ILLINOIS DEPARTMENT OF TRANSPORTATION PAGE: 1 08/05/05 07:20:48 U N I T P R I C E T A B U L A T I O N O F B I D S LETTING DATE: 06/17/2005 LETTING TYPE: SCHEDULED CONTRACT NUMBER: 62695 LETTING ITEM NUMBER: 160 RESPONSIBLE DISTRICT: 01 BIDS LOCKED: Y SECTION: (1516.1,1717&1818)R-9 COUNTY: COOK ESTIMATE: -------------------------- SUMMARY OF CONTRACTOR BIDS -------------------------- "AS READ" SUMMATION SUMMATION OF NBR BIDR CONTR COMB ITEM CONTR BIDDER OF BIDDER CALCULATED LOW BIDR CALC BLANK NBR BIDDER NAME GROUP COMB GRP NBR GROUP TOTAL PRICE EXTENSIONS EXTENSIONS BID EXTENSION DIFF BIDS 1728 FHP Tectonics Corp. NO ALT 38,278,549.58 38,278,549.60 38,278,549.03 .57- 6327 Walsh Construction Company NO ALT 34,920,003.77 * 34,920,003.77 34,920,003.77 * **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT = 401 ---------------------- DETAIL CONTRACTOR BIDS ---------------------- ITEM NBR ITEM DESCRIPTION UNIT OF UNIT BIDDER CALCULATED BIDR CALC BIDR NBR BIDDER NAME QUANTITY MEASURE PRICE EXTENSION EXTENSION EXTENSION DIFF E20200G1 V-PARTHEN QUINQ 1G 1,304.000 EACH 1728 FHP Tectonics Corp. 12.0000 15,648.00 15,648.00 6327 Walsh Construction Company 12.0000 15,648.00 15,648.00 K0030400 PERENNIAL PLANT DAYLI 13.000 UNIT 1728 FHP Tectonics Corp. 650.0000 8,450.00 8,450.00 6327 Walsh Construction Company 650.0000 8,450.00 8,450.00 XX004046 AERIAL CABLE REMOVAL 370.000 FOOT 1728 FHP Tectonics Corp. 15.0000 5,550.00 5,550.00 6327 Walsh Construction Company 10.0000 3,700.00 3,700.00 XX005128 STRIP SEAL EXP JT ASY 167.000 FOOT 1728 FHP Tectonics Corp. 146.9000 24,532.30 24,532.30 6327 Walsh Construction Company 185.0000 30,895.00 30,895.00 XX005489 STEEL CASING 48 129.000 FOOT 1728 FHP Tectonics Corp. 600.0000 77,400.00 77,400.00 6327 Walsh Construction Company 700.0000 90,300.00 90,300.00 XX104800 COMB CC&G TBV.12 6,343.000 FOOT 1728 FHP Tectonics Corp. 5.0000 31,715.00 31,715.00 6327 Walsh Construction Company 12.0000 76,116.00 76,116.00 X0300057 MAN TA 6D T1FCL R-PLT 3.000 EACH 1728 FHP Tectonics Corp. 11,220.0000 33,660.00 33,660.00 6327 Walsh Construction Company 9,082.0000 27,246.00 27,246.00 X0301295 ELECT MAN REMOVAL 8.000 EACH 1728 FHP Tectonics Corp. 400.0000 3,200.00 3,200.00 6327 Walsh Construction Company 250.0000 2,000.00 2,000.00 X0301898 E MAN 3'X4'X4' W24F&L 8.000 EACH 1728 FHP Tectonics Corp. 5,500.0000 44,000.00 44,000.00 6327 Walsh Construction Company 5,500.0000 44,000.00 44,000.00 X0320001 PVC CON T 2 (S40) 219.000 FOOT 1728 FHP Tectonics Corp. 10.0000 2,190.00 2,190.00 6327 Walsh Construction Company 10.0000 2,190.00 2,190.00 X0320080 ROD & CL DUCT EX COND 610.000 FOOT 1728 FHP Tectonics Corp. 2.0000 1,220.00 1,220.00 6327 Walsh Construction Company 2.0000 1,220.00 1,220.00 X0320815 SLEEPER SLAB 206.000 FOOT 1728 FHP Tectonics Corp. 47.5700 9,799.42 9,799.42 6327 Walsh Construction Company 185.0000 38,110.00 38,110.00 X0320868 BRACED EXCAVATION SPL 216.000 CU YD 1728 FHP Tectonics Corp. 1,227.0000 265,032.00 265,032.00 6327 Walsh Construction Company 1,200.0000 259,200.00 259,200.00 X0321072 BRIDGE FENCE RAIL 694.000 FOOT 1728 FHP Tectonics Corp. 140.0000 97,160.00 97,160.00 6327 Walsh Construction Company 140.0000 97,160.00 97,160.00 X0321519 CONDUIT SUPPORT SYS 1.000 L SUM 1728 FHP Tectonics Corp. 95,000.0000 95,000.00 95,000.00 6327 Walsh Construction Company 95,000.0000 95,000.00 95,000.00 X0322122 METALLIZE STRUCT STL 1.000 L SUM 1728 FHP Tectonics Corp. 5,000.0000 5,000.00 5,000.00 6327 Walsh Construction Company 200,000.0000 200,000.00 200,000.00 X0322256 TEMP INFO SIGNING 144.000 SQ FT 1728 FHP Tectonics Corp. 14.0000 2,016.00 2,016.00 6327 Walsh Construction Company 14.0000 2,016.00 2,016.00 X0322425 C BRK 1P 70/480 EXCT 2.000 EACH 1728 FHP Tectonics Corp. 600.0000 1,200.00 1,200.00 6327 Walsh Construction Company 600.0000 1,200.00 1,200.00 X0322671 STAB CONSTR ENTRANCE 1,857.000 SQ YD 1728 FHP Tectonics Corp. 25.0000 46,425.00 46,425.00 6327 Walsh Construction Company 15.0000 27,855.00 27,855.00 X0322679 C FDN TY P BM TS CONT 2.000 EACH 1728 FHP Tectonics Corp. 2,700.0000 5,400.00 5,400.00 6327 Walsh Construction Company 2,700.0000 5,400.00 5,400.00 X0322706 ELCBL C 12 10C 512.000 FOOT 1728 FHP Tectonics Corp. 9.0000 4,608.00 4,608.00 6327 Walsh Construction Company 9.0000 4,608.00 4,608.00 X0322741 LPS34.5MH12MA3G 1.50A 1.000 EACH 1728 FHP Tectonics Corp. 5,700.0000 5,700.00 5,700.00 6327 Walsh Construction Company 5,700.0000 5,700.00 5,700.00 X0322859 WEED CONTR PRE-EM GRN 20.000 POUND 1728 FHP Tectonics Corp. 20.0000 400.00 400.00 6327 Walsh Construction Company 20.0000 400.00 400.00 X0323426 SED CONT DR ST INL CL 30.000 EACH 1728 FHP Tectonics Corp. 40.0000 1,200.00 1,200.00 6327 Walsh Construction Company 145.0000 4,350.00 4,350.00 X0323574 MAINTAIN LIGHTING SYS 18.000 CAL MO 1728 FHP Tectonics Corp. 2,000.0000 36,000.00 36,000.00 6327 Walsh Construction Company 2,000.0000 36,000.00 36,000.00 X0323710 REMOV COND ATT TO STR 760.000 FOOT 1728 FHP Tectonics Corp. 5.0000 3,800.00 3,800.00 6327 Walsh Construction Company 5.0000 3,800.00 3,800.00 X0323830 DRAINAGE SCUPPR DS-11 10.000 EACH 1728 FHP Tectonics Corp. 722.0700 7,220.70 7,220.70 6327 Walsh Construction Company 919.6500 9,196.50 9,196.50 X0323907 COMMUNICATIONS VAULT 6.000 EACH 1728 FHP Tectonics Corp. 30.0000 180.00 180.00 6327 Walsh Construction Company 4,000.0000 24,000.00 24,000.00 X0324112 BARRIER BASE 1,039.000 FOOT 1728 FHP Tectonics Corp. 30.0000 31,170.00 31,170.00 6327 Walsh Construction Company 26.0000 27,014.00 27,014.00 X0324198 REMOV ASB CEM CONDUIT 795.000 FOOT 1728 FHP Tectonics Corp. 32.0000 25,440.00 25,440.00 6327 Walsh Construction Company 6.1000 4,849.50 4,849.50 X0324210 C EN RC 4-4 CNC 2X2 160.000 FOOT 1728 FHP Tectonics Corp. 250.0000 40,000.00 40,000.00 6327 Walsh Construction Company 250.0000 40,000.00 40,000.00 X0324212 C EN RC 6-4 CNC 2X3 40.000 FOOT 1728 FHP Tectonics Corp. 310.0000 12,400.00 12,400.00 6327 Walsh Construction Company 310.0000 12,400.00 12,400.00 X0324225 CONTR TRAF 16LB P CAB 2.000 EACH 1728 FHP Tectonics Corp. 20,000.0000 40,000.00 40,000.00 6327 Walsh Construction Company 20,000.0000 40,000.00 40,000.00 X0324414 CON EN RC 1-3 CNC 48.000 FOOT 1728 FHP Tectonics Corp. 180.0000 8,640.00 8,640.00 6327 Walsh Construction Company 180.0000 8,640.00 8,640.00 X0324420 PVC CON T 4 (S40) 68.000 FOOT 1728 FHP Tectonics Corp. 25.0000 1,700.00 1,700.00 6327 Walsh Construction Company 25.0000 1,700.00 1,700.00 X0324433 LT TOWER SERV PAD 6 411.000 SQ FT 1728 FHP Tectonics Corp. 20.0000 8,220.00 8,220.00 6327 Walsh Construction Company 25.0000 10,275.00 10,275.00 X0324455 DRILL/SET SOLD P SOIL 185,131.000 CU FT 1728 FHP Tectonics Corp. 2.0000 370,262.00 370,262.00 6327 Walsh Construction Company 15.0000 2,776,965.00 2,776,965.00 X0324456 DRILL/SET SOLD P ROCK 152.000 CU FT 1728 FHP Tectonics Corp. 126.0000 19,152.00 19,152.00 6327 Walsh Construction Company 200.0000 30,400.00 30,400.00 X0324478 PVC CON T 3 (S40) 150.000 FOOT 1728 FHP Tectonics Corp. 18.0000 2,700.00 2,700.00 6327 Walsh Construction Company 18.0000 2,700.00 2,700.00 X0324486 C F 24D 1.25AR 15BC 9 54.000 FOOT 1728 FHP Tectonics Corp. 200.0000 10,800.00 10,800.00 6327 Walsh Construction Company 200.0000 10,800.00 10,800.00 X0324487 C F 30D 1.5AR 16.5BC 11.000 FOOT 1728 FHP Tectonics Corp. 230.0000 2,530.00 2,530.00 6327 Walsh Construction Company 230.0000 2,530.00 2,530.00 X0324491 CONC MED WALL 18 WIDE 435.000 FOOT 1728 FHP Tectonics Corp. 39.0700 16,995.45 16,995.45 6327 Walsh Construction Company 150.0000 65,250.00 65,250.00 X0324493 CONC MEDIAN SURF SP 527.000 SQ FT 1728 FHP Tectonics Corp. 3.8000 2,002.60 2,002.60 6327 Walsh Construction Company 6.5000 3,425.50 3,425.50 X0324571 MAINT ST LTG SYS CHGO 1.000 L SUM 1728 FHP Tectonics Corp. 35,000.0000 35,000.00 35,000.00 6327 Walsh Construction Company 35,000.0000 35,000.00 35,000.00 X0324697 SOIL STABILIZERS 528,845.000 POUND 1728 FHP Tectonics Corp. 0.5500 290,864.75 290,864.75 6327 Walsh Construction Company 0.5500 290,864.75 290,864.75 X0324698 APPLY DUST SUP AGENTS 196.000 UNIT 1728 FHP Tectonics Corp. 78.0000 15,288.00 15,288.00 6327 Walsh Construction Company 30.0000 5,880.00 5,880.00 X0324706 CF 30D 1.25AR17.25B 9 18.000 FOOT 1728 FHP Tectonics Corp. 220.0000 3,960.00 3,960.00 6327 Walsh Construction Company 220.0000 3,960.00 3,960.00 X0324864 DRAIN CONNECTIONS 212.000 FOOT 1728 FHP Tectonics Corp. 60.0000 12,720.00 12,720.00 6327 Walsh Construction Company 150.0000 31,800.00 31,800.00 X0324872 CIP T/D WSS RAMP DISB 156.000 SQ FT 1728 FHP Tectonics Corp. 100.0000 15,600.00 15,600.00 6327 Walsh Construction Company 15.0000 2,340.00 2,340.00 X0325015 ADJ FR & LID 6.000 EACH 1728 FHP Tectonics Corp. 600.0000 3,600.00 3,600.00 6327 Walsh Construction Company 396.0000 2,376.00 2,376.00 X0325016 CLEAN EX MH & HH 4.000 FOOT 1728 FHP Tectonics Corp. 350.0000 1,400.00 1,400.00 6327 Walsh Construction Company 507.0400 2,028.16 2,028.16 X0325017 COMBINED SEWER T2 8" 56.000 FOOT 1728 FHP Tectonics Corp. 150.0000 8,400.00 8,400.00 6327 Walsh Construction Company 400.0000 22,400.00 22,400.00 X0325018 C ENC RC 3-2 CNC 2X2 20.000 FOOT 1728 FHP Tectonics Corp. 220.0000 4,400.00 4,400.00 6327 Walsh Construction Company 220.0000 4,400.00 4,400.00 X0325021 INTER 7 WIRE LOCAL 1.000 EACH 1728 FHP Tectonics Corp. 1,100.0000 1,100.00 1,100.00 6327 Walsh Construction Company 1,100.0000 1,100.00 1,100.00 X0325022 INTER 7 WIRE MASTER 1.000 EACH 1728 FHP Tectonics Corp. 1,100.0000 1,100.00 1,100.00 6327 Walsh Construction Company 1,100.0000 1,100.00 1,100.00 X0325023 LPS32.5MH12MA7G11.5IO 6.000 EACH 1728 FHP Tectonics Corp. 1,000.0000 6,000.00 6,000.00 6327 Walsh Construction Company 1,000.0000 6,000.00 6,000.00 X0325024 LPS34.5MH12MA3G 15 BC 3.000 EACH 1728 FHP Tectonics Corp. 5,000.0000 15,000.00 15,000.00 6327 Walsh Construction Company 5,000.0000 15,000.00 15,000.00 X0325025 LPS34.5MH12MA3G 17.25 2.000 EACH 1728 FHP Tectonics Corp. 5,200.0000 10,400.00 10,400.00 6327 Walsh Construction Company 5,200.0000 10,400.00 10,400.00 X0325026 LPS34.5MH12MA7G 15 BC 3.000 EACH 1728 FHP Tectonics Corp. 4,400.0000 13,200.00 13,200.00 6327 Walsh Construction Company 4,400.0000 13,200.00 13,200.00 X0325027 MED & PVT REM (SPL) 560.000 SQ YD 1728 FHP Tectonics Corp. 38.0000 21,280.00 21,280.00 6327 Walsh Construction Company 30.0000 16,800.00 16,800.00 X0325028 P CITY STL 7 32.5 IO 6.000 EACH 1728 FHP Tectonics Corp. 1,000.0000 6,000.00 6,000.00 6327 Walsh Construction Company 1,000.0000 6,000.00 6,000.00 X0325029 PVC CON IN DCT 2-3" 194.000 FOOT 1728 FHP Tectonics Corp. 45.0000 8,730.00 8,730.00 6327 Walsh Construction Company 45.0000 8,730.00 8,730.00 X0325030 TR & BKFIL 2-4 DUCTS 448.000 FOOT 1728 FHP Tectonics Corp. 22.0000 9,856.00 9,856.00 6327 Walsh Construction Company 22.0000 9,856.00 9,856.00 X0325050 C ENC RC 4-4 2-2 2X3 394.000 FOOT 1728 FHP Tectonics Corp. 260.0000 102,440.00 102,440.00 6327 Walsh Construction Company 260.0000 102,440.00 102,440.00 X0325051 C ENC RC 6-4 2-3 2X4 31.000 FOOT 1728 FHP Tectonics Corp. 330.0000 10,230.00 10,230.00 6327 Walsh Construction Company 330.0000 10,230.00 10,230.00 X0325052 C ENC RC 5-4 1-2 2X3 34.000 FOOT 1728 FHP Tectonics Corp. 300.0000 10,200.00 10,200.00 6327 Walsh Construction Company 300.0000 10,200.00 10,200.00 X0325053 C ENC RC 6-4 2-2 2X4 35.000 FOOT 1728 FHP Tectonics Corp. 400.0000 14,000.00 14,000.00 6327 Walsh Construction Company 400.0000 14,000.00 14,000.00 X0325054 C ENC RC 5-4 3-2 2X4 431.000 FOOT 1728 FHP Tectonics Corp. 350.0000 150,850.00 150,850.00 6327 Walsh Construction Company 350.0000 150,850.00 150,850.00 X0329888 REM EX ST LIGHT EQUIP 1.000 L SUM 1728 FHP Tectonics Corp. 20,250.0000 20,250.00 20,250.00 6327 Walsh Construction Company 18,000.0000 18,000.00 18,000.00 X0656300 PAVEMENT REM & REPL 74.000 SQ YD 1728 FHP Tectonics Corp. 60.0000 4,440.00 4,440.00 6327 Walsh Construction Company 25.8500 1,912.90 1,912.90 X0712400 TEMP PAVEMENT 11,045.000 SQ YD 1728 FHP Tectonics Corp. 35.5000 392,097.50 392,097.50 6327 Walsh Construction Company 52.0000 574,340.00 574,340.00 X0933900 PVC CON T 3 (S80) 295.000 FOOT 1728 FHP Tectonics Corp. 25.0000 7,375.00 7,375.00 6327 Walsh Construction Company 25.0000 7,375.00 7,375.00 X0934000 PVC CON T 4 (S80) 405.000 FOOT 1728 FHP Tectonics Corp. 30.0000 12,150.00 12,150.00 6327 Walsh Construction Company 30.0000 12,150.00 12,150.00 X0934800 MA STL MONOTUBE 20 1.000 EACH 1728 FHP Tectonics Corp. 3,100.0000 3,100.00 3,100.00 6327 Walsh Construction Company 3,100.0000 3,100.00 3,100.00 X0934900 MA STL MONOTUBE 26 2.000 EACH 1728 FHP Tectonics Corp. 3,200.0000 6,400.00 6,400.00 6327 Walsh Construction Company 3,200.0000 6,400.00 6,400.00 X0935000 MA STL MONOTUBE 30 2.000 EACH 1728 FHP Tectonics Corp. 3,300.0000 6,600.00 6,600.00 6327 Walsh Construction Company 3,300.0000 6,600.00 6,600.00 X0935100 MA STL MONOTUBE 35 1.000 EACH 1728 FHP Tectonics Corp. 4,400.0000 4,400.00 4,400.00 6327 Walsh Construction Company 4,400.0000 4,400.00 4,400.00 X0966500 SN MES ELEC ILLUM MAM 3.000 EACH 1728 FHP Tectonics Corp. 3,400.0000 10,200.00 10,200.00 6327 Walsh Construction Company 3,400.0000 10,200.00 10,200.00 X0966600 SN MESS ELEC ILLUM BM 5.000 EACH 1728 FHP Tectonics Corp. 3,400.0000 17,000.00 17,000.00 6327 Walsh Construction Company 3,400.0000 17,000.00 17,000.00 X0966700 JUNC BOX POLE/POST MT 9.000 EACH 1728 FHP Tectonics Corp. 850.0000 7,650.00 7,650.00 6327 Walsh Construction Company 850.0000 7,650.00 7,650.00 X4021000 TEMP ACCESS- PRIV ENT 5.000 EACH 1728 FHP Tectonics Corp. 2,500.0000 12,500.00 12,500.00 6327 Walsh Construction Company 700.0000 3,500.00 3,500.00 X4022000 TEMP ACCESS- COM ENT 5.000 EACH 1728 FHP Tectonics Corp. 2,500.0000 12,500.00 12,500.00 6327 Walsh Construction Company 2,000.0000 10,000.00 10,000.00 X4023000 TEMP ACCESS- ROAD 5.000 EACH 1728 FHP Tectonics Corp. 4,500.0000 22,500.00 22,500.00 6327 Walsh Construction Company 2,600.0000 13,000.00 13,000.00 X4066426 BC SC SUPER "D" N70 1,721.000 TON 1728 FHP Tectonics Corp. 60.0000 103,260.00 103,260.00 6327 Walsh Construction Company 60.0000 103,260.00 103,260.00 X4066770 LEV BIND MM SUPER N70 710.000 TON 1728 FHP Tectonics Corp. 65.0000 46,150.00 46,150.00 6327 Walsh Construction Company 65.0000 46,150.00 46,150.00 X4067100 P LB MM SU IL4.75 N50 533.000 TON 1728 FHP Tectonics Corp. 90.0000 47,970.00 47,970.00 6327 Walsh Construction Company 90.0000 47,970.00 47,970.00 X6022120 MAN DT 7 DIA T1F CL 1.000 EACH 1728 FHP Tectonics Corp. 11,000.0000 11,000.00 11,000.00 6327 Walsh Construction Company 8,381.0000 8,381.00 8,381.00 X6022130 MAN DT 8 DIA T1F CL 1.000 EACH 1728 FHP Tectonics Corp. 11,220.0000 11,220.00 11,220.00 6327 Walsh Construction Company 11,254.0000 11,254.00 11,254.00 X6060015 COMB CC&G TM4.24 VWGF 207.000 FOOT 1728 FHP Tectonics Corp. 17.1300 3,545.91 3,545.91 6327 Walsh Construction Company 14.5000 3,001.50 3,001.50 X6061001 COMB CC&G TM4.48 6,448.500 FOOT 1728 FHP Tectonics Corp. 18.4400 118,910.34 118,910.34 6327 Walsh Construction Company 25.0000 161,212.50 161,212.50 X6063401 COMB CC&G TM4.12 5,145.500 FOOT 1728 FHP Tectonics Corp. 11.6100 59,739.26 59,739.26 6327 Walsh Construction Company 11.7500 60,459.63 60,459.63 X6063600 COMB CC&G TM4.24 5,086.000 FOOT 1728 FHP Tectonics Corp. 13.9400 70,898.84 70,898.84 6327 Walsh Construction Company 13.5000 68,661.00 68,661.00 X6065740 CONC MED SURF 5 MOD 14,493.000 SQ FT 1728 FHP Tectonics Corp. 3.3500 48,551.55 48,551.55 6327 Walsh Construction Company 5.2500 76,088.25 76,088.25 X6370920 CONC BAR 1F 42HT 478.000 FOOT 1728 FHP Tectonics Corp. 182.2500 87,115.50 87,115.50 6327 Walsh Construction Company 79.0200 37,771.56 37,771.56 X6370930 CONC BAR 2F 32HT 420.000 FOOT 1728 FHP Tectonics Corp. 176.6800 74,205.60 74,205.60 6327 Walsh Construction Company 83.9600 35,263.20 35,263.20 X6640210 TEMP CH LK FENCE PORT 14,693.000 FOOT 1728 FHP Tectonics Corp. 8.5000 124,890.50 124,890.50 6327 Walsh Construction Company 8.5000 124,890.50 124,890.50 X6643300 CH LK FENCE REMOV CTA 270.000 FOOT 1728 FHP Tectonics Corp. 9.0000 2,430.00 2,430.00 6327 Walsh Construction Company 9.0000 2,430.00 2,430.00 X6643310 CH LK FN REM/RE-E CTA 100.000 FOOT 1728 FHP Tectonics Corp. 51.7500 5,175.00 5,175.00 6327 Walsh Construction Company 51.7500 5,175.00 5,175.00 X6700410 ENGR FLD OFF A SPL 15.000 CAL MO 1728 FHP Tectonics Corp. 2,500.0000 37,500.00 37,500.00 6327 Walsh Construction Company 3,200.0000 48,000.00 48,000.00 X7011015 TR C-PROT EXPRESSWAYS 1.000 L SUM 1728 FHP Tectonics Corp. 65,000.0000 65,000.00 65,000.00 6327 Walsh Construction Company 85,000.0000 85,000.00 85,000.00 X7013820 TR CONT SURVEIL EXPWY 330.000 CAL DA 1728 FHP Tectonics Corp. 350.0000 115,500.00 115,500.00 6327 Walsh Construction Company 150.0000 49,500.00 49,500.00 X7015000 CHANGEABLE MESSAGE SN 144.000 CAL MO 1728 FHP Tectonics Corp. 1,200.0000 172,800.00 172,800.00 6327 Walsh Construction Company 1,200.0000 172,800.00 172,800.00 X7040600 FUR TEMP CONC BARRIER 510.000 FOOT 1728 FHP Tectonics Corp. 52.0000 26,520.00 26,520.00 6327 Walsh Construction Company 12.0000 6,120.00 6,120.00 X8100060 CON T 4 GALVS PVC CTD 48.000 FOOT 1728 FHP Tectonics Corp. 125.0000 6,000.00 6,000.00 6327 Walsh Construction Company 125.0000 6,000.00 6,000.00 X8110125 CON ATS 4 GALVS PVC 1,100.000 FOOT 1728 FHP Tectonics Corp. 49.0000 53,900.00 53,900.00 6327 Walsh Construction Company 49.0000 53,900.00 53,900.00 X8150200 TR & BKFIL W SCRN 882.000 FOOT 1728 FHP Tectonics Corp. 16.0000 14,112.00 14,112.00 6327 Walsh Construction Company 16.0000 14,112.00 14,112.00 X8170400 EC C EPR HYP 1C 6 2,240.000 FOOT 1728 FHP Tectonics Corp. 3.0000 6,720.00 6,720.00 6327 Walsh Construction Company 3.0000 6,720.00 6,720.00 X8170405 EC C EPR HYP 1C 8 1,120.000 FOOT 1728 FHP Tectonics Corp. 2.0000 2,240.00 2,240.00 6327 Walsh Construction Company 2.0000 2,240.00 2,240.00 X8210451 LUM SL HPS 400W 240V 9.000 EACH 1728 FHP Tectonics Corp. 650.0000 5,850.00 5,850.00 6327 Walsh Construction Company 650.0000 5,850.00 5,850.00 X8210453 LUM SL HPS400W240V IO 6.000 EACH 1728 FHP Tectonics Corp. 300.0000 1,800.00 1,800.00 6327 Walsh Construction Company 300.0000 1,800.00 1,800.00 X8420090 REM EXIST SIGN LUM 10.000 EACH 1728 FHP Tectonics Corp. 500.0000 5,000.00 5,000.00 6327 Walsh Construction Company 500.0000 5,000.00 5,000.00 X8801300 SH P LED 1F 3S BM 4.000 EACH 1728 FHP Tectonics Corp. 1,300.0000 5,200.00 5,200.00 6327 Walsh Construction Company 1,300.0000 5,200.00 5,200.00 X8801310 SH P LED 1F 3S MAM 11.000 EACH 1728 FHP Tectonics Corp. 1,400.0000 15,400.00 15,400.00 6327 Walsh Construction Company 1,400.0000 15,400.00 15,400.00 X8801395 SH P LED 1F 5S BM 2.000 EACH 1728 FHP Tectonics Corp. 2,100.0000 4,200.00 4,200.00 6327 Walsh Construction Company 2,100.0000 4,200.00 4,200.00 X8801400 SH P LED 1F 5S MAM 2.000 EACH 1728 FHP Tectonics Corp. 2,200.0000 4,400.00 4,400.00 6327 Walsh Construction Company 2,200.0000 4,400.00 4,400.00 X8810610 PED SH LED 1F BM 6.000 EACH 1728 FHP Tectonics Corp. 1,200.0000 7,200.00 7,200.00 6327 Walsh Construction Company 1,200.0000 7,200.00 7,200.00 X8810620 PED SH LED 2F BM 3.000 EACH 1728 FHP Tectonics Corp. 2,400.0000 7,200.00 7,200.00 6327 Walsh Construction Company 2,400.0000 7,200.00 7,200.00 Z0002600 BAR SPLICERS 164.000 EACH 1728 FHP Tectonics Corp. 30.0000 4,920.00 4,920.00 6327 Walsh Construction Company 18.5000 3,034.00 3,034.00 Z0008236 DRIL SHAFT/SOIL 36 430.000 FOOT 1728 FHP Tectonics Corp. 600.0000 258,000.00 258,000.00 6327 Walsh Construction Company 350.0000 150,500.00 150,500.00 Z0008342 DRIL SHAFT/ROCK 42 10.000 FOOT 1728 FHP Tectonics Corp. 1,000.0000 10,000.00 10,000.00 6327 Walsh Construction Company 1,200.0000 12,000.00 12,000.00 Z0013798 CONSTRUCTION LAYOUT 1.000 L SUM 1728 FHP Tectonics Corp. 100,000.0000 100,000.00 100,000.00 6327 Walsh Construction Company 350,000.0000 350,000.00 350,000.00 Z0018800 DRAINAGE SYSTEM 1.000 L SUM 1728 FHP Tectonics Corp. 58,725.0000 58,725.00 58,725.00 6327 Walsh Construction Company 31,244.7200 31,244.72 31,244.72 Z0018940 DRILL EX MAN/HANDHOLE 13.000 EACH 1728 FHP Tectonics Corp. 450.0000 5,850.00 5,850.00 6327 Walsh Construction Company 450.0000 5,850.00 5,850.00 Z0030020 IMP ATTEN FRD NAR TL2 2.000 EACH 1728 FHP Tectonics Corp. 13,500.0000 27,000.00 27,000.00 6327 Walsh Construction Company 12,104.4500 24,208.90 24,208.90 Z0030070 IMP ATTEN SU NAR TL3 2.000 EACH 1728 FHP Tectonics Corp. 40,500.0000 81,000.00 81,000.00 6327 Walsh Construction Company 39,104.4500 78,208.90 78,208.90 Z0030240 IMP ATTN TEMP NRD TL2 4.000 EACH 1728 FHP Tectonics Corp. 3,600.0000 14,400.00 14,400.00 6327 Walsh Construction Company 5,704.4300 22,817.72 22,817.72 Z0030250 IMP ATTN TEMP NRD TL3 14.000 EACH 1728 FHP Tectonics Corp. 3,600.0000 50,400.00 50,400.00 6327 Walsh Construction Company 5,709.4700 79,932.58 79,932.58 Z0030340 IMP ATTN REL NRD TL2 4.000 EACH 1728 FHP Tectonics Corp. 600.0000 2,400.00 2,400.00 6327 Walsh Construction Company 2,704.4300 10,817.72 10,817.72 Z0030350 IMP ATTN REL NRD TL3 5.000 EACH 1728 FHP Tectonics Corp. 600.0000 3,000.00 3,000.00 6327 Walsh Construction Company 2,704.6800 13,523.40 13,523.40 Z0047300 PROTECTIVE SHIELD 4,727.000 SQ YD 1728 FHP Tectonics Corp. 40.0000 189,080.00 189,080.00 6327 Walsh Construction Company 0.0100 47.27 47.27 Z0048665 RR PROT LIABILITY INS 1.000 L SUM 1728 FHP Tectonics Corp. 120,000.0000 120,000.00 120,000.00 6327 Walsh Construction Company 28,150.0000 28,150.00 28,150.00 Z0056220 SAND MOD IMP ATT REM 1.000 EACH 1728 FHP Tectonics Corp. 1,500.0000 1,500.00 1,500.00 6327 Walsh Construction Company 100.0000 100.00 100.00 Z0068400 STEEL CASINGS 42 159.000 FOOT 1728 FHP Tectonics Corp. 500.0000 79,500.00 79,500.00 6327 Walsh Construction Company 600.0000 95,400.00 95,400.00 Z0075300 TIE BARS 91.000 EACH 1728 FHP Tectonics Corp. 5.0000 455.00 455.00 6327 Walsh Construction Company 7.0000 637.00 637.00 Z0076600 TRAINEES 3,000.000 HOUR 1728 FHP Tectonics Corp. 0.8000 2,400.00 2,400.00 6327 Walsh Construction Company 0.8000 2,400.00 2,400.00 Z0076705 OJT (LABORER TR) 2,000.000 HOUR 1728 FHP Tectonics Corp. 14.9700 29,940.00 29,940.00 6327 Walsh Construction Company 14.9700 29,940.00 29,940.00 Z0076710 OJT (CARPENTER TR) 1,000.000 HOUR 1728 FHP Tectonics Corp. 15.9300 15,930.00 15,930.00 6327 Walsh Construction Company 15.9300 15,930.00 15,930.00 Z0076715 OJT (CEMENT MASON TR) 1,000.000 HOUR 1728 FHP Tectonics Corp. 19.9900 19,990.00 19,990.00 6327 Walsh Construction Company 19.9900 19,990.00 19,990.00 20100110 TREE REMOV 6-15 3,369.000 UNIT 1728 FHP Tectonics Corp. 10.0000 33,690.00 33,690.00 6327 Walsh Construction Company 10.0000 33,690.00 33,690.00 20100210 TREE REMOV OVER 15 915.000 UNIT 1728 FHP Tectonics Corp. 12.0000 10,980.00 10,980.00 6327 Walsh Construction Company 12.0000 10,980.00 10,980.00 20101000 TEMPORARY FENCE 11,361.000 FOOT 1728 FHP Tectonics Corp. 5.7000 64,757.70 64,757.70 6327 Walsh Construction Company 4.5000 51,124.50 51,124.50 20200100 EARTH EXCAVATION 83,380.000 CU YD 1728 FHP Tectonics Corp. 20.0000 1,667,600.00 1,667,600.00 6327 Walsh Construction Company 25.0000 2,084,500.00 2,084,500.00 20201200 REM & DISP UNS MATL 12,238.000 CU YD 1728 FHP Tectonics Corp. 26.0000 318,188.00 318,188.00 6327 Walsh Construction Company 25.0000 305,950.00 305,950.00 20700220 POROUS GRAN EMBANK 3,479.000 CU YD 1728 FHP Tectonics Corp. 22.0000 76,538.00 76,538.00 6327 Walsh Construction Company 45.0000 156,555.00 156,555.00 20700420 POROUS GRAN EMB SUBGR 809.000 CU YD 1728 FHP Tectonics Corp. 54.0000 43,686.00 43,686.00 6327 Walsh Construction Company 35.0000 28,315.00 28,315.00 20800150 TRENCH BACKFILL 15,209.000 CU YD 1728 FHP Tectonics Corp. 5.0000 76,045.00 76,045.00 6327 Walsh Construction Company 27.1400 412,772.26 412,772.26 21001000 GEOTECH FAB F/GR STAB 25,432.000 SQ YD 1728 FHP Tectonics Corp. 1.3500 34,333.20 34,333.20 6327 Walsh Construction Company 1.5500 39,419.60 39,419.60 21101615 TOPSOIL F & P 4 69,172.000 SQ YD 1728 FHP Tectonics Corp. 2.5000 172,930.00 172,930.00 6327 Walsh Construction Company 2.5000 172,930.00 172,930.00 21101645 TOPSOIL F & P 12 16,364.000 SQ YD 1728 FHP Tectonics Corp. 7.5000 122,730.00 122,730.00 6327 Walsh Construction Company 7.5000 122,730.00 122,730.00 21101825 COMPOST F & P 6 16,364.000 SQ YD 1728 FHP Tectonics Corp. 5.0000 81,820.00 81,820.00 6327 Walsh Construction Company 5.0000 81,820.00 81,820.00 25000210 SEEDING CL 2A 17.250 ACRE 1728 FHP Tectonics Corp. 1,650.0000 28,462.50 28,462.50 6327 Walsh Construction Company 1,650.0000 28,462.50 28,462.50 25000400 NITROGEN FERT NUTR 1,541.000 POUND 1728 FHP Tectonics Corp. 0.6000 924.60 924.60 6327 Walsh Construction Company 0.6000 924.60 924.60 25000500 PHOSPHORUS FERT NUTR 1,541.000 POUND 1728 FHP Tectonics Corp. 0.6000 924.60 924.60 6327 Walsh Construction Company 0.6000 924.60 924.60 25000600 POTASSIUM FERT NUTR 1,541.000 POUND 1728 FHP Tectonics Corp. 0.6000 924.60 924.60 6327 Walsh Construction Company 0.6000 924.60 924.60 25000750 MOWING 27.250 ACRE 1728 FHP Tectonics Corp. 100.0000 2,725.00 2,725.00 6327 Walsh Construction Company 100.0000 2,725.00 2,725.00 25100630 EROSION CONTR BLANKET 82,729.000 SQ YD 1728 FHP Tectonics Corp. 1.0000 82,729.00 82,729.00 6327 Walsh Construction Company 1.0000 82,729.00 82,729.00 28000200 EARTH EXC - EROS CONT 870.000 CU YD 1728 FHP Tectonics Corp. 20.0000 17,400.00 17,400.00 6327 Walsh Construction Company 25.0000 21,750.00 21,750.00 28000250 TEMP EROS CONTR SEED 3,380.000 POUND 1728 FHP Tectonics Corp. 3.0000 10,140.00 10,140.00 6327 Walsh Construction Company 3.0000 10,140.00 10,140.00 28000300 TEMP DITCH CHECKS 37.000 EACH 1728 FHP Tectonics Corp. 500.0000 18,500.00 18,500.00 6327 Walsh Construction Company 120.0000 4,440.00 4,440.00 28000400 PERIMETER EROS BAR 19,148.000 FOOT 1728 FHP Tectonics Corp. 2.7500 52,657.00 52,657.00 6327 Walsh Construction Company 3.0000 57,444.00 57,444.00 28000510 INLET FILTERS 159.000 EACH 1728 FHP Tectonics Corp. 200.0000 31,800.00 31,800.00 6327 Walsh Construction Company 140.0000 22,260.00 22,260.00 28001000 AGGREGATE - EROS CONT 12.000 TON 1728 FHP Tectonics Corp. 28.0000 336.00 336.00 6327 Walsh Construction Company 50.0000 600.00 600.00 31101400 SUB GRAN MAT B 6 12,210.000 SQ YD 1728 FHP Tectonics Corp. 6.5000 79,365.00 79,365.00 6327 Walsh Construction Company 12.0000 146,520.00 146,520.00 31101810 SUB GRAN MAT B 12 2,319.000 SQ YD 1728 FHP Tectonics Corp. 10.3000 23,885.70 23,885.70 6327 Walsh Construction Company 18.0000 41,742.00 41,742.00 31101860 SUB GRAN MAT B 24 23,113.000 SQ YD 1728 FHP Tectonics Corp. 16.7500 387,142.75 387,142.75 6327 Walsh Construction Company 26.0000 600,938.00 600,938.00 31200100 STAB SUB-BASE 4 21,434.000 SQ YD 1728 FHP Tectonics Corp. 10.5000 225,057.00 225,057.00 6327 Walsh Construction Company 10.5000 225,057.00 225,057.00 35300400 PCC BSE CSE 9 4,681.000 SQ YD 1728 FHP Tectonics Corp. 33.2000 155,409.20 155,409.20 6327 Walsh Construction Company 40.2500 188,410.25 188,410.25 35300510 PCC BSE CSE 10 1/2 5,913.000 SQ YD 1728 FHP Tectonics Corp. 37.4000 221,146.20 221,146.20 6327 Walsh Construction Company 43.5000 257,215.50 257,215.50 40600200 BIT MATLS PR CT 30.500 TON 1728 FHP Tectonics Corp. 250.0000 7,625.00 7,625.00 6327 Walsh Construction Company 250.0000 7,625.00 7,625.00 40600300 AGG PR CT 65.000 TON 1728 FHP Tectonics Corp. 20.0000 1,300.00 1,300.00 6327 Walsh Construction Company 20.0000 1,300.00 1,300.00 40600895 CONSTRUC TEST STRIP 2.000 EACH 1728 FHP Tectonics Corp. 350.0000 700.00 700.00 6327 Walsh Construction Company 350.0000 700.00 700.00 40600980 BIT SURF REM BUTT JT 145.000 SQ YD 1728 FHP Tectonics Corp. 25.0000 3,625.00 3,625.00 6327 Walsh Construction Company 25.0000 3,625.00 3,625.00 40601000 BIT REPL OVER PATCH 29.000 TON 1728 FHP Tectonics Corp. 280.0000 8,120.00 8,120.00 6327 Walsh Construction Company 280.0000 8,120.00 8,120.00 42000501 PCC PVT 10 JOINTED 2,576.000 SQ YD 1728 FHP Tectonics Corp. 42.0000 108,192.00 108,192.00 6327 Walsh Construction Company 36.5500 94,152.80 94,152.80 42000521 PCC PVT 11 JOINTED 15,900.000 SQ YD 1728 FHP Tectonics Corp. 45.0000 715,500.00 715,500.00 6327 Walsh Construction Company 40.7500 647,925.00 647,925.00 42001300 PROTECTIVE COAT 33,363.000 SQ YD 1728 FHP Tectonics Corp. 1.0000 33,363.00 33,363.00 6327 Walsh Construction Company 1.5000 50,044.50 50,044.50 42001400 BR APPROACH PAVT SPL 540.000 SQ YD 1728 FHP Tectonics Corp. 200.0000 108,000.00 108,000.00 6327 Walsh Construction Company 210.0000 113,400.00 113,400.00 42001420 BR APPR PVT CON (PCC) 88.000 SQ YD 1728 FHP Tectonics Corp. 85.0000 7,480.00 7,480.00 6327 Walsh Construction Company 175.0000 15,400.00 15,400.00 42400200 PC CONC SIDEWALK 5 3,415.000 SQ FT 1728 FHP Tectonics Corp. 3.0000 10,245.00 10,245.00 6327 Walsh Construction Company 3.2500 11,098.75 11,098.75 42400410 PC CONC SIDEWALK 8 649.000 SQ FT 1728 FHP Tectonics Corp. 4.0000 2,596.00 2,596.00 6327 Walsh Construction Company 35.0000 22,715.00 22,715.00 44000006 BIT SURF REM 1 1/2 6,023.000 SQ YD 1728 FHP Tectonics Corp. 6.6000 39,751.80 39,751.80 6327 Walsh Construction Company 6.6000 39,751.80 39,751.80 44000007 BIT SURF REM 2 3,516.000 SQ YD 1728 FHP Tectonics Corp. 8.5000 29,886.00 29,886.00 6327 Walsh Construction Company 8.5000 29,886.00 29,886.00 44000100 PAVEMENT REM 24,568.000 SQ YD 1728 FHP Tectonics Corp. 21.3000 523,298.40 523,298.40 6327 Walsh Construction Company 18.0000 442,224.00 442,224.00 44000112 BIT RM OV PATCH 3 326.000 SQ YD 1728 FHP Tectonics Corp. 24.0000 7,824.00 7,824.00 6327 Walsh Construction Company 50.0000 16,300.00 16,300.00 44000500 COMB CURB GUTTER REM 23,935.000 FOOT 1728 FHP Tectonics Corp. 2.5000 59,837.50 59,837.50 6327 Walsh Construction Company 2.5000 59,837.50 59,837.50 44000600 SIDEWALK REM 8,580.000 SQ FT 1728 FHP Tectonics Corp. 1.0500 9,009.00 9,009.00 6327 Walsh Construction Company 3.5000 30,030.00 30,030.00 44000700 APPROACH SLAB REM 450.000 SQ YD 1728 FHP Tectonics Corp. 8.0000 3,600.00 3,600.00 6327 Walsh Construction Company 30.0000 13,500.00 13,500.00 44001980 CONC BARRIER REMOV 938.000 FOOT 1728 FHP Tectonics Corp. 34.0000 31,892.00 31,892.00 6327 Walsh Construction Company 35.0000 32,830.00 32,830.00 44003100 MEDIAN REMOVAL 241.000 SQ FT 1728 FHP Tectonics Corp. 2.3000 554.30 554.30 6327 Walsh Construction Company 10.0000 2,410.00 2,410.00 44004250 PAVED SHLD REMOVAL 7,276.000 SQ YD 1728 FHP Tectonics Corp. 12.3000 89,494.80 89,494.80 6327 Walsh Construction Company 6.0000 43,656.00 43,656.00 44004260 PAVED SHLD REMOVAL SP 250.000 SQ YD 1728 FHP Tectonics Corp. 30.0000 7,500.00 7,500.00 6327 Walsh Construction Company 40.0000 10,000.00 10,000.00 44004400 PAVT REMOVAL SPL 542.000 SQ YD 1728 FHP Tectonics Corp. 38.0000 20,596.00 20,596.00 6327 Walsh Construction Company 45.0000 24,390.00 24,390.00 44201351 CL C PATCH T1 10 1/2 150.000 SQ YD 1728 FHP Tectonics Corp. 63.0000 9,450.00 9,450.00 6327 Walsh Construction Company 125.0000 18,750.00 18,750.00 44201355 CL C PATCH T2 10 1/2 290.000 SQ YD 1728 FHP Tectonics Corp. 59.5000 17,255.00 17,255.00 6327 Walsh Construction Company 53.0000 15,370.00 15,370.00 44201360 CL C PATCH T4 10 1/2 412.000 SQ YD 1728 FHP Tectonics Corp. 59.5000 24,514.00 24,514.00 6327 Walsh Construction Company 25.0000 10,300.00 10,300.00 48202400 BIT SHLD SUPER 6 560.000 SQ YD 1728 FHP Tectonics Corp. 38.0000 21,280.00 21,280.00 6327 Walsh Construction Company 38.0000 21,280.00 21,280.00 48300600 PCC SHOULDERS 11 752.100 SQ YD 1728 FHP Tectonics Corp. 50.5800 38,041.22 38,041.22 6327 Walsh Construction Company 41.3000 31,061.73 31,061.73 48300700 PCC SHOULDERS 12 126.200 SQ YD 1728 FHP Tectonics Corp. 52.7000 6,650.74 6,650.74 6327 Walsh Construction Company 49.0000 6,183.80 6,183.80 50100300 REM EXIST STRUCT N1 1.000 EACH 1728 FHP Tectonics Corp. 100,000.0000 100,000.00 100,000.00 6327 Walsh Construction Company 295,000.0000 295,000.00 295,000.00 50100400 REM EXIST STRUCT N2 1.000 EACH 1728 FHP Tectonics Corp. 50,000.0000 50,000.00 50,000.00 6327 Walsh Construction Company 78,000.0000 78,000.00 78,000.00 50100500 REM EXIST STRUCT N3 1.000 EACH 1728 FHP Tectonics Corp. 2,500,000.0000 2,500,000.00 2,500,000.00 6327 Walsh Construction Company 661,000.0000 661,000.00 661,000.00 50102400 CONC REM 1.000 CU YD 1728 FHP Tectonics Corp. 1,950.0000 1,950.00 1,950.00 6327 Walsh Construction Company 1,000.0000 1,000.00 1,000.00 50104650 SLOPE WALL REMOV 43.000 SQ YD 1728 FHP Tectonics Corp. 100.0000 4,300.00 4,300.00 6327 Walsh Construction Company 35.0000 1,505.00 1,505.00 50200100 STRUCTURE EXCAVATION 13,811.000 CU YD 1728 FHP Tectonics Corp. 40.0000 552,440.00 552,440.00 6327 Walsh Construction Company 20.0000 276,220.00 276,220.00 50200410 ROCK EXC STRUCT SPL 27.000 CU YD 1728 FHP Tectonics Corp. 350.0000 9,450.00 9,450.00 6327 Walsh Construction Company 2,000.0000 54,000.00 54,000.00 50300225 CONC STRUCT 5,452.000 CU YD 1728 FHP Tectonics Corp. 900.0000 4,906,800.00 4,906,800.00 6327 Walsh Construction Company 700.0000 3,816,400.00 3,816,400.00 50300255 CONC SUP-STR 784.000 CU YD 1728 FHP Tectonics Corp. 1,050.0000 823,200.00 823,200.00 6327 Walsh Construction Company 700.0000 548,800.00 548,800.00 50300260 BR DECK GROOVING 1,943.000 SQ YD 1728 FHP Tectonics Corp. 2.5100 4,876.93 4,876.93 6327 Walsh Construction Company 2.5500 4,954.65 4,954.65 50300300 PROTECTIVE COAT 13,196.000 SQ YD 1728 FHP Tectonics Corp. 1.0000 13,196.00 13,196.00 6327 Walsh Construction Company 1.5000 19,794.00 19,794.00 50300310 ELAST BEARING ASSY T1 24.000 EACH 1728 FHP Tectonics Corp. 445.0000 10,680.00 10,680.00 6327 Walsh Construction Company 1,200.0000 28,800.00 28,800.00 50300510 RUSTICATION FINISH 34,916.000 SQ FT 1728 FHP Tectonics Corp. 2.1900 76,466.04 76,466.04 6327 Walsh Construction Company 3.0000 104,748.00 104,748.00 50500105 F & E STRUCT STEEL 1.000 L SUM 1728 FHP Tectonics Corp. 1,472,000.0000 1,472,000.00 1,472,000.00 6327 Walsh Construction Company 1,376,000.0000 1,376,000.00 1,376,000.00 50500405 F & E STRUCT STEEL 2,770.000 POUND 1728 FHP Tectonics Corp. 0.4300 1,191.10 1,191.10 6327 Walsh Construction Company 3.0000 8,310.00 8,310.00 50500505 STUD SHEAR CONNECTORS 15,144.000 EACH 1728 FHP Tectonics Corp. 5.0000 75,720.00 75,720.00 6327 Walsh Construction Company 7.0000 106,008.00 106,008.00 50700209 UNTREATED TIMBER LAG 40,859.000 SQ FT 1728 FHP Tectonics Corp. 4.0000 163,436.00 163,436.00 6327 Walsh Construction Company 10.0000 408,590.00 408,590.00 50700211 FUR SOLDIER PILES HP 3,698.000 FOOT 1728 FHP Tectonics Corp. 160.0000 591,680.00 591,680.00 6327 Walsh Construction Company 55.0000 203,390.00 203,390.00 50700213 FUR SOLDIER PILES BU 79.000 FOOT 1728 FHP Tectonics Corp. 500.0000 39,500.00 39,500.00 6327 Walsh Construction Company 330.0000 26,070.00 26,070.00 50700215 FUR SOLDIER PILES WS 31,247.000 FOOT 1728 FHP Tectonics Corp. 177.0000 5,530,719.00 5,530,719.00 6327 Walsh Construction Company 72.0000 2,249,784.00 2,249,784.00 50800205 REINF BARS, EPOXY CTD 852,040.000 POUND 1728 FHP Tectonics Corp. 0.9600 817,958.40 817,958.40 6327 Walsh Construction Company 1.1000 937,244.00 937,244.00 50900905 REM & RE EX RAILING 11.000 FOOT 1728 FHP Tectonics Corp. 225.0000 2,475.00 2,475.00 6327 Walsh Construction Company 225.0000 2,475.00 2,475.00 51100100 SLOPE WALL 4 11.000 SQ YD 1728 FHP Tectonics Corp. 100.3600 1,103.96 1,103.96 6327 Walsh Construction Company 250.0000 2,750.00 2,750.00 51205200 TEMP SHT PILING 5,040.000 SQ FT 1728 FHP Tectonics Corp. 30.0000 151,200.00 151,200.00 6327 Walsh Construction Company 35.0000 176,400.00 176,400.00 51500100 NAME PLATES 1.000 EACH 1728 FHP Tectonics Corp. 348.3100 348.31 348.31 6327 Walsh Construction Company 235.0000 235.00 235.00 5421D012 P CUL CL D 1 12 TEMP 85.000 FOOT 1728 FHP Tectonics Corp. 100.0000 8,500.00 8,500.00 6327 Walsh Construction Company 44.2600 3,762.10 3,762.10 550A0340 STORM SEW CL A 2 12 5,368.000 FOOT 1728 FHP Tectonics Corp. 41.0000 220,088.00 220,088.00 6327 Walsh Construction Company 79.2000 425,145.60 425,145.60 550A0360 STORM SEW CL A 2 15 270.000 FOOT 1728 FHP Tectonics Corp. 62.0000 16,740.00 16,740.00 6327 Walsh Construction Company 90.5000 24,435.00 24,435.00 550A0380 STORM SEW CL A 2 18 1,405.000 FOOT 1728 FHP Tectonics Corp. 72.0000 101,160.00 101,160.00 6327 Walsh Construction Company 101.8000 143,029.00 143,029.00 550A0400 STORM SEW CL A 2 21 34.000 FOOT 1728 FHP Tectonics Corp. 75.0000 2,550.00 2,550.00 6327 Walsh Construction Company 125.5500 4,268.70 4,268.70 550A0410 STORM SEW CL A 2 24 1,184.000 FOOT 1728 FHP Tectonics Corp. 80.0000 94,720.00 94,720.00 6327 Walsh Construction Company 84.8500 100,462.40 100,462.40 550A0420 STORM SEW CL A 2 27 1,370.000 FOOT 1728 FHP Tectonics Corp. 85.0000 116,450.00 116,450.00 6327 Walsh Construction Company 91.6000 125,492.00 125,492.00 550A0430 STORM SEW CL A 2 30 310.000 FOOT 1728 FHP Tectonics Corp. 95.0000 29,450.00 29,450.00 6327 Walsh Construction Company 99.5000 30,845.00 30,845.00 550A0450 STORM SEW CL A 2 36 1,466.000 FOOT 1728 FHP Tectonics Corp. 116.0000 170,056.00 170,056.00 6327 Walsh Construction Company 109.7000 160,820.20 160,820.20 550A0470 STORM SEW CL A 2 42 126.000 FOOT 1728 FHP Tectonics Corp. 167.0000 21,042.00 21,042.00 6327 Walsh Construction Company 125.5500 15,819.30 15,819.30 550A0640 STORM SEW CL A 3 12 437.000 FOOT 1728 FHP Tectonics Corp. 74.0000 32,338.00 32,338.00 6327 Walsh Construction Company 78.0000 34,086.00 34,086.00 550A0660 STORM SEW CL A 3 15 8.000 FOOT 1728 FHP Tectonics Corp. 80.0000 640.00 640.00 6327 Walsh Construction Company 148.1500 1,185.20 1,185.20 550A0680 STORM SEW CL A 3 18 1,041.000 FOOT 1728 FHP Tectonics Corp. 76.0000 79,116.00 79,116.00 6327 Walsh Construction Company 101.8000 105,973.80 105,973.80 550A0700 STORM SEW CL A 3 21 432.000 FOOT 1728 FHP Tectonics Corp. 86.0000 37,152.00 37,152.00 6327 Walsh Construction Company 125.5500 54,237.60 54,237.60 550A0710 STORM SEW CL A 3 24 719.000 FOOT 1728 FHP Tectonics Corp. 110.0000 79,090.00 79,090.00 6327 Walsh Construction Company 85.9500 61,798.05 61,798.05 550A0720 STORM SEW CL A 3 27 516.000 FOOT 1728 FHP Tectonics Corp. 125.0000 64,500.00 64,500.00 6327 Walsh Construction Company 92.7500 47,859.00 47,859.00 550A0730 STORM SEW CL A 3 30 443.000 FOOT 1728 FHP Tectonics Corp. 140.0000 62,020.00 62,020.00 6327 Walsh Construction Company 97.2500 43,081.75 43,081.75 550A0750 STORM SEW CL A 3 36 589.000 FOOT 1728 FHP Tectonics Corp. 160.0000 94,240.00 94,240.00 6327 Walsh Construction Company 109.7000 64,613.30 64,613.30 550A0770 STORM SEW CL A 3 42 95.000 FOOT 1728 FHP Tectonics Corp. 210.0000 19,950.00 19,950.00 6327 Walsh Construction Company 125.5500 11,927.25 11,927.25 550A0960 STORM SEW CL A 4 15 191.000 FOOT 1728 FHP Tectonics Corp. 68.0000 12,988.00 12,988.00 6327 Walsh Construction Company 148.1500 28,296.65 28,296.65 550A0980 STORM SEW CL A 4 18 457.000 FOOT 1728 FHP Tectonics Corp. 145.0000 66,265.00 66,265.00 6327 Walsh Construction Company 170.7500 78,032.75 78,032.75 550A1010 STORM SEW CL A 4 24 396.000 FOOT 1728 FHP Tectonics Corp. 166.0000 65,736.00 65,736.00 6327 Walsh Construction Company 147.0000 58,212.00 58,212.00 550A1020 STORM SEW CL A 4 27 38.000 FOOT 1728 FHP Tectonics Corp. 280.0000 10,640.00 10,640.00 6327 Walsh Construction Company 158.3500 6,017.30 6,017.30 550A1030 STORM SEW CL A 4 30 217.000 FOOT 1728 FHP Tectonics Corp. 180.0000 39,060.00 39,060.00 6327 Walsh Construction Company 169.6500 36,814.05 36,814.05 55100300 STORM SEWER REM 8 7.000 FOOT 1728 FHP Tectonics Corp. 30.0000 210.00 210.00 6327 Walsh Construction Company 9.0000 63.00 63.00 55100400 STORM SEWER REM 10 321.000 FOOT 1728 FHP Tectonics Corp. 20.0000 6,420.00 6,420.00 6327 Walsh Construction Company 9.0000 2,889.00 2,889.00 55100500 STORM SEWER REM 12 516.000 FOOT 1728 FHP Tectonics Corp. 20.0000 10,320.00 10,320.00 6327 Walsh Construction Company 9.0000 4,644.00 4,644.00 55101600 STORM SEWER REM 36 27.000 FOOT 1728 FHP Tectonics Corp. 40.0000 1,080.00 1,080.00 6327 Walsh Construction Company 9.0000 243.00 243.00 552A0900 SS JKD CL A 24 159.000 FOOT 1728 FHP Tectonics Corp. 49.0000 7,791.00 7,791.00 6327 Walsh Construction Company 70.0000 11,130.00 11,130.00 552A1100 SS JKD CL A 30 65.000 FOOT 1728 FHP Tectonics Corp. 72.0000 4,680.00 4,680.00 6327 Walsh Construction Company 79.0000 5,135.00 5,135.00 552A1300 SS JKD CL A 36 64.000 FOOT 1728 FHP Tectonics Corp. 72.0000 4,608.00 4,608.00 6327 Walsh Construction Company 91.0000 5,824.00 5,824.00 56200900 WATER SERV LINE 2 1/2 110.000 FOOT 1728 FHP Tectonics Corp. 80.0000 8,800.00 8,800.00 6327 Walsh Construction Company 71.2500 7,837.50 7,837.50 58700200 BRIDGE SEAT SEALER 422.000 SQ FT 1728 FHP Tectonics Corp. 2.4700 1,042.34 1,042.34 6327 Walsh Construction Company 2.0000 844.00 844.00 59100100 GEOCOMPOSITE WALL DR 5,272.000 SQ YD 1728 FHP Tectonics Corp. 9.5100 50,136.72 50,136.72 6327 Walsh Construction Company 17.5000 92,260.00 92,260.00 60107700 PIPE UNDERDRAINS 6 17,893.000 FOOT 1728 FHP Tectonics Corp. 14.0000 250,502.00 250,502.00 6327 Walsh Construction Company 9.0000 161,037.00 161,037.00 60108200 PIPE UNDERDRAIN 6 SP 1,788.000 FOOT 1728 FHP Tectonics Corp. 24.0000 42,912.00 42,912.00 6327 Walsh Construction Company 18.0000 32,184.00 32,184.00 60109582 P UNDR FOR STRUCT 6 8,290.000 FOOT 1728 FHP Tectonics Corp. 15.0000 124,350.00 124,350.00 6327 Walsh Construction Company 12.0000 99,480.00 99,480.00 60200105 CB TA 4 DIA T1F OL 37.000 EACH 1728 FHP Tectonics Corp. 2,350.0000 86,950.00 86,950.00 6327 Walsh Construction Company 2,100.0000 77,700.00 77,700.00 60200205 CB TA 4 DIA T1F CL 1.000 EACH 1728 FHP Tectonics Corp. 2,425.0000 2,425.00 2,425.00 6327 Walsh Construction Company 2,100.0000 2,100.00 2,100.00 60201310 CB TA 4 DIA T20F&G 189.000 EACH 1728 FHP Tectonics Corp. 2,525.0000 477,225.00 477,225.00 6327 Walsh Construction Company 2,135.0000 403,515.00 403,515.00 60202505 CB TA 4D T1FOL (CHGO) 33.000 EACH 1728 FHP Tectonics Corp. 2,600.0000 85,800.00 85,800.00 6327 Walsh Construction Company 1,945.0000 64,185.00 64,185.00 60206905 CB TC T1F OL 16.000 EACH 1728 FHP Tectonics Corp. 1,000.0000 16,000.00 16,000.00 6327 Walsh Construction Company 1,640.0000 26,240.00 26,240.00 60208210 CB TC T20F&G 4.000 EACH 1728 FHP Tectonics Corp. 1,100.0000 4,400.00 4,400.00 6327 Walsh Construction Company 1,685.0000 6,740.00 6,740.00 60218400 MAN TA 4 DIA T1F CL 34.000 EACH 1728 FHP Tectonics Corp. 2,100.0000 71,400.00 71,400.00 6327 Walsh Construction Company 2,330.0000 79,220.00 79,220.00 60221100 MAN TA 5 DIA T1F CL 58.000 EACH 1728 FHP Tectonics Corp. 2,600.0000 150,800.00 150,800.00 6327 Walsh Construction Company 3,380.0000 196,040.00 196,040.00 60223800 MAN TA 6 DIA T1F CL 2.000 EACH 1728 FHP Tectonics Corp. 4,900.0000 9,800.00 9,800.00 6327 Walsh Construction Company 5,710.0000 11,420.00 11,420.00 60224446 MAN TA 7 DIA T1F CL 2.000 EACH 1728 FHP Tectonics Corp. 7,000.0000 14,000.00 14,000.00 6327 Walsh Construction Company 7,850.0000 15,700.00 15,700.00 60250200 CB ADJUST 25.000 EACH 1728 FHP Tectonics Corp. 400.0000 10,000.00 10,000.00 6327 Walsh Construction Company 396.0000 9,900.00 9,900.00 60255500 MAN ADJUST 58.000 EACH 1728 FHP Tectonics Corp. 400.0000 23,200.00 23,200.00 6327 Walsh Construction Company 396.0000 22,968.00 22,968.00 60257900 MAN RECONST 4.000 EACH 1728 FHP Tectonics Corp. 1,200.0000 4,800.00 4,800.00 6327 Walsh Construction Company 1,350.0000 5,400.00 5,400.00 60260100 INLETS ADJUST 4.000 EACH 1728 FHP Tectonics Corp. 200.0000 800.00 800.00 6327 Walsh Construction Company 396.0000 1,584.00 1,584.00 60260400 INLETS ADJ NEW T1F CL 4.000 EACH 1728 FHP Tectonics Corp. 400.0000 1,600.00 1,600.00 6327 Walsh Construction Company 610.0000 2,440.00 2,440.00 60265700 VV ADJUST 2.000 EACH 1728 FHP Tectonics Corp. 400.0000 800.00 800.00 6327 Walsh Construction Company 396.0000 792.00 792.00 60406520 FR & LIDS OL (CHGO) 5.000 EACH 1728 FHP Tectonics Corp. 250.0000 1,250.00 1,250.00 6327 Walsh Construction Company 260.0000 1,300.00 1,300.00 60406530 FR & LIDS CL (CHGO) 5.000 EACH 1728 FHP Tectonics Corp. 250.0000 1,250.00 1,250.00 6327 Walsh Construction Company 260.0000 1,300.00 1,300.00 60500040 REMOV MANHOLES 8.000 EACH 1728 FHP Tectonics Corp. 200.0000 1,600.00 1,600.00 6327 Walsh Construction Company 56.0000 448.00 448.00 60500050 REMOV CATCH BAS 50.000 EACH 1728 FHP Tectonics Corp. 200.0000 10,000.00 10,000.00 6327 Walsh Construction Company 56.0000 2,800.00 2,800.00 60500060 REMOV INLETS 95.000 EACH 1728 FHP Tectonics Corp. 100.0000 9,500.00 9,500.00 6327 Walsh Construction Company 28.0000 2,660.00 2,660.00 60500105 FILL MANHOLES 3.000 EACH 1728 FHP Tectonics Corp. 200.0000 600.00 600.00 6327 Walsh Construction Company 367.0000 1,101.00 1,101.00 60600605 CONC CURB TB 172.000 FOOT 1728 FHP Tectonics Corp. 12.0500 2,072.60 2,072.60 6327 Walsh Construction Company 18.0000 3,096.00 3,096.00 60602200 CONC GUTTER 1,214.000 FOOT 1728 FHP Tectonics Corp. 13.3500 16,206.90 16,206.90 6327 Walsh Construction Company 16.0000 19,424.00 19,424.00 60603800 COMB CC&G TB6.12 993.000 FOOT 1728 FHP Tectonics Corp. 12.3600 12,273.48 12,273.48 6327 Walsh Construction Company 11.7500 11,667.75 11,667.75 60605000 COMB CC&G TB6.24 126.500 FOOT 1728 FHP Tectonics Corp. 16.2400 2,054.36 2,054.36 6327 Walsh Construction Company 13.2500 1,676.13 1,676.13 60605900 COMB CC&G TB9.12 51.000 FOOT 1728 FHP Tectonics Corp. 15.1300 771.63 771.63 6327 Walsh Construction Company 18.0000 918.00 918.00 60608300 COMB CC&G TM2.12 739.500 FOOT 1728 FHP Tectonics Corp. 12.2800 9,081.06 9,081.06 6327 Walsh Construction Company 11.5000 8,504.25 8,504.25 60608521 COMB CC&G TM2.24 641.600 FOOT 1728 FHP Tectonics Corp. 14.4800 9,290.37 9,290.37 6327 Walsh Construction Company 12.5000 8,020.00 8,020.00 60608530 COMB CC&G TM2.48 155.500 FOOT 1728 FHP Tectonics Corp. 19.0100 2,956.06 2,956.06 6327 Walsh Construction Company 23.0000 3,576.50 3,576.50 * 60618324 CONC MEDIAN SURF 6 SP 7,366.000 SQ FT 1728 FHP Tectonics Corp. 7.1000 52,298.60 52,298.60 6327 Walsh Construction Company 10.0000 73,660.00 73,660.00 60618390 CONC MED SURF CORR 444.000 SQ FT 1728 FHP Tectonics Corp. 6.7500 2,997.00 2,997.00 6327 Walsh Construction Company 8.0000 3,552.00 3,552.00 63000000 SPBGR TY A 138.000 FOOT 1728 FHP Tectonics Corp. 25.0000 3,450.00 3,450.00 6327 Walsh Construction Company 25.0000 3,450.00 3,450.00 63100045 TRAF BAR TERM T2 3.000 EACH 1728 FHP Tectonics Corp. 750.0000 2,250.00 2,250.00 6327 Walsh Construction Company 750.0000 2,250.00 2,250.00 63100085 TRAF BAR TERM T6 4.000 EACH 1728 FHP Tectonics Corp. 2,235.0000 8,940.00 8,940.00 6327 Walsh Construction Company 2,235.0000 8,940.00 8,940.00 63100167 TR BAR TRM T1 SPL TAN 5.000 EACH 1728 FHP Tectonics Corp. 2,140.0000 10,700.00 10,700.00 6327 Walsh Construction Company 2,140.0000 10,700.00 10,700.00 63200310 GUARDRAIL REMOV 600.000 FOOT 1728 FHP Tectonics Corp. 5.5000 3,300.00 3,300.00 6327 Walsh Construction Company 5.5000 3,300.00 3,300.00 63700805 CONC BAR TRANS 142.000 FOOT 1728 FHP Tectonics Corp. 97.1600 13,797.29 13,796.72 .57- 6327 Walsh Construction Company 200.0000 28,400.00 28,400.00 66400305 CH LK FENCE 6 2,992.000 FOOT 1728 FHP Tectonics Corp. 28.0000 83,776.00 83,776.00 6327 Walsh Construction Company 28.0000 83,776.00 83,776.00 66410300 CH LK FENCE REMOV 9,270.000 FOOT 1728 FHP Tectonics Corp. 4.5000 41,715.00 41,715.00 6327 Walsh Construction Company 4.5000 41,715.00 41,715.00 66900200 NON SPL WASTE DISPOSL 19,481.000 CU YD 1728 FHP Tectonics Corp. 40.0000 779,240.00 779,240.00 6327 Walsh Construction Company 45.0000 876,645.00 876,645.00 66900450 SPL WASTE PLNS/REPORT 1.000 L SUM 1728 FHP Tectonics Corp. 23,700.0000 23,700.00 23,700.00 6327 Walsh Construction Company 5,500.0000 5,500.00 5,500.00 66900530 SOIL DISPOSAL ANALY 6.000 EACH 1728 FHP Tectonics Corp. 1,500.0000 9,000.00 9,000.00 6327 Walsh Construction Company 900.0000 5,400.00 5,400.00 67100100 MOBILIZATION 1.000 L SUM 1728 FHP Tectonics Corp. 2,300,000.0000 2,300,000.00 2,300,000.00 6327 Walsh Construction Company 2,055,500.0000 2,055,500.00 2,055,500.00 70101800 TRAF CONT & PROT SPL 1.000 L SUM 1728 FHP Tectonics Corp. 20,000.0000 20,000.00 20,000.00 6327 Walsh Construction Company 20,000.0000 20,000.00 20,000.00 70102550 TR CONT-PROT TEMP DET 2.000 EACH 1728 FHP Tectonics Corp. 6,000.0000 12,000.00 12,000.00 6327 Walsh Construction Company 6,000.0000 12,000.00 12,000.00 70103815 TR CONT SURVEILLANCE 60.000 CAL DA 1728 FHP Tectonics Corp. 200.0000 12,000.00 12,000.00 6327 Walsh Construction Company 200.0000 12,000.00 12,000.00 70300100 SHORT-TERM PAVT MKING 1,250.000 FOOT 1728 FHP Tectonics Corp. 1.2500 1,562.50 1,562.50 6327 Walsh Construction Company 1.0000 1,250.00 1,250.00 70300240 TEMP PVT MK LINE 6 17,970.000 FOOT 1728 FHP Tectonics Corp. 0.2500 4,492.50 4,492.50 6327 Walsh Construction Company 0.2500 4,492.50 4,492.50 70300510 PAVT MARK TAPE T3 L&S 293.000 SQ FT 1728 FHP Tectonics Corp. 2.5500 747.15 747.15 6327 Walsh Construction Company 2.5500 747.15 747.15 70300520 PAVT MARK TAPE T3 4 19,784.000 FOOT 1728 FHP Tectonics Corp. 0.8500 16,816.40 16,816.40 6327 Walsh Construction Company 0.8500 16,816.40 16,816.40 70300540 PAVT MARK TAPE T3 6 1,100.000 FOOT 1728 FHP Tectonics Corp. 1.2000 1,320.00 1,320.00 6327 Walsh Construction Company 1.2000 1,320.00 1,320.00 70300550 PAVT MARK TAPE T3 8 2,112.000 FOOT 1728 FHP Tectonics Corp. 1.7000 3,590.40 3,590.40 6327 Walsh Construction Company 1.7000 3,590.40 3,590.40 70300570 PAVT MARK TAPE T3 24 202.000 FOOT 1728 FHP Tectonics Corp. 5.1500 1,040.30 1,040.30 6327 Walsh Construction Company 5.1500 1,040.30 1,040.30 70301000 WORK ZONE PAVT MK REM 12,424.000 SQ FT 1728 FHP Tectonics Corp. 0.9000 11,181.60 11,181.60 6327 Walsh Construction Company 0.8500 10,560.40 10,560.40 70400100 TEMP CONC BARRIER 20,340.000 FOOT 1728 FHP Tectonics Corp. 24.6200 500,770.80 500,770.80 6327 Walsh Construction Company 14.5000 294,930.00 294,930.00 70400200 REL TEMP CONC BARRIER 6,686.000 FOOT 1728 FHP Tectonics Corp. 5.8000 38,778.80 38,778.80 6327 Walsh Construction Company 3.7500 25,072.50 25,072.50 72000100 SIGN PANEL T1 50.000 SQ FT 1728 FHP Tectonics Corp. 22.0000 1,100.00 1,100.00 6327 Walsh Construction Company 25.0000 1,250.00 1,250.00 72000200 SIGN PANEL T2 189.000 SQ FT 1728 FHP Tectonics Corp. 22.0000 4,158.00 4,158.00 6327 Walsh Construction Company 27.0000 5,103.00 5,103.00 72000300 SIGN PANEL T3 4,606.000 SQ FT 1728 FHP Tectonics Corp. 25.0000 115,150.00 115,150.00 6327 Walsh Construction Company 27.0000 124,362.00 124,362.00 72100100 SIGN PANEL OVERLAY 72.000 SQ FT 1728 FHP Tectonics Corp. 35.0000 2,520.00 2,520.00 6327 Walsh Construction Company 20.0000 1,440.00 1,440.00 72400310 REMOV SIGN PANEL T1 9.000 SQ FT 1728 FHP Tectonics Corp. 100.0000 900.00 900.00 6327 Walsh Construction Company 7.0000 63.00 63.00 72400330 REMOV SIGN PANEL T3 1,119.000 SQ FT 1728 FHP Tectonics Corp. 15.0000 16,785.00 16,785.00 6327 Walsh Construction Company 5.0000 5,595.00 5,595.00 72400720 RELOC SIGN PANEL T2 20.000 SQ FT 1728 FHP Tectonics Corp. 25.0000 500.00 500.00 6327 Walsh Construction Company 25.0000 500.00 500.00 72700100 STR STL SIN SUP BA 3,547.000 POUND 1728 FHP Tectonics Corp. 6.0000 21,282.00 21,282.00 6327 Walsh Construction Company 2.5000 8,867.50 8,867.50 72800100 TELES STL SIN SUPPORT 18.000 FOOT 1728 FHP Tectonics Corp. 25.0000 450.00 450.00 6327 Walsh Construction Company 10.0000 180.00 180.00 72900100 METAL POST TY A 165.000 FOOT 1728 FHP Tectonics Corp. 25.0000 4,125.00 4,125.00 6327 Walsh Construction Company 8.0000 1,320.00 1,320.00 72900200 METAL POST TY B 197.000 FOOT 1728 FHP Tectonics Corp. 25.0000 4,925.00 4,925.00 6327 Walsh Construction Company 8.0000 1,576.00 1,576.00 73000100 WOOD SIN SUPPORT 395.000 FOOT 1728 FHP Tectonics Corp. 30.0000 11,850.00 11,850.00 6327 Walsh Construction Company 15.0000 5,925.00 5,925.00 73000105 WOOD SIN SUPPORT SPL 34.000 FOOT 1728 FHP Tectonics Corp. 35.0000 1,190.00 1,190.00 6327 Walsh Construction Company 20.0000 680.00 680.00 73100100 BASE TEL STL SIN SUPP 2.000 EACH 1728 FHP Tectonics Corp. 500.0000 1,000.00 1,000.00 6327 Walsh Construction Company 130.0000 260.00 260.00 73300100 OVHD SIN STR-SPAN T1A 86.000 FOOT 1728 FHP Tectonics Corp. 610.0000 52,460.00 52,460.00 6327 Walsh Construction Company 450.0000 38,700.00 38,700.00 73300200 OVHD SIN STR-SPAN T2A 418.000 FOOT 1728 FHP Tectonics Corp. 625.0000 261,250.00 261,250.00 6327 Walsh Construction Company 520.0000 217,360.00 217,360.00 73300300 OVHD SIN STR-SPAN T3A 93.000 FOOT 1728 FHP Tectonics Corp. 680.0000 63,240.00 63,240.00 6327 Walsh Construction Company 625.0000 58,125.00 58,125.00 73302190 OSS CANT 3CA 2-0X7-0 149.000 FOOT 1728 FHP Tectonics Corp. 1,500.0000 223,500.00 223,500.00 6327 Walsh Construction Company 1,000.0000 149,000.00 149,000.00 73304000 OVHD SIN STR BR MT 173.000 FOOT 1728 FHP Tectonics Corp. 650.0000 112,450.00 112,450.00 6327 Walsh Construction Company 525.0000 90,825.00 90,825.00 73305000 OVHD SIN STR WALKWAY 475.000 FOOT 1728 FHP Tectonics Corp. 150.0000 71,250.00 71,250.00 6327 Walsh Construction Company 180.0000 85,500.00 85,500.00 73400100 CONC FOUNDATION 9.000 CU YD 1728 FHP Tectonics Corp. 1,600.0000 14,400.00 14,400.00 6327 Walsh Construction Company 1,000.0000 9,000.00 9,000.00 73400200 DRILL SHAFT CONC FDN 169.000 CU YD 1728 FHP Tectonics Corp. 1,800.0000 304,200.00 304,200.00 6327 Walsh Construction Company 1,174.0000 198,406.00 198,406.00 73600100 REMOV OH SIN STR-SPAN 5.000 EACH 1728 FHP Tectonics Corp. 9,000.0000 45,000.00 45,000.00 6327 Walsh Construction Company 6,000.0000 30,000.00 30,000.00 73600200 REMOV OH SIN STR-CANT 3.000 EACH 1728 FHP Tectonics Corp. 5,000.0000 15,000.00 15,000.00 6327 Walsh Construction Company 4,000.0000 12,000.00 12,000.00 73602000 REM OVHD SN STR-BR MT 1.000 EACH 1728 FHP Tectonics Corp. 4,000.0000 4,000.00 4,000.00 6327 Walsh Construction Company 4,500.0000 4,500.00 4,500.00 73700100 REM GR-MT SIN SUPPORT 20.000 EACH 1728 FHP Tectonics Corp. 200.0000 4,000.00 4,000.00 6327 Walsh Construction Company 175.0000 3,500.00 3,500.00 73700200 REM CONC FDN-GR MT 18.000 EACH 1728 FHP Tectonics Corp. 300.0000 5,400.00 5,400.00 6327 Walsh Construction Company 300.0000 5,400.00 5,400.00 73700300 REM CONC FDN-OVHD 8.000 EACH 1728 FHP Tectonics Corp. 1,900.0000 15,200.00 15,200.00 6327 Walsh Construction Company 2,000.0000 16,000.00 16,000.00 78000100 THPL PVT MK LTR & SYM 904.000 SQ FT 1728 FHP Tectonics Corp. 3.6500 3,299.60 3,299.60 6327 Walsh Construction Company 5.8200 5,261.28 5,261.28 78000200 THPL PVT MK LINE 4 6,600.000 FOOT 1728 FHP Tectonics Corp. 0.6200 4,092.00 4,092.00 6327 Walsh Construction Company 0.9800 6,468.00 6,468.00 78000400 THPL PVT MK LINE 6 3,393.000 FOOT 1728 FHP Tectonics Corp. 0.9500 3,223.35 3,223.35 6327 Walsh Construction Company 1.4400 4,885.92 4,885.92 78000500 THPL PVT MK LINE 8 2,787.000 FOOT 1728 FHP Tectonics Corp. 1.6300 4,542.81 4,542.81 6327 Walsh Construction Company 2.3200 6,465.84 6,465.84 78000600 THPL PVT MK LINE 12 378.000 FOOT 1728 FHP Tectonics Corp. 2.1500 812.70 812.70 6327 Walsh Construction Company 2.9200 1,103.76 1,103.76 78000650 THPL PVT MK LINE 24 460.000 FOOT 1728 FHP Tectonics Corp. 3.8500 1,771.00 1,771.00 6327 Walsh Construction Company 5.8200 2,677.20 2,677.20 78003100 PREF PL PM TB LTR-SYM 146.000 SQ FT 1728 FHP Tectonics Corp. 42.0000 6,132.00 6,132.00 6327 Walsh Construction Company 40.2500 5,876.50 5,876.50 78003110 PREF PL PM TB LINE 4 85.000 FOOT 1728 FHP Tectonics Corp. 6.9000 586.50 586.50 6327 Walsh Construction Company 6.7500 573.75 573.75 78003130 PREF PL PM TB LINE 6 1,953.000 FOOT 1728 FHP Tectonics Corp. 11.5000 22,459.50 22,459.50 6327 Walsh Construction Company 10.2000 19,920.60 19,920.60 78003150 PREF PL PM TB LINE 12 92.000 FOOT 1728 FHP Tectonics Corp. 26.0000 2,392.00 2,392.00 6327 Walsh Construction Company 20.3500 1,872.20 1,872.20 78003180 PREF PL PM TB LINE 24 61.000 FOOT 1728 FHP Tectonics Corp. 42.0000 2,562.00 2,562.00 6327 Walsh Construction Company 40.2500 2,455.25 2,455.25 78005110 EPOXY PVT MK LINE 4 14,096.000 FOOT 1728 FHP Tectonics Corp. 0.4900 6,907.04 6,907.04 6327 Walsh Construction Company 0.5700 8,034.72 8,034.72 78005120 EPOXY PVT MK LINE 5 10,304.000 FOOT 1728 FHP Tectonics Corp. 0.6900 7,109.76 7,109.76 6327 Walsh Construction Company 0.7800 8,037.12 8,037.12 78005140 EPOXY PVT MK LINE 8 12,221.000 FOOT 1728 FHP Tectonics Corp. 1.6500 20,164.65 20,164.65 6327 Walsh Construction Company 1.1700 14,298.57 14,298.57 78005150 EPOXY PVT MK LINE 12 2,967.000 FOOT 1728 FHP Tectonics Corp. 2.2500 6,675.75 6,675.75 6327 Walsh Construction Company 1.9800 5,874.66 5,874.66 78008210 POLYUREA PM T1 LN 4 11,040.000 FOOT 1728 FHP Tectonics Corp. 0.9400 10,377.60 10,377.60 6327 Walsh Construction Company 1.2300 13,579.20 13,579.20 78008220 POLYUREA PM T1 LN 5 224.000 FOOT 1728 FHP Tectonics Corp. 1.2900 288.96 288.96 6327 Walsh Construction Company 1.9800 443.52 443.52 78008240 POLYUREA PM T1 LN 8 5,185.000 FOOT 1728 FHP Tectonics Corp. 2.2500 11,666.25 11,666.25 6327 Walsh Construction Company 2.4300 12,599.55 12,599.55 78008250 POLYUREA PM T1 LN 12 2,398.000 FOOT 1728 FHP Tectonics Corp. 4.1000 9,831.80 9,831.80 6327 Walsh Construction Company 3.6700 8,800.66 8,800.66 78008270 POLYUREA PM T1 LN 24 68.000 FOOT 1728 FHP Tectonics Corp. 7.9000 537.20 537.20 6327 Walsh Construction Company 7.4500 506.60 506.60 78100100 RAISED REFL PAVT MKR 32.000 EACH 1728 FHP Tectonics Corp. 119.0000 3,808.00 3,808.00 6327 Walsh Construction Company 155.0000 4,960.00 4,960.00 78100300 REPLACEMENT REFLECTOR 762.000 EACH 1728 FHP Tectonics Corp. 25.0000 19,050.00 19,050.00 6327 Walsh Construction Company 9.8700 7,520.94 7,520.94 78200100 MONODIR PRIS BAR REFL 758.000 EACH 1728 FHP Tectonics Corp. 6.0000 4,548.00 4,548.00 6327 Walsh Construction Company 16.0000 12,128.00 12,128.00 78200410 GUARDRAIL MKR TYPE A 32.000 EACH 1728 FHP Tectonics Corp. 8.0000 256.00 256.00 6327 Walsh Construction Company 8.0000 256.00 256.00 78200530 BAR WALL MKR TYPE C 20.000 EACH 1728 FHP Tectonics Corp. 20.0000 400.00 400.00 6327 Walsh Construction Company 20.0000 400.00 400.00 78201000 TERMINAL MARKER - DA 5.000 EACH 1728 FHP Tectonics Corp. 40.0000 200.00 200.00 6327 Walsh Construction Company 40.0000 200.00 200.00 78300100 PAVT MARKING REMOVAL 12,061.000 SQ FT 1728 FHP Tectonics Corp. 1.5000 18,091.50 18,091.50 6327 Walsh Construction Company 1.0500 12,664.05 12,664.05 80700140 GROUND ROD 5/8 X 10 68.000 EACH 1728 FHP Tectonics Corp. 180.0000 12,240.00 12,240.00 6327 Walsh Construction Company 180.0000 12,240.00 12,240.00 80800525 TEMP WP60 CL4 15MA 6.000 EACH 1728 FHP Tectonics Corp. 2,500.0000 15,000.00 15,000.00 6327 Walsh Construction Company 2,500.0000 15,000.00 15,000.00 81000600 CON T 2 GALVS 2,405.000 FOOT 1728 FHP Tectonics Corp. 21.0000 50,505.00 50,505.00 6327 Walsh Construction Company 21.0000 50,505.00 50,505.00 81000800 CON T 3 GALVS 227.000 FOOT 1728 FHP Tectonics Corp. 35.0000 7,945.00 7,945.00 6327 Walsh Construction Company 35.0000 7,945.00 7,945.00 81012805 CON T 3 PVC ENC CONC 1,016.000 FOOT 1728 FHP Tectonics Corp. 50.0000 50,800.00 50,800.00 6327 Walsh Construction Company 50.0000 50,800.00 50,800.00 81023750 CON ENC C 3 PVC 343.000 FOOT 1728 FHP Tectonics Corp. 140.0000 48,020.00 48,020.00 6327 Walsh Construction Company 140.0000 48,020.00 48,020.00 81200100 CON EMB STR 1 GALVS 15.000 FOOT 1728 FHP Tectonics Corp. 60.0000 900.00 900.00 6327 Walsh Construction Company 60.0000 900.00 900.00 81200120 CON EMB STR 2 GALVS 15.000 FOOT 1728 FHP Tectonics Corp. 100.0000 1,500.00 1,500.00 6327 Walsh Construction Company 100.0000 1,500.00 1,500.00 81200230 CON EMB STR 2 PVC 384.000 FOOT 1728 FHP Tectonics Corp. 16.0000 6,144.00 6,144.00 6327 Walsh Construction Company 16.0000 6,144.00 6,144.00 81301010 JUN BX SS ES 10X8X4 2.000 EACH 1728 FHP Tectonics Corp. 1,100.0000 2,200.00 2,200.00 6327 Walsh Construction Company 1,100.0000 2,200.00 2,200.00 81400200 HD HANDHOLE 24.000 EACH 1728 FHP Tectonics Corp. 4,000.0000 96,000.00 96,000.00 6327 Walsh Construction Company 4,000.0000 96,000.00 96,000.00 81400205 HD HANDHOLE SPL 2.000 EACH 1728 FHP Tectonics Corp. 4,000.0000 8,000.00 8,000.00 6327 Walsh Construction Company 4,000.0000 8,000.00 8,000.00 81500200 TR & BKFIL F ELECT WK 4,192.000 FOOT 1728 FHP Tectonics Corp. 10.0000 41,920.00 41,920.00 6327 Walsh Construction Company 10.0000 41,920.00 41,920.00 81800700 A CBL 3-1C2 AL MESS W 890.000 FOOT 1728 FHP Tectonics Corp. 7.0000 6,230.00 6,230.00 6327 Walsh Construction Company 7.0000 6,230.00 6,230.00 82102310 LUM SV HOR MT 310W 6.000 EACH 1728 FHP Tectonics Corp. 600.0000 3,600.00 3,600.00 6327 Walsh Construction Company 600.0000 3,600.00 3,600.00 83600300 LIGHT POLE FDN 30D 60.000 FOOT 1728 FHP Tectonics Corp. 240.0000 14,400.00 14,400.00 6327 Walsh Construction Company 240.0000 14,400.00 14,400.00 83700250 LT TOWER FDN 44D 180.000 FOOT 1728 FHP Tectonics Corp. 700.0000 126,000.00 126,000.00 6327 Walsh Construction Company 700.0000 126,000.00 126,000.00 84200700 LIGHTING FDN REMOV 9.000 EACH 1728 FHP Tectonics Corp. 400.0000 3,600.00 3,600.00 6327 Walsh Construction Company 500.0000 4,500.00 4,500.00 84200705 LIGHTING FDN REM PART 36.000 EACH 1728 FHP Tectonics Corp. 400.0000 14,400.00 14,400.00 6327 Walsh Construction Company 150.0000 5,400.00 5,400.00 85000200 MAIN EX TR SIG INSTAL 7.000 EACH 1728 FHP Tectonics Corp. 6,000.0000 42,000.00 42,000.00 6327 Walsh Construction Company 6,000.0000 42,000.00 42,000.00 87301155 ELCBL C SIGNAL 12 7C 662.000 FOOT 1728 FHP Tectonics Corp. 9.0000 5,958.00 5,958.00 6327 Walsh Construction Company 9.0000 5,958.00 5,958.00 87301185 ELCBL C SIGNAL 12 19C 792.000 FOOT 1728 FHP Tectonics Corp. 15.0000 11,880.00 11,880.00 6327 Walsh Construction Company 15.0000 11,880.00 11,880.00 87301805 ELCBL C SERV 6 2C 426.000 FOOT 1728 FHP Tectonics Corp. 6.0000 2,556.00 2,556.00 6327 Walsh Construction Company 6.0000 2,556.00 2,556.00 87800100 CONC FDN TY A 12.000 FOOT 1728 FHP Tectonics Corp. 250.0000 3,000.00 3,000.00 6327 Walsh Construction Company 250.0000 3,000.00 3,000.00 87900200 DRILL EX HANDHOLE 1.000 EACH 1728 FHP Tectonics Corp. 450.0000 450.00 450.00 6327 Walsh Construction Company 450.0000 450.00 450.00 89000100 TEMP TR SIG INSTALL 2.000 EACH 1728 FHP Tectonics Corp. 50,000.0000 100,000.00 100,000.00 6327 Walsh Construction Company 50,000.0000 100,000.00 100,000.00 89502300 REM ELCBL FR CON 1,624.000 FOOT 1728 FHP Tectonics Corp. 1.0000 1,624.00 1,624.00 6327 Walsh Construction Company 1.0000 1,624.00 1,624.00 89502375 REMOV EX TS EQUIP 2.000 EACH 1728 FHP Tectonics Corp. 8,000.0000 16,000.00 16,000.00 6327 Walsh Construction Company 8,000.0000 16,000.00 16,000.00 89502385 REMOV EX CONC FDN 19.000 EACH 1728 FHP Tectonics Corp. 400.0000 7,600.00 7,600.00 6327 Walsh Construction Company 270.0000 5,130.00 5,130.00 * - PAY ITEM UNIT PRICE AND/OR BIDDER TOTAL PRICE WAS OMITTED