ILLINOIS DEPARTMENT OF TRANSPORTATION PAGE: 1 06/30/06 15:10:06 U N I T P R I C E T A B U L A T I O N O F B I D S LETTING DATE: 04/28/2006 LETTING TYPE: SCHEDULED CONTRACT NUMBER: 83840 LETTING ITEM NUMBER: 099 RESPONSIBLE DISTRICT: 01 BIDS LOCKED: Y SECTION: 00-00243-00-FP COUNTY: MCHENRY ESTIMATE: STATE JOB NUMBER: C-91-429-01 MUNICIPALITY: PROJECT NUMBER: M-RS-8003/142/000 -------------------------- SUMMARY OF CONTRACTOR BIDS -------------------------- "AS READ" SUMMATION SUMMATION OF NBR BIDR CONTR COMB ITEM CONTR BIDDER OF BIDDER CALCULATED LOW BIDR CALC BLANK NBR BIDDER NAME GROUP COMB GRP NBR GROUP TOTAL PRICE EXTENSIONS EXTENSIONS BID EXTENSION DIFF BIDS 0392 Berger Excavating Contractors, Inc. NO ALT 3,993,339.14 3,993,339.14 3,993,339.14 4813 Plote Construction Inc. NO ALT 3,081,200.60 3,081,200.60 3,081,200.60 5100 Rockford Blacktop Construction Co. NO ALT 3,043,539.00 * 3,043,539.00 3,043,539.00 * **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT = 128 ---------------------- DETAIL CONTRACTOR BIDS ---------------------- ITEM NBR ITEM DESCRIPTION UNIT OF UNIT BIDDER CALCULATED BIDR CALC BIDR NBR BIDDER NAME QUANTITY MEASURE PRICE EXTENSION EXTENSION EXTENSION DIFF A2000620 T-ACER PLAT 2-1/2 10.000 EACH 0392 Berger Excavating Contractors, Inc. 400.0000 4,000.00 4,000.00 4813 Plote Construction Inc. 325.0000 3,250.00 3,250.00 5100 Rockford Blacktop Construction Co. 320.0000 3,200.00 3,200.00 A2001020 T-ACER RUBRM 2-1/2 10.000 EACH 0392 Berger Excavating Contractors, Inc. 435.0000 4,350.00 4,350.00 4813 Plote Construction Inc. 350.0000 3,500.00 3,500.00 5100 Rockford Blacktop Construction Co. 308.0000 3,080.00 3,080.00 A2003320 T-FRAXINUS AMER 2-1/2 1.000 EACH 0392 Berger Excavating Contractors, Inc. 433.0000 433.00 433.00 4813 Plote Construction Inc. 350.0000 350.00 350.00 5100 Rockford Blacktop Construction Co. 297.0000 297.00 297.00 A2004620 T-GLEDIT TRI IN 2-1/2 11.000 EACH 0392 Berger Excavating Contractors, Inc. 393.0000 4,323.00 4,323.00 4813 Plote Construction Inc. 350.0000 3,850.00 3,850.00 5100 Rockford Blacktop Construction Co. 363.0000 3,993.00 3,993.00 A2008120 T-TILIA CORD GS 2-1/2 10.000 EACH 0392 Berger Excavating Contractors, Inc. 403.0000 4,030.00 4,030.00 4813 Plote Construction Inc. 350.0000 3,500.00 3,500.00 5100 Rockford Blacktop Construction Co. 374.0000 3,740.00 3,740.00 B2000266 T-ACER GINN SF 6' 32.000 EACH 0392 Berger Excavating Contractors, Inc. 233.0000 7,456.00 7,456.00 4813 Plote Construction Inc. 200.0000 6,400.00 6,400.00 5100 Rockford Blacktop Construction Co. 212.5000 6,800.00 6,800.00 B2000666 T-AMELAN X GF SF 6' 49.000 EACH 0392 Berger Excavating Contractors, Inc. 265.0000 12,985.00 12,985.00 4813 Plote Construction Inc. 275.0000 13,475.00 13,475.00 5100 Rockford Blacktop Construction Co. 176.0000 8,624.00 8,624.00 B2001166 T-CERCIS CAN CL 6' 14.000 EACH 0392 Berger Excavating Contractors, Inc. 253.0000 3,542.00 3,542.00 4813 Plote Construction Inc. 300.0000 4,200.00 4,200.00 5100 Rockford Blacktop Construction Co. 196.0000 2,744.00 2,744.00 B2001266 T-CORNUS ALT CL 6' 2.000 EACH 0392 Berger Excavating Contractors, Inc. 175.0000 350.00 350.00 4813 Plote Construction Inc. 300.0000 600.00 600.00 5100 Rockford Blacktop Construction Co. 207.0000 414.00 414.00 B2001666 T-CRATAE CRU-I SF 6' 30.000 EACH 0392 Berger Excavating Contractors, Inc. 255.0000 7,650.00 7,650.00 4813 Plote Construction Inc. 300.0000 9,000.00 9,000.00 5100 Rockford Blacktop Construction Co. 264.0000 7,920.00 7,920.00 B2002266 T-CRAT VIR WK CL 6' 10.000 EACH 0392 Berger Excavating Contractors, Inc. 188.0000 1,880.00 1,880.00 4813 Plote Construction Inc. 275.0000 2,750.00 2,750.00 5100 Rockford Blacktop Construction Co. 264.0000 2,640.00 2,640.00 B2002466 T-MAGNOL SOL CL 6' 35.000 EACH 0392 Berger Excavating Contractors, Inc. 275.0000 9,625.00 9,625.00 4813 Plote Construction Inc. 275.0000 9,625.00 9,625.00 5100 Rockford Blacktop Construction Co. 196.0000 6,860.00 6,860.00 B2004166 T-MALUS PF CL 6' 3.000 EACH 0392 Berger Excavating Contractors, Inc. 218.0000 654.00 654.00 4813 Plote Construction Inc. 250.0000 750.00 750.00 5100 Rockford Blacktop Construction Co. 196.0000 588.00 588.00 D2000172 E-ABIES CONCOLOR 6' 29.000 EACH 0392 Berger Excavating Contractors, Inc. 525.0000 15,225.00 15,225.00 4813 Plote Construction Inc. 400.0000 11,600.00 11,600.00 5100 Rockford Blacktop Construction Co. 253.0000 7,337.00 7,337.00 D2001772 E-PICEA ABIES 6' 7.000 EACH 0392 Berger Excavating Contractors, Inc. 223.0000 1,561.00 1,561.00 4813 Plote Construction Inc. 325.0000 2,275.00 2,275.00 5100 Rockford Blacktop Construction Co. 240.0000 1,680.00 1,680.00 D2001788 E-PICEA ABIES 8' 6.000 EACH 0392 Berger Excavating Contractors, Inc. 563.0000 3,378.00 3,378.00 4813 Plote Construction Inc. 475.0000 2,850.00 2,850.00 5100 Rockford Blacktop Construction Co. 338.0000 2,028.00 2,028.00 D2001872 E-PICEA GLAUCA 6' 34.000 EACH 0392 Berger Excavating Contractors, Inc. 223.0000 7,582.00 7,582.00 4813 Plote Construction Inc. 350.0000 11,900.00 11,900.00 5100 Rockford Blacktop Construction Co. 252.0000 8,568.00 8,568.00 D2002272 E-PICEA PUNG GLAU 6' 18.000 EACH 0392 Berger Excavating Contractors, Inc. 313.0000 5,634.00 5,634.00 4813 Plote Construction Inc. 350.0000 6,300.00 6,300.00 5100 Rockford Blacktop Construction Co. 252.0000 4,536.00 4,536.00 D2002288 E-PICEA PUNG GLAU 8' 2.000 EACH 0392 Berger Excavating Contractors, Inc. 550.0000 1,100.00 1,100.00 4813 Plote Construction Inc. 450.0000 900.00 900.00 5100 Rockford Blacktop Construction Co. 354.0000 708.00 708.00 D2002772 E-PINUS NIGRA 6' 10.000 EACH 0392 Berger Excavating Contractors, Inc. 338.0000 3,380.00 3,380.00 4813 Plote Construction Inc. 300.0000 3,000.00 3,000.00 5100 Rockford Blacktop Construction Co. 224.4000 2,244.00 2,244.00 D2002788 E-PINUS NIGRA 8' 31.000 EACH 0392 Berger Excavating Contractors, Inc. 518.0000 16,058.00 16,058.00 4813 Plote Construction Inc. 400.0000 12,400.00 12,400.00 5100 Rockford Blacktop Construction Co. 338.8000 10,502.80 10,502.80 K1005421 SEEDING SPL 9.600 ACRE 0392 Berger Excavating Contractors, Inc. 1,200.0000 11,520.00 11,520.00 4813 Plote Construction Inc. 1,300.0000 12,480.00 12,480.00 5100 Rockford Blacktop Construction Co. 1,700.0000 16,320.00 16,320.00 XX004007 BIT DRIVEWAY PAVT 209.000 SQ YD 0392 Berger Excavating Contractors, Inc. 35.0000 7,315.00 7,315.00 4813 Plote Construction Inc. 57.0000 11,913.00 11,913.00 5100 Rockford Blacktop Construction Co. 37.0000 7,733.00 7,733.00 XX004373 REM & RELOCATE INLETS 2.000 EACH 0392 Berger Excavating Contractors, Inc. 1,500.0000 3,000.00 3,000.00 4813 Plote Construction Inc. 1,000.0000 2,000.00 2,000.00 5100 Rockford Blacktop Construction Co. 1,662.3700 3,324.74 3,324.74 XX006066 SIGN TO BE RELOCATED 10.000 EACH 0392 Berger Excavating Contractors, Inc. 125.0000 1,250.00 1,250.00 4813 Plote Construction Inc. 100.0000 1,000.00 1,000.00 5100 Rockford Blacktop Construction Co. 200.0000 2,000.00 2,000.00 XX006517 CATCH BASINS RELOCATE 2.000 EACH 0392 Berger Excavating Contractors, Inc. 1,500.0000 3,000.00 3,000.00 4813 Plote Construction Inc. 1,200.0000 2,400.00 2,400.00 5100 Rockford Blacktop Construction Co. 1,662.3700 3,324.74 3,324.74 XX006518 T-C CRABAPPLE 6 CF BB 37.000 EACH 0392 Berger Excavating Contractors, Inc. 250.0000 9,250.00 9,250.00 4813 Plote Construction Inc. 275.0000 10,175.00 10,175.00 5100 Rockford Blacktop Construction Co. 210.0000 7,770.00 7,770.00 XX006519 EVERG WHITE FIR 8' BB 55.000 EACH 0392 Berger Excavating Contractors, Inc. 640.0000 35,200.00 35,200.00 4813 Plote Construction Inc. 425.0000 23,375.00 23,375.00 5100 Rockford Blacktop Construction Co. 323.4000 17,787.00 17,787.00 XX006520 AGGREGATE DRIVEWAY 6" 51.000 SQ YD 0392 Berger Excavating Contractors, Inc. 20.0000 1,020.00 1,020.00 4813 Plote Construction Inc. 15.0000 765.00 765.00 5100 Rockford Blacktop Construction Co. 16.7400 853.74 853.74 XX006521 E-PICEA GLAUCA 8' 22.000 EACH 0392 Berger Excavating Contractors, Inc. 500.0000 11,000.00 11,000.00 4813 Plote Construction Inc. 425.0000 9,350.00 9,350.00 5100 Rockford Blacktop Construction Co. 338.8000 7,453.60 7,453.60 X0322256 TEMP INFO SIGNING 153.000 SQ FT 0392 Berger Excavating Contractors, Inc. 15.0000 2,295.00 2,295.00 4813 Plote Construction Inc. 15.0000 2,295.00 2,295.00 5100 Rockford Blacktop Construction Co. 18.0000 2,754.00 2,754.00 X0712400 TEMP PAVEMENT 2,029.000 SQ YD 0392 Berger Excavating Contractors, Inc. 35.0000 71,015.00 71,015.00 4813 Plote Construction Inc. 33.0000 66,957.00 66,957.00 5100 Rockford Blacktop Construction Co. 31.8200 64,562.78 64,562.78 X3550300 BIT BC SUPER 6 1,216.000 SQ YD 0392 Berger Excavating Contractors, Inc. 17.2500 20,976.00 20,976.00 4813 Plote Construction Inc. 15.0000 18,240.00 18,240.00 5100 Rockford Blacktop Construction Co. 17.2500 20,976.00 20,976.00 X3550600 BIT BC SUPER 9 670.000 SQ YD 0392 Berger Excavating Contractors, Inc. 28.3000 18,961.00 18,961.00 4813 Plote Construction Inc. 23.4000 15,678.00 15,678.00 5100 Rockford Blacktop Construction Co. 28.3000 18,961.00 18,961.00 X4021000 TEMP ACCESS- PRIV ENT 2.000 EACH 0392 Berger Excavating Contractors, Inc. 650.0000 1,300.00 1,300.00 4813 Plote Construction Inc. 900.0000 1,800.00 1,800.00 5100 Rockford Blacktop Construction Co. 400.9200 801.84 801.84 X4023000 TEMP ACCESS- ROAD 3.000 EACH 0392 Berger Excavating Contractors, Inc. 1,000.0000 3,000.00 3,000.00 4813 Plote Construction Inc. 1,000.0000 3,000.00 3,000.00 5100 Rockford Blacktop Construction Co. 801.8300 2,405.49 2,405.49 X4066426 BC SC SUPER "D" N70 651.000 TON 0392 Berger Excavating Contractors, Inc. 70.0000 45,570.00 45,570.00 4813 Plote Construction Inc. 64.0000 41,664.00 41,664.00 5100 Rockford Blacktop Construction Co. 70.0000 45,570.00 45,570.00 X4066616 BCBC SUP IL-19.0 N70 420.000 TON 0392 Berger Excavating Contractors, Inc. 63.0000 26,460.00 26,460.00 4813 Plote Construction Inc. 57.0000 23,940.00 23,940.00 5100 Rockford Blacktop Construction Co. 63.0000 26,460.00 26,460.00 X4073081 BIT C PVT FD SUP 10 6,942.000 SQ YD 0392 Berger Excavating Contractors, Inc. 34.5000 239,499.00 239,499.00 4813 Plote Construction Inc. 32.0000 222,144.00 222,144.00 5100 Rockford Blacktop Construction Co. 32.5000 225,615.00 225,615.00 X4073141 BIT C PVT FD SUP 13 14,375.000 SQ YD 0392 Berger Excavating Contractors, Inc. 41.2500 592,968.75 592,968.75 4813 Plote Construction Inc. 39.0000 560,625.00 560,625.00 5100 Rockford Blacktop Construction Co. 39.2500 564,218.75 564,218.75 X7011005 TR CONT-PROT TEMP DET 1.000 L SUM 0392 Berger Excavating Contractors, Inc. 8,500.0000 8,500.00 8,500.00 4813 Plote Construction Inc. 3,500.0000 3,500.00 3,500.00 5100 Rockford Blacktop Construction Co. 4,000.0000 4,000.00 4,000.00 Z0013798 CONSTRUCTION LAYOUT 1.000 L SUM 0392 Berger Excavating Contractors, Inc. 44,000.0000 44,000.00 44,000.00 4813 Plote Construction Inc. 17,000.0000 17,000.00 17,000.00 5100 Rockford Blacktop Construction Co. 43,600.0000 43,600.00 43,600.00 Z0017400 DRAIN UTIL STR ADJ 2.000 EACH 0392 Berger Excavating Contractors, Inc. 350.0000 700.00 700.00 4813 Plote Construction Inc. 400.0000 800.00 800.00 5100 Rockford Blacktop Construction Co. 737.2300 1,474.46 1,474.46 Z0076600 TRAINEES 1,000.000 HOUR 0392 Berger Excavating Contractors, Inc. 0.8000 800.00 800.00 4813 Plote Construction Inc. 0.8000 800.00 800.00 5100 Rockford Blacktop Construction Co. 0.8000 800.00 800.00 20100110 TREE REMOV 6-15 185.000 UNIT 0392 Berger Excavating Contractors, Inc. 10.0000 1,850.00 1,850.00 4813 Plote Construction Inc. 10.0000 1,850.00 1,850.00 5100 Rockford Blacktop Construction Co. 37.0400 6,852.40 6,852.40 20100210 TREE REMOV OVER 15 205.000 UNIT 0392 Berger Excavating Contractors, Inc. 12.0000 2,460.00 2,460.00 4813 Plote Construction Inc. 12.0000 2,460.00 2,460.00 5100 Rockford Blacktop Construction Co. 48.6000 9,963.00 9,963.00 20200100 EARTH EXCAVATION 63,805.000 CU YD 0392 Berger Excavating Contractors, Inc. 18.1500 1,158,060.75 1,158,060.75 4813 Plote Construction Inc. 8.5000 542,342.50 542,342.50 5100 Rockford Blacktop Construction Co. 10.7300 684,627.65 684,627.65 20201200 REM & DISP UNS MATL 25,311.000 CU YD 0392 Berger Excavating Contractors, Inc. 18.0000 455,598.00 455,598.00 4813 Plote Construction Inc. 8.5000 215,143.50 215,143.50 5100 Rockford Blacktop Construction Co. 8.8000 222,736.80 222,736.80 20700420 POROUS GRAN EMB SUBGR 4,998.000 CU YD 0392 Berger Excavating Contractors, Inc. 38.0000 189,924.00 189,924.00 4813 Plote Construction Inc. 36.0000 179,928.00 179,928.00 5100 Rockford Blacktop Construction Co. 26.9300 134,596.14 134,596.14 20800150 TRENCH BACKFILL 60.000 CU YD 0392 Berger Excavating Contractors, Inc. 40.0000 2,400.00 2,400.00 4813 Plote Construction Inc. 100.0000 6,000.00 6,000.00 5100 Rockford Blacktop Construction Co. 17.4100 1,044.60 1,044.60 21001000 GEOTECH FAB F/GR STAB 5,115.000 SQ YD 0392 Berger Excavating Contractors, Inc. 1.3500 6,905.25 6,905.25 4813 Plote Construction Inc. 3.0000 15,345.00 15,345.00 5100 Rockford Blacktop Construction Co. 0.6000 3,069.00 3,069.00 21101625 TOPSOIL F & P 6 46,345.000 SQ YD 0392 Berger Excavating Contractors, Inc. 3.3000 152,938.50 152,938.50 4813 Plote Construction Inc. 2.0000 92,690.00 92,690.00 5100 Rockford Blacktop Construction Co. 1.2700 58,858.15 58,858.15 25000400 NITROGEN FERT NUTR 810.000 POUND 0392 Berger Excavating Contractors, Inc. 0.7500 607.50 607.50 4813 Plote Construction Inc. 0.9500 769.50 769.50 5100 Rockford Blacktop Construction Co. 1.1500 931.50 931.50 25000500 PHOSPHORUS FERT NUTR 810.000 POUND 0392 Berger Excavating Contractors, Inc. 0.7500 607.50 607.50 4813 Plote Construction Inc. 0.9500 769.50 769.50 5100 Rockford Blacktop Construction Co. 1.1500 931.50 931.50 25000600 POTASSIUM FERT NUTR 810.000 POUND 0392 Berger Excavating Contractors, Inc. 0.7500 607.50 607.50 4813 Plote Construction Inc. 0.9500 769.50 769.50 5100 Rockford Blacktop Construction Co. 1.1500 931.50 931.50 25100630 EROSION CONTR BLANKET 46,345.000 SQ YD 0392 Berger Excavating Contractors, Inc. 1.0000 46,345.00 46,345.00 4813 Plote Construction Inc. 1.1000 50,979.50 50,979.50 5100 Rockford Blacktop Construction Co. 1.3000 60,248.50 60,248.50 28000250 TEMP EROS CONTR SEED 900.000 POUND 0392 Berger Excavating Contractors, Inc. 5.3500 4,815.00 4,815.00 4813 Plote Construction Inc. 5.0000 4,500.00 4,500.00 5100 Rockford Blacktop Construction Co. 1.5000 1,350.00 1,350.00 28000300 TEMP DITCH CHECKS 48.000 EACH 0392 Berger Excavating Contractors, Inc. 80.0000 3,840.00 3,840.00 4813 Plote Construction Inc. 85.0000 4,080.00 4,080.00 5100 Rockford Blacktop Construction Co. 55.0000 2,640.00 2,640.00 28000400 PERIMETER EROS BAR 13,584.000 FOOT 0392 Berger Excavating Contractors, Inc. 2.5000 33,960.00 33,960.00 4813 Plote Construction Inc. 2.0000 27,168.00 27,168.00 5100 Rockford Blacktop Construction Co. 0.8500 11,546.40 11,546.40 28000500 INLET & PIPE PROTECT 21.000 EACH 0392 Berger Excavating Contractors, Inc. 75.0000 1,575.00 1,575.00 4813 Plote Construction Inc. 120.0000 2,520.00 2,520.00 5100 Rockford Blacktop Construction Co. 45.0000 945.00 945.00 28000510 INLET FILTERS 4.000 EACH 0392 Berger Excavating Contractors, Inc. 195.0000 780.00 780.00 4813 Plote Construction Inc. 500.0000 2,000.00 2,000.00 5100 Rockford Blacktop Construction Co. 35.0000 140.00 140.00 31101200 SUB GRAN MAT B 4 25,464.000 SQ YD 0392 Berger Excavating Contractors, Inc. 3.8000 96,763.20 96,763.20 4813 Plote Construction Inc. 5.5000 140,052.00 140,052.00 5100 Rockford Blacktop Construction Co. 5.3200 135,468.48 135,468.48 40600100 BIT MATLS PR CT 22,135.000 GALLON 0392 Berger Excavating Contractors, Inc. 1.0000 22,135.00 22,135.00 4813 Plote Construction Inc. 1.5000 33,202.50 33,202.50 5100 Rockford Blacktop Construction Co. 0.9800 21,692.30 21,692.30 40600300 AGG PR CT 80.000 TON 0392 Berger Excavating Contractors, Inc. 1.0000 80.00 80.00 4813 Plote Construction Inc. 18.0000 1,440.00 1,440.00 5100 Rockford Blacktop Construction Co. 1.0000 80.00 80.00 40600980 BIT SURF REM BUTT JT 245.000 SQ YD 0392 Berger Excavating Contractors, Inc. 7.1500 1,751.75 1,751.75 4813 Plote Construction Inc. 17.0000 4,165.00 4,165.00 5100 Rockford Blacktop Construction Co. 7.1500 1,751.75 1,751.75 44000006 BIT SURF REM 1 1/2 6,510.000 SQ YD 0392 Berger Excavating Contractors, Inc. 2.1000 13,671.00 13,671.00 4813 Plote Construction Inc. 1.9000 12,369.00 12,369.00 5100 Rockford Blacktop Construction Co. 2.1000 13,671.00 13,671.00 44000100 PAVEMENT REM 5,890.000 SQ YD 0392 Berger Excavating Contractors, Inc. 9.1000 53,599.00 53,599.00 4813 Plote Construction Inc. 5.0000 29,450.00 29,450.00 5100 Rockford Blacktop Construction Co. 8.6100 50,712.90 50,712.90 44000500 COMB CURB GUTTER REM 120.000 FOOT 0392 Berger Excavating Contractors, Inc. 3.0000 360.00 360.00 4813 Plote Construction Inc. 4.0000 480.00 480.00 5100 Rockford Blacktop Construction Co. 12.8000 1,536.00 1,536.00 44300200 STRIP REF CR CON TR 1,236.000 FOOT 0392 Berger Excavating Contractors, Inc. 12.0000 14,832.00 14,832.00 4813 Plote Construction Inc. 11.0000 13,596.00 13,596.00 5100 Rockford Blacktop Construction Co. 12.0000 14,832.00 14,832.00 48101200 AGGREGATE SHLDS B 45.000 TON 0392 Berger Excavating Contractors, Inc. 26.0000 1,170.00 1,170.00 4813 Plote Construction Inc. 27.0000 1,215.00 1,215.00 5100 Rockford Blacktop Construction Co. 16.5300 743.85 743.85 48101500 AGGREGATE SHLDS B 6 5,400.000 SQ YD 0392 Berger Excavating Contractors, Inc. 8.5500 46,170.00 46,170.00 4813 Plote Construction Inc. 6.5000 35,100.00 35,100.00 5100 Rockford Blacktop Construction Co. 3.8700 20,898.00 20,898.00 48202600 BIT SHLD SUPER 8 3,830.000 SQ YD 0392 Berger Excavating Contractors, Inc. 22.6000 86,558.00 86,558.00 4813 Plote Construction Inc. 22.0000 84,260.00 84,260.00 5100 Rockford Blacktop Construction Co. 22.6000 86,558.00 86,558.00 50105220 PIPE CULVERT REMOV 409.000 FOOT 0392 Berger Excavating Contractors, Inc. 12.0000 4,908.00 4,908.00 4813 Plote Construction Inc. 15.0000 6,135.00 6,135.00 5100 Rockford Blacktop Construction Co. 39.2800 16,065.52 16,065.52 542A0220 P CUL CL A 1 15 53.000 FOOT 0392 Berger Excavating Contractors, Inc. 37.0000 1,961.00 1,961.00 4813 Plote Construction Inc. 40.0000 2,120.00 2,120.00 5100 Rockford Blacktop Construction Co. 33.3300 1,766.49 1,766.49 542A0229 P CUL CL A 1 24 50.000 FOOT 0392 Berger Excavating Contractors, Inc. 42.0000 2,100.00 2,100.00 4813 Plote Construction Inc. 55.0000 2,750.00 2,750.00 5100 Rockford Blacktop Construction Co. 42.7800 2,139.00 2,139.00 542A5479 P CUL CL A 1 EQRS 24 56.000 FOOT 0392 Berger Excavating Contractors, Inc. 76.0000 4,256.00 4,256.00 4813 Plote Construction Inc. 58.0000 3,248.00 3,248.00 5100 Rockford Blacktop Construction Co. 56.2700 3,151.12 3,151.12 542A5491 P CUL CL A 1 EQRS 36 60.000 FOOT 0392 Berger Excavating Contractors, Inc. 86.0000 5,160.00 5,160.00 4813 Plote Construction Inc. 72.0000 4,320.00 4,320.00 5100 Rockford Blacktop Construction Co. 81.9700 4,918.20 4,918.20 542D0220 P CUL CL D 1 15 51.000 FOOT 0392 Berger Excavating Contractors, Inc. 37.0000 1,887.00 1,887.00 4813 Plote Construction Inc. 40.0000 2,040.00 2,040.00 5100 Rockford Blacktop Construction Co. 25.0100 1,275.51 1,275.51 542D5470 P CUL CL D 1 EQRS 15 81.000 FOOT 0392 Berger Excavating Contractors, Inc. 67.0000 5,427.00 5,427.00 4813 Plote Construction Inc. 43.0000 3,483.00 3,483.00 5100 Rockford Blacktop Construction Co. 22.7300 1,841.13 1,841.13 54213660 PRC FLAR END SEC 15 4.000 EACH 0392 Berger Excavating Contractors, Inc. 1,125.0000 4,500.00 4,500.00 4813 Plote Construction Inc. 700.0000 2,800.00 2,800.00 5100 Rockford Blacktop Construction Co. 552.6700 2,210.68 2,210.68 54213663 PRC FLAR END SEC 18 1.000 EACH 0392 Berger Excavating Contractors, Inc. 1,175.0000 1,175.00 1,175.00 4813 Plote Construction Inc. 825.0000 825.00 825.00 5100 Rockford Blacktop Construction Co. 583.4300 583.43 583.43 54213669 PRC FLAR END SEC 24 2.000 EACH 0392 Berger Excavating Contractors, Inc. 1,250.0000 2,500.00 2,500.00 4813 Plote Construction Inc. 1,000.0000 2,000.00 2,000.00 5100 Rockford Blacktop Construction Co. 657.4600 1,314.92 1,314.92 54214080 ALUM END SEC 15 4.000 EACH 0392 Berger Excavating Contractors, Inc. 450.0000 1,800.00 1,800.00 4813 Plote Construction Inc. 300.0000 1,200.00 1,200.00 5100 Rockford Blacktop Construction Co. 236.0000 944.00 944.00 54214509 PRC FL END S EQ RS 24 1.000 EACH 0392 Berger Excavating Contractors, Inc. 2,500.0000 2,500.00 2,500.00 4813 Plote Construction Inc. 1,200.0000 1,200.00 1,200.00 5100 Rockford Blacktop Construction Co. 727.3600 727.36 727.36 54214521 PRC FL END S EQ RS 36 2.000 EACH 0392 Berger Excavating Contractors, Inc. 3,300.0000 6,600.00 6,600.00 4813 Plote Construction Inc. 1,500.0000 3,000.00 3,000.00 5100 Rockford Blacktop Construction Co. 1,309.5400 2,619.08 2,619.08 54215340 ALUM END SEC EQ RS 15 6.000 EACH 0392 Berger Excavating Contractors, Inc. 650.0000 3,900.00 3,900.00 4813 Plote Construction Inc. 300.0000 1,800.00 1,800.00 5100 Rockford Blacktop Construction Co. 246.7900 1,480.74 1,480.74 54247100 GRATING-C FL END S 15 4.000 EACH 0392 Berger Excavating Contractors, Inc. 500.0000 2,000.00 2,000.00 4813 Plote Construction Inc. 350.0000 1,400.00 1,400.00 5100 Rockford Blacktop Construction Co. 401.5800 1,606.32 1,606.32 54247110 GRATING-C FL END S 18 1.000 EACH 0392 Berger Excavating Contractors, Inc. 416.0000 416.00 416.00 4813 Plote Construction Inc. 400.0000 400.00 400.00 5100 Rockford Blacktop Construction Co. 422.2200 422.22 422.22 54247130 GRATING-C FL END S 24 2.000 EACH 0392 Berger Excavating Contractors, Inc. 850.0000 1,700.00 1,700.00 4813 Plote Construction Inc. 450.0000 900.00 900.00 5100 Rockford Blacktop Construction Co. 469.9600 939.92 939.92 54248160 GRT-C FL END S EQV 36 2.000 EACH 0392 Berger Excavating Contractors, Inc. 1,025.0000 2,050.00 2,050.00 4813 Plote Construction Inc. 750.0000 1,500.00 1,500.00 5100 Rockford Blacktop Construction Co. 685.3200 1,370.64 1,370.64 550A0050 STORM SEW CL A 1 12 19.000 FOOT 0392 Berger Excavating Contractors, Inc. 36.0000 684.00 684.00 4813 Plote Construction Inc. 50.0000 950.00 950.00 5100 Rockford Blacktop Construction Co. 632.7500 12,022.25 12,022.25 550A0070 STORM SEW CL A 1 15 84.000 FOOT 0392 Berger Excavating Contractors, Inc. 38.0000 3,192.00 3,192.00 4813 Plote Construction Inc. 38.0000 3,192.00 3,192.00 5100 Rockford Blacktop Construction Co. 33.3300 2,799.72 2,799.72 550A0090 STORM SEW CL A 1 18 232.000 FOOT 0392 Berger Excavating Contractors, Inc. 42.0000 9,744.00 9,744.00 4813 Plote Construction Inc. 45.0000 10,440.00 10,440.00 5100 Rockford Blacktop Construction Co. 42.0900 9,764.88 9,764.88 550A0120 STORM SEW CL A 1 24 13.000 FOOT 0392 Berger Excavating Contractors, Inc. 44.0000 572.00 572.00 4813 Plote Construction Inc. 75.0000 975.00 975.00 5100 Rockford Blacktop Construction Co. 86.6300 1,126.19 1,126.19 550A0130 STORM SEW CL A 1 27 19.000 FOOT 0392 Berger Excavating Contractors, Inc. 46.0000 874.00 874.00 4813 Plote Construction Inc. 100.0000 1,900.00 1,900.00 5100 Rockford Blacktop Construction Co. 68.8000 1,307.20 1,307.20 55100900 STORM SEWER REM 18 30.000 FOOT 0392 Berger Excavating Contractors, Inc. 12.0000 360.00 360.00 4813 Plote Construction Inc. 20.0000 600.00 600.00 5100 Rockford Blacktop Construction Co. 20.6700 620.10 620.10 60100060 CONC HDWL FOR P DRAIN 2.000 EACH 0392 Berger Excavating Contractors, Inc. 350.0000 700.00 700.00 4813 Plote Construction Inc. 400.0000 800.00 800.00 5100 Rockford Blacktop Construction Co. 290.3300 580.66 580.66 60107600 PIPE UNDERDRAINS 4 3,023.000 FOOT 0392 Berger Excavating Contractors, Inc. 10.0000 30,230.00 30,230.00 4813 Plote Construction Inc. 18.0000 54,414.00 54,414.00 5100 Rockford Blacktop Construction Co. 14.1700 42,835.91 42,835.91 60108100 PIPE UNDERDRAIN 4 SP 50.000 FOOT 0392 Berger Excavating Contractors, Inc. 11.0000 550.00 550.00 4813 Plote Construction Inc. 30.0000 1,500.00 1,500.00 5100 Rockford Blacktop Construction Co. 10.0400 502.00 502.00 60219000 MAN TA 4 DIA T8G 1.000 EACH 0392 Berger Excavating Contractors, Inc. 1,400.0000 1,400.00 1,400.00 4813 Plote Construction Inc. 1,800.0000 1,800.00 1,800.00 5100 Rockford Blacktop Construction Co. 1,873.9100 1,873.91 1,873.91 60221700 MAN TA 5 DIA T8G 1.000 EACH 0392 Berger Excavating Contractors, Inc. 1,800.0000 1,800.00 1,800.00 4813 Plote Construction Inc. 2,800.0000 2,800.00 2,800.00 5100 Rockford Blacktop Construction Co. 2,159.6800 2,159.68 2,159.68 60260300 INLETS ADJ NEW T1F OL 1.000 EACH 0392 Berger Excavating Contractors, Inc. 650.0000 650.00 650.00 4813 Plote Construction Inc. 800.0000 800.00 800.00 5100 Rockford Blacktop Construction Co. 1,115.4000 1,115.40 1,115.40 60600095 CLASS SI CONC OUTLET 7.200 CU YD 0392 Berger Excavating Contractors, Inc. 495.0000 3,564.00 3,564.00 4813 Plote Construction Inc. 310.0000 2,232.00 2,232.00 5100 Rockford Blacktop Construction Co. 500.0000 3,600.00 3,600.00 60602800 CONC GUTTER TB 1,180.000 FOOT 0392 Berger Excavating Contractors, Inc. 21.4000 25,252.00 25,252.00 4813 Plote Construction Inc. 15.0000 17,700.00 17,700.00 5100 Rockford Blacktop Construction Co. 13.5000 15,930.00 15,930.00 60608300 COMB CC&G TM2.12 167.000 FOOT 0392 Berger Excavating Contractors, Inc. 23.4000 3,907.80 3,907.80 4813 Plote Construction Inc. 23.0000 3,841.00 3,841.00 5100 Rockford Blacktop Construction Co. 15.0000 2,505.00 2,505.00 67000400 ENGR FIELD OFFICE A 12.000 CAL MO 0392 Berger Excavating Contractors, Inc. 1,500.0000 18,000.00 18,000.00 4813 Plote Construction Inc. 1,500.0000 18,000.00 18,000.00 5100 Rockford Blacktop Construction Co. 1,250.0000 15,000.00 15,000.00 67100100 MOBILIZATION 1.000 L SUM 0392 Berger Excavating Contractors, Inc. 77,111.0000 77,111.00 77,111.00 4813 Plote Construction Inc. 180,000.0000 180,000.00 180,000.00 5100 Rockford Blacktop Construction Co. 90,500.0000 90,500.00 90,500.00 70101800 TRAF CONT & PROT SPL 1.000 L SUM 0392 Berger Excavating Contractors, Inc. 25,000.0000 25,000.00 25,000.00 4813 Plote Construction Inc. 16,040.0000 16,040.00 16,040.00 5100 Rockford Blacktop Construction Co. 13,500.0000 13,500.00 13,500.00 70300100 SHORT-TERM PAVT MKING 3,424.000 FOOT 0392 Berger Excavating Contractors, Inc. 1.0000 3,424.00 3,424.00 4813 Plote Construction Inc. 0.6000 2,054.40 2,054.40 5100 Rockford Blacktop Construction Co. 0.4500 1,540.80 1,540.80 70300210 TEMP PVT MK LTR & SYM 619.000 SQ FT 0392 Berger Excavating Contractors, Inc. 3.7500 2,321.25 2,321.25 4813 Plote Construction Inc. 1.2000 742.80 742.80 5100 Rockford Blacktop Construction Co. 1.2000 742.80 742.80 70300220 TEMP PVT MK LINE 4 62,793.000 FOOT 0392 Berger Excavating Contractors, Inc. 0.1800 11,302.74 11,302.74 4813 Plote Construction Inc. 0.1500 9,418.95 9,418.95 5100 Rockford Blacktop Construction Co. 0.1700 10,674.81 10,674.81 70300240 TEMP PVT MK LINE 6 8,067.000 FOOT 0392 Berger Excavating Contractors, Inc. 0.2300 1,855.41 1,855.41 4813 Plote Construction Inc. 0.2500 2,016.75 2,016.75 5100 Rockford Blacktop Construction Co. 0.2500 2,016.75 2,016.75 70300260 TEMP PVT MK LINE 12 1,742.000 FOOT 0392 Berger Excavating Contractors, Inc. 0.4500 783.90 783.90 4813 Plote Construction Inc. 0.5000 871.00 871.00 5100 Rockford Blacktop Construction Co. 0.5000 871.00 871.00 70300280 TEMP PVT MK LINE 24 438.000 FOOT 0392 Berger Excavating Contractors, Inc. 0.9300 407.34 407.34 4813 Plote Construction Inc. 1.0000 438.00 438.00 5100 Rockford Blacktop Construction Co. 1.2000 525.60 525.60 70300520 PAVT MARK TAPE T3 4 4,080.000 FOOT 0392 Berger Excavating Contractors, Inc. 0.8500 3,468.00 3,468.00 4813 Plote Construction Inc. 1.0000 4,080.00 4,080.00 5100 Rockford Blacktop Construction Co. 1.0500 4,284.00 4,284.00 70300540 PAVT MARK TAPE T3 6 1,361.000 FOOT 0392 Berger Excavating Contractors, Inc. 1.0000 1,361.00 1,361.00 4813 Plote Construction Inc. 1.2000 1,633.20 1,633.20 5100 Rockford Blacktop Construction Co. 1.2000 1,633.20 1,633.20 72000100 SIGN PANEL T1 358.000 SQ FT 0392 Berger Excavating Contractors, Inc. 17.5000 6,265.00 6,265.00 4813 Plote Construction Inc. 17.0000 6,086.00 6,086.00 5100 Rockford Blacktop Construction Co. 16.0000 5,728.00 5,728.00 72000200 SIGN PANEL T2 23.000 SQ FT 0392 Berger Excavating Contractors, Inc. 25.0000 575.00 575.00 4813 Plote Construction Inc. 38.0000 874.00 874.00 5100 Rockford Blacktop Construction Co. 18.0000 414.00 414.00 72900100 METAL POST TY A 240.000 FOOT 0392 Berger Excavating Contractors, Inc. 12.5000 3,000.00 3,000.00 4813 Plote Construction Inc. 5.2500 1,260.00 1,260.00 5100 Rockford Blacktop Construction Co. 6.0000 1,440.00 1,440.00 72900200 METAL POST TY B 375.000 FOOT 0392 Berger Excavating Contractors, Inc. 12.5000 4,687.50 4,687.50 4813 Plote Construction Inc. 5.5000 2,062.50 2,062.50 5100 Rockford Blacktop Construction Co. 7.0000 2,625.00 2,625.00 78005100 EPOXY PVT MK LTR-SYM 620.000 SQ FT 0392 Berger Excavating Contractors, Inc. 2.8500 1,767.00 1,767.00 4813 Plote Construction Inc. 2.8500 1,767.00 1,767.00 5100 Rockford Blacktop Construction Co. 2.8500 1,767.00 1,767.00 78005110 EPOXY PVT MK LINE 4 22,062.000 FOOT 0392 Berger Excavating Contractors, Inc. 0.4600 10,148.52 10,148.52 4813 Plote Construction Inc. 0.4600 10,148.52 10,148.52 5100 Rockford Blacktop Construction Co. 0.4600 10,148.52 10,148.52 78005130 EPOXY PVT MK LINE 6 2,312.000 FOOT 0392 Berger Excavating Contractors, Inc. 0.6900 1,595.28 1,595.28 4813 Plote Construction Inc. 0.6900 1,595.28 1,595.28 5100 Rockford Blacktop Construction Co. 0.6900 1,595.28 1,595.28 78005140 EPOXY PVT MK LINE 8 55.000 FOOT 0392 Berger Excavating Contractors, Inc. 0.9200 50.60 50.60 4813 Plote Construction Inc. 0.9200 50.60 50.60 5100 Rockford Blacktop Construction Co. 0.9200 50.60 50.60 78005150 EPOXY PVT MK LINE 12 340.000 FOOT 0392 Berger Excavating Contractors, Inc. 1.3800 469.20 469.20 4813 Plote Construction Inc. 1.3800 469.20 469.20 5100 Rockford Blacktop Construction Co. 1.3800 469.20 469.20 78005180 EPOXY PVT MK LINE 24 170.000 FOOT 0392 Berger Excavating Contractors, Inc. 2.8000 476.00 476.00 4813 Plote Construction Inc. 2.8000 476.00 476.00 5100 Rockford Blacktop Construction Co. 2.8000 476.00 476.00 78100100 RAISED REFL PAVT MKR 283.000 EACH 0392 Berger Excavating Contractors, Inc. 22.3000 6,310.90 6,310.90 4813 Plote Construction Inc. 22.3000 6,310.90 6,310.90 5100 Rockford Blacktop Construction Co. 22.3000 6,310.90 6,310.90 78300200 RAISED REF PVT MK REM 48.000 EACH 0392 Berger Excavating Contractors, Inc. 10.0000 480.00 480.00 4813 Plote Construction Inc. 15.0000 720.00 720.00 5100 Rockford Blacktop Construction Co. 10.0000 480.00 480.00