ILLINOIS DEPARTMENT OF TRANSPORTATION PAGE: 1 03/03/08 10:46:49 U N I T P R I C E T A B U L A T I O N O F B I D S LETTING DATE: 01/18/2008 LETTING TYPE: SCHEDULED CONTRACT NUMBER: 60C20 LETTING ITEM NUMBER: 139 RESPONSIBLE DISTRICT: 01 BIDS LOCKED: Y SECTION: 211-K-V-X-B COUNTY: COOK ESTIMATE: -------------------------- SUMMARY OF CONTRACTOR BIDS -------------------------- "AS READ" SUMMATION SUMMATION OF NBR BIDR CONTR COMB ITEM CONTR BIDDER OF BIDDER CALCULATED LOW BIDR CALC BLANK NBR BIDDER NAME GROUP COMB GRP NBR GROUP TOTAL PRICE EXTENSIONS EXTENSIONS BID EXTENSION DIFF BIDS 0204 Areatha Construction Co., Inc. NO ALT 2,980,558.31 2,980,558.31 2,980,558.31 0820 Albin Carlson & Co. NO ALT 2,103,812.20 2,103,812.20 2,103,812.20 1552 Dunnet Bay Construction Company NO ALT 2,179,069.00 2,179,069.00 2,179,069.00 2520 Herlihy Mid-Continent Company NO ALT 2,042,679.85 2,042,679.85 2,042,679.85 2779 Illinois Constructors Corporation NO ALT 2,338,419.53 2,338,419.53 2,338,419.53 3127 Kenny Construction Company NO ALT 2,223,926.15 2,223,926.15 2,223,926.15 3505 Lorig Construction Company NO ALT 1,809,204.50 * 1,809,204.50 1,809,204.50 * **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT = 67 ---------------------- DETAIL CONTRACTOR BIDS ---------------------- ITEM NBR ITEM DESCRIPTION UNIT OF UNIT BIDDER CALCULATED BIDR CALC BIDR NBR BIDDER NAME QUANTITY MEASURE PRICE EXTENSION EXTENSION EXTENSION DIFF X0321743 SILICONE JT SEAL 1 86.000 FOOT 0820 Albin Carlson & Co. 47.0000 4,042.00 4,042.00 0204 Areatha Construction Co., Inc. 54.0000 4,644.00 4,644.00 1552 Dunnet Bay Construction Company 22.0000 1,892.00 1,892.00 2520 Herlihy Mid-Continent Company 32.0000 2,752.00 2,752.00 2779 Illinois Constructors Corporation 45.0000 3,870.00 3,870.00 3127 Kenny Construction Company 25.0000 2,150.00 2,150.00 3505 Lorig Construction Company 28.0000 2,408.00 2,408.00 X0322256 TEMP INFO SIGNING 51.400 SQ FT 0820 Albin Carlson & Co. 12.0000 616.80 616.80 0204 Areatha Construction Co., Inc. 15.7500 809.55 809.55 1552 Dunnet Bay Construction Company 12.0000 616.80 616.80 2520 Herlihy Mid-Continent Company 12.0000 616.80 616.80 2779 Illinois Constructors Corporation 12.0000 616.80 616.80 3127 Kenny Construction Company 14.0000 719.60 719.60 3505 Lorig Construction Company 15.0000 771.00 771.00 X0322932 SILICONE JT SEAL 1.5" 258.000 FOOT 0820 Albin Carlson & Co. 39.0000 10,062.00 10,062.00 0204 Areatha Construction Co., Inc. 55.8500 14,409.30 14,409.30 1552 Dunnet Bay Construction Company 23.2500 5,998.50 5,998.50 2520 Herlihy Mid-Continent Company 34.0000 8,772.00 8,772.00 2779 Illinois Constructors Corporation 45.0000 11,610.00 11,610.00 3127 Kenny Construction Company 28.0000 7,224.00 7,224.00 3505 Lorig Construction Company 30.0000 7,740.00 7,740.00 X0325239 TEMP PAVT 10 882.000 SQ YD 0820 Albin Carlson & Co. 75.0000 66,150.00 66,150.00 0204 Areatha Construction Co., Inc. 96.1500 84,804.30 84,804.30 1552 Dunnet Bay Construction Company 55.0000 48,510.00 48,510.00 2520 Herlihy Mid-Continent Company 80.0000 70,560.00 70,560.00 2779 Illinois Constructors Corporation 55.0000 48,510.00 48,510.00 3127 Kenny Construction Company 52.5000 46,305.00 46,305.00 3505 Lorig Construction Company 22.0000 19,404.00 19,404.00 X0325303 STR REP CON DP OVER 5 20.000 SQ FT 0820 Albin Carlson & Co. 90.0000 1,800.00 1,800.00 0204 Areatha Construction Co., Inc. 162.7500 3,255.00 3,255.00 1552 Dunnet Bay Construction Company 150.0000 3,000.00 3,000.00 2520 Herlihy Mid-Continent Company 230.0000 4,600.00 4,600.00 2779 Illinois Constructors Corporation 250.0000 5,000.00 5,000.00 3127 Kenny Construction Company 147.0000 2,940.00 2,940.00 3505 Lorig Construction Company 150.0000 3,000.00 3,000.00 X0325305 STR REP CON DP = < 5 397.500 SQ FT 0820 Albin Carlson & Co. 85.0000 33,787.50 33,787.50 0204 Areatha Construction Co., Inc. 158.5000 63,003.75 63,003.75 1552 Dunnet Bay Construction Company 180.0000 71,550.00 71,550.00 2520 Herlihy Mid-Continent Company 250.0000 99,375.00 99,375.00 2779 Illinois Constructors Corporation 150.0000 59,625.00 59,625.00 3127 Kenny Construction Company 147.0000 58,432.50 58,432.50 3505 Lorig Construction Company 110.0000 43,725.00 43,725.00 X5030305 CONC WEARING SURF 5 1,020.000 SQ YD 0820 Albin Carlson & Co. 75.0000 76,500.00 76,500.00 0204 Areatha Construction Co., Inc. 134.9500 137,649.00 137,649.00 1552 Dunnet Bay Construction Company 92.0000 93,840.00 93,840.00 2520 Herlihy Mid-Continent Company 82.0000 83,640.00 83,640.00 2779 Illinois Constructors Corporation 100.0000 102,000.00 102,000.00 3127 Kenny Construction Company 68.0000 69,360.00 69,360.00 3505 Lorig Construction Company 64.0000 65,280.00 65,280.00 X7030125 TEMP PM LN 4 T3 SPL 7,200.000 FOOT 0820 Albin Carlson & Co. 0.8500 6,120.00 6,120.00 0204 Areatha Construction Co., Inc. 1.3500 9,720.00 9,720.00 1552 Dunnet Bay Construction Company 0.8500 6,120.00 6,120.00 2520 Herlihy Mid-Continent Company 0.8500 6,120.00 6,120.00 2779 Illinois Constructors Corporation 0.8500 6,120.00 6,120.00 3127 Kenny Construction Company 1.2500 9,000.00 9,000.00 3505 Lorig Construction Company 1.0000 7,200.00 7,200.00 X8710020 FOCC62.5/125 MM12SM12 2,273.000 FOOT 0820 Albin Carlson & Co. 7.0000 15,911.00 15,911.00 0204 Areatha Construction Co., Inc. 3.7000 8,410.10 8,410.10 1552 Dunnet Bay Construction Company 7.0000 15,911.00 15,911.00 2520 Herlihy Mid-Continent Company 3.5000 7,955.50 7,955.50 2779 Illinois Constructors Corporation 4.1200 9,364.76 9,364.76 3127 Kenny Construction Company 3.5000 7,955.50 7,955.50 3505 Lorig Construction Company 4.0000 9,092.00 9,092.00 Z0001900 ASB BEARING PAD REMOV 162.000 EACH 0820 Albin Carlson & Co. 51.2000 8,294.40 8,294.40 0204 Areatha Construction Co., Inc. 158.0000 25,596.00 25,596.00 1552 Dunnet Bay Construction Company 80.0000 12,960.00 12,960.00 2520 Herlihy Mid-Continent Company 50.0000 8,100.00 8,100.00 2779 Illinois Constructors Corporation 75.0000 12,150.00 12,150.00 3127 Kenny Construction Company 83.6000 13,543.20 13,543.20 3505 Lorig Construction Company 100.0000 16,200.00 16,200.00 Z0030250 IMP ATTN TEMP NRD TL3 1.000 EACH 0820 Albin Carlson & Co. 3,025.0000 3,025.00 3,025.00 0204 Areatha Construction Co., Inc. 3,360.0000 3,360.00 3,360.00 1552 Dunnet Bay Construction Company 3,025.0000 3,025.00 3,025.00 2520 Herlihy Mid-Continent Company 3,025.0000 3,025.00 3,025.00 2779 Illinois Constructors Corporation 3,025.0000 3,025.00 3,025.00 3127 Kenny Construction Company 2,700.0000 2,700.00 2,700.00 3505 Lorig Construction Company 3,100.0000 3,100.00 3,100.00 Z0030350 IMP ATTN REL NRD TL3 1.000 EACH 0820 Albin Carlson & Co. 550.0000 550.00 550.00 0204 Areatha Construction Co., Inc. 525.0000 525.00 525.00 1552 Dunnet Bay Construction Company 550.0000 550.00 550.00 2520 Herlihy Mid-Continent Company 550.0000 550.00 550.00 2779 Illinois Constructors Corporation 550.0000 550.00 550.00 3127 Kenny Construction Company 1,200.0000 1,200.00 1,200.00 3505 Lorig Construction Company 600.0000 600.00 600.00 Z0048665 RR PROT LIABILITY INS 1.000 L SUM 0820 Albin Carlson & Co. 28,000.0000 28,000.00 28,000.00 0204 Areatha Construction Co., Inc. 39,735.0000 39,735.00 39,735.00 1552 Dunnet Bay Construction Company 20,000.0000 20,000.00 20,000.00 2520 Herlihy Mid-Continent Company 6,500.0000 6,500.00 6,500.00 2779 Illinois Constructors Corporation 15,000.0000 15,000.00 15,000.00 3127 Kenny Construction Company 35,000.0000 35,000.00 35,000.00 3505 Lorig Construction Company 12,000.0000 12,000.00 12,000.00 31101400 SUB GRAN MAT B 6 150.000 SQ YD 0820 Albin Carlson & Co. 50.0000 7,500.00 7,500.00 0204 Areatha Construction Co., Inc. 61.6500 9,247.50 9,247.50 1552 Dunnet Bay Construction Company 19.7500 2,962.50 2,962.50 2520 Herlihy Mid-Continent Company 19.0000 2,850.00 2,850.00 2779 Illinois Constructors Corporation 50.0000 7,500.00 7,500.00 3127 Kenny Construction Company 30.0000 4,500.00 4,500.00 3505 Lorig Construction Company 17.0000 2,550.00 2,550.00 42000500 PCC PVT 10 150.000 SQ YD 0820 Albin Carlson & Co. 95.0000 14,250.00 14,250.00 0204 Areatha Construction Co., Inc. 178.6000 26,790.00 26,790.00 1552 Dunnet Bay Construction Company 58.0000 8,700.00 8,700.00 2520 Herlihy Mid-Continent Company 85.0000 12,750.00 12,750.00 2779 Illinois Constructors Corporation 75.7500 11,362.50 11,362.50 3127 Kenny Construction Company 60.0000 9,000.00 9,000.00 3505 Lorig Construction Company 70.0000 10,500.00 10,500.00 42001165 BR APPR PAVT 325.000 SQ YD 0820 Albin Carlson & Co. 210.0000 68,250.00 68,250.00 0204 Areatha Construction Co., Inc. 322.0000 104,650.00 104,650.00 1552 Dunnet Bay Construction Company 295.0000 95,875.00 95,875.00 2520 Herlihy Mid-Continent Company 210.0000 68,250.00 68,250.00 2779 Illinois Constructors Corporation 307.0000 99,775.00 99,775.00 3127 Kenny Construction Company 300.0000 97,500.00 97,500.00 3505 Lorig Construction Company 300.0000 97,500.00 97,500.00 42001200 PAVEMENT FABRIC 150.000 SQ YD 0820 Albin Carlson & Co. 10.5000 1,575.00 1,575.00 0204 Areatha Construction Co., Inc. 12.6500 1,897.50 1,897.50 1552 Dunnet Bay Construction Company 6.0000 900.00 900.00 2520 Herlihy Mid-Continent Company 2.2500 337.50 337.50 2779 Illinois Constructors Corporation 6.0000 900.00 900.00 3127 Kenny Construction Company 6.0000 900.00 900.00 3505 Lorig Construction Company 6.0000 900.00 900.00 42001300 PROTECTIVE COAT 1,733.000 SQ YD 0820 Albin Carlson & Co. 2.0000 3,466.00 3,466.00 0204 Areatha Construction Co., Inc. 3.0000 5,199.00 5,199.00 1552 Dunnet Bay Construction Company 1.0000 1,733.00 1,733.00 2520 Herlihy Mid-Continent Company 1.9000 3,292.70 3,292.70 2779 Illinois Constructors Corporation 4.0000 6,932.00 6,932.00 3127 Kenny Construction Company 4.0000 6,932.00 6,932.00 3505 Lorig Construction Company 1.0000 1,733.00 1,733.00 42400200 PC CONC SIDEWALK 5 270.000 SQ FT 0820 Albin Carlson & Co. 8.0000 2,160.00 2,160.00 0204 Areatha Construction Co., Inc. 27.8000 7,506.00 7,506.00 1552 Dunnet Bay Construction Company 5.1500 1,390.50 1,390.50 2520 Herlihy Mid-Continent Company 6.5000 1,755.00 1,755.00 2779 Illinois Constructors Corporation 7.0000 1,890.00 1,890.00 3127 Kenny Construction Company 7.0000 1,890.00 1,890.00 3505 Lorig Construction Company 6.0000 1,620.00 1,620.00 44000500 COMB CURB GUTTER REM 360.000 FOOT 0820 Albin Carlson & Co. 25.0000 9,000.00 9,000.00 0204 Areatha Construction Co., Inc. 11.8500 4,266.00 4,266.00 1552 Dunnet Bay Construction Company 5.0000 1,800.00 1,800.00 2520 Herlihy Mid-Continent Company 11.0000 3,960.00 3,960.00 2779 Illinois Constructors Corporation 20.0000 7,200.00 7,200.00 3127 Kenny Construction Company 10.0000 3,600.00 3,600.00 3505 Lorig Construction Company 5.0000 1,800.00 1,800.00 44000600 SIDEWALK REM 270.000 SQ FT 0820 Albin Carlson & Co. 30.0000 8,100.00 8,100.00 0204 Areatha Construction Co., Inc. 4.8000 1,296.00 1,296.00 1552 Dunnet Bay Construction Company 2.2500 607.50 607.50 2520 Herlihy Mid-Continent Company 3.0000 810.00 810.00 2779 Illinois Constructors Corporation 6.0000 1,620.00 1,620.00 3127 Kenny Construction Company 8.0000 2,160.00 2,160.00 3505 Lorig Construction Company 3.0000 810.00 810.00 44000700 APPROACH SLAB REM 475.000 SQ YD 0820 Albin Carlson & Co. 55.0000 26,125.00 26,125.00 0204 Areatha Construction Co., Inc. 87.1000 41,372.50 41,372.50 1552 Dunnet Bay Construction Company 20.0000 9,500.00 9,500.00 2520 Herlihy Mid-Continent Company 51.0000 24,225.00 24,225.00 2779 Illinois Constructors Corporation 20.0000 9,500.00 9,500.00 3127 Kenny Construction Company 40.0000 19,000.00 19,000.00 3505 Lorig Construction Company 40.0000 19,000.00 19,000.00 44002020 CONC MEDIAN SURF REM 270.000 SQ FT 0820 Albin Carlson & Co. 85.0000 22,950.00 22,950.00 0204 Areatha Construction Co., Inc. 5.0000 1,350.00 1,350.00 1552 Dunnet Bay Construction Company 2.3500 634.50 634.50 2520 Herlihy Mid-Continent Company 7.0000 1,890.00 1,890.00 2779 Illinois Constructors Corporation 10.0000 2,700.00 2,700.00 3127 Kenny Construction Company 8.0000 2,160.00 2,160.00 3505 Lorig Construction Company 2.0000 540.00 540.00 44003100 MEDIAN REMOVAL 7,937.000 SQ FT 0820 Albin Carlson & Co. 10.0000 79,370.00 79,370.00 0204 Areatha Construction Co., Inc. 4.1500 32,938.55 32,938.55 1552 Dunnet Bay Construction Company 3.4000 26,985.80 26,985.80 2520 Herlihy Mid-Continent Company 8.0000 63,496.00 63,496.00 2779 Illinois Constructors Corporation 6.0000 47,622.00 47,622.00 3127 Kenny Construction Company 5.0000 39,685.00 39,685.00 3505 Lorig Construction Company 3.0000 23,811.00 23,811.00 50101500 REM EXIST SUP-STR 1.000 EACH 0820 Albin Carlson & Co. 284,000.0000 284,000.00 284,000.00 0204 Areatha Construction Co., Inc. 545,250.0000 545,250.00 545,250.00 1552 Dunnet Bay Construction Company 216,000.0000 216,000.00 216,000.00 2520 Herlihy Mid-Continent Company 165,000.0000 165,000.00 165,000.00 2779 Illinois Constructors Corporation 255,194.0000 255,194.00 255,194.00 3127 Kenny Construction Company 224,500.0000 224,500.00 224,500.00 3505 Lorig Construction Company 200,000.0000 200,000.00 200,000.00 50104650 SLOPE WALL REMOV 185.000 SQ YD 0820 Albin Carlson & Co. 50.0000 9,250.00 9,250.00 0204 Areatha Construction Co., Inc. 182.7000 33,799.50 33,799.50 1552 Dunnet Bay Construction Company 45.0000 8,325.00 8,325.00 2520 Herlihy Mid-Continent Company 251.0000 46,435.00 46,435.00 2779 Illinois Constructors Corporation 75.0000 13,875.00 13,875.00 3127 Kenny Construction Company 20.0000 3,700.00 3,700.00 3505 Lorig Construction Company 55.0000 10,175.00 10,175.00 50300255 CONC SUP-STR 182.600 CU YD 0820 Albin Carlson & Co. 550.0000 100,430.00 100,430.00 0204 Areatha Construction Co., Inc. 962.6000 175,770.76 175,770.76 1552 Dunnet Bay Construction Company 1,500.0000 273,900.00 273,900.00 2520 Herlihy Mid-Continent Company 800.0000 146,080.00 146,080.00 2779 Illinois Constructors Corporation 850.0000 155,210.00 155,210.00 3127 Kenny Construction Company 560.0000 102,256.00 102,256.00 3505 Lorig Construction Company 700.0000 127,820.00 127,820.00 50300260 BR DECK GROOVING 940.000 SQ YD 0820 Albin Carlson & Co. 4.2500 3,995.00 3,995.00 0204 Areatha Construction Co., Inc. 6.9500 6,533.00 6,533.00 1552 Dunnet Bay Construction Company 4.5000 4,230.00 4,230.00 2520 Herlihy Mid-Continent Company 5.0000 4,700.00 4,700.00 2779 Illinois Constructors Corporation 6.0000 5,640.00 5,640.00 3127 Kenny Construction Company 3.0000 2,820.00 2,820.00 3505 Lorig Construction Company 7.0000 6,580.00 6,580.00 50300300 PROTECTIVE COAT 1,582.000 SQ YD 0820 Albin Carlson & Co. 2.0000 3,164.00 3,164.00 0204 Areatha Construction Co., Inc. 3.1000 4,904.20 4,904.20 1552 Dunnet Bay Construction Company 1.0000 1,582.00 1,582.00 2520 Herlihy Mid-Continent Company 1.8000 2,847.60 2,847.60 2779 Illinois Constructors Corporation 3.0000 4,746.00 4,746.00 3127 Kenny Construction Company 4.0000 6,328.00 6,328.00 3505 Lorig Construction Company 1.0000 1,582.00 1,582.00 50400505 P P CONC DK BM 27 DP 13,185.000 SQ FT 0820 Albin Carlson & Co. 60.0000 791,100.00 791,100.00 0204 Areatha Construction Co., Inc. 74.5000 982,282.50 982,282.50 1552 Dunnet Bay Construction Company 59.2000 780,552.00 780,552.00 2520 Herlihy Mid-Continent Company 55.0000 725,175.00 725,175.00 2779 Illinois Constructors Corporation 71.0000 936,135.00 936,135.00 3127 Kenny Construction Company 75.3000 992,830.50 992,830.50 3505 Lorig Construction Company 55.0000 725,175.00 725,175.00 50500405 F & E STRUCT STEEL 9,000.000 POUND 0820 Albin Carlson & Co. 1.7500 15,750.00 15,750.00 0204 Areatha Construction Co., Inc. 5.6000 50,400.00 50,400.00 1552 Dunnet Bay Construction Company 3.0000 27,000.00 27,000.00 2520 Herlihy Mid-Continent Company 3.2500 29,250.00 29,250.00 2779 Illinois Constructors Corporation 4.1800 37,620.00 37,620.00 3127 Kenny Construction Company 2.6000 23,400.00 23,400.00 3505 Lorig Construction Company 1.0000 9,000.00 9,000.00 50800205 REINF BARS, EPOXY CTD 36,590.000 POUND 0820 Albin Carlson & Co. 1.1000 40,249.00 40,249.00 0204 Areatha Construction Co., Inc. 2.0500 75,009.50 75,009.50 1552 Dunnet Bay Construction Company 1.5900 58,178.10 58,178.10 2520 Herlihy Mid-Continent Company 1.5000 54,885.00 54,885.00 2779 Illinois Constructors Corporation 1.4500 53,055.50 53,055.50 3127 Kenny Construction Company 1.5500 56,714.50 56,714.50 3505 Lorig Construction Company 1.7000 62,203.00 62,203.00 50800515 BAR SPLICERS 162.000 EACH 0820 Albin Carlson & Co. 12.5000 2,025.00 2,025.00 0204 Areatha Construction Co., Inc. 30.0000 4,860.00 4,860.00 1552 Dunnet Bay Construction Company 32.0000 5,184.00 5,184.00 2520 Herlihy Mid-Continent Company 36.0000 5,832.00 5,832.00 2779 Illinois Constructors Corporation 36.0000 5,832.00 5,832.00 3127 Kenny Construction Company 25.0000 4,050.00 4,050.00 3505 Lorig Construction Company 35.0000 5,670.00 5,670.00 50900105 ALUM RAILING TY L 326.000 FOOT 0820 Albin Carlson & Co. 72.5000 23,635.00 23,635.00 0204 Areatha Construction Co., Inc. 76.1500 24,824.90 24,824.90 1552 Dunnet Bay Construction Company 80.0000 26,080.00 26,080.00 2520 Herlihy Mid-Continent Company 84.0000 27,384.00 27,384.00 2779 Illinois Constructors Corporation 78.0100 25,431.26 25,431.26 3127 Kenny Construction Company 72.5000 23,635.00 23,635.00 3505 Lorig Construction Company 75.0000 24,450.00 24,450.00 51100100 SLOPE WALL 4 185.000 SQ YD 0820 Albin Carlson & Co. 70.0000 12,950.00 12,950.00 0204 Areatha Construction Co., Inc. 159.0000 29,415.00 29,415.00 1552 Dunnet Bay Construction Company 150.0000 27,750.00 27,750.00 2520 Herlihy Mid-Continent Company 190.0000 35,150.00 35,150.00 2779 Illinois Constructors Corporation 120.0000 22,200.00 22,200.00 3127 Kenny Construction Company 86.0000 15,910.00 15,910.00 3505 Lorig Construction Company 110.0000 20,350.00 20,350.00 55039700 SS CLEANED 605.000 FOOT 0820 Albin Carlson & Co. 4.9500 2,994.75 2,994.75 0204 Areatha Construction Co., Inc. 12.6000 7,623.00 7,623.00 1552 Dunnet Bay Construction Company 9.8000 5,929.00 5,929.00 2520 Herlihy Mid-Continent Company 4.7000 2,843.50 2,843.50 2779 Illinois Constructors Corporation 10.0000 6,050.00 6,050.00 3127 Kenny Construction Company 12.0000 7,260.00 7,260.00 3505 Lorig Construction Company 5.0000 3,025.00 3,025.00 60253000 CB RECON NEW T1F OL 1.000 EACH 0820 Albin Carlson & Co. 1,500.0000 1,500.00 1,500.00 0204 Areatha Construction Co., Inc. 1,000.0000 1,000.00 1,000.00 1552 Dunnet Bay Construction Company 1,200.0000 1,200.00 1,200.00 2520 Herlihy Mid-Continent Company 1,111.0000 1,111.00 1,111.00 2779 Illinois Constructors Corporation 1,100.0000 1,100.00 1,100.00 3127 Kenny Construction Company 2,800.0000 2,800.00 2,800.00 3505 Lorig Construction Company 2,000.0000 2,000.00 2,000.00 60605000 COMB CC&G TB6.24 180.000 FOOT 0820 Albin Carlson & Co. 30.0000 5,400.00 5,400.00 0204 Areatha Construction Co., Inc. 49.3500 8,883.00 8,883.00 1552 Dunnet Bay Construction Company 24.9000 4,482.00 4,482.00 2520 Herlihy Mid-Continent Company 25.0000 4,500.00 4,500.00 2779 Illinois Constructors Corporation 45.0000 8,100.00 8,100.00 3127 Kenny Construction Company 27.5000 4,950.00 4,950.00 3505 Lorig Construction Company 31.0000 5,580.00 5,580.00 60605900 COMB CC&G TB9.12 1,235.000 FOOT 0820 Albin Carlson & Co. 6.8000 8,398.00 8,398.00 0204 Areatha Construction Co., Inc. 45.1000 55,698.50 55,698.50 1552 Dunnet Bay Construction Company 23.4000 28,899.00 28,899.00 2520 Herlihy Mid-Continent Company 22.0000 27,170.00 27,170.00 2779 Illinois Constructors Corporation 32.0000 39,520.00 39,520.00 3127 Kenny Construction Company 19.5000 24,082.50 24,082.50 3505 Lorig Construction Company 25.0000 30,875.00 30,875.00 60618300 CONC MEDIAN SURF 4 4,457.000 SQ FT 0820 Albin Carlson & Co. 5.5000 24,513.50 24,513.50 0204 Areatha Construction Co., Inc. 4.4500 19,833.65 19,833.65 1552 Dunnet Bay Construction Company 3.2500 14,485.25 14,485.25 2520 Herlihy Mid-Continent Company 9.0000 40,113.00 40,113.00 2779 Illinois Constructors Corporation 6.0000 26,742.00 26,742.00 * 3127 Kenny Construction Company 4.8500 21,616.45 21,616.45 3505 Lorig Construction Company 4.5000 20,056.50 20,056.50 60620800 CONC MED TSB9.12 1,973.000 SQ FT 0820 Albin Carlson & Co. 14.5000 28,608.50 28,608.50 0204 Areatha Construction Co., Inc. 20.5000 40,446.50 40,446.50 1552 Dunnet Bay Construction Company 10.5000 20,716.50 20,716.50 2520 Herlihy Mid-Continent Company 10.0000 19,730.00 19,730.00 2779 Illinois Constructors Corporation 12.0000 23,676.00 23,676.00 3127 Kenny Construction Company 10.7500 21,209.75 21,209.75 3505 Lorig Construction Company 16.0000 31,568.00 31,568.00 63100070 TRAF BAR TERM T5 2.000 EACH 0820 Albin Carlson & Co. 675.0000 1,350.00 1,350.00 0204 Areatha Construction Co., Inc. 772.0000 1,544.00 1,544.00 1552 Dunnet Bay Construction Company 735.0000 1,470.00 1,470.00 2520 Herlihy Mid-Continent Company 735.0000 1,470.00 1,470.00 2779 Illinois Constructors Corporation 740.0000 1,480.00 1,480.00 3127 Kenny Construction Company 735.0000 1,470.00 1,470.00 3505 Lorig Construction Company 800.0000 1,600.00 1,600.00 63100085 TRAF BAR TERM T6 2.000 EACH 0820 Albin Carlson & Co. 2,850.0000 5,700.00 5,700.00 0204 Areatha Construction Co., Inc. 3,000.0000 6,000.00 6,000.00 1552 Dunnet Bay Construction Company 2,850.0000 5,700.00 5,700.00 2520 Herlihy Mid-Continent Company 2,850.0000 5,700.00 5,700.00 2779 Illinois Constructors Corporation 2,925.0000 5,850.00 5,850.00 3127 Kenny Construction Company 2,850.0000 5,700.00 5,700.00 3505 Lorig Construction Company 3,000.0000 6,000.00 6,000.00 63200310 GUARDRAIL REMOV 100.000 FOOT 0820 Albin Carlson & Co. 5.0000 500.00 500.00 0204 Areatha Construction Co., Inc. 6.3000 630.00 630.00 1552 Dunnet Bay Construction Company 6.0000 600.00 600.00 2520 Herlihy Mid-Continent Company 15.0000 1,500.00 1,500.00 2779 Illinois Constructors Corporation 10.0000 1,000.00 1,000.00 3127 Kenny Construction Company 10.0000 1,000.00 1,000.00 3505 Lorig Construction Company 8.0000 800.00 800.00 67000400 ENGR FIELD OFFICE A 6.000 CAL MO 0820 Albin Carlson & Co. 2,500.0000 15,000.00 15,000.00 0204 Areatha Construction Co., Inc. 2,310.0000 13,860.00 13,860.00 1552 Dunnet Bay Construction Company 2,500.0000 15,000.00 15,000.00 2520 Herlihy Mid-Continent Company 3,970.0000 23,820.00 23,820.00 2779 Illinois Constructors Corporation 2,800.0000 16,800.00 16,800.00 3127 Kenny Construction Company 3,900.0000 23,400.00 23,400.00 3505 Lorig Construction Company 3,500.0000 21,000.00 21,000.00 67100100 MOBILIZATION 1.000 L SUM 0820 Albin Carlson & Co. 120,000.0000 120,000.00 120,000.00 0204 Areatha Construction Co., Inc. 168,700.0000 168,700.00 168,700.00 1552 Dunnet Bay Construction Company 135,000.0000 135,000.00 135,000.00 2520 Herlihy Mid-Continent Company 108,520.0000 108,520.00 108,520.00 2779 Illinois Constructors Corporation 125,000.0000 125,000.00 125,000.00 3127 Kenny Construction Company 130,000.0000 130,000.00 130,000.00 3505 Lorig Construction Company 55,000.0000 55,000.00 55,000.00 70101800 TRAF CONT & PROT SPL 1.000 L SUM 0820 Albin Carlson & Co. 31,000.0000 31,000.00 31,000.00 0204 Areatha Construction Co., Inc. 10,080.0000 10,080.00 10,080.00 1552 Dunnet Bay Construction Company 30,000.0000 30,000.00 30,000.00 2520 Herlihy Mid-Continent Company 14,700.0000 14,700.00 14,700.00 2779 Illinois Constructors Corporation 17,700.0000 17,700.00 17,700.00 3127 Kenny Construction Company 9,600.0000 9,600.00 9,600.00 3505 Lorig Construction Company 25,000.0000 25,000.00 25,000.00 70103815 TR CONT SURVEILLANCE 10.000 CAL DA 0820 Albin Carlson & Co. 250.0000 2,500.00 2,500.00 0204 Areatha Construction Co., Inc. 236.2500 2,362.50 2,362.50 1552 Dunnet Bay Construction Company 250.0000 2,500.00 2,500.00 2520 Herlihy Mid-Continent Company 250.0000 2,500.00 2,500.00 2779 Illinois Constructors Corporation 250.0000 2,500.00 2,500.00 3127 Kenny Construction Company 225.0000 2,250.00 2,250.00 3505 Lorig Construction Company 400.0000 4,000.00 4,000.00 70300210 TEMP PVT MK LTR & SYM 40.000 SQ FT 0820 Albin Carlson & Co. 25.0000 1,000.00 1,000.00 0204 Areatha Construction Co., Inc. 0.8000 32.00 32.00 1552 Dunnet Bay Construction Company 1.0000 40.00 40.00 2520 Herlihy Mid-Continent Company 2.3500 94.00 94.00 2779 Illinois Constructors Corporation 1.0000 40.00 40.00 3127 Kenny Construction Company 0.7500 30.00 30.00 3505 Lorig Construction Company 1.0000 40.00 40.00 70300220 TEMP PVT MK LINE 4 3,020.000 FOOT 0820 Albin Carlson & Co. 0.2000 604.00 604.00 0204 Areatha Construction Co., Inc. 0.2500 755.00 755.00 1552 Dunnet Bay Construction Company 0.2000 604.00 604.00 2520 Herlihy Mid-Continent Company 0.2000 604.00 604.00 2779 Illinois Constructors Corporation 0.2000 604.00 604.00 3127 Kenny Construction Company 0.2200 664.40 664.40 3505 Lorig Construction Company 0.3000 906.00 906.00 70300240 TEMP PVT MK LINE 6 110.000 FOOT 0820 Albin Carlson & Co. 0.4000 44.00 44.00 0204 Areatha Construction Co., Inc. 0.4500 49.50 49.50 1552 Dunnet Bay Construction Company 0.4000 44.00 44.00 2520 Herlihy Mid-Continent Company 0.4000 44.00 44.00 2779 Illinois Constructors Corporation 0.4000 44.00 44.00 3127 Kenny Construction Company 0.4000 44.00 44.00 3505 Lorig Construction Company 0.7500 82.50 82.50 70300260 TEMP PVT MK LINE 12 230.000 FOOT 0820 Albin Carlson & Co. 0.6000 138.00 138.00 0204 Areatha Construction Co., Inc. 1.5000 345.00 345.00 1552 Dunnet Bay Construction Company 0.6000 138.00 138.00 2520 Herlihy Mid-Continent Company 0.6000 138.00 138.00 2779 Illinois Constructors Corporation 0.6000 138.00 138.00 3127 Kenny Construction Company 0.7500 172.50 172.50 3505 Lorig Construction Company 1.0000 230.00 230.00 70301000 WORK ZONE PAVT MK REM 7,200.000 SQ FT 0820 Albin Carlson & Co. 0.0100 72.00 72.00 0204 Areatha Construction Co., Inc. 0.7500 5,400.00 5,400.00 1552 Dunnet Bay Construction Company 0.0100 72.00 72.00 2520 Herlihy Mid-Continent Company 0.0100 72.00 72.00 2779 Illinois Constructors Corporation 0.0100 72.00 72.00 3127 Kenny Construction Company 0.7000 5,040.00 5,040.00 3505 Lorig Construction Company 0.1000 720.00 720.00 70400500 TEMP CON BAR (ST OWN) 750.000 FOOT 0820 Albin Carlson & Co. 50.0000 37,500.00 37,500.00 0204 Areatha Construction Co., Inc. 43.5000 32,625.00 32,625.00 1552 Dunnet Bay Construction Company 20.0000 15,000.00 15,000.00 2520 Herlihy Mid-Continent Company 35.0000 26,250.00 26,250.00 2779 Illinois Constructors Corporation 39.1900 29,392.50 29,392.50 3127 Kenny Construction Company 35.0000 26,250.00 26,250.00 3505 Lorig Construction Company 24.0000 18,000.00 18,000.00 70400600 REL TEMP CONC BAR SO 750.000 FOOT 0820 Albin Carlson & Co. 5.0000 3,750.00 3,750.00 0204 Areatha Construction Co., Inc. 7.0000 5,250.00 5,250.00 1552 Dunnet Bay Construction Company 4.8000 3,600.00 3,600.00 2520 Herlihy Mid-Continent Company 2.0000 1,500.00 1,500.00 2779 Illinois Constructors Corporation 9.6200 7,215.00 7,215.00 3127 Kenny Construction Company 6.0000 4,500.00 4,500.00 3505 Lorig Construction Company 2.0000 1,500.00 1,500.00 72000100 SIGN PANEL T1 20.000 SQ FT 0820 Albin Carlson & Co. 14.9500 299.00 299.00 0204 Areatha Construction Co., Inc. 26.2500 525.00 525.00 1552 Dunnet Bay Construction Company 14.9500 299.00 299.00 2520 Herlihy Mid-Continent Company 14.9500 299.00 299.00 2779 Illinois Constructors Corporation 14.9500 299.00 299.00 3127 Kenny Construction Company 20.0000 400.00 400.00 3505 Lorig Construction Company 17.0000 340.00 340.00 78000200 THPL PVT MK LINE 4 660.000 FOOT 0820 Albin Carlson & Co. 1.0000 660.00 660.00 0204 Areatha Construction Co., Inc. 4.9000 3,234.00 3,234.00 1552 Dunnet Bay Construction Company 5.0000 3,300.00 3,300.00 2520 Herlihy Mid-Continent Company 5.0000 3,300.00 3,300.00 2779 Illinois Constructors Corporation 4.6500 3,069.00 3,069.00 3127 Kenny Construction Company 4.6500 3,069.00 3,069.00 3505 Lorig Construction Company 6.0000 3,960.00 3,960.00 78008200 POLYUREA PM T1 LTR-SY 40.000 SQ FT 0820 Albin Carlson & Co. 2.0000 80.00 80.00 0204 Areatha Construction Co., Inc. 5.8000 232.00 232.00 1552 Dunnet Bay Construction Company 5.0000 200.00 200.00 2520 Herlihy Mid-Continent Company 5.0000 200.00 200.00 2779 Illinois Constructors Corporation 5.5000 220.00 220.00 3127 Kenny Construction Company 5.5000 220.00 220.00 3505 Lorig Construction Company 6.0000 240.00 240.00 78008210 POLYUREA PM T1 LN 4 2,360.000 FOOT 0820 Albin Carlson & Co. 2.0000 4,720.00 4,720.00 0204 Areatha Construction Co., Inc. 1.6500 3,894.00 3,894.00 1552 Dunnet Bay Construction Company 1.5000 3,540.00 3,540.00 2520 Herlihy Mid-Continent Company 1.5000 3,540.00 3,540.00 2779 Illinois Constructors Corporation 1.5500 3,658.00 3,658.00 3127 Kenny Construction Company 1.5500 3,658.00 3,658.00 3505 Lorig Construction Company 2.0000 4,720.00 4,720.00 78008230 POLYUREA PM T1 LN 6 110.000 FOOT 0820 Albin Carlson & Co. 3.0000 330.00 330.00 0204 Areatha Construction Co., Inc. 3.1500 346.50 346.50 1552 Dunnet Bay Construction Company 2.2500 247.50 247.50 2520 Herlihy Mid-Continent Company 2.2500 247.50 247.50 2779 Illinois Constructors Corporation 2.7300 300.30 300.30 3127 Kenny Construction Company 3.0000 330.00 330.00 3505 Lorig Construction Company 3.0000 330.00 330.00 78100100 RAISED REFL PAVT MKR 35.000 EACH 0820 Albin Carlson & Co. 100.0000 3,500.00 3,500.00 0204 Areatha Construction Co., Inc. 80.8500 2,829.75 2,829.75 1552 Dunnet Bay Construction Company 70.0000 2,450.00 2,450.00 2520 Herlihy Mid-Continent Company 70.0000 2,450.00 2,450.00 2779 Illinois Constructors Corporation 77.0000 2,695.00 2,695.00 3127 Kenny Construction Company 77.0000 2,695.00 2,695.00 3505 Lorig Construction Company 80.0000 2,800.00 2,800.00 78100105 RAISED REF PVT MKR BR 10.000 EACH 0820 Albin Carlson & Co. 100.0000 1,000.00 1,000.00 0204 Areatha Construction Co., Inc. 96.6000 966.00 966.00 1552 Dunnet Bay Construction Company 110.0000 1,100.00 1,100.00 2520 Herlihy Mid-Continent Company 110.0000 1,100.00 1,100.00 2779 Illinois Constructors Corporation 92.0000 920.00 920.00 3127 Kenny Construction Company 92.0000 920.00 920.00 3505 Lorig Construction Company 125.0000 1,250.00 1,250.00 78300100 PAVT MARKING REMOVAL 1,355.000 SQ FT 0820 Albin Carlson & Co. 1.0500 1,422.75 1,422.75 0204 Areatha Construction Co., Inc. 1.5000 2,032.50 2,032.50 1552 Dunnet Bay Construction Company 1.0500 1,422.75 1,422.75 2520 Herlihy Mid-Continent Company 1.0500 1,422.75 1,422.75 2779 Illinois Constructors Corporation 2.0000 2,710.00 2,710.00 3127 Kenny Construction Company 1.2500 1,693.75 1,693.75 3505 Lorig Construction Company 1.5000 2,032.50 2,032.50 78300200 RAISED REF PVT MK REM 10.000 EACH 0820 Albin Carlson & Co. 20.0000 200.00 200.00 0204 Areatha Construction Co., Inc. 26.2500 262.50 262.50 1552 Dunnet Bay Construction Company 31.1800 311.80 311.80 2520 Herlihy Mid-Continent Company 12.0000 120.00 120.00 2779 Illinois Constructors Corporation 15.0000 150.00 150.00 3127 Kenny Construction Company 20.0000 200.00 200.00 3505 Lorig Construction Company 16.0000 160.00 160.00 81018500 CON P 2 GALVS 625.000 FOOT 0820 Albin Carlson & Co. 19.0000 11,875.00 11,875.00 0204 Areatha Construction Co., Inc. 18.9000 11,812.50 11,812.50 1552 Dunnet Bay Construction Company 19.0000 11,875.00 11,875.00 2520 Herlihy Mid-Continent Company 18.0000 11,250.00 11,250.00 2779 Illinois Constructors Corporation 21.1700 13,231.25 13,231.25 3127 Kenny Construction Company 18.0000 11,250.00 11,250.00 3505 Lorig Construction Company 20.0000 12,500.00 12,500.00 85000200 MAIN EX TR SIG INSTAL 1.000 EACH 0820 Albin Carlson & Co. 4,400.0000 4,400.00 4,400.00 0204 Areatha Construction Co., Inc. 7,350.0000 7,350.00 7,350.00 1552 Dunnet Bay Construction Company 4,400.0000 4,400.00 4,400.00 2520 Herlihy Mid-Continent Company 7,000.0000 7,000.00 7,000.00 2779 Illinois Constructors Corporation 8,232.4300 8,232.43 8,232.43 3127 Kenny Construction Company 7,000.0000 7,000.00 7,000.00 3505 Lorig Construction Company 8,000.0000 8,000.00 8,000.00 87900200 DRILL EX HANDHOLE 1.000 EACH 0820 Albin Carlson & Co. 600.0000 600.00 600.00 0204 Areatha Construction Co., Inc. 472.5000 472.50 472.50 1552 Dunnet Bay Construction Company 600.0000 600.00 600.00 2520 Herlihy Mid-Continent Company 450.0000 450.00 450.00 2779 Illinois Constructors Corporation 529.2300 529.23 529.23 3127 Kenny Construction Company 450.0000 450.00 450.00 3505 Lorig Construction Company 600.0000 600.00 600.00 * - PAY ITEM UNIT PRICE AND/OR BIDDER TOTAL PRICE WAS OMITTED