ILLINOIS DEPARTMENT OF TRANSPORTATION PAGE: 1 06/06/06 08:24:05 U N I T P R I C E T A B U L A T I O N O F B I D S LETTING DATE: 04/28/2006 LETTING TYPE: SCHEDULED CONTRACT NUMBER: 68356 LETTING ITEM NUMBER: 090 RESPONSIBLE DISTRICT: 04 BIDS LOCKED: Y SECTION: 103N-1,TS COUNTY: WARREN ESTIMATE: -------------------------- SUMMARY OF CONTRACTOR BIDS -------------------------- "AS READ" SUMMATION SUMMATION OF NBR BIDR CONTR COMB ITEM CONTR BIDDER OF BIDDER CALCULATED LOW BIDR CALC BLANK NBR BIDDER NAME GROUP COMB GRP NBR GROUP TOTAL PRICE EXTENSIONS EXTENSIONS BID EXTENSION DIFF BIDS 2270 Gunther Construction Co. NO ALT 541,765.33 * 541,765.35 541,765.35 * **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT = 109 ---------------------- DETAIL CONTRACTOR BIDS ---------------------- ITEM NBR ITEM DESCRIPTION UNIT OF UNIT BIDDER CALCULATED BIDR CALC BIDR NBR BIDDER NAME QUANTITY MEASURE PRICE EXTENSION EXTENSION EXTENSION DIFF XX002094 REM & REIN FIB OPT CC 1.000 L SUM 2270 Gunther Construction Co. 1,834.4500 1,834.45 1,834.45 XX003503 FLARED END SEC REM 2.000 EACH 2270 Gunther Construction Co. 330.0000 660.00 660.00 XX005611 ADJ MNHOLE FR,CVR,RGS 2.000 EACH 2270 Gunther Construction Co. 747.8000 1,495.60 1,495.60 X0323426 SED CONT DR ST INL CL 3.000 EACH 2270 Gunther Construction Co. 327.8300 983.49 983.49 X0323481 VIDEO VEH DET 4 CAM 1.000 EACH 2270 Gunther Construction Co. 23,927.1500 23,927.15 23,927.15 X0324134 BATT BACKUP SYS/CABNT 1.000 EACH 2270 Gunther Construction Co. 4,214.4100 4,214.41 4,214.41 X0325295 COMB CC&G TM4.24 SPL 77.000 FOOT 2270 Gunther Construction Co. 44.1700 3,401.09 3,401.09 X0325296 INLET-MAN TG-1 8D SP 1.000 EACH 2270 Gunther Construction Co. 25,670.0000 25,670.00 25,670.00 X4066538 P BCSC SUPER "E" N90 256.000 TON 2270 Gunther Construction Co. 125.5800 32,148.48 32,148.48 X4067100 P LB MM SU IL4.75 N50 165.000 TON 2270 Gunther Construction Co. 160.1900 26,431.35 26,431.35 X7015000 CHANGEABLE MESSAGE SN 4.000 CAL MO 2270 Gunther Construction Co. 3,622.3900 14,489.56 14,489.56 X8730027 ELCBL C GROUND 6 1C 636.500 FOOT 2270 Gunther Construction Co. 2.5300 1,610.35 1,610.35 X8800020 SH LED 1F 3S MAM 10.000 EACH 2270 Gunther Construction Co. 765.3100 7,653.10 7,653.10 X8800035 SH LED 1F 3S BM 6.000 EACH 2270 Gunther Construction Co. 704.3200 4,225.92 4,225.92 X8810610 PED SH LED 1F BM 2.000 EACH 2270 Gunther Construction Co. 545.5100 1,091.02 1,091.02 Z0013798 CONSTRUCTION LAYOUT 1.000 L SUM 2270 Gunther Construction Co. 10,817.9700 10,817.97 10,817.97 Z0030240 IMP ATTN TEMP NRD TL2 1.000 EACH 2270 Gunther Construction Co. 0.0100 0.01 0.01 20200100 EARTH EXCAVATION 540.000 CU YD 2270 Gunther Construction Co. 19.3100 10,427.40 10,427.40 20400800 FURNISHED EXCAV 12.000 CU YD 2270 Gunther Construction Co. 77.2700 927.24 927.24 20900110 POROUS GRAN BACKFILL 23.700 CU YD 2270 Gunther Construction Co. 70.9800 1,682.23 1,682.23 21001000 GEOTECH FAB F/GR STAB 938.800 SQ YD 2270 Gunther Construction Co. 1.4600 1,370.65 1,370.65 21101615 TOPSOIL F & P 4 2,078.000 SQ YD 2270 Gunther Construction Co. 5.1900 10,784.82 10,784.82 25000210 SEEDING CL 2A .400 ACRE 2270 Gunther Construction Co. 2,531.8800 1,012.75 1,012.75 25000400 NITROGEN FERT NUTR 26.000 POUND 2270 Gunther Construction Co. 13.2300 343.98 343.98 25000500 PHOSPHORUS FERT NUTR 26.000 POUND 2270 Gunther Construction Co. 13.2300 343.98 343.98 25000600 POTASSIUM FERT NUTR 26.000 POUND 2270 Gunther Construction Co. 13.2300 343.98 343.98 25100115 MULCH METHOD 2 .400 ACRE 2270 Gunther Construction Co. 2,531.8800 1,012.75 1,012.75 28000250 TEMP EROS CONTR SEED 129.000 POUND 2270 Gunther Construction Co. 4.9400 637.26 637.26 28000300 TEMP DITCH CHECKS 7.000 EACH 2270 Gunther Construction Co. 326.5600 2,285.92 2,285.92 28000400 PERIMETER EROS BAR 800.000 FOOT 2270 Gunther Construction Co. 3.5300 2,824.00 2,824.00 28000500 INLET & PIPE PROTECT 3.000 EACH 2270 Gunther Construction Co. 237.2600 711.78 711.78 28000510 INLET FILTERS 3.000 EACH 2270 Gunther Construction Co. 667.2800 2,001.84 2,001.84 28100105 STONE RIPRAP CL A3 3.500 SQ YD 2270 Gunther Construction Co. 95.5200 334.32 334.32 28200200 FILTER FABRIC 3.500 SQ YD 2270 Gunther Construction Co. 9.7300 34.06 34.06 28500100 FAB FORM CONC REV MAT 8.100 SQ YD 2270 Gunther Construction Co. 569.4200 4,612.30 4,612.30 31100300 SUB GRAN MAT A 4 392.000 SQ YD 2270 Gunther Construction Co. 8.4500 3,312.40 3,312.40 31100700 SUB GRAN MAT A 8 1,018.000 SQ YD 2270 Gunther Construction Co. 11.3800 11,584.84 11,584.84 35300500 PCC BSE CSE 10 695.700 SQ YD 2270 Gunther Construction Co. 53.4300 37,171.25 37,171.25 35400500 PCC BASE CSE W 10 243.100 SQ YD 2270 Gunther Construction Co. 70.2700 17,082.64 17,082.64 40600200 BIT MATLS PR CT 1.300 TON 2270 Gunther Construction Co. 2,091.4800 2,718.92 2,718.92 40600990 TEMPORARY RAMP 264.500 SQ YD 2270 Gunther Construction Co. 22.2000 5,871.90 5,871.90 42300300 PCC DRIVEWAY PAVT 7 97.300 SQ YD 2270 Gunther Construction Co. 98.2500 9,559.73 9,559.73 42400100 PC CONC SIDEWALK 4 986.300 SQ FT 2270 Gunther Construction Co. 6.5200 6,430.68 6,430.68 44000008 BIT SURF REM 2 1/2 2,003.300 SQ YD 2270 Gunther Construction Co. 6.6400 13,301.91 13,301.91 44000200 DRIVE PAVEMENT REM 126.100 SQ YD 2270 Gunther Construction Co. 16.7400 2,110.91 2,110.91 44000500 COMB CURB GUTTER REM 511.000 FOOT 2270 Gunther Construction Co. 9.5300 4,869.83 4,869.83 44001430 BIT SHOULDER REMOV 778.700 SQ YD 2270 Gunther Construction Co. 9.0000 7,008.30 7,008.30 44002800 ISLAND PAVEMENT REM 116.400 SQ YD 2270 Gunther Construction Co. 31.7000 3,689.88 3,689.88 48101200 AGGREGATE SHLDS B 50.700 TON 2270 Gunther Construction Co. 36.6000 1,855.62 1,855.62 48202600 BIT SHLD SUPER 8 304.300 SQ YD 2270 Gunther Construction Co. 55.6100 16,922.12 16,922.12 50102400 CONC REM 4.600 CU YD 2270 Gunther Construction Co. 97.7300 449.56 449.56 54215979 R C PIPE ELBOW 24 1.000 EACH 2270 Gunther Construction Co. 2,200.0000 2,200.00 2,200.00 54215985 R C PIPE ELBOW 30 1.000 EACH 2270 Gunther Construction Co. 2,350.0000 2,350.00 2,350.00 54246205 INLET BOX 542526 1.000 EACH 2270 Gunther Construction Co. 7,100.0000 7,100.00 7,100.00 54248515 CONCRETE COLLAR 4.000 EACH 2270 Gunther Construction Co. 500.0000 2,000.00 2,000.00 550A0090 STORM SEW CL A 1 18 26.000 FOOT 2270 Gunther Construction Co. 70.0000 1,820.00 1,820.00 550A0120 STORM SEW CL A 1 24 106.000 FOOT 2270 Gunther Construction Co. 75.0000 7,950.00 7,950.00 550A0140 STORM SEW CL A 1 30 34.000 FOOT 2270 Gunther Construction Co. 150.0000 5,100.00 5,100.00 55101200 STORM SEWER REM 24 9.000 FOOT 2270 Gunther Construction Co. 35.0000 315.00 315.00 55101400 STORM SEWER REM 30 54.300 FOOT 2270 Gunther Construction Co. 40.0000 2,172.00 2,172.00 60219000 MAN TA 4 DIA T8G 1.000 EACH 2270 Gunther Construction Co. 2,200.0000 2,200.00 2,200.00 60221100 MAN TA 5 DIA T1F CL 1.000 EACH 2270 Gunther Construction Co. 3,000.0000 3,000.00 3,000.00 60500060 REMOV INLETS 1.000 EACH 2270 Gunther Construction Co. 2,000.0000 2,000.00 2,000.00 60605000 COMB CC&G TB6.24 518.000 FOOT 2270 Gunther Construction Co. 34.5100 17,876.18 17,876.18 60610800 COMB CC&G TM6.24 SPL 75.000 FOOT 2270 Gunther Construction Co. 45.3500 3,401.25 3,401.25 60625600 ISLAND PAVEMENT 6 69.600 SQ YD 2270 Gunther Construction Co. 64.0100 4,455.10 4,455.10 67000400 ENGR FIELD OFFICE A 4.000 CAL MO 2270 Gunther Construction Co. 1,150.8500 4,603.40 4,603.40 67100100 MOBILIZATION 1.000 L SUM 2270 Gunther Construction Co. 18,918.0000 18,918.00 18,918.00 70100330 TRAF CONT-PROT 701426 1.000 L SUM 2270 Gunther Construction Co. 1.1500 1.15 1.15 70102630 TR CONT & PROT 701601 1.000 L SUM 2270 Gunther Construction Co. 863.1400 863.14 863.14 70102632 TR CONT & PROT 701602 1.000 L SUM 2270 Gunther Construction Co. 2,747.5400 2,747.54 2,747.54 70102635 TR CONT & PROT 701701 1.000 L SUM 2270 Gunther Construction Co. 6,760.0800 6,760.08 6,760.08 70103815 TR CONT SURVEILLANCE 15.000 CAL DA 2270 Gunther Construction Co. 525.6100 7,884.15 7,884.15 70300100 SHORT-TERM PAVT MKING 160.000 FOOT 2270 Gunther Construction Co. 1.9300 308.80 308.80 70300200 TEMP PAVT MARKING 2,867.000 FOOT 2270 Gunther Construction Co. 0.0100 28.67 28.67 70300210 TEMP PVT MK LTR & SYM 299.000 SQ FT 2270 Gunther Construction Co. 0.0100 2.99 2.99 70301000 WORK ZONE PAVT MK REM 53.300 SQ FT 2270 Gunther Construction Co. 11.3000 602.29 602.29 70400100 TEMP CONC BARRIER 400.000 FOOT 2270 Gunther Construction Co. 0.0100 4.00 4.00 78005100 EPOXY PVT MK LTR-SYM 299.000 SQ FT 2270 Gunther Construction Co. 5.1800 1,548.82 1,548.82 78005110 EPOXY PVT MK LINE 4 826.000 FOOT 2270 Gunther Construction Co. 1.1500 949.90 949.90 78005140 EPOXY PVT MK LINE 8 2,138.000 FOOT 2270 Gunther Construction Co. 2.3000 4,917.40 4,917.40 78005150 EPOXY PVT MK LINE 12 530.200 FOOT 2270 Gunther Construction Co. 2.5300 1,341.41 1,341.41 78005180 EPOXY PVT MK LINE 24 153.300 FOOT 2270 Gunther Construction Co. 3.4500 528.89 528.89 78100100 RAISED REFL PAVT MKR 61.000 EACH 2270 Gunther Construction Co. 60.9900 3,720.39 3,720.39 78300200 RAISED REF PVT MK REM 35.000 EACH 2270 Gunther Construction Co. 15.2700 534.45 534.45 81012600 CON T 2 PVC 230.000 FOOT 2270 Gunther Construction Co. 4.2600 979.80 979.80 81012800 CON T 3 PVC 114.000 FOOT 2270 Gunther Construction Co. 9.9500 1,134.30 1,134.30 81012900 CON T 3 1/2 PVC 109.000 FOOT 2270 Gunther Construction Co. 14.6200 1,593.58 1,593.58 81021360 CON P 3 1/2 PVC 313.000 FOOT 2270 Gunther Construction Co. 14.6200 4,576.06 4,576.06 81400400 CONC HANDHOLE 3.000 EACH 2270 Gunther Construction Co. 1,006.9900 3,020.97 3,020.97 81500200 TR & BKFIL F ELECT WK 497.000 FOOT 2270 Gunther Construction Co. 2.0100 998.97 998.97 81702130 EC C XLP USE 1C 6 802.000 FOOT 2270 Gunther Construction Co. 1.7300 1,387.46 1,387.46 82102400 LUM SV HOR MT 400W 2.000 EACH 2270 Gunther Construction Co. 574.2700 1,148.54 1,148.54 85700505 FAC IN EXIST CAB SPL 1.000 EACH 2270 Gunther Construction Co. 4,551.6000 4,551.60 4,551.60 87301225 ELCBL C SIGNAL 14 3C 535.500 FOOT 2270 Gunther Construction Co. 1.0000 535.50 535.50 87301245 ELCBL C SIGNAL 14 5C 3,843.000 FOOT 2270 Gunther Construction Co. 0.9900 3,804.57 3,804.57 87502490 TS POST GALVS 15 1.000 EACH 2270 Gunther Construction Co. 857.3800 857.38 857.38 87700220 S MAA & P 36 1.000 EACH 2270 Gunther Construction Co. 4,926.7800 4,926.78 4,926.78 87700290 S MAA & P 50 1.000 EACH 2270 Gunther Construction Co. 6,148.9700 6,148.97 6,148.97 87702960 STL COMB MAA&P 46 2.000 EACH 2270 Gunther Construction Co. 9,083.6400 18,167.28 18,167.28 87800100 CONC FDN TY A 3.000 FOOT 2270 Gunther Construction Co. 195.6400 586.92 586.92 87800415 CONC FDN TY E 36D 50.000 FOOT 2270 Gunther Construction Co. 207.1500 10,357.50 10,357.50 87900200 DRILL EX HANDHOLE 5.000 EACH 2270 Gunther Construction Co. 126.5900 632.95 632.95 88200410 TS BACKPLATE L F PLAS 10.000 EACH 2270 Gunther Construction Co. 113.9300 1,139.30 1,139.30 88500100 INDUCTIVE LOOP DETECT 4.000 EACH 2270 Gunther Construction Co. 134.0800 536.32 536.32 88800100 PED PUSH-BUTTON 2.000 EACH 2270 Gunther Construction Co. 377.4800 754.96 754.96 89502375 REMOV EX TS EQUIP 1.000 EACH 2270 Gunther Construction Co. 3,689.6200 3,689.62 3,689.62 89502380 REMOV EX HANDHOLE 8.000 EACH 2270 Gunther Construction Co. 208.7200 1,669.76 1,669.76 89502385 REMOV EX CONC FDN 4.000 EACH 2270 Gunther Construction Co. 518.8900 2,075.56 2,075.56