Illinois Department of Transportation, Ann L. Schneider, Acting Secretary
Patrick J. Quinn, Governor
Traveling PublicMapsProjectsRoad ClosuresNewsDoing BusinessLetting & BiddingCareers@IDOTGeneral Info

BUREAU OF BRIDGES AND STRUCTURES

If you have questions regarding these forms, please email bbs.comsuggest@dot.il.gov

File Name

Form Title

Last Revision

BBS 132 Abbreviated Structure Geotechnical Report

09/15/11

BBS 133 Drilled Shaft Installation Plan

09/14/11

BBS 134 Drilled Shaft Excavation and Inspection Record

07/15/11

BBS 135 Drilled Shaft Concrete Placement Log

07/25/11

BBS 136 Pile Driving Equipment Data

10/30/08

BBS 137

Soil Boring Log

01/04/12

BBS 138

Rock Core Log

01/04/12

BBS 153

Structure Report 

09/06

BBS 757 Test Pile Driving Record 01/21/10
BBS 2184 Production Pile Driving Data 01/21/10
BBS 2536 Asbestos Determination Certification 05/02
BBS 2546 Pay Item Worksheet (Standard or Metric) 09/02
BBS 2557 Pre-Project Environmental Submittal Review Checklist 06/03
BBS 2558 Pre-Project Painting Submittal Review Checklist 7/15/08
BBS 2559 Environmental Daily Report 06/03
BBS 2560A Nonconformance Report 06/03
BBS 2560B Nonconformance Log 06/03
BBS 2561 Construction Inspector Project Start Up Checklist 6/03
BBS 2562 Construction Inspector Daily (QA) Report 02/04
BBS 2563 Contractor Daily (QC) Report 7/15/08
BBS 2596 Hydraulic Engineer Qualification Form 05/06
BBS 2610 Program Manager Qualifications 7/21/11
BBS 2620 Team Leader Qualifications 7/21/11
BBS 2630 Summary Report on Pavement, Base and Sub-Base Design 09/06
BBS 2640 Soil Test Data 09/06
BBS 2660A Fabrication Nonconformance Report 09/06
BBS 2680 Scour Critical Bridge Plan of Action (POA) 01/07
BBS 2720 Bridge Core 12/10/07
BBS 2730 Waterway Information Table 08/02/10
BBS 2740 Hydraulic Report Outline (HRO) 02/27/08
BBS 2750 Quality Verification Statement 03/13/08
BBS 2760 Preliminary Pin and Link Inspection Journal - A 04/25/08
BBS 2770 Preliminary Pin and Link Inspection Journal - B 04/25/08
BBS 2780 Supplemental Pin / Link Inspection Journal 04/25/08
BBS 2790 Bridge Inspection Procedures Review 04/14/08
BBS 2795 Structure Load Rating Summary 06/27/11
BBS 2800 Hydraulic Report Data Sheets 03/10/11
BBS 2802 Culvert Waterway Information Table 07/29/10
BBS 2804 Multiple Openings Waterway Information Table 02/28/11
BBS BIR-1 Bridge Inspection Report (MI) 10/01
BBS BIR-2 Bridge Inspection Report (SI) 10/01
BBS-BIR-FC1 Bridge Inspection Report Fracture Critical Inspection 12/15/08
BBS BIR-UW1 Bridge Inspection Report Underwater Inspection 02/99
BBS SFI-1 Special Feature Inspection Report 01/07

NOTE: Files are MS Word templates. Tips - Tools -Troubleshooting

IDOT Privacy Statement | Illinois Privacy Information | Kids Privacy | Web Accessibility  | FOIA