ILLINOIS DEPARTMENT OF TRANSPORTATION PAGE: 1 11/14/03 08:29:53 U N I T P R I C E T A B U L A T I O N O F B I D S LETTING DATE: 08/01/2003 LETTING TYPE: SCHEDULED CONTRACT NUMBER: 64507 LETTING ITEM NUMBER: 099 RESPONSIBLE DISTRICT: 02 BIDS LOCKED: Y SECTION: 10M-1 COUNTY: HENRY ESTIMATE: -------------------------- SUMMARY OF CONTRACTOR BIDS -------------------------- "AS READ" SUMMATION SUMMATION OF NBR BIDR CONTR COMB ITEM CONTR BIDDER OF BIDDER CALCULATED LOW BIDR CALC BLANK NBR BIDDER NAME GROUP COMB GRP NBR GROUP TOTAL PRICE EXTENSIONS EXTENSIONS BID EXTENSION DIFF BIDS 0049 Advanced Asphalt Co. NO ALT 2,247,131.78 2,247,131.78 2,247,131.78 4887 Bob Propheter Construction, L.L.C. NO ALT 2,219,437.79 * 2,219,437.79 2,219,437.79 * **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT = 107 ---------------------- DETAIL CONTRACTOR BIDS ---------------------- ITEM NBR ITEM DESCRIPTION UNIT OF UNIT BIDDER CALCULATED BIDR CALC BIDR NBR BIDDER NAME QUANTITY MEASURE PRICE EXTENSION EXTENSION EXTENSION DIFF B2004114 T-MALUS PF TF 1-3/4 14.000 EACH 0049 Advanced Asphalt Co. 279.3400 3,910.76 3,910.76 4887 Bob Propheter Construction, L.L.C. 255.0000 3,570.00 3,570.00 X0731705 DROP STRUCTURE C1 1.000 EACH 0049 Advanced Asphalt Co. 2,094.2500 2,094.25 2,094.25 4887 Bob Propheter Construction, L.L.C. 1,751.5000 1,751.50 1,751.50 X0731710 DROP STRUCTURE C2 1.000 EACH 0049 Advanced Asphalt Co. 3,929.0000 3,929.00 3,929.00 4887 Bob Propheter Construction, L.L.C. 1,484.7100 1,484.71 1,484.71 X4066414 BC SC SUPER "C" N50 244.000 TON 0049 Advanced Asphalt Co. 39.6400 9,672.16 9,672.16 4887 Bob Propheter Construction, L.L.C. 59.4800 14,513.12 14,513.12 X4073136 B C PVT FD SUP 12.75 18,535.000 SQ YD 0049 Advanced Asphalt Co. 32.7600 607,206.60 607,206.60 4887 Bob Propheter Construction, L.L.C. 30.4400 564,205.40 564,205.40 X7013015 TRAF CONT RD CLOSURE 1.000 L SUM 0049 Advanced Asphalt Co. 898.2600 898.26 898.26 4887 Bob Propheter Construction, L.L.C. 820.0000 820.00 820.00 X7015000 CHANGEABLE MESSAGE SN 3.000 CAL MO 0049 Advanced Asphalt Co. 1,533.6100 4,600.83 4,600.83 4887 Bob Propheter Construction, L.L.C. 1,400.0000 4,200.00 4,200.00 Z0013798 CONSTRUCTION LAYOUT 1.000 L SUM 0049 Advanced Asphalt Co. 15,971.4600 15,971.46 15,971.46 4887 Bob Propheter Construction, L.L.C. 26,400.0000 26,400.00 26,400.00 Z0048665 RR PROT LIABILITY INS 1.000 L SUM 0049 Advanced Asphalt Co. 3,380.7400 3,380.74 3,380.74 4887 Bob Propheter Construction, L.L.C. 7,322.5100 7,322.51 7,322.51 Z0050900 REM CONC FDN 2.000 EACH 0049 Advanced Asphalt Co. 419.0800 838.16 838.16 4887 Bob Propheter Construction, L.L.C. 795.3400 1,590.68 1,590.68 Z0065752 SLOT DR 12" W/6" SLOT 77.000 FOOT 0049 Advanced Asphalt Co. 251.0700 19,332.39 19,332.39 4887 Bob Propheter Construction, L.L.C. 76.7000 5,905.90 5,905.90 20100110 TREE REMOV 6-15 86.000 UNIT 0049 Advanced Asphalt Co. 27.3900 2,355.54 2,355.54 4887 Bob Propheter Construction, L.L.C. 20.0000 1,720.00 1,720.00 20100210 TREE REMOV OVER 15 40.000 UNIT 0049 Advanced Asphalt Co. 27.3900 1,095.60 1,095.60 4887 Bob Propheter Construction, L.L.C. 25.0000 1,000.00 1,000.00 20200100 EARTH EXCAVATION 30,751.000 CU YD 0049 Advanced Asphalt Co. 7.3400 225,712.34 225,712.34 4887 Bob Propheter Construction, L.L.C. 7.4600 229,402.46 229,402.46 20800150 TRENCH BACKFILL 1,158.000 CU YD 0049 Advanced Asphalt Co. 20.9100 24,213.78 24,213.78 4887 Bob Propheter Construction, L.L.C. 18.3000 21,191.40 21,191.40 21001000 GEOTECH FAB F/GR STAB 20,546.000 SQ YD 0049 Advanced Asphalt Co. 1.0300 21,162.38 21,162.38 4887 Bob Propheter Construction, L.L.C. 1.0400 21,367.84 21,367.84 25000400 NITROGEN FERT NUTR 312.000 POUND 0049 Advanced Asphalt Co. 1.0400 324.48 324.48 4887 Bob Propheter Construction, L.L.C. 0.9500 296.40 296.40 25000500 PHOSPHORUS FERT NUTR 312.000 POUND 0049 Advanced Asphalt Co. 1.0400 324.48 324.48 4887 Bob Propheter Construction, L.L.C. 0.9500 296.40 296.40 25000600 POTASSIUM FERT NUTR 312.000 POUND 0049 Advanced Asphalt Co. 1.0400 324.48 324.48 4887 Bob Propheter Construction, L.L.C. 0.9500 296.40 296.40 25000910 SEEDING CL 1 MOD .800 ACRE 0049 Advanced Asphalt Co. 1,150.2100 920.17 920.17 4887 Bob Propheter Construction, L.L.C. 1,050.0000 840.00 840.00 25001830 SEEDING CL 6 MOD 2.500 ACRE 0049 Advanced Asphalt Co. 1,040.6600 2,601.65 2,601.65 4887 Bob Propheter Construction, L.L.C. 950.0000 2,375.00 2,375.00 25100115 MULCH METHOD 2 3.000 ACRE 0049 Advanced Asphalt Co. 1,040.6600 3,121.98 3,121.98 4887 Bob Propheter Construction, L.L.C. 950.0000 2,850.00 2,850.00 25100630 EROSION CONTR BLANKET 467.000 SQ YD 0049 Advanced Asphalt Co. 1.5600 728.52 728.52 4887 Bob Propheter Construction, L.L.C. 1.4200 663.14 663.14 25200100 SODDING 4,226.000 SQ YD 0049 Advanced Asphalt Co. 3.1200 13,185.12 13,185.12 4887 Bob Propheter Construction, L.L.C. 2.8500 12,044.10 12,044.10 25200200 SUPPLE WATERING 38.000 UNIT 0049 Advanced Asphalt Co. 115.0200 4,370.76 4,370.76 4887 Bob Propheter Construction, L.L.C. 105.0000 3,990.00 3,990.00 28000250 TEMP EROS CONTR SEED 1,654.000 POUND 0049 Advanced Asphalt Co. 1.7500 2,894.50 2,894.50 4887 Bob Propheter Construction, L.L.C. 1.1000 1,819.40 1,819.40 28000300 TEMP DITCH CHECKS 30.000 EACH 0049 Advanced Asphalt Co. 99.1200 2,973.60 2,973.60 4887 Bob Propheter Construction, L.L.C. 72.8100 2,184.30 2,184.30 28000400 PERIMETER EROS BAR 1,875.000 FOOT 0049 Advanced Asphalt Co. 3.9200 7,350.00 7,350.00 4887 Bob Propheter Construction, L.L.C. 1.8300 3,431.25 3,431.25 28000500 INLET & PIPE PROTECT 2.000 EACH 0049 Advanced Asphalt Co. 175.2500 350.50 350.50 4887 Bob Propheter Construction, L.L.C. 72.8100 145.62 145.62 28100107 STONE RIPRAP CL A4 94.000 SQ YD 0049 Advanced Asphalt Co. 34.3100 3,225.14 3,225.14 4887 Bob Propheter Construction, L.L.C. 47.6700 4,480.98 4,480.98 28200100 FILTER FAB FOR RIPRAP 94.000 SQ YD 0049 Advanced Asphalt Co. 4.4100 414.54 414.54 4887 Bob Propheter Construction, L.L.C. 1.5200 142.88 142.88 31100100 SUB GRAN MAT A 32,420.000 TON 0049 Advanced Asphalt Co. 16.8900 547,573.80 547,573.80 4887 Bob Propheter Construction, L.L.C. 16.2400 526,500.80 526,500.80 35101400 AGG BASE CSE B 1,173.000 TON 0049 Advanced Asphalt Co. 15.0000 17,595.00 17,595.00 4887 Bob Propheter Construction, L.L.C. 24.5900 28,844.07 28,844.07 40200800 AGG SURF CSE B 70.000 TON 0049 Advanced Asphalt Co. 18.5500 1,298.50 1,298.50 4887 Bob Propheter Construction, L.L.C. 20.6700 1,446.90 1,446.90 40600200 BIT MATLS PR CT 17.930 TON 0049 Advanced Asphalt Co. 398.6400 7,147.62 7,147.62 4887 Bob Propheter Construction, L.L.C. 225.0000 4,034.25 4,034.25 40600300 AGG PR CT 31.000 TON 0049 Advanced Asphalt Co. 29.6000 917.60 917.60 4887 Bob Propheter Construction, L.L.C. 1.0000 31.00 31.00 40600895 CONSTRUC TEST STRIP 2.000 EACH 0049 Advanced Asphalt Co. 1,272.4700 2,544.94 2,544.94 4887 Bob Propheter Construction, L.L.C. 1,679.1700 3,358.34 3,358.34 40600990 TEMPORARY RAMP 69.000 SQ YD 0049 Advanced Asphalt Co. 13.5600 935.64 935.64 4887 Bob Propheter Construction, L.L.C. 14.5100 1,001.19 1,001.19 40702700 FURNISH PROFILOGRAPH 1.000 L SUM 0049 Advanced Asphalt Co. 8,215.7700 8,215.77 8,215.77 4887 Bob Propheter Construction, L.L.C. 10,000.0000 10,000.00 10,000.00 40800040 INCIDENTAL BIT SURF 165.000 TON 0049 Advanced Asphalt Co. 55.2700 9,119.55 9,119.55 4887 Bob Propheter Construction, L.L.C. 81.7900 13,495.35 13,495.35 42300300 PCC DRIVEWAY PAVT 7 909.000 SQ YD 0049 Advanced Asphalt Co. 44.4000 40,359.60 40,359.60 4887 Bob Propheter Construction, L.L.C. 28.0900 25,533.81 25,533.81 44000100 PAVEMENT REM 10,034.000 SQ YD 0049 Advanced Asphalt Co. 2.9000 29,098.60 29,098.60 4887 Bob Propheter Construction, L.L.C. 5.8700 58,899.58 58,899.58 44000400 GUTTER REM 1,076.000 FOOT 0049 Advanced Asphalt Co. 0.7700 828.52 828.52 4887 Bob Propheter Construction, L.L.C. 3.4100 3,669.16 3,669.16 44000600 SIDEWALK REM 40.000 SQ FT 0049 Advanced Asphalt Co. 2.0800 83.20 83.20 4887 Bob Propheter Construction, L.L.C. 5.3500 214.00 214.00 48101200 AGGREGATE SHLDS B 95.000 TON 0049 Advanced Asphalt Co. 16.0200 1,521.90 1,521.90 4887 Bob Propheter Construction, L.L.C. 22.0000 2,090.00 2,090.00 48202400 BIT SHLD SUPER 6 370.000 SQ YD 0049 Advanced Asphalt Co. 16.7000 6,179.00 6,179.00 4887 Bob Propheter Construction, L.L.C. 23.1400 8,561.80 8,561.80 50100300 REM EXIST STRUCT N1 1.000 EACH 0049 Advanced Asphalt Co. 3,239.2700 3,239.27 3,239.27 4887 Bob Propheter Construction, L.L.C. 1,929.8300 1,929.83 1,929.83 50104400 CONC HDWL REM 1.000 EACH 0049 Advanced Asphalt Co. 233.5600 233.56 233.56 4887 Bob Propheter Construction, L.L.C. 385.9700 385.97 385.97 50301245 FORM CONC REP =< 5 80.000 SQ FT 0049 Advanced Asphalt Co. 109.5400 8,763.20 8,763.20 4887 Bob Propheter Construction, L.L.C. 155.0000 12,400.00 12,400.00 50301250 FORM CONC REP > 5 112.000 SQ FT 0049 Advanced Asphalt Co. 180.7500 20,244.00 20,244.00 4887 Bob Propheter Construction, L.L.C. 225.0000 25,200.00 25,200.00 50800105 REINFORCEMENT BARS 50.000 POUND 0049 Advanced Asphalt Co. 1.9900 99.50 99.50 4887 Bob Propheter Construction, L.L.C. 3.9400 197.00 197.00 54002020 EXPAN BOLTS 3/4 8.000 EACH 0049 Advanced Asphalt Co. 12.0300 96.24 96.24 4887 Bob Propheter Construction, L.L.C. 14.3700 114.96 114.96 542A0229 P CUL CL A 1 24 113.000 FOOT 0049 Advanced Asphalt Co. 45.6900 5,162.97 5,162.97 4887 Bob Propheter Construction, L.L.C. 44.2400 4,999.12 4,999.12 542A1081 P CUL CL A 2 36 68.000 FOOT 0049 Advanced Asphalt Co. 57.3100 3,897.08 3,897.08 4887 Bob Propheter Construction, L.L.C. 56.8900 3,868.52 3,868.52 542D0217 P CUL CL D 1 12 33.000 FOOT 0049 Advanced Asphalt Co. 12.6400 417.12 417.12 4887 Bob Propheter Construction, L.L.C. 15.7000 518.10 518.10 542D5479 P CUL CL D 1 EQRS 24 110.000 FOOT 0049 Advanced Asphalt Co. 20.5800 2,263.80 2,263.80 4887 Bob Propheter Construction, L.L.C. 28.9600 3,185.60 3,185.60 54213447 END SECTIONS 12 6.000 EACH 0049 Advanced Asphalt Co. 187.9500 1,127.70 1,127.70 4887 Bob Propheter Construction, L.L.C. 94.9300 569.58 569.58 54214299 END SEC EQV R-S 24 2.000 EACH 0049 Advanced Asphalt Co. 231.7700 463.54 463.54 4887 Bob Propheter Construction, L.L.C. 147.1600 294.32 294.32 54248510 CONCRETE COLLAR 1.100 CU YD 0049 Advanced Asphalt Co. 496.2700 545.90 545.90 4887 Bob Propheter Construction, L.L.C. 1,109.3500 1,220.29 1,220.29 550A0050 STORM SEW CL A 1 12 890.000 FOOT 0049 Advanced Asphalt Co. 37.3900 33,277.10 33,277.10 4887 Bob Propheter Construction, L.L.C. 44.2800 39,409.20 39,409.20 550A0070 STORM SEW CL A 1 15 162.000 FOOT 0049 Advanced Asphalt Co. 37.3300 6,047.46 6,047.46 4887 Bob Propheter Construction, L.L.C. 46.1500 7,476.30 7,476.30 550A0090 STORM SEW CL A 1 18 80.000 FOOT 0049 Advanced Asphalt Co. 39.5500 3,164.00 3,164.00 4887 Bob Propheter Construction, L.L.C. 48.2500 3,860.00 3,860.00 550A0120 STORM SEW CL A 1 24 438.000 FOOT 0049 Advanced Asphalt Co. 47.9600 21,006.48 21,006.48 4887 Bob Propheter Construction, L.L.C. 54.0400 23,669.52 23,669.52 550A0340 STORM SEW CL A 2 12 658.000 FOOT 0049 Advanced Asphalt Co. 37.6600 24,780.28 24,780.28 4887 Bob Propheter Construction, L.L.C. 44.2800 29,136.24 29,136.24 550A0360 STORM SEW CL A 2 15 63.000 FOOT 0049 Advanced Asphalt Co. 37.3300 2,351.79 2,351.79 4887 Bob Propheter Construction, L.L.C. 46.1500 2,907.45 2,907.45 550A0380 STORM SEW CL A 2 18 340.000 FOOT 0049 Advanced Asphalt Co. 42.1600 14,334.40 14,334.40 4887 Bob Propheter Construction, L.L.C. 48.2500 16,405.00 16,405.00 550A0450 STORM SEW CL A 2 36 74.000 FOOT 0049 Advanced Asphalt Co. 57.3100 4,240.94 4,240.94 4887 Bob Propheter Construction, L.L.C. 64.9900 4,809.26 4,809.26 60100060 CONC HDWL FOR P DRAIN 1.000 EACH 0049 Advanced Asphalt Co. 132.1300 132.13 132.13 4887 Bob Propheter Construction, L.L.C. 176.7200 176.72 176.72 60107600 PIPE UNDERDRAINS 4 905.000 FOOT 0049 Advanced Asphalt Co. 9.9400 8,995.70 8,995.70 4887 Bob Propheter Construction, L.L.C. 13.9800 12,651.90 12,651.90 60107700 PIPE UNDERDRAINS 6 900.000 FOOT 0049 Advanced Asphalt Co. 11.3100 10,179.00 10,179.00 4887 Bob Propheter Construction, L.L.C. 17.7100 15,939.00 15,939.00 60218300 MAN TA 4 DIA T1F OL 4.000 EACH 0049 Advanced Asphalt Co. 1,400.0200 5,600.08 5,600.08 4887 Bob Propheter Construction, L.L.C. 1,153.2000 4,612.80 4,612.80 60242400 INLETS SPL 5.000 EACH 0049 Advanced Asphalt Co. 1,422.4500 7,112.25 7,112.25 4887 Bob Propheter Construction, L.L.C. 1,543.7400 7,718.70 7,718.70 60242801 INLETS SPL N5 34.000 EACH 0049 Advanced Asphalt Co. 2,006.6400 68,225.76 68,225.76 4887 Bob Propheter Construction, L.L.C. 1,676.5600 57,003.04 57,003.04 60600095 CLASS SI CONC OUTLET 12.900 CU YD 0049 Advanced Asphalt Co. 474.1400 6,116.41 6,116.41 4887 Bob Propheter Construction, L.L.C. 345.9700 4,463.01 4,463.01 60605000 COMB CC&G TB6.24 5,726.000 FOOT 0049 Advanced Asphalt Co. 17.2200 98,601.72 98,601.72 4887 Bob Propheter Construction, L.L.C. 16.8500 96,483.10 96,483.10 60608521 COMB CC&G TM2.24 112.000 FOOT 0049 Advanced Asphalt Co. 22.1400 2,479.68 2,479.68 4887 Bob Propheter Construction, L.L.C. 27.2900 3,056.48 3,056.48 60608600 COMB CC&G TM6.06 354.000 FOOT 0049 Advanced Asphalt Co. 18.7200 6,626.88 6,626.88 4887 Bob Propheter Construction, L.L.C. 23.7300 8,400.42 8,400.42 60618300 CONC MEDIAN SURF 4 2,905.000 SQ FT 0049 Advanced Asphalt Co. 4.5500 13,217.75 13,217.75 4887 Bob Propheter Construction, L.L.C. 3.5000 10,167.50 10,167.50 63000000 SPBGR TY A 313.000 FOOT 0049 Advanced Asphalt Co. 14.7900 4,629.27 4,629.27 4887 Bob Propheter Construction, L.L.C. 11.0000 3,443.00 3,443.00 63100045 TRAF BAR TERM T2 1.000 EACH 0049 Advanced Asphalt Co. 602.4900 602.49 602.49 4887 Bob Propheter Construction, L.L.C. 450.0000 450.00 450.00 63100085 TRAF BAR TERM T6 4.000 EACH 0049 Advanced Asphalt Co. 1,588.3800 6,353.52 6,353.52 4887 Bob Propheter Construction, L.L.C. 1,400.0000 5,600.00 5,600.00 63100169 TR BAR TRM T1 SPL FLR 3.000 EACH 0049 Advanced Asphalt Co. 1,643.1500 4,929.45 4,929.45 4887 Bob Propheter Construction, L.L.C. 1,600.0000 4,800.00 4,800.00 63200310 GUARDRAIL REMOV 613.000 FOOT 0049 Advanced Asphalt Co. 4.0500 2,482.65 2,482.65 4887 Bob Propheter Construction, L.L.C. 2.0000 1,226.00 1,226.00 66600105 FUR ERECT ROW MARKERS 25.000 EACH 0049 Advanced Asphalt Co. 112.0100 2,800.25 2,800.25 4887 Bob Propheter Construction, L.L.C. 63.7500 1,593.75 1,593.75 66700205 PERM SURV MKRS T1 1.000 EACH 0049 Advanced Asphalt Co. 329.7900 329.79 329.79 4887 Bob Propheter Construction, L.L.C. 200.0000 200.00 200.00 67000400 ENGR FIELD OFFICE A 5.000 CAL MO 0049 Advanced Asphalt Co. 1,663.8400 8,319.20 8,319.20 4887 Bob Propheter Construction, L.L.C. 1,362.3300 6,811.65 6,811.65 67100100 MOBILIZATION 1.000 L SUM 0049 Advanced Asphalt Co. 134,630.0000 134,630.00 134,630.00 4887 Bob Propheter Construction, L.L.C. 133,170.0000 133,170.00 133,170.00 70100460 TRAF CONT-PROT 701306 1.000 L SUM 0049 Advanced Asphalt Co. 1,648.8700 1,648.87 1,648.87 4887 Bob Propheter Construction, L.L.C. 810.0000 810.00 810.00 70101830 TRAF CONT-PROT BLR 21 1.000 L SUM 0049 Advanced Asphalt Co. 3,009.4000 3,009.40 3,009.40 4887 Bob Propheter Construction, L.L.C. 1,050.0000 1,050.00 1,050.00 70102620 TR CONT & PROT 701501 1.000 L SUM 0049 Advanced Asphalt Co. 4,470.7200 4,470.72 4,470.72 4887 Bob Propheter Construction, L.L.C. 775.0000 775.00 775.00 70300100 SHORT-TERM PAVT MKING 1,480.000 FOOT 0049 Advanced Asphalt Co. 0.4300 636.40 636.40 4887 Bob Propheter Construction, L.L.C. 0.5500 814.00 814.00 70301000 WORK ZONE PAVT MK REM 493.000 SQ FT 0049 Advanced Asphalt Co. 1.1000 542.30 542.30 4887 Bob Propheter Construction, L.L.C. 2.8500 1,405.05 1,405.05 78000100 THPL PVT MK LTR & SYM 148.000 SQ FT 0049 Advanced Asphalt Co. 4.1100 608.28 608.28 4887 Bob Propheter Construction, L.L.C. 3.7500 555.00 555.00 78000200 THPL PVT MK LINE 4 11,263.000 FOOT 0049 Advanced Asphalt Co. 0.5500 6,194.65 6,194.65 4887 Bob Propheter Construction, L.L.C. 0.5000 5,631.50 5,631.50 78000500 THPL PVT MK LINE 8 1,944.000 FOOT 0049 Advanced Asphalt Co. 0.8200 1,594.08 1,594.08 4887 Bob Propheter Construction, L.L.C. 0.7500 1,458.00 1,458.00 78000600 THPL PVT MK LINE 12 1,404.000 FOOT 0049 Advanced Asphalt Co. 1.6400 2,302.56 2,302.56 4887 Bob Propheter Construction, L.L.C. 1.5000 2,106.00 2,106.00 78000650 THPL PVT MK LINE 24 106.000 FOOT 0049 Advanced Asphalt Co. 2.7400 290.44 290.44 4887 Bob Propheter Construction, L.L.C. 2.5000 265.00 265.00 78001100 PT PVT MK LTRS & SYMB 148.000 SQ FT 0049 Advanced Asphalt Co. 1.6400 242.72 242.72 4887 Bob Propheter Construction, L.L.C. 1.5000 222.00 222.00 78001110 PAINT PVT MK LINE 4 11,263.000 FOOT 0049 Advanced Asphalt Co. 0.2200 2,477.86 2,477.86 4887 Bob Propheter Construction, L.L.C. 0.2000 2,252.60 2,252.60 78001140 PAINT PVT MK LINE 8 1,944.000 FOOT 0049 Advanced Asphalt Co. 0.4400 855.36 855.36 4887 Bob Propheter Construction, L.L.C. 0.4000 777.60 777.60 78001150 PAINT PVT MK LINE 12 1,404.000 FOOT 0049 Advanced Asphalt Co. 0.5500 772.20 772.20 4887 Bob Propheter Construction, L.L.C. 0.5000 702.00 702.00 78001180 PAINT PVT MK LINE 24 106.000 FOOT 0049 Advanced Asphalt Co. 1.6400 173.84 173.84 4887 Bob Propheter Construction, L.L.C. 1.5000 159.00 159.00 78100100 RAISED REFL PAVT MKR 245.000 EACH 0049 Advanced Asphalt Co. 32.8600 8,050.70 8,050.70 4887 Bob Propheter Construction, L.L.C. 30.0000 7,350.00 7,350.00 78200410 GUARDRAIL MKR TYPE A 16.000 EACH 0049 Advanced Asphalt Co. 8.7600 140.16 140.16 4887 Bob Propheter Construction, L.L.C. 20.0000 320.00 320.00 78201000 TERMINAL MARKER - DA 4.000 EACH 0049 Advanced Asphalt Co. 32.8600 131.44 131.44 4887 Bob Propheter Construction, L.L.C. 50.0000 200.00 200.00 78300200 RAISED REF PVT MK REM 43.000 EACH 0049 Advanced Asphalt Co. 7.5100 322.93 322.93 4887 Bob Propheter Construction, L.L.C. 13.4900 580.07 580.07 89502375 REMOV EX TS EQUIP 1.000 EACH 0049 Advanced Asphalt Co. 1,643.1500 1,643.15 1,643.15 4887 Bob Propheter Construction, L.L.C. 1,500.0000 1,500.00 1,500.00