2006 CONSTRUCTION MANUAL
Addendum
CD-ROM has been selected as the primary format for distribution
of the Construction Manual. In even numbered years, the entire
manual will be reissued via an updated CD-ROM. Changes to the
current manual are posted below.
TO VIEW A SUMMARY OF CHANGES FROM THE 2004 VERSION TO
THE 2006 VERSION PLEASE REVIEW THE
PREFACE.
| Addendum |
Subject/s |
Date |
|
07-2006 |
BC 22, Authorization of Contract Changes
BC 111, Checklist for Engineer’s Final Payment Estimate
BC 775, Local Public Agency Resident construction Supervisor/In Responsible Charge
BBC 776, Local Public Agency Construction Inspector
BC 820, Project Labor Agreement (PLA) Workforce Participation Quarterly Reporting Form
BC 981, Agreement on Accuracy of Plan Quantities (English)
BC 981M, Agreement on Accuracy of Plan Quantities (Metric)
Memorandums
Memorandum 04: Contract Changes
Memorandum 06: Procedures for Local Agency Contracts Exempt from Federal Oversight.
Memorandum 30: Policies and Procedures for Approval of Subcontractors
Memorandum 33: Operational Review of Contract Quantities
Memorandum 79: Contract Closeouts
Memorandum 80: Interest for Late Payments
Construction Inspector's Checklists
Pipe Culverts
Storm Sewers |
May 24, 2012 |
|
06-2006 |
BC 131,
Statement of Material Allowance
BC 1777, Contractor’s
Performance Evaluation
BC 2331, ICORS PC Backup
Schedule
BC 239, Weekly Report of
Resident
BC 503, Assignment of
Contract/Consent to Assignment of Contract
BC 71, Final Inspection Report of
State Road Work
Memorandums
Memorandum 04: Contract Changes
Memorandum 14: Labor Compliance Federal-aid Highway Projects
Memorandum 22: Procedures for Applying the Bituminous Materials
Cost Adjustment
Memorandum 28: Administration of Contract Time
Memorandum 43: Coring Policy for Thickness Determination
Construction Inspector's Checklists
Bridge Superstructures
Precast Concrete Box Culverts
Sections
Section 100: General Requirements and Covenants
Section 500: Structures
Section 700: Work Zone Traffic Control
Documentation Guide
Section A: General Requirements
|
March 20, 2009 |
| 05-2006 |
BC 261, Substance Abuse Prevention Program Certification
(New)
BC 260A, Request for Approval of Subcontractor
BC503, Assignment of Contract/Consent to Assignment of Contract
(New)
BC 24, Request for Procurement Policy Board Waiver
BC 111, Checklist for Engineer's Final Payment Estimate
Memorandum 4: Contract Changes
Memorandum 28: Administration of Contract Time
Memorandum 68: Borrow, Use and Waste Site, And Excess Material Disposition Documentation, Review and Approval
|
April 16, 2008 |
| 04-2006 |
BC 22, Authorization of Contract Change
BC 757, Test Pile Driving Record
BC 1256, Bidder's Employee Utilization Form Construction
BC 2184, Piling Diagram Report
BC 2256, Prior Approval Authorization of Contract
Change
Memorandum 04: Contract Changes
Memorandum 09: Force Account Billing
Memorandum 11: Hot Mix Asphalt (HMA) Spreading and Finishing Machines Approved For Use in Illinois
Memorandum 45: Type III High-Early-Strength Portland Cement Concrete Mixture
Memorandum 53: Surface Testing of Pavements California Type Profilograph
Memorandum 55: Placement of Hot Mix Asphalt
Memorandum 68: Borrow, Use and Waste Site, And Excess Material Disposition Documentation, Review and Approval
Memorandum 75: PCC Patching-Opening Road to Traffic
Section 400: Surface Courses, Pavements, Rehabilitation and Shoulders
Documentation Guide
Section A: General Requirements
Section B: Final Documentation Requirements By Pay Unit
Section C: Final Documentation Requirements By Pay Item
Section D: Reference Tables
Section E: Trench Backfill Tables For Concrete Pipes
Section F: Documentation Examples
Construction Inspector's Checklists
Bridge Superstructures
Concrete Structures Other Than Bridge Decks
Continuously Reinforced PCC Pavement
Contract Administration
Earth Excavation and Embankment
Erosion Control
Hot Mix Asphalt (HMA) Binder and Surface Course
Hot Mix Asphalt (HMA) Pavement (Full Depth)
Hot Mix Asphalt (HMA) Shoulders
Pavement Patching
Piling
Pipe Culverts
Portland Cement Concrete Pavement
Soil Modification
Stabilized Subbase, BAM, CAM, PAM & CAM II
Storm Sewers
Structural Steel Bolting
Traffic Signal Installation
|
January 8. 2008 |
| 03-2006 |
BC 20, Affidavit
BC 111, Checklist for Engineer's
Final Payment Estimate
BC 71, Final Inspection Report of
State Road Work
BC 501, Consent To Assignment of
Contract
BC 502, Assignment of Contract
BC 2259, Storm Water Pollution
Prevention Plan/Erosion Control Inspection Report
FHWA 47, Statement of Materials and Labor Used by Contractors on
Highway Construction Involving Federal Funds (English)
FHWA 47M, Statement of Materials and Labor Used by Contractors
on Highway Construction Involving Federal Funds (Metric)
BC 1777, Contractor's Performance
Evaluation
BC 981, Agreement on Accuracy of
Plan Quantities
BC 981M, Agreement on Accuracy
of Plan Quantities
|
September 17, 2007 |
| 02-2006 |
BC 635, Extra Work Daily Report
BC 2370, Equipment Expense Rate Data
Memorandum 09: Force Account Billing
Memorandum 15: Welding of Construction Accessories to Structural Steel Bridge Members
Memorandum 44: Pile Splices
Memorandum 64: Sequential Deck Pours
Memorandum 68: Trees
Memorandum 72: Structural Steel Damaged During Deck Removal
Memorandum 73: Guidelines for the Use of a Vibratory Screed to Finish Bridge Decks
Memorandum 74: Guidelines for Pumping Bridge Deck Concrete
Section 500: Structures
Section 700: Work Zone Traffic Control
Documentation Guide - Section A: General Requirements
Construction Inspector's Checklists:
Continuously Reinforced PCC Pavement
Hot Mix Asphalt (HMA) Binder and Surface Course
Hot Mix Asphalt (HMA) Pavement (Full Depth)
Hot Mix Asphalt (HMA) Shoulders
Pavement Patching
Piling
Pipe Culverts
Portland Cement Concrete Pavement
Soil Modification
Stabilized Subbase, BAM, CAM, PAM & CAM II
Storm Sewers
|
May 15, 2007 |
01-2006 |
|
March 5, 2007 |
|