Illinois Department of Transportation, Milton R. Sees, Secretary Rod R. Blagojevich, Governor
Traveling PublicMapsProjectsRoad ClosuresNewsDoing BusinessLetting & BiddingCareers@IDOTGeneral Info

New US 67 Bridge Over Illinois River at Beardstown

On the future Professional Transportation Bulletin (PTB 140), IDOT, District Six, is planning to select a Consultant Engineer to guide IDOT through the stakeholder involvement process to help determine the type and style of the proposed bridge to carry the proposed four-lanes of US 67 over the Illinois River and Curry Lake near Beardstown, Illinois in Cass and Schuyler Counties.

The Phase 1 Engineering Study for the proposed US 67 from the existing Jacksonville Bypass to US 136 at Macomb was started in October, 1995 and later received Design Approval in October, 2003. Now with the alignment determined through our standard public involvement processes, we are proposing to continue stakeholder involvement by having the public assist IDOT in determining the most feasible and pleasing bridge to compliment the surrounding area. This will also involve determining the proposed roadway landscaping and aesthetic features for the entire study area along the US 67 alignment, from east of the proposed IL Route 125 Interchange to west of the IL Route 100 / IL Route 103 Interchange, for a total length of approximately 3.7 miles. The construction cost of the project within the CSS Study limits is estimated to be approximately $150,000,000.

 

CSS Links

CSS Home
Guidelines for CSS
What Is CSS?
The Purpose of CSS
CSS Policy for Illinois
CSS Policy for IDOT
Departmental Policy for CSS
Department's Environment
Federal CSS Info
Resources
Design & Environment Manual
Contact Information
Training
Feedback

Find Your District


IDOT Privacy Statement | Illinois Privacy Information | Kids Privacy | Web Accessibility  | FOIA