Illinois Department of Transportation, Erica Borggren, Acting Secretary
Loading
Patrick J. Quinn, Governor
Traveling PublicMapsProjectsRoad ClosuresNewsDoing BusinessLetting & BiddingCareers@IDOTGeneral Info


 

2006 CONSTRUCTION MANUAL

DOCUMENTATION OF
CONTRACT QUANTITIES

Table of Contents

 


*Asterisks next to the links indicate that the file has been updated and is posted on the Addendum page.

Section A – General Requirements*
Use of ICORS for Documentation
Project Diary
The Quantity Book
Field Inspection Reports/Source Documentation
Field Books
Initials and Dates
Plan Quantity Acceptance
Progress Documentation
Items That Must Be Final Measured
Use of Computers for Final Documentation
Extra Work (Article 109.04)
Materials Allowance
Maximum Payment
Yield Checks
Thickness Determination Schedule
Documentation Procedures for Construction Engineering Performed by Consultants
Documentation of Pay Quantities Based on Weight Tickets
Documentation of Roller Weights
Final Documentation

Section B – Final Documentation Requirements by Pay Unit *
Section C – Final Documentation Requirements by Pay Item *
Section D – Reference Tables
*
Estimating Daily Earth Volumes with Load Counts
Maximum Legal Load Limits for Trucks, Form BT 753

Section E – Trench Backfill Tables*

Trench Backfill Table for Circular Concrete Pipes, Metric
Trench Backfill Table for Elliptical Pipes, Metric
Trench Backfill Table for Arch Pipes, Metric
Trench Backfill Table for Circular Concrete Pipes, English
Trench Backfill Table for Elliptical Pipes, English
Trench Backfill Table for Arch Pipes, English

Section F – Documentation Examples*



 Construction Manual Addendum Page  

 
IDOT Privacy Statement | Illinois Privacy Information | Kids Privacy | Web Accessibility  | FOIA