|
Number
|
Date Issued |
Title
|
|
CL1990-09
|
02/27/1990
|
Allocation
of FAS and State Matching Funds to the Counties |
|
CL1990-23
|
07/27/1990
|
Township
Bridge Program |
|
CL1990-31
|
10/12/1990
|
Underwater
Inspection of Local Agency Bridges |
|
CL1990-34
|
12/21/1990
|
Cold-Recycled Bituminous Concrete Using Bituminous
Materials |
|
CL1990-36
|
12/31/1990
|
Allocation
of FAS and State Matching Funds to the Counties |
|
CL1991-14
|
08/01/1991
|
Township
Bridge Program |
|
CL1992-08
|
03/30/1992
|
Allocation
of STR and State Matching Funds to the Counties |
|
CL1992-15
|
08/03/1992
|
Township
Bridge Program |
|
CL1992-17
|
12/02/1992
|
Allocation
of STR and State Matching Funds to the Counties |
|
CL1993-13
|
06/08/1993
|
Corrosion of
Traffic Signal Mast Arms |
|
CL1993-19
|
08/06/1993
|
Township
Bridge Program |
|
CL1993-21
|
10/08/1993
|
PA 88-79 |
|
CL1994-02
|
01/11/1994
|
State Truck
Route System |
|
CL1994-04
|
01/25/1994
|
Allocation
of STR and State Matching Funds to the Counties |
|
CL1994-12
|
05/18/1994
|
Metric
Highway Design for Local Roads and Streets |
|
CL1994-22
|
12/23/1994
|
Allocation
of STR and State Matching Funds to the Counties |
|
CL1995-03
|
03/16/1995
|
Metric
Highway Design Update |
|
CL1995-15
|
11/07/1995
|
Metric "3R"
Policies |
|
CL1996-03
|
02/08/1996
|
Allocations
of STR and State Matching Funds to the Counties |
|
CL1996-12
|
07/26/1996
|
Township
Bridge Program |
|
CL1997-01
|
02/11/1997
|
Allocation
of STR and State Matching Funds to Counties |
|
CL1997-04
|
08/11/1997
|
Township
Bridge Program |
|
CL1998-05
|
04/07/1998
|
Allocation
of State Matching Funds |
|
CL1998-08
|
08/10/1998
|
Township
Bridge Program |
|
CL1999-05
|
03/05/1999
|
Allocation
of STR and State Matching Funds to the Counties |
|
CL1999-08
|
08/09/1999
|
Township
Bridge Program |
|
CL2000-02
|
01/18/2000
|
Allocation
of STR and State Matching Assistance Funds to the
Counties
|
|
CL2000-08
|
08/09/2000
|
Township
Bridge Program |
|
CL2001-03
|
01/31/2001
|
Expense
Rates for Publicly Owned Equipment |
|
CL2001-04
|
02/08/2001
|
Allocation
of STR and State Matching Assistance Funds to the
Counties
|
|
CL2001-10
|
08/14/2001
|
Township
Bridge Program |
|
CL2001-13
|
11/28/2001
|
Major Bridge
Program |
|
CL2002-04
|
03/06/2002
|
Allocation
of STR Funds to the Counties |
|
CL2002-09
|
05/24/2002
|
Subscription
Service |
|
CL2002-14
|
07/05/2002
|
Storm Water
Phase II Guidance |
|
CL2002-17
|
08/09/2002
|
Township
Bridge Program |
|
CL2002-21 |
10/21/2002
|
Township Bridge
Program Database |
|
CL2002-23 |
12/06/2002 |
2002 Road,
Bridge, and Other Related Laws of Illinois |
|
CL2002-24 |
01/07/2003
|
Major Bridge
Program |
|
CL2003-02 |
01/10/2003 |
Erosion &
Sediment Control Seminar |
|
CL2003-03 |
02/06/2003 |
Roadway Weather
Info Web Site |
|
CL2003-04 |
02/28/2003 |
Allocation of
STR Funds & State Matching Assistance Funds to the
Counties |
|
CL2003-07 |
04/14/2003
|
Safety Vest |
|
CL2003-08 |
06/27/2003
|
Structures
Information Management System (SIMS) Survey |
|
CL2003-09 |
06/27/2003
|
Erosion and
Sediment Control Seminar |
|
CL2003-10 |
08/08/2003
|
Township Bridge
Program |
|
CL2003-11 |
08/25/2003
|
Public Act
0093-0032 - Permit Fees |
|
CL2003-16 |
11/23/2003 |
Highway Bridge Replacement &
Rehabilitation Program (HBRRP) Soft Match Credit Program |
|
CL2003-17 |
12/02/2003 |
Major Bridge Program |
|
CL2003-19 |
12/31/2003 |
Allocation of Surface
Transportation Program Rural (STR) Funds |
|
CL2004-02 |
01/20/2004 |
Project Procedures Guide
Revision |
|
CL2004-03 |
02/02/2004 |
Allocation of State Matching
Assistance Funds to the Counties |
|
CL2004-05 |
04/26/2004 |
Detectable Warnings for Curb
Ramps, and Other Locations |
|
CL2004-06 |
04/26/2004 |
Slow-Moving Vehicle Emblem |
|
CL2004-07 |
04/26/2004 |
IRS W-9 Form |
|
CL2004-11 |
08/06/2004 |
Township Bridge Program |
|
CL2004-14 |
11/18/2004 |
Major Bridge Program |
|
CL2004-15 |
11/29/2004 |
Structure Information and
Procedure (SIP) Manual Revisions |
|
CL2004-16 |
12/08/2004 |
2004 Road, Bridge, and Other
Laws of Illinois |
|
CL2004-19 |
12/20/2004 |
Allocation of Surface
Transportation Program Rural (STR) Funds and State
Matching Assistance Funds to the Counties |
|
CL2005-01 |
4/15/2005 |
Bureau of Local Road and
Streets Manual |
|
CL2005-02 |
5/16/2005 |
2003 Illinois Manual on
Uniform Traffic Control Devices |
|
CL2005-03 |
7/12/2005 |
Surplus Temporary New Jersey
Concrete Barriers |
|
CL2005-04 |
7/12/2005 |
Renumbering of BLR Forms |
|
CL2005-05 |
7/12/2005 |
Qualification Based
Selection for Consultant Engineering Services |
|
CL2005-06 |
8/08/2005 |
Township Bridge Program |
|
CL2005-07 |
8/31/2005 |
Positive Protection for
Workers CD-ROM |
|
CL2005-09 |
11/02/2005 |
2006 Special Provisions,
Usage Sheet, and Cross Reference Sheet |
|
CL2005-10 |
11/09/2005 |
Major Bridge Program |
|
CL2005-11 |
12/08/2005 |
FY2007 Highway Safety
Improvement Program and High Risk Rural Roads Program |
|
CL2005-12 |
12/22/2005 |
Allocation of Surface
Transportation Program Rural (STR), State Matching
Assistance and Highway Bridge Program (HBP) Funds to the
Counties |
|
CL2006-01 |
02/03/2006 |
Responsible Bidder Protests
on Local Lettings |
|
CL2006-02 |
04/10/2006 |
Local Letting Procedures |
|
CL2006-03 |
04/18/2006 |
Highway Jurisdiction
Guidelines for Highway and Street Systems |
|
CL2006-04 |
06/21/2006 |
Federal Highway Earmarks
Guidelines |
|
CL2006-05 |
06/21/2006 |
2005 Joint Construction
Progress Review Program |
|
CL2006-06 |
06/21/2006 |
Public Act 94-0763:
Designated Truck Route System |
|
CL2006-07 |
08/02/2006 |
Township Bridge Program |
|
CL2006-08 |
08/21/2006 |
Local Agency Financial
Statement Review |
|
CL2006-09 |
08/25/2006 |
Major Bridge Program |
|
CL2006-10 |
08/29/2006 |
Circular Letter Electronic
Distribution |
|
CL2006-11 |
10/10/2006 |
2007 Special Provisions
Usage Sheet, and Cross Reference Sheet |
|
CL2006-12 |
11/15/2006 |
Average Annual Equipment
Ownership Expense Database |
|
CL2006-13 |
12/06/2006 |
Certified Apprenticeship and
Training Program |
|
CL2006-14 |
12/06/2006 |
2006 Road, Bridge and other
related laws of Illinois |
|
CL2006-15 |
12/20/2006 |
Allocation of Surface
Transportation Program Rural (STR), state matching
assistance and Highway Bridge Program (HBP) funds to the
counties |
|
CL2007-01 |
01/18/2007 |
Township Bridge Lapse Pool
Program |
|
CL2007-02 |
02/08/2007 |
2008 Highway Safety
Improvement Program and High Risk Rural Roads Program |
|
CL2007-03 |
03/19/2007 |
Local Agency Federal
Flexible Match Program |
|
CL2007-04 |
03/22/2007 |
Local Crash Data Collection
Program |
|
CL2007-05 |
03/22/2007 |
Scour Critical Bridges and
Plans of Action |
|
CL2007-06 |
04/27/2007 |
LRFD Design Implementation |
|
CL2007-07 |
06/05/2007 |
Force Account Billing for
Local Projects on the State Letting |
|
CL2007-08 |
06/06/2007 |
Safe Routes to School
Program (SRTS) |
|
CL2007-09 |
07/02/2007 |
Eligible Funds for Bridge
Inspections and Bridge Inspection Training |
|
CL2007-10 |
08/06/2007 |
Structure Information and
Procedure (SIP) Manual Revisions |
|
CL2007-11 |
08/10/2007 |
Electronic Environmental
Survey Request Submittal |
|
CL2007-12 |
08/14/2007 |
Eberle Design, Inc., Recall
of Conflict Monitors / Malfunction Management Units |
|
CL2007-13 |
08/14/2007 |
Construction Loads on
Bridges (FHWA TECHNICAL ADVISORY 5140.28) |
|
CL2007-14 |
08/30/2007 |
Immediate Inspection of Deck
Truss Bridges Containing Fracture Critical Members (FCM)
(FHWA TECHNICAL ADVISORY 5140.27) |
|
CL2007-15 |
08/29/2007 |
Township Bridge Program |
|
CL2007-16 |
09/19/2007 |
Major Bridge Program |
|
CL2007-17 |
10/23/2007 |
NPDES Permits for Local
Projects on the Sate Letting |
|
CL2007-18 |
11/05/2007 |
2009 Highway Safety
Improvements Program and High Risk Rural Roads Program |
|
CL2007-19 |
11/19/2007 |
NBIS Personnel
Qualifications |
|
CL2007-20 |
12/03/2007 |
PPC Deck Beam - New Shape
Implementation, Standard Bridge Plan Retirement, and PPC
Deck Beam Inspection |
|
CL2007-21 |
12/03/2007 |
Scour Critical Bridges -
Plan of Action Update |
|
CL2007-22 |
12/20/2007 |
FY09 Allotments of STR, State Matching Assistance and HBP Funds to the Counties |
|
CL2007-23 |
12/31/2007 |
Substance Abuse Prevention
Program |
|
CL2008-01 |
01/29/2008 |
Illinois State Transportation Plan 2007 |
|
CL2008-02 |
03/07/2008 |
FHWA 2008 Excellence in Highway Design Awards |
|
CL2008-03 |
04/23/2008 |
Standard Bridge Plan Retirement |
|
CL2008-04 |
05/15/2008 |
Pile Load Conversions for New IDOT Driving Specifications |
|
CL2008-05 |
05/15/2008 |
2004 Regression Equations/Streamstats |
|
CL2008-06 |
05/20/2008 |
Manual for Fabrication of Precast Prestressed Concrete Products |
|
CL2008-07 |
05/27/2008 |
Manual on Uniform Traffic Control Devices (MUTCD) Compliance |
|
CL2008-08 |
06/02/2008 |
Schedule of Average Annual Equipment Ownership Expense Index |