ILLINOIS DEPARTMENT OF TRANSPORTATION PAGE: 1 09/07/07 14:58:55 U N I T P R I C E T A B U L A T I O N O F B I D S LETTING DATE: 08/03/2007 LETTING TYPE: SCHEDULED CONTRACT NUMBER: 60C22 LETTING ITEM NUMBER: 023 RESPONSIBLE DISTRICT: 01 BIDS LOCKED: Y SECTION: 2007-003I COUNTY: WILL ESTIMATE: -------------------------- SUMMARY OF CONTRACTOR BIDS -------------------------- "AS READ" SUMMATION SUMMATION OF NBR BIDR CONTR COMB ITEM CONTR BIDDER OF BIDDER CALCULATED LOW BIDR CALC BLANK NBR BIDDER NAME GROUP COMB GRP NBR GROUP TOTAL PRICE EXTENSIONS EXTENSIONS BID EXTENSION DIFF BIDS 1320 D. Construction, Inc. NO ALT 768,519.25 * 764,070.85 798,162.05 * 34,091.20+ 1750 P. T. Ferro Construction Co. NO ALT 997,619.89 992,315.89 1,023,307.89 30,992.00+ **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT = 66 ---------------------- DETAIL CONTRACTOR BIDS ---------------------- ITEM NBR ITEM DESCRIPTION UNIT OF UNIT BIDDER CALCULATED BIDR CALC BIDR NBR BIDDER NAME QUANTITY MEASURE PRICE EXTENSION EXTENSION EXTENSION DIFF XX001011 BICYCLE RACKS 6.000 EACH 1320 D. Construction, Inc. 1,241.0000 7,446.00 7,446.00 1750 P. T. Ferro Construction Co. 1,139.0000 6,834.00 6,834.00 XX006937 GROUND ROD 5/8 X 10 9.000 EACH 1320 D. Construction, Inc. 110.0000 550.00 990.00 440.00+ 1750 P. T. Ferro Construction Co. 100.0000 500.00 900.00 400.00+ X0300019 REM REIN PARKING BLKS 71.000 EACH 1320 D. Construction, Inc. 25.0000 1,775.00 1,775.00 1750 P. T. Ferro Construction Co. 115.0000 8,165.00 8,165.00 X0323574 MAINTAIN LIGHTING SYS 6.000 CAL MO 1320 D. Construction, Inc. 1.1000 6.60 6.60 1750 P. T. Ferro Construction Co. 1.0000 6.00 6.00 X0323973 SED CONT SILT FENCE 3,163.000 FOOT 1320 D. Construction, Inc. 3.5000 11,070.50 11,070.50 1750 P. T. Ferro Construction Co. 3.3000 10,437.90 10,437.90 X0323974 SED CONT SILT FN MAIN 1,120.000 FOOT 1320 D. Construction, Inc. 3.5000 3,920.00 3,920.00 1750 P. T. Ferro Construction Co. 3.5000 3,920.00 3,920.00 X0324045 SED CON STAB CON EN R 3.000 EACH 1320 D. Construction, Inc. 2,100.0000 6,300.00 6,300.00 1750 P. T. Ferro Construction Co. 4,000.0000 12,000.00 12,000.00 X0324774 SED CON STAB CONST EN 756.000 SQ YD 1320 D. Construction, Inc. 25.0000 18,900.00 18,900.00 1750 P. T. Ferro Construction Co. 50.0000 37,800.00 37,800.00 X0324775 SED CON STAB CON EN M 756.000 SQ YD 1320 D. Construction, Inc. 5.0000 3,780.00 3,780.00 1750 P. T. Ferro Construction Co. 10.0000 7,560.00 7,560.00 X0325800 PARK LOT SEAL CT 4,572.000 SQ YD 1320 D. Construction, Inc. 2.4800 11,338.56 11,338.56 1750 P. T. Ferro Construction Co. 2.0000 9,144.00 9,144.00 X0696100 PARKING BLOCKS 150.000 EACH 1320 D. Construction, Inc. 50.0000 7,500.00 7,500.00 1750 P. T. Ferro Construction Co. 150.0000 22,500.00 22,500.00 X8160395 UD 3#2 #4G EPRRHW1.5 760.000 FOOT 1320 D. Construction, Inc. 15.4000 21,560.00 11,704.00 9,856.00- 1750 P. T. Ferro Construction Co. 14.0000 19,600.00 10,640.00 8,960.00- Z0001050 AGG SUBGRADE 12 7,803.000 SQ YD 1320 D. Construction, Inc. 14.0000 109,242.00 109,242.00 1750 P. T. Ferro Construction Co. 16.0000 124,848.00 124,848.00 Z0013798 CONSTRUCTION LAYOUT 1.000 L SUM 1320 D. Construction, Inc. 12,000.0000 12,000.00 12,000.00 1750 P. T. Ferro Construction Co. 27,660.0000 27,660.00 27,660.00 Z0076600 TRAINEES 1,000.000 HOUR 1320 D. Construction, Inc. 0.8000 800.00 800.00 1750 P. T. Ferro Construction Co. 0.8000 800.00 800.00 20100110 TREE REMOV 6-15 283.000 UNIT 1320 D. Construction, Inc. 12.0000 3,396.00 3,396.00 1750 P. T. Ferro Construction Co. 10.0000 2,830.00 2,830.00 20100210 TREE REMOV OVER 15 446.000 UNIT 1320 D. Construction, Inc. 13.2000 5,887.20 5,887.20 1750 P. T. Ferro Construction Co. 12.0000 5,352.00 5,352.00 20200100 EARTH EXCAVATION 820.000 CU YD 1320 D. Construction, Inc. 19.2000 15,744.00 15,744.00 1750 P. T. Ferro Construction Co. 35.0000 28,700.00 28,700.00 20201200 REM & DISP UNS MATL 2,975.000 CU YD 1320 D. Construction, Inc. 19.2000 57,120.00 57,120.00 1750 P. T. Ferro Construction Co. 30.0000 89,250.00 89,250.00 20400800 FURNISHED EXCAV 290.000 CU YD 1320 D. Construction, Inc. 19.2000 5,568.00 5,568.00 1750 P. T. Ferro Construction Co. 30.0000 8,700.00 8,700.00 20700420 POROUS GRAN EMB SUBGR 161.000 CU YD 1320 D. Construction, Inc. 45.0000 7,245.00 7,245.00 1750 P. T. Ferro Construction Co. 60.0000 9,660.00 9,660.00 21101505 TOPSOIL EXC & PLAC 1,350.000 CU YD 1320 D. Construction, Inc. 24.8000 33,480.00 33,480.00 1750 P. T. Ferro Construction Co. 48.0000 64,800.00 64,800.00 25000210 SEEDING CL 2A 1.970 ACRE 1320 D. Construction, Inc. 1,089.0000 2,145.33 2,145.33 1750 P. T. Ferro Construction Co. 850.0000 1,674.50 1,674.50 25000400 NITROGEN FERT NUTR 177.000 POUND 1320 D. Construction, Inc. 1.1000 194.70 194.70 1750 P. T. Ferro Construction Co. 3.9000 690.30 690.30 25000500 PHOSPHORUS FERT NUTR 177.000 POUND 1320 D. Construction, Inc. 1.1000 194.70 194.70 1750 P. T. Ferro Construction Co. 3.9000 690.30 690.30 25000600 POTASSIUM FERT NUTR 177.000 POUND 1320 D. Construction, Inc. 1.1000 194.70 194.70 1750 P. T. Ferro Construction Co. 3.9000 690.30 690.30 25100115 MULCH METHOD 2 1.410 ACRE 1320 D. Construction, Inc. 1,089.0000 1,535.49 1,535.49 1750 P. T. Ferro Construction Co. 1,200.0000 1,692.00 1,692.00 25100630 EROSION CONTR BLANKET 2,689.000 SQ YD 1320 D. Construction, Inc. 1.5200 4,087.28 4,087.28 1750 P. T. Ferro Construction Co. 1.6000 4,302.40 4,302.40 28000250 TEMP EROS CONTR SEED 192.000 POUND 1320 D. Construction, Inc. 7.0000 1,344.00 1,344.00 1750 P. T. Ferro Construction Co. 5.4000 1,036.80 1,036.80 28000300 TEMP DITCH CHECKS 5.000 EACH 1320 D. Construction, Inc. 100.0000 500.00 500.00 1750 P. T. Ferro Construction Co. 177.0000 885.00 885.00 40600200 BIT MATLS PR CT 3.000 TON 1320 D. Construction, Inc. 800.0000 2,400.00 2,400.00 1750 P. T. Ferro Construction Co. 0.0100 0.03 0.03 40600300 AGG PR CT 16.000 TON 1320 D. Construction, Inc. 25.0000 400.00 400.00 1750 P. T. Ferro Construction Co. 0.0100 0.16 0.16 40600400 MIX CR JTS FLANGEWYS 1.100 TON 1320 D. Construction, Inc. 400.0000 440.00 440.00 1750 P. T. Ferro Construction Co. 1,000.0000 1,100.00 1,100.00 40603080 HMA BC IL-19.0 N50 3,601.000 TON 1320 D. Construction, Inc. 49.0000 176,449.00 176,449.00 1750 P. T. Ferro Construction Co. 65.0000 234,065.00 234,065.00 40603335 HMA SC "D" N50 675.000 TON 1320 D. Construction, Inc. 56.0000 37,800.00 37,800.00 1750 P. T. Ferro Construction Co. 70.0000 47,250.00 47,250.00 44000100 PAVEMENT REM 163.000 SQ YD 1320 D. Construction, Inc. 18.0000 2,934.00 2,934.00 1750 P. T. Ferro Construction Co. 20.0000 3,260.00 3,260.00 44000500 COMB CURB GUTTER REM 10.000 FOOT 1320 D. Construction, Inc. 15.0000 150.00 150.00 1750 P. T. Ferro Construction Co. 10.0000 100.00 100.00 44001700 COMB C C&G REM & REPL 60.000 FOOT 1320 D. Construction, Inc. 45.0000 2,700.00 2,700.00 1750 P. T. Ferro Construction Co. 50.0000 3,000.00 3,000.00 50105220 PIPE CULVERT REMOV 40.000 FOOT 1320 D. Construction, Inc. 12.0000 480.00 480.00 1750 P. T. Ferro Construction Co. 20.0000 800.00 800.00 50800105 REINFORCEMENT BARS 624.000 POUND 1320 D. Construction, Inc. 3.0000 1,872.00 1,872.00 1750 P. T. Ferro Construction Co. 3.0000 1,872.00 1,872.00 54200439 P CUL 1 RCCP 24 65.000 FOOT 1320 D. Construction, Inc. 60.0000 3,900.00 3,900.00 1750 P. T. Ferro Construction Co. 80.0000 5,200.00 5,200.00 5421D015 P CUL CL D 1 15 TEMP 40.000 FOOT 1320 D. Construction, Inc. 45.0000 1,800.00 1,800.00 1750 P. T. Ferro Construction Co. 95.0000 3,800.00 3,800.00 54213669 PRC FLAR END SEC 24 2.000 EACH 1320 D. Construction, Inc. 600.0000 1,200.00 1,200.00 1750 P. T. Ferro Construction Co. 900.0000 1,800.00 1,800.00 60603800 COMB CC&G TB6.12 137.000 FOOT 1320 D. Construction, Inc. 15.0000 2,055.00 2,055.00 1750 P. T. Ferro Construction Co. 75.0000 10,275.00 10,275.00 66400105 CH LK FENCE 4 649.000 FOOT 1320 D. Construction, Inc. 4.1000 2,660.90 2,660.90 1750 P. T. Ferro Construction Co. 13.8900 9,014.61 9,014.61 66410300 CH LK FENCE REMOV 671.000 FOOT 1320 D. Construction, Inc. 15.3000 10,266.30 10,266.30 1750 P. T. Ferro Construction Co. 3.8000 2,549.80 2,549.80 67100100 MOBILIZATION 1.000 L SUM 1320 D. Construction, Inc. 43,000.0000 43,000.00 43,000.00 1750 P. T. Ferro Construction Co. 59,500.0000 59,500.00 59,500.00 70101800 TRAF CONT & PROT SPL 1.000 L SUM 1320 D. Construction, Inc. 6,000.0000 6,000.00 6,000.00 1750 P. T. Ferro Construction Co. 3,200.0000 3,200.00 3,200.00 72000100 SIGN PANEL T1 134.000 SQ FT 1320 D. Construction, Inc. 29.7000 3,979.80 3,979.80 1750 P. T. Ferro Construction Co. 19.0000 2,546.00 2,546.00 72000300 SIGN PANEL T3 396.000 SQ FT 1320 D. Construction, Inc. 26.4000 10,454.40 10,454.40 1750 P. T. Ferro Construction Co. 24.0000 9,504.00 9,504.00 72700100 STR STL SIN SUP BA 3,051.000 POUND 1320 D. Construction, Inc. 3.3000 10,068.30 10,068.30 1750 P. T. Ferro Construction Co. 3.0000 9,153.00 9,153.00 72900300 METAL POSTS 84.000 FOOT 1320 D. Construction, Inc. 31.9000 2,679.60 2,679.60 1750 P. T. Ferro Construction Co. 9.0000 756.00 756.00 73000100 WOOD SIN SUPPORT 176.000 FOOT 1320 D. Construction, Inc. 25.5700 4,500.32 4,500.32 1750 P. T. Ferro Construction Co. 16.0000 2,816.00 2,816.00 73400100 CONC FOUNDATION 5.600 CU YD 1320 D. Construction, Inc. 1,720.0000 9,632.00 9,632.00 1750 P. T. Ferro Construction Co. 1,570.0000 8,792.00 8,792.00 78000100 THPL PVT MK LTR & SYM 358.000 SQ FT 1320 D. Construction, Inc. 4.1000 1,467.80 1,467.80 1750 P. T. Ferro Construction Co. 3.2000 1,145.60 1,145.60 78000200 THPL PVT MK LINE 4 8,228.000 FOOT 1320 D. Construction, Inc. 1.2200 10,038.16 10,038.16 1750 P. T. Ferro Construction Co. 0.5500 4,525.40 4,525.40 78000400 THPL PVT MK LINE 6 118.000 FOOT 1320 D. Construction, Inc. 1.8300 215.94 215.94 1750 P. T. Ferro Construction Co. 0.8300 97.94 97.94 78000650 THPL PVT MK LINE 24 44.000 FOOT 1320 D. Construction, Inc. 4.2300 186.12 186.12 1750 P. T. Ferro Construction Co. 3.2000 140.80 140.80 78300100 PAVT MARKING REMOVAL 1,549.000 SQ FT 1320 D. Construction, Inc. 2.1500 3,330.35 3,330.35 1750 P. T. Ferro Construction Co. 1.4500 2,246.05 2,246.05 81603210 UD 3#4#6GEPRRHW 1 1/4 1,300.000 FOOT 1320 D. Construction, Inc. 15.4000 3,542.00 20,020.00 16,478.00+ 1750 P. T. Ferro Construction Co. 14.0000 3,220.00 18,200.00 14,980.00+ 81900200 TR & BKFIL F ELECT WK 1,482.000 FOOT 1320 D. Construction, Inc. 4.4000 5,645.20 6,520.80 875.60+ 1750 P. T. Ferro Construction Co. 4.0000 5,132.00 5,928.00 796.00+ 81900300 TR & BKFIL W SCR/SAND 534.000 FOOT 1320 D. Construction, Inc. 8.8000 4,021.60 4,699.20 677.60+ 1750 P. T. Ferro Construction Co. 8.0000 3,656.00 4,272.00 616.00+ 82102400 LUM SV HOR MT 400W 13.000 EACH 1320 D. Construction, Inc. 495.0000 4,455.00 6,435.00 1,980.00+ 1750 P. T. Ferro Construction Co. 450.0000 4,050.00 5,850.00 1,800.00+ 83050760 LT P A 47.5MH 8MA 5.000 EACH 1320 D. Construction, Inc. 3,410.0000 3,410.00 17,050.00 13,640.00+ 1750 P. T. Ferro Construction Co. 3,100.0000 3,100.00 15,500.00 12,400.00+ 83050880 LT P A 47.5MH 2-8MA 4.000 EACH 1320 D. Construction, Inc. 5,390.0000 21,560.00 21,560.00 1750 P. T. Ferro Construction Co. 4,900.0000 19,600.00 19,600.00 83600200 LIGHT POLE FDN 24D 152.000 FOOT 1320 D. Construction, Inc. 154.0000 13,552.00 23,408.00 9,856.00+ 1750 P. T. Ferro Construction Co. 140.0000 12,320.00 21,280.00 8,960.00+