ILLINOIS DEPARTMENT OF TRANSPORTATION PAGE: 1 11/08/07 13:31:49 U N I T P R I C E T A B U L A T I O N O F B I D S LETTING DATE: 09/21/2007 LETTING TYPE: SCHEDULED CONTRACT NUMBER: 87341 LETTING ITEM NUMBER: 006 RESPONSIBLE DISTRICT: 03 BIDS LOCKED: Y SECTION: 05-00198-00-RS COUNTY: BUREAU ESTIMATE: STATE JOB NUMBER: C-93-037-07 MUNICIPALITY: PROJECT NUMBER: RS-1253/103/000 -------------------------- SUMMARY OF CONTRACTOR BIDS -------------------------- "AS READ" SUMMATION SUMMATION OF NBR BIDR CONTR COMB ITEM CONTR BIDDER OF BIDDER CALCULATED LOW BIDR CALC BLANK NBR BIDDER NAME GROUP COMB GRP NBR GROUP TOTAL PRICE EXTENSIONS EXTENSIONS BID EXTENSION DIFF BIDS 0049 Advanced Asphalt Co. NO ALT 1,620,711.53 * 1,620,711.53 1,620,711.53 * **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT = 44 ---------------------- DETAIL CONTRACTOR BIDS ---------------------- ITEM NBR ITEM DESCRIPTION UNIT OF UNIT BIDDER CALCULATED BIDR CALC BIDR NBR BIDDER NAME QUANTITY MEASURE PRICE EXTENSION EXTENSION EXTENSION DIFF XX003565 SEEDING SPEC COMPLETE .510 ACRE 0049 Advanced Asphalt Co. 6,843.8400 3,490.36 3,490.36 XX003643 BASE REPAIR SPECIAL 1,500.000 SQ YD 0049 Advanced Asphalt Co. 27.5700 41,355.00 41,355.00 XX006942 P CUL CL D 2 ERS 120 116.000 FOOT 0049 Advanced Asphalt Co. 762.9200 88,498.72 88,498.72 XX006943 REM COR STR PL P ARCH 62.000 FOOT 0049 Advanced Asphalt Co. 86.2800 5,349.36 5,349.36 X0320547 REM & REIN END SECT 6.000 EACH 0049 Advanced Asphalt Co. 832.8600 4,997.16 4,997.16 X0976500 END SECTIONS REMOVED 2.000 EACH 0049 Advanced Asphalt Co. 416.4300 832.86 832.86 X5121800 PERM STEEL SHT PILING 216.000 SQ FT 0049 Advanced Asphalt Co. 42.6300 9,208.08 9,208.08 Z0048665 RR PROT LIABILITY INS 1.000 L SUM 0049 Advanced Asphalt Co. 1,682.9100 1,682.91 1,682.91 Z0076600 TRAINEES 1,000.000 HOUR 0049 Advanced Asphalt Co. 0.8000 800.00 800.00 20200100 EARTH EXCAVATION 962.000 CU YD 0049 Advanced Asphalt Co. 13.0100 12,515.62 12,515.62 28000250 TEMP EROS CONTR SEED 51.000 POUND 0049 Advanced Asphalt Co. 9.8900 504.39 504.39 28000300 TEMP DITCH CHECKS 7.000 EACH 0049 Advanced Asphalt Co. 93.1400 651.98 651.98 28000500 INLET & PIPE PROTECT 4.000 EACH 0049 Advanced Asphalt Co. 204.2700 817.08 817.08 28101300 DUMPED RIPRAP SPL 129.000 TON 0049 Advanced Asphalt Co. 63.9500 8,249.55 8,249.55 31100300 SUB GRAN MAT A 4 842.000 SQ YD 0049 Advanced Asphalt Co. 5.6200 4,732.04 4,732.04 31100910 SUB GRAN MAT A 12 1,335.000 SQ YD 0049 Advanced Asphalt Co. 12.9000 17,221.50 17,221.50 40200800 AGG SURF CSE B 543.000 TON 0049 Advanced Asphalt Co. 25.3200 13,748.76 13,748.76 40600100 BIT MATLS PR CT 6,878.000 GALLON 0049 Advanced Asphalt Co. 0.0100 68.78 68.78 40600300 AGG PR CT 150.000 TON 0049 Advanced Asphalt Co. 0.0100 1.50 1.50 40600895 CONSTRUC TEST STRIP 1.000 EACH 0049 Advanced Asphalt Co. 567.3400 567.34 567.34 40600982 HMA SURF REM BUTT JT 257.000 SQ YD 0049 Advanced Asphalt Co. 13.3100 3,420.67 3,420.67 40600990 TEMPORARY RAMP 84.000 SQ YD 0049 Advanced Asphalt Co. 6.9400 582.96 582.96 40603100 HMA BC IL-19.0L N30 12,393.000 TON 0049 Advanced Asphalt Co. 53.7300 665,875.89 665,875.89 40603305 HMA SC "C" N30 7,484.000 TON 0049 Advanced Asphalt Co. 56.8800 425,689.92 425,689.92 40800050 INCIDENTAL HMA SURF 69.000 TON 0049 Advanced Asphalt Co. 109.8400 7,578.96 7,578.96 42000200 PCC PVT 7 794.000 SQ YD 0049 Advanced Asphalt Co. 58.6800 46,591.92 46,591.92 48101200 AGGREGATE SHLDS B 5,391.000 TON 0049 Advanced Asphalt Co. 20.3200 109,545.12 109,545.12 48300200 PCC SHOULDERS 7 127.000 SQ YD 0049 Advanced Asphalt Co. 45.4700 5,774.69 5,774.69 50100100 REM EXIST STRUCT 1.000 EACH 0049 Advanced Asphalt Co. 28,609.4900 28,609.49 28,609.49 51500100 NAME PLATES 1.000 EACH 0049 Advanced Asphalt Co. 448.7800 448.78 448.78 54103900 COR STR PL P ARCH 46 82.000 FOOT 0049 Advanced Asphalt Co. 534.6700 43,842.94 43,842.94 542C0271 P CUL CL C 1 66 5.000 FOOT 0049 Advanced Asphalt Co. 614.2100 3,071.05 3,071.05 54205923 P CUL 1 CS EQ RS 48 7.000 FOOT 0049 Advanced Asphalt Co. 345.4400 2,418.08 2,418.08 54205929 P CUL 1 CS EQ RS 54 12.000 FOOT 0049 Advanced Asphalt Co. 385.2700 4,623.24 4,623.24 54207153 P CUL 1 RC-E EQRS 18 36.000 FOOT 0049 Advanced Asphalt Co. 62.4000 2,246.40 2,246.40 54214713 PRCF END S EL EQRS 18 2.000 EACH 0049 Advanced Asphalt Co. 609.2100 1,218.42 1,218.42 54215163 STL END SEC EQ RS 48 2.000 EACH 0049 Advanced Asphalt Co. 1,067.1500 2,134.30 2,134.30 67100100 MOBILIZATION 1.000 L SUM 0049 Advanced Asphalt Co. 35,487.7800 35,487.78 35,487.78 70101700 TRAF CONT & PROT 1.000 L SUM 0049 Advanced Asphalt Co. 13,295.0000 13,295.00 13,295.00 70300100 SHORT-TERM PAVT MKING 3,095.000 FOOT 0049 Advanced Asphalt Co. 0.3700 1,145.15 1,145.15 78001100 PT PVT MK LTRS & SYMB 123.000 SQ FT 0049 Advanced Asphalt Co. 4.4900 552.27 552.27 78001140 PAINT PVT MK LINE 8 102.000 FOOT 0049 Advanced Asphalt Co. 2.2400 228.48 228.48 78001150 PAINT PVT MK LINE 12 122.000 FOOT 0049 Advanced Asphalt Co. 3.3700 411.14 411.14 78001180 PAINT PVT MK LINE 24 93.000 FOOT 0049 Advanced Asphalt Co. 6.7300 625.89 625.89