ILLINOIS DEPARTMENT OF TRANSPORTATION PAGE: 1 06/06/06 08:24:05 U N I T P R I C E T A B U L A T I O N O F B I D S LETTING DATE: 04/28/2006 LETTING TYPE: SCHEDULED CONTRACT NUMBER: 64B51 LETTING ITEM NUMBER: 027 RESPONSIBLE DISTRICT: 02 BIDS LOCKED: Y SECTION: D2 PATCHING 2006-1 COUNTY: WHITESIDE ESTIMATE: -------------------------- SUMMARY OF CONTRACTOR BIDS -------------------------- "AS READ" SUMMATION SUMMATION OF NBR BIDR CONTR COMB ITEM CONTR BIDDER OF BIDDER CALCULATED LOW BIDR CALC BLANK NBR BIDDER NAME GROUP COMB GRP NBR GROUP TOTAL PRICE EXTENSIONS EXTENSIONS BID EXTENSION DIFF BIDS 0025 AEH Construction, Inc. NO ALT 98,657.28 98,657.28 98,657.28 4438 Northwest Illinois Construction Co. NO ALT 139,630.10 139,630.10 139,630.10 5564 G. M. Sipes Construction, Inc. NO ALT 98,610.80 * 98,610.80 98,610.80 * **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT = 9 ---------------------- DETAIL CONTRACTOR BIDS ---------------------- ITEM NBR ITEM DESCRIPTION UNIT OF UNIT BIDDER CALCULATED BIDR CALC BIDR NBR BIDDER NAME QUANTITY MEASURE PRICE EXTENSION EXTENSION EXTENSION DIFF X3120600 STAB SUB-BASE REPL 4 188.000 SQ YD 0025 AEH Construction, Inc. 1.0000 188.00 188.00 5564 G. M. Sipes Construction, Inc. 5.0000 940.00 940.00 4438 Northwest Illinois Construction Co. 10.0000 1,880.00 1,880.00 Z0075300 TIE BARS 140.000 EACH 0025 AEH Construction, Inc. 6.0000 840.00 840.00 5564 G. M. Sipes Construction, Inc. 8.0000 1,120.00 1,120.00 4438 Northwest Illinois Construction Co. 12.0000 1,680.00 1,680.00 44200535 CL A PATCH T4 8 752.000 SQ YD 0025 AEH Construction, Inc. 79.2900 59,626.08 59,626.08 5564 G. M. Sipes Construction, Inc. 92.5000 69,560.00 69,560.00 4438 Northwest Illinois Construction Co. 85.5000 64,296.00 64,296.00 44213000 PATCH REINFORCEMENT 752.000 SQ YD 0025 AEH Construction, Inc. 22.1000 16,619.20 16,619.20 5564 G. M. Sipes Construction, Inc. 20.0000 15,040.00 15,040.00 4438 Northwest Illinois Construction Co. 57.4000 43,164.80 43,164.80 44213200 SAW CUTS 378.000 FOOT 0025 AEH Construction, Inc. 3.5000 1,323.00 1,323.00 5564 G. M. Sipes Construction, Inc. 7.0000 2,646.00 2,646.00 4438 Northwest Illinois Construction Co. 6.8500 2,589.30 2,589.30 67100100 MOBILIZATION 1.000 L SUM 0025 AEH Construction, Inc. 3,500.0000 3,500.00 3,500.00 5564 G. M. Sipes Construction, Inc. 4,000.0000 4,000.00 4,000.00 4438 Northwest Illinois Construction Co. 8,300.0000 8,300.00 8,300.00 70100800 TRAF CONT-PROT 701401 1.000 L SUM 0025 AEH Construction, Inc. 10,500.0000 10,500.00 10,500.00 5564 G. M. Sipes Construction, Inc. 1.0000 1.00 1.00 4438 Northwest Illinois Construction Co. 6,500.0000 6,500.00 6,500.00 78005110 EPOXY PVT MK LINE 4 635.000 FOOT 0025 AEH Construction, Inc. 8.6000 5,461.00 5,461.00 5564 G. M. Sipes Construction, Inc. 7.8800 5,003.80 5,003.80 4438 Northwest Illinois Construction Co. 12.0000 7,620.00 7,620.00 78100100 RAISED REFL PAVT MKR 3.000 EACH 0025 AEH Construction, Inc. 200.0000 600.00 600.00 5564 G. M. Sipes Construction, Inc. 100.0000 300.00 300.00 4438 Northwest Illinois Construction Co. 1,200.0000 3,600.00 3,600.00