting was open house format
and attended by 75 people,
including elected officials and
staff from Will County, and the
Villages of Romeoville,
Bolingbrook, and Crest Hill. The
meeting was also well attended
by businesses and residents
adjacent to the project study
area. The presentation and
handouts given at this meeting
are available on the
Study Documents page.
Community Advisory Group (CAG) Meetings
CAG Meeting #5
The fifth CAG meeting was held on April 26th, 2011 at the Romeoville Village Hall. The purpose of the meeting was to review and solicit input on the presentation and displays for Public Meeting #2, held on May 12, 2011. An agenda and additional documents from this meeting can be found on the
Study Documents page.
CAG Meeting #4
The purpose of CAG Meeting #4
was to provide a project status
update, review the draft Purpose
and Need for the project,
present engineering and
environmental considerations,
and to develop an initial range
of improvement alternatives.
Information was presented to the
group and attendees participated
in an alternatives development
workshop. An agenda and
additional documents from this
meeting can be found on the
Study Documents page.
CAG
Meeting #3
The third CAG meeting
was held on November 30, 2010 at
the Romeoville Village Hall. The purpose of CAG
Meeting #3 was to present an update
on the
project status, review the draft
Purpose and Need for the
project, present criteria that
may be used in to evaluate
alternatives, and present the
process for evaluating
alternatives. An agenda and
additional documents from this
meeting can be found on the
Study Documents page.
CAG
Meeting #2
The second CAG meeting was
held on November 9, 2010 at the
Romeoville Recreation Center. The purpose of CAG #2
was to present an update on the project
status, review the results of
the first CAG meeting, and present
a draft of the Purpose and Need
Report. An agenda and additional
documents from this meeting can
be found on the
Study Documents page.
CAG Meeting #1
The first CAG meeting was held
on June 23, 2010 at the
Romeoville Recreation Center.
The CAG consists of elected
officials and staff from Will
County and the Village of
Romeoville as well as residents
and representatives from local
business. The purpose of CAG #1
was to discuss the study
process, initial findings, the
role of the CAG, and to perform
a workshop to brainstorm the
more subtle transportation
problems at the I-55 at Weber
Road Interchange. The results
from the Problem Statement
Workshop and other materials
from this meeting can be found
on the
Study Documents page.