ILLINOIS DEPARTMENT OF TRANSPORTATION PAGE: 1 09/17/04 13:00:24 U N I T P R I C E T A B U L A T I O N O F B I D S LETTING DATE: 07/30/2004 LETTING TYPE: SCHEDULED CONTRACT NUMBER: 62585 LETTING ITEM NUMBER: 002 RESPONSIBLE DISTRICT: 01 BIDS LOCKED: Y SECTION: (2323.6-2P&2324.6-1P)K-1 COUNTY: COOK ESTIMATE: -------------------------- SUMMARY OF CONTRACTOR BIDS -------------------------- "AS READ" SUMMATION SUMMATION OF NBR BIDR CONTR COMB ITEM CONTR BIDDER OF BIDDER CALCULATED LOW BIDR CALC BLANK NBR BIDDER NAME GROUP COMB GRP NBR GROUP TOTAL PRICE EXTENSIONS EXTENSIONS BID EXTENSION DIFF BIDS 0801 Capitol Cement Co., Inc. NO ALT 6,393,308.72 6,393,308.72 6,393,308.72 3069 K-Five Construction Corporation NO ALT 5,024,925.80 * 5,024,925.80 5,024,925.80 * **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT = 168 ---------------------- DETAIL CONTRACTOR BIDS ---------------------- ITEM NBR ITEM DESCRIPTION UNIT OF UNIT BIDDER CALCULATED BIDR CALC BIDR NBR BIDDER NAME QUANTITY MEASURE PRICE EXTENSION EXTENSION EXTENSION DIFF X0320598 TEMP SHT PILING (RIP) 970.000 SQ FT 0801 Capitol Cement Co., Inc. 38.0000 36,860.00 36,860.00 3069 K-Five Construction Corporation 39.0000 37,830.00 37,830.00 X0320815 SLEEPER SLAB 40.000 FOOT 0801 Capitol Cement Co., Inc. 200.0000 8,000.00 8,000.00 3069 K-Five Construction Corporation 240.0000 9,600.00 9,600.00 X0322256 TEMP INFO SIGNING 762.000 SQ FT 0801 Capitol Cement Co., Inc. 22.0000 16,764.00 16,764.00 3069 K-Five Construction Corporation 24.0000 18,288.00 18,288.00 X0322433 LT TOWER SERVICE PAD 2.000 EACH 0801 Capitol Cement Co., Inc. 2,500.0000 5,000.00 5,000.00 3069 K-Five Construction Corporation 2,200.0000 4,400.00 4,400.00 X0323160 VIDEO INSP OF SS 745.000 FOOT 0801 Capitol Cement Co., Inc. 15.0000 11,175.00 11,175.00 3069 K-Five Construction Corporation 4.0000 2,980.00 2,980.00 X0323426 SED CONT DR ST INL CL 40.000 EACH 0801 Capitol Cement Co., Inc. 150.0000 6,000.00 6,000.00 3069 K-Five Construction Corporation 170.0000 6,800.00 6,800.00 X0323900 CONC FDN TY 1 2.000 FOOT 0801 Capitol Cement Co., Inc. 4,375.0000 8,750.00 8,750.00 3069 K-Five Construction Corporation 3,600.0000 7,200.00 7,200.00 X0323907 COMMUNICATIONS VAULT 3.000 EACH 0801 Capitol Cement Co., Inc. 3,509.0000 10,527.00 10,527.00 3069 K-Five Construction Corporation 3,600.0000 10,800.00 10,800.00 X0324159 WHITEWASH CONC PAVT 2,394.000 SQ YD 0801 Capitol Cement Co., Inc. 2.0000 4,788.00 4,788.00 3069 K-Five Construction Corporation 2.0000 4,788.00 4,788.00 X0324469 CON EN RC 2-4 CNC 73.000 FOOT 0801 Capitol Cement Co., Inc. 81.0000 5,913.00 5,913.00 3069 K-Five Construction Corporation 62.0000 4,526.00 4,526.00 X0324470 CON EN RC 3-4 CNC 107.000 FOOT 0801 Capitol Cement Co., Inc. 72.3000 7,736.10 7,736.10 3069 K-Five Construction Corporation 80.0000 8,560.00 8,560.00 X0324471 CON EN RC 4-4 CNC 88.000 FOOT 0801 Capitol Cement Co., Inc. 85.0000 7,480.00 7,480.00 3069 K-Five Construction Corporation 100.0000 8,800.00 8,800.00 X0324472 CON EN RC 5-4 CNC 80.000 FOOT 0801 Capitol Cement Co., Inc. 90.0000 7,200.00 7,200.00 3069 K-Five Construction Corporation 120.0000 9,600.00 9,600.00 X0324505 CON EN RC 1-2 RGC 23.000 FOOT 0801 Capitol Cement Co., Inc. 80.0000 1,840.00 1,840.00 3069 K-Five Construction Corporation 70.0000 1,610.00 1,610.00 X0324638 LT SERV PAD/WALL 3'6" 3.000 EACH 0801 Capitol Cement Co., Inc. 2,500.0000 7,500.00 7,500.00 3069 K-Five Construction Corporation 13,000.0000 39,000.00 39,000.00 X0324639 LT SERV PAD/WALL 5'0" 2.000 EACH 0801 Capitol Cement Co., Inc. 5,000.0000 10,000.00 10,000.00 3069 K-Five Construction Corporation 15,000.0000 30,000.00 30,000.00 X0324640 FLUTED KNEEWALL 24.000 FOOT 0801 Capitol Cement Co., Inc. 300.0000 7,200.00 7,200.00 3069 K-Five Construction Corporation 330.0000 7,920.00 7,920.00 X0324641 CONCRETE CORING 10.000 FOOT 0801 Capitol Cement Co., Inc. 200.0000 2,000.00 2,000.00 3069 K-Five Construction Corporation 160.0000 1,600.00 1,600.00 X0324642 CON EN RC 1-3 RGC 34.000 FOOT 0801 Capitol Cement Co., Inc. 60.5000 2,057.00 2,057.00 3069 K-Five Construction Corporation 74.0000 2,516.00 2,516.00 X0324643 CON EN RC 3-2 RGC 53.000 FOOT 0801 Capitol Cement Co., Inc. 80.0000 4,240.00 4,240.00 3069 K-Five Construction Corporation 80.0000 4,240.00 4,240.00 X0324644 CON EN RC 3 PVC 80.000 FOOT 0801 Capitol Cement Co., Inc. 52.9000 4,232.00 4,232.00 3069 K-Five Construction Corporation 62.0000 4,960.00 4,960.00 X0324645 CON T 4 CNC 343.000 FOOT 0801 Capitol Cement Co., Inc. 25.9000 8,883.70 8,883.70 3069 K-Five Construction Corporation 35.0000 12,005.00 12,005.00 X0324646 CON EN RC 6-4 CNC 15.000 FOOT 0801 Capitol Cement Co., Inc. 150.0000 2,250.00 2,250.00 3069 K-Five Construction Corporation 210.0000 3,150.00 3,150.00 X0324697 SOIL STABILIZERS 139,688.000 POUND 0801 Capitol Cement Co., Inc. 0.6500 90,797.20 90,797.20 3069 K-Five Construction Corporation 0.7000 97,781.60 97,781.60 X0324698 APPLY DUST SUP AGENTS .200 UNIT 0801 Capitol Cement Co., Inc. 5,000.0000 1,000.00 1,000.00 3069 K-Five Construction Corporation 5,500.0000 1,100.00 1,100.00 X0712400 TEMP PAVEMENT 9,883.000 SQ YD 0801 Capitol Cement Co., Inc. 50.0000 494,150.00 494,150.00 3069 K-Five Construction Corporation 50.0000 494,150.00 494,150.00 X4066426 BC SC SUPER "D" N70 572.000 TON 0801 Capitol Cement Co., Inc. 50.0000 28,600.00 28,600.00 3069 K-Five Construction Corporation 56.0000 32,032.00 32,032.00 X4066770 LEV BIND MM SUPER N70 572.000 TON 0801 Capitol Cement Co., Inc. 50.0000 28,600.00 28,600.00 3069 K-Five Construction Corporation 55.0000 31,460.00 31,460.00 X4832450 PCC SHOULDERS 11 SPL 645.000 SQ YD 0801 Capitol Cement Co., Inc. 65.0000 41,925.00 41,925.00 3069 K-Five Construction Corporation 63.0000 40,635.00 40,635.00 X6061001 COMB CC&G TM4.48 311.000 FOOT 0801 Capitol Cement Co., Inc. 50.0000 15,550.00 15,550.00 3069 K-Five Construction Corporation 20.0000 6,220.00 6,220.00 X6063401 COMB CC&G TM4.12 1,880.000 FOOT 0801 Capitol Cement Co., Inc. 20.0000 37,600.00 37,600.00 3069 K-Five Construction Corporation 13.0000 24,440.00 24,440.00 X6063600 COMB CC&G TM4.24 2,345.000 FOOT 0801 Capitol Cement Co., Inc. 25.0000 58,625.00 58,625.00 3069 K-Five Construction Corporation 16.0000 37,520.00 37,520.00 X6065740 CONC MED SURF 5 MOD 8,458.000 SQ FT 0801 Capitol Cement Co., Inc. 8.0000 67,664.00 67,664.00 3069 K-Five Construction Corporation 4.0000 33,832.00 33,832.00 X7011015 TR C-PROT EXPRESSWAYS 1.000 L SUM 0801 Capitol Cement Co., Inc. 488,000.0000 488,000.00 488,000.00 3069 K-Five Construction Corporation 50,000.0000 50,000.00 50,000.00 X7013820 TR CONT SURVEIL EXPWY 444.000 CAL DA 0801 Capitol Cement Co., Inc. 600.0000 266,400.00 266,400.00 3069 K-Five Construction Corporation 650.0000 288,600.00 288,600.00 X7015000 CHANGEABLE MESSAGE SN 16.000 CAL MO 0801 Capitol Cement Co., Inc. 2,000.0000 32,000.00 32,000.00 3069 K-Five Construction Corporation 2,000.0000 32,000.00 32,000.00 X7040600 FUR TEMP CONC BARRIER 910.000 FOOT 0801 Capitol Cement Co., Inc. 25.0000 22,750.00 22,750.00 3069 K-Five Construction Corporation 30.0000 27,300.00 27,300.00 Z0008244 DRIL SHAFT/SOIL 44 133.000 FOOT 0801 Capitol Cement Co., Inc. 500.0000 66,500.00 66,500.00 3069 K-Five Construction Corporation 450.0000 59,850.00 59,850.00 Z0013798 CONSTRUCTION LAYOUT 1.000 L SUM 0801 Capitol Cement Co., Inc. 75,000.0000 75,000.00 75,000.00 3069 K-Five Construction Corporation 75,000.0000 75,000.00 75,000.00 Z0013825 CONTR LOW-STRENG MATL 64.200 CU YD 0801 Capitol Cement Co., Inc. 75.0000 4,815.00 4,815.00 3069 K-Five Construction Corporation 167.0000 10,721.40 10,721.40 Z0018500 DRAINAGE STR CLEANED 68.000 EACH 0801 Capitol Cement Co., Inc. 500.0000 34,000.00 34,000.00 3069 K-Five Construction Corporation 210.0000 14,280.00 14,280.00 Z0030070 IMP ATTEN SU NAR TL3 1.000 EACH 0801 Capitol Cement Co., Inc. 34,400.0000 34,400.00 34,400.00 3069 K-Five Construction Corporation 39,000.0000 39,000.00 39,000.00 Z0030250 IMP ATTN TEMP NRD TL3 1.000 EACH 0801 Capitol Cement Co., Inc. 3,600.0000 3,600.00 3,600.00 3069 K-Five Construction Corporation 4,000.0000 4,000.00 4,000.00 Z0048665 RR PROT LIABILITY INS 1.000 L SUM 0801 Capitol Cement Co., Inc. 25,000.0000 25,000.00 25,000.00 3069 K-Five Construction Corporation 4,500.0000 4,500.00 4,500.00 Z0076600 TRAINEES 2,000.000 HOUR 0801 Capitol Cement Co., Inc. 0.8000 1,600.00 1,600.00 3069 K-Five Construction Corporation 0.8000 1,600.00 1,600.00 20100110 TREE REMOV 6-15 749.000 UNIT 0801 Capitol Cement Co., Inc. 10.0000 7,490.00 7,490.00 3069 K-Five Construction Corporation 11.0000 8,239.00 8,239.00 20100210 TREE REMOV OVER 15 757.000 UNIT 0801 Capitol Cement Co., Inc. 12.0000 9,084.00 9,084.00 3069 K-Five Construction Corporation 13.0000 9,841.00 9,841.00 20101000 TEMPORARY FENCE 520.000 FOOT 0801 Capitol Cement Co., Inc. 1.7500 910.00 910.00 3069 K-Five Construction Corporation 5.0000 2,600.00 2,600.00 20200100 EARTH EXCAVATION 14,480.000 CU YD 0801 Capitol Cement Co., Inc. 33.0000 477,840.00 477,840.00 3069 K-Five Construction Corporation 22.0000 318,560.00 318,560.00 20201200 REM & DISP UNS MATL 5,668.000 CU YD 0801 Capitol Cement Co., Inc. 35.0000 198,380.00 198,380.00 3069 K-Five Construction Corporation 25.0000 141,700.00 141,700.00 20700220 POROUS GRAN EMBANK 700.000 CU YD 0801 Capitol Cement Co., Inc. 49.0000 34,300.00 34,300.00 3069 K-Five Construction Corporation 30.0000 21,000.00 21,000.00 20800150 TRENCH BACKFILL 32.000 CU YD 0801 Capitol Cement Co., Inc. 50.0000 1,600.00 1,600.00 3069 K-Five Construction Corporation 22.0000 704.00 704.00 21001000 GEOTECH FAB F/GR STAB 4,771.000 SQ YD 0801 Capitol Cement Co., Inc. 4.0000 19,084.00 19,084.00 3069 K-Five Construction Corporation 1.0000 4,771.00 4,771.00 21101615 TOPSOIL F & P 4 22,418.000 SQ YD 0801 Capitol Cement Co., Inc. 3.3500 75,100.30 75,100.30 3069 K-Five Construction Corporation 3.0000 67,254.00 67,254.00 21301052 EXPLOR TRENCH 52 550.000 FOOT 0801 Capitol Cement Co., Inc. 30.0000 16,500.00 16,500.00 3069 K-Five Construction Corporation 22.0000 12,100.00 12,100.00 25000210 SEEDING CL 2A 4.750 ACRE 0801 Capitol Cement Co., Inc. 1,790.0000 8,502.50 8,502.50 3069 K-Five Construction Corporation 1,800.0000 8,550.00 8,550.00 25000400 NITROGEN FERT NUTR 417.000 POUND 0801 Capitol Cement Co., Inc. 0.7500 312.75 312.75 3069 K-Five Construction Corporation 0.7500 312.75 312.75 25000500 PHOSPHORUS FERT NUTR 417.000 POUND 0801 Capitol Cement Co., Inc. 0.7500 312.75 312.75 3069 K-Five Construction Corporation 0.7500 312.75 312.75 25000600 POTASSIUM FERT NUTR 417.000 POUND 0801 Capitol Cement Co., Inc. 0.7500 312.75 312.75 3069 K-Five Construction Corporation 0.7500 312.75 312.75 25000750 MOWING 11.500 ACRE 0801 Capitol Cement Co., Inc. 150.0000 1,725.00 1,725.00 3069 K-Five Construction Corporation 160.0000 1,840.00 1,840.00 25100630 EROSION CONTR BLANKET 22,418.000 SQ YD 0801 Capitol Cement Co., Inc. 0.9000 20,176.20 20,176.20 3069 K-Five Construction Corporation 1.0000 22,418.00 22,418.00 28000250 TEMP EROS CONTR SEED 463.000 POUND 0801 Capitol Cement Co., Inc. 5.3500 2,477.05 2,477.05 3069 K-Five Construction Corporation 5.0000 2,315.00 2,315.00 28000400 PERIMETER EROS BAR 5,595.000 FOOT 0801 Capitol Cement Co., Inc. 3.0000 16,785.00 16,785.00 3069 K-Five Construction Corporation 2.0000 11,190.00 11,190.00 28000510 INLET FILTERS 40.000 EACH 0801 Capitol Cement Co., Inc. 150.0000 6,000.00 6,000.00 3069 K-Five Construction Corporation 200.0000 8,000.00 8,000.00 31101400 SUB GRAN MAT B 6 4,658.000 SQ YD 0801 Capitol Cement Co., Inc. 7.0000 32,606.00 32,606.00 3069 K-Five Construction Corporation 6.0000 27,948.00 27,948.00 31101860 SUB GRAN MAT B 24 3,967.000 SQ YD 0801 Capitol Cement Co., Inc. 25.0000 99,175.00 99,175.00 3069 K-Five Construction Corporation 19.0000 75,373.00 75,373.00 31200100 STAB SUB-BASE 4 2,394.000 SQ YD 0801 Capitol Cement Co., Inc. 17.5000 41,895.00 41,895.00 3069 K-Five Construction Corporation 20.0000 47,880.00 47,880.00 35300400 PCC BSE CSE 9 3,777.000 SQ YD 0801 Capitol Cement Co., Inc. 46.0000 173,742.00 173,742.00 3069 K-Five Construction Corporation 31.0000 117,087.00 117,087.00 40600200 BIT MATLS PR CT 5.000 TON 0801 Capitol Cement Co., Inc. 225.0000 1,125.00 1,125.00 3069 K-Five Construction Corporation 200.0000 1,000.00 1,000.00 42000521 PCC PVT 11 JOINTED 2,394.000 SQ YD 0801 Capitol Cement Co., Inc. 65.0000 155,610.00 155,610.00 3069 K-Five Construction Corporation 55.0000 131,670.00 131,670.00 42001300 PROTECTIVE COAT 6,498.000 SQ YD 0801 Capitol Cement Co., Inc. 2.0000 12,996.00 12,996.00 3069 K-Five Construction Corporation 0.1000 649.80 649.80 44000006 BIT SURF REM 1 1/2 2,074.000 SQ YD 0801 Capitol Cement Co., Inc. 3.0000 6,222.00 6,222.00 3069 K-Five Construction Corporation 5.0000 10,370.00 10,370.00 44000009 BIT SURF REM 3 3,027.000 SQ YD 0801 Capitol Cement Co., Inc. 4.5000 13,621.50 13,621.50 3069 K-Five Construction Corporation 6.0000 18,162.00 18,162.00 44000100 PAVEMENT REM 7,491.000 SQ YD 0801 Capitol Cement Co., Inc. 25.0000 187,275.00 187,275.00 3069 K-Five Construction Corporation 10.0000 74,910.00 74,910.00 44000500 COMB CURB GUTTER REM 15,328.000 FOOT 0801 Capitol Cement Co., Inc. 5.0000 76,640.00 76,640.00 3069 K-Five Construction Corporation 10.0000 153,280.00 153,280.00 44004250 PAVED SHLD REMOVAL 6,616.000 SQ YD 0801 Capitol Cement Co., Inc. 12.0000 79,392.00 79,392.00 3069 K-Five Construction Corporation 9.5000 62,852.00 62,852.00 44201349 CL C PATCH T1 10 11.000 SQ YD 0801 Capitol Cement Co., Inc. 175.0000 1,925.00 1,925.00 3069 K-Five Construction Corporation 165.0000 1,815.00 1,815.00 44201385 CL C PATCH T1 13 30.000 SQ YD 0801 Capitol Cement Co., Inc. 175.0000 5,250.00 5,250.00 3069 K-Five Construction Corporation 160.0000 4,800.00 4,800.00 44201389 CL C PATCH T2 13 45.000 SQ YD 0801 Capitol Cement Co., Inc. 175.0000 7,875.00 7,875.00 3069 K-Five Construction Corporation 160.0000 7,200.00 7,200.00 44213200 SAW CUTS 294.000 FOOT 0801 Capitol Cement Co., Inc. 5.0000 1,470.00 1,470.00 3069 K-Five Construction Corporation 3.0000 882.00 882.00 44300200 STRIP REF CR CON TR 2,291.000 FOOT 0801 Capitol Cement Co., Inc. 2.0000 4,582.00 4,582.00 3069 K-Five Construction Corporation 0.6800 1,557.88 1,557.88 50100100 REM EXIST STRUCT 1.000 EACH 0801 Capitol Cement Co., Inc. 190,000.0000 190,000.00 190,000.00 3069 K-Five Construction Corporation 140,000.0000 140,000.00 140,000.00 50102400 CONC REM 368.000 CU YD 0801 Capitol Cement Co., Inc. 250.0000 92,000.00 92,000.00 3069 K-Five Construction Corporation 260.0000 95,680.00 95,680.00 50200100 STRUCTURE EXCAVATION 1,471.000 CU YD 0801 Capitol Cement Co., Inc. 40.0000 58,840.00 58,840.00 3069 K-Five Construction Corporation 45.0000 66,195.00 66,195.00 50300225 CONC STRUCT 565.000 CU YD 0801 Capitol Cement Co., Inc. 485.0000 274,025.00 274,025.00 3069 K-Five Construction Corporation 500.0000 282,500.00 282,500.00 50300255 CONC SUP-STR 271.000 CU YD 0801 Capitol Cement Co., Inc. 700.0000 189,700.00 189,700.00 3069 K-Five Construction Corporation 850.0000 230,350.00 230,350.00 50300300 PROTECTIVE COAT 944.000 SQ YD 0801 Capitol Cement Co., Inc. 10.0000 9,440.00 9,440.00 3069 K-Five Construction Corporation 10.0000 9,440.00 9,440.00 50300510 RUSTICATION FINISH 9,781.000 SQ FT 0801 Capitol Cement Co., Inc. 5.0000 48,905.00 48,905.00 3069 K-Five Construction Corporation 5.0000 48,905.00 48,905.00 50301245 FORM CONC REP =< 5 2.000 SQ FT 0801 Capitol Cement Co., Inc. 600.0000 1,200.00 1,200.00 3069 K-Five Construction Corporation 600.0000 1,200.00 1,200.00 50800105 REINFORCEMENT BARS 10,290.000 POUND 0801 Capitol Cement Co., Inc. 1.0500 10,804.50 10,804.50 3069 K-Five Construction Corporation 1.0500 10,804.50 10,804.50 50800205 REINF BARS, EPOXY CTD 99,580.000 POUND 0801 Capitol Cement Co., Inc. 1.2500 124,475.00 124,475.00 3069 K-Five Construction Corporation 1.2500 124,475.00 124,475.00 51205200 TEMP SHT PILING 8,740.000 SQ FT 0801 Capitol Cement Co., Inc. 1.0000 8,740.00 8,740.00 3069 K-Five Construction Corporation 1.0000 8,740.00 8,740.00 550A0040 STORM SEW CL A 1 10 415.000 FOOT 0801 Capitol Cement Co., Inc. 55.0000 22,825.00 22,825.00 3069 K-Five Construction Corporation 50.0000 20,750.00 20,750.00 550A0050 STORM SEW CL A 1 12 188.000 FOOT 0801 Capitol Cement Co., Inc. 65.0000 12,220.00 12,220.00 3069 K-Five Construction Corporation 60.0000 11,280.00 11,280.00 55100300 STORM SEWER REM 8 307.000 FOOT 0801 Capitol Cement Co., Inc. 12.0000 3,684.00 3,684.00 3069 K-Five Construction Corporation 12.0000 3,684.00 3,684.00 55100400 STORM SEWER REM 10 154.000 FOOT 0801 Capitol Cement Co., Inc. 12.0000 1,848.00 1,848.00 3069 K-Five Construction Corporation 12.0000 1,848.00 1,848.00 55100500 STORM SEWER REM 12 18.000 FOOT 0801 Capitol Cement Co., Inc. 12.0000 216.00 216.00 3069 K-Five Construction Corporation 12.0000 216.00 216.00 60107700 PIPE UNDERDRAINS 6 3,945.000 FOOT 0801 Capitol Cement Co., Inc. 40.0000 157,800.00 157,800.00 3069 K-Five Construction Corporation 26.0000 102,570.00 102,570.00 60109582 P UNDR FOR STRUCT 6 535.000 FOOT 0801 Capitol Cement Co., Inc. 23.0000 12,305.00 12,305.00 3069 K-Five Construction Corporation 26.0000 13,910.00 13,910.00 60109584 P UNDR FOR STRUCT 8 97.000 FOOT 0801 Capitol Cement Co., Inc. 25.0000 2,425.00 2,425.00 3069 K-Five Construction Corporation 27.0000 2,619.00 2,619.00 60200105 CB TA 4 DIA T1F OL 1.000 EACH 0801 Capitol Cement Co., Inc. 2,750.0000 2,750.00 2,750.00 3069 K-Five Construction Corporation 2,850.0000 2,850.00 2,850.00 60201310 CB TA 4 DIA T20F&G 4.000 EACH 0801 Capitol Cement Co., Inc. 2,750.0000 11,000.00 11,000.00 3069 K-Five Construction Corporation 2,850.0000 11,400.00 11,400.00 60202505 CB TA 4D T1FOL (CHGO) 5.000 EACH 0801 Capitol Cement Co., Inc. 2,750.0000 13,750.00 13,750.00 3069 K-Five Construction Corporation 2,900.0000 14,500.00 14,500.00 60213800 RD CB 4 DIA T1F OL 9.000 EACH 0801 Capitol Cement Co., Inc. 2,750.0000 24,750.00 24,750.00 3069 K-Five Construction Corporation 2,900.0000 26,100.00 26,100.00 60234200 INLETS TA T1F OL 18.000 EACH 0801 Capitol Cement Co., Inc. 1,750.0000 31,500.00 31,500.00 3069 K-Five Construction Corporation 800.0000 14,400.00 14,400.00 60250300 CB ADJUST SPL 15.000 EACH 0801 Capitol Cement Co., Inc. 575.0000 8,625.00 8,625.00 3069 K-Five Construction Corporation 600.0000 9,000.00 9,000.00 60250400 CB ADJ NEW T1F OL 4.000 EACH 0801 Capitol Cement Co., Inc. 575.0000 2,300.00 2,300.00 3069 K-Five Construction Corporation 575.0000 2,300.00 2,300.00 60255700 MAN ADJ NEW T1F OL 3.000 EACH 0801 Capitol Cement Co., Inc. 575.0000 1,725.00 1,725.00 3069 K-Five Construction Corporation 575.0000 1,725.00 1,725.00 60255800 MAN ADJ NEW T1F CL 22.000 EACH 0801 Capitol Cement Co., Inc. 575.0000 12,650.00 12,650.00 3069 K-Five Construction Corporation 575.0000 12,650.00 12,650.00 60260200 INLETS ADJUST SPL 1.000 EACH 0801 Capitol Cement Co., Inc. 575.0000 575.00 575.00 3069 K-Five Construction Corporation 600.0000 600.00 600.00 60260300 INLETS ADJ NEW T1F OL 4.000 EACH 0801 Capitol Cement Co., Inc. 575.0000 2,300.00 2,300.00 3069 K-Five Construction Corporation 575.0000 2,300.00 2,300.00 60500040 REMOV MANHOLES 1.000 EACH 0801 Capitol Cement Co., Inc. 400.0000 400.00 400.00 3069 K-Five Construction Corporation 250.0000 250.00 250.00 60500050 REMOV CATCH BAS 8.000 EACH 0801 Capitol Cement Co., Inc. 300.0000 2,400.00 2,400.00 3069 K-Five Construction Corporation 150.0000 1,200.00 1,200.00 60500060 REMOV INLETS 21.000 EACH 0801 Capitol Cement Co., Inc. 200.0000 4,200.00 4,200.00 3069 K-Five Construction Corporation 100.0000 2,100.00 2,100.00 60500305 FILL INLETS 7.000 EACH 0801 Capitol Cement Co., Inc. 150.0000 1,050.00 1,050.00 3069 K-Five Construction Corporation 75.0000 525.00 525.00 60603800 COMB CC&G TB6.12 3,133.000 FOOT 0801 Capitol Cement Co., Inc. 18.0000 56,394.00 56,394.00 3069 K-Five Construction Corporation 14.0000 43,862.00 43,862.00 63200310 GUARDRAIL REMOV 268.000 FOOT 0801 Capitol Cement Co., Inc. 2.2500 603.00 603.00 3069 K-Five Construction Corporation 2.5000 670.00 670.00 63700600 CONC BAR SIN FACE SPL 883.000 FOOT 0801 Capitol Cement Co., Inc. 80.0000 70,640.00 70,640.00 3069 K-Five Construction Corporation 80.0000 70,640.00 70,640.00 66400105 CH LK FENCE 4 2,814.000 FOOT 0801 Capitol Cement Co., Inc. 12.0000 33,768.00 33,768.00 3069 K-Five Construction Corporation 14.0000 39,396.00 39,396.00 66400905 CH LK GATE 4X6 SINGL 3.000 EACH 0801 Capitol Cement Co., Inc. 680.0000 2,040.00 2,040.00 3069 K-Five Construction Corporation 750.0000 2,250.00 2,250.00 66410200 CH LK FENCE SPL 1,551.000 FOOT 0801 Capitol Cement Co., Inc. 32.0000 49,632.00 49,632.00 3069 K-Five Construction Corporation 33.0000 51,183.00 51,183.00 66410300 CH LK FENCE REMOV 2,979.000 FOOT 0801 Capitol Cement Co., Inc. 5.0000 14,895.00 14,895.00 3069 K-Five Construction Corporation 5.5000 16,384.50 16,384.50 66410700 CH LK GATES SPL 3.000 EACH 0801 Capitol Cement Co., Inc. 6,800.0000 20,400.00 20,400.00 3069 K-Five Construction Corporation 7,500.0000 22,500.00 22,500.00 67000600 ENGR FIELD LAB 18.000 CAL MO 0801 Capitol Cement Co., Inc. 2,000.0000 36,000.00 36,000.00 3069 K-Five Construction Corporation 250.0000 4,500.00 4,500.00 67100100 MOBILIZATION 1.000 L SUM 0801 Capitol Cement Co., Inc. 350,000.0000 350,000.00 350,000.00 3069 K-Five Construction Corporation 71,000.0000 71,000.00 71,000.00 70101800 TRAF CONT & PROT SPL 1.000 L SUM 0801 Capitol Cement Co., Inc. 100,000.0000 100,000.00 100,000.00 3069 K-Five Construction Corporation 35,000.0000 35,000.00 35,000.00 70300210 TEMP PVT MK LTR & SYM 289.000 SQ FT 0801 Capitol Cement Co., Inc. 1.0000 289.00 289.00 3069 K-Five Construction Corporation 2.0000 578.00 578.00 70300220 TEMP PVT MK LINE 4 9,366.000 FOOT 0801 Capitol Cement Co., Inc. 0.1800 1,685.88 1,685.88 3069 K-Five Construction Corporation 0.1600 1,498.56 1,498.56 70300240 TEMP PVT MK LINE 6 3,953.000 FOOT 0801 Capitol Cement Co., Inc. 0.2700 1,067.31 1,067.31 3069 K-Five Construction Corporation 0.4300 1,699.79 1,699.79 70300250 TEMP PVT MK LINE 8 582.000 FOOT 0801 Capitol Cement Co., Inc. 0.5500 320.10 320.10 3069 K-Five Construction Corporation 0.5700 331.74 331.74 70300260 TEMP PVT MK LINE 12 91.000 FOOT 0801 Capitol Cement Co., Inc. 1.0000 91.00 91.00 3069 K-Five Construction Corporation 0.9200 83.72 83.72 70301000 WORK ZONE PAVT MK REM 14,926.000 SQ FT 0801 Capitol Cement Co., Inc. 1.0000 14,926.00 14,926.00 3069 K-Five Construction Corporation 0.8700 12,985.62 12,985.62 70400100 TEMP CONC BARRIER 5,520.000 FOOT 0801 Capitol Cement Co., Inc. 26.0000 143,520.00 143,520.00 3069 K-Five Construction Corporation 15.0000 82,800.00 82,800.00 72000200 SIGN PANEL T2 24.000 SQ FT 0801 Capitol Cement Co., Inc. 21.3000 511.20 511.20 3069 K-Five Construction Corporation 32.0000 768.00 768.00 72300100 INSTALL EX SIGN PANEL 107.000 SQ FT 0801 Capitol Cement Co., Inc. 12.0000 1,284.00 1,284.00 3069 K-Five Construction Corporation 12.0000 1,284.00 1,284.00 72400200 REMOV SIN PAN ASSY TB 4.000 EACH 0801 Capitol Cement Co., Inc. 200.0000 800.00 800.00 3069 K-Five Construction Corporation 52.0000 208.00 208.00 72400320 REMOV SIGN PANEL T2 24.000 SQ FT 0801 Capitol Cement Co., Inc. 10.0000 240.00 240.00 3069 K-Five Construction Corporation 13.0000 312.00 312.00 72400330 REMOV SIGN PANEL T3 38.000 SQ FT 0801 Capitol Cement Co., Inc. 16.6000 630.80 630.80 3069 K-Five Construction Corporation 17.0000 646.00 646.00 72400500 RELOC SIN PAN ASSY TA 29.000 EACH 0801 Capitol Cement Co., Inc. 310.0000 8,990.00 8,990.00 3069 K-Five Construction Corporation 150.0000 4,350.00 4,350.00 72400600 RELOC SIN PAN ASSY TB 10.000 EACH 0801 Capitol Cement Co., Inc. 330.0000 3,300.00 3,300.00 3069 K-Five Construction Corporation 150.0000 1,500.00 1,500.00 72800100 TELES STL SIN SUPPORT 28.000 FOOT 0801 Capitol Cement Co., Inc. 15.0000 420.00 420.00 3069 K-Five Construction Corporation 10.0000 280.00 280.00 72900200 METAL POST TY B 234.000 FOOT 0801 Capitol Cement Co., Inc. 7.0000 1,638.00 1,638.00 3069 K-Five Construction Corporation 10.0000 2,340.00 2,340.00 73000100 WOOD SIN SUPPORT 432.000 FOOT 0801 Capitol Cement Co., Inc. 19.5000 8,424.00 8,424.00 3069 K-Five Construction Corporation 34.0000 14,688.00 14,688.00 73100100 BASE TEL STL SIN SUPP 2.000 EACH 0801 Capitol Cement Co., Inc. 200.0000 400.00 400.00 3069 K-Five Construction Corporation 250.0000 500.00 500.00 73200100 CONC FDN-WOOD SN SUPP 8.000 EACH 0801 Capitol Cement Co., Inc. 250.0000 2,000.00 2,000.00 3069 K-Five Construction Corporation 250.0000 2,000.00 2,000.00 73600200 REMOV OH SIN STR-CANT 1.000 EACH 0801 Capitol Cement Co., Inc. 4,000.0000 4,000.00 4,000.00 3069 K-Five Construction Corporation 4,200.0000 4,200.00 4,200.00 73700300 REM CONC FDN-OVHD 1.000 EACH 0801 Capitol Cement Co., Inc. 3,100.0000 3,100.00 3,100.00 3069 K-Five Construction Corporation 3,200.0000 3,200.00 3,200.00 78000100 THPL PVT MK LTR & SYM 126.000 SQ FT 0801 Capitol Cement Co., Inc. 2.4000 302.40 302.40 3069 K-Five Construction Corporation 8.5000 1,071.00 1,071.00 78000200 THPL PVT MK LINE 4 2,023.000 FOOT 0801 Capitol Cement Co., Inc. 0.4200 849.66 849.66 3069 K-Five Construction Corporation 0.4700 950.81 950.81 78000400 THPL PVT MK LINE 6 335.000 FOOT 0801 Capitol Cement Co., Inc. 0.6400 214.40 214.40 3069 K-Five Construction Corporation 2.0000 670.00 670.00 78000500 THPL PVT MK LINE 8 582.000 FOOT 0801 Capitol Cement Co., Inc. 0.8500 494.70 494.70 3069 K-Five Construction Corporation 2.7000 1,571.40 1,571.40 78000600 THPL PVT MK LINE 12 91.000 FOOT 0801 Capitol Cement Co., Inc. 2.4000 218.40 218.40 3069 K-Five Construction Corporation 4.0000 364.00 364.00 78003110 PREF PL PM TB LINE 4 1,815.000 FOOT 0801 Capitol Cement Co., Inc. 2.7500 4,991.25 4,991.25 3069 K-Five Construction Corporation 5.0000 9,075.00 9,075.00 78008210 POLYUREA PM T1 LN 4 21,784.000 FOOT 0801 Capitol Cement Co., Inc. 0.7900 17,209.36 17,209.36 3069 K-Five Construction Corporation 0.6200 13,506.08 13,506.08 78008220 POLYUREA PM T1 LN 5 11,522.000 FOOT 0801 Capitol Cement Co., Inc. 0.9800 11,291.56 11,291.56 3069 K-Five Construction Corporation 0.7500 8,641.50 8,641.50 78008240 POLYUREA PM T1 LN 8 7,630.000 FOOT 0801 Capitol Cement Co., Inc. 1.5000 11,445.00 11,445.00 3069 K-Five Construction Corporation 1.7500 13,352.50 13,352.50 78008250 POLYUREA PM T1 LN 12 998.000 FOOT 0801 Capitol Cement Co., Inc. 5.1000 5,089.80 5,089.80 3069 K-Five Construction Corporation 3.0000 2,994.00 2,994.00 78100100 RAISED REFL PAVT MKR 18.000 EACH 0801 Capitol Cement Co., Inc. 80.0000 1,440.00 1,440.00 3069 K-Five Construction Corporation 78.0000 1,404.00 1,404.00 78200100 MONODIR PRIS BAR REFL 112.000 EACH 0801 Capitol Cement Co., Inc. 7.0000 784.00 784.00 3069 K-Five Construction Corporation 8.6000 963.20 963.20 78300100 PAVT MARKING REMOVAL 8,165.000 SQ FT 0801 Capitol Cement Co., Inc. 1.0000 8,165.00 8,165.00 3069 K-Five Construction Corporation 0.8700 7,103.55 7,103.55 80700140 GROUND ROD 5/8 X 10 52.000 EACH 0801 Capitol Cement Co., Inc. 109.0000 5,668.00 5,668.00 3069 K-Five Construction Corporation 120.0000 6,240.00 6,240.00 81000600 CON T 2 GALVS 113.000 FOOT 0801 Capitol Cement Co., Inc. 9.8000 1,107.40 1,107.40 3069 K-Five Construction Corporation 15.0000 1,695.00 1,695.00 81000800 CON T 3 GALVS 210.000 FOOT 0801 Capitol Cement Co., Inc. 14.4000 3,024.00 3,024.00 3069 K-Five Construction Corporation 18.0000 3,780.00 3,780.00 81012800 CON T 3 PVC 6.000 FOOT 0801 Capitol Cement Co., Inc. 10.7000 64.20 64.20 3069 K-Five Construction Corporation 14.0000 84.00 84.00 81400200 HD HANDHOLE 2.000 EACH 0801 Capitol Cement Co., Inc. 2,599.0000 5,198.00 5,198.00 3069 K-Five Construction Corporation 3,100.0000 6,200.00 6,200.00 81400205 HD HANDHOLE SPL 2.000 EACH 0801 Capitol Cement Co., Inc. 3,264.0000 6,528.00 6,528.00 3069 K-Five Construction Corporation 3,500.0000 7,000.00 7,000.00 81500200 TR & BKFIL F ELECT WK 712.000 FOOT 0801 Capitol Cement Co., Inc. 0.4000 284.80 284.80 3069 K-Five Construction Corporation 0.2000 142.40 142.40 83700250 LT TOWER FDN 44D 391.000 FOOT 0801 Capitol Cement Co., Inc. 338.2000 132,236.20 132,236.20 3069 K-Five Construction Corporation 360.0000 140,760.00 140,760.00