ILLINOIS DEPARTMENT OF TRANSPORTATION PAGE: 1 01/07/08 10:23:27 U N I T P R I C E T A B U L A T I O N O F B I D S LETTING DATE: 11/16/2007 LETTING TYPE: SCHEDULED CONTRACT NUMBER: 94967 LETTING ITEM NUMBER: 064 RESPONSIBLE DISTRICT: 07 BIDS LOCKED: Y SECTION: (51-23)B-3 COUNTY: LAWRENCE ESTIMATE: -------------------------- SUMMARY OF CONTRACTOR BIDS -------------------------- "AS READ" SUMMATION SUMMATION OF NBR BIDR CONTR COMB ITEM CONTR BIDDER OF BIDDER CALCULATED LOW BIDR CALC BLANK NBR BIDDER NAME GROUP COMB GRP NBR GROUP TOTAL PRICE EXTENSIONS EXTENSIONS BID EXTENSION DIFF BIDS 2323 Halverson Construction Co., Inc. NO ALT 4,647,455.84 * 4,647,455.84 4,647,455.84 * 5310 Sangamo Construction Company NO ALT 5,529,127.30 5,529,127.30 5,529,127.30 **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT = 102 ---------------------- DETAIL CONTRACTOR BIDS ---------------------- ITEM NBR ITEM DESCRIPTION UNIT OF UNIT BIDDER CALCULATED BIDR CALC BIDR NBR BIDDER NAME QUANTITY MEASURE PRICE EXTENSION EXTENSION EXTENSION DIFF A2002416 T-BETUL NIG HRT 2 35.000 EACH 2323 Halverson Construction Co., Inc. 119.3800 4,178.30 4,178.30 5310 Sangamo Construction Company 126.6400 4,432.40 4,432.40 A2007616 T-TAXODIUM DIS 2 35.000 EACH 2323 Halverson Construction Co., Inc. 150.6300 5,272.05 5,272.05 5310 Sangamo Construction Company 159.7900 5,592.65 5,592.65 B2001116 T-CERCIS CAN TF 2 35.000 EACH 2323 Halverson Construction Co., Inc. 200.6300 7,022.05 7,022.05 5310 Sangamo Construction Company 212.8300 7,449.05 7,449.05 X0321781 MECHANICAL SPLICE 556.000 EACH 2323 Halverson Construction Co., Inc. 85.0000 47,260.00 47,260.00 5310 Sangamo Construction Company 70.2300 39,047.88 39,047.88 X0323988 TEMP SOIL RETEN SYSTM 1,551.000 SQ FT 2323 Halverson Construction Co., Inc. 72.5000 112,447.50 112,447.50 5310 Sangamo Construction Company 87.5400 135,774.54 135,774.54 Z0030250 IMP ATTN TEMP NRD TL3 2.000 EACH 2323 Halverson Construction Co., Inc. 4,600.0000 9,200.00 9,200.00 5310 Sangamo Construction Company 3,187.6300 6,375.26 6,375.26 Z0030350 IMP ATTN REL NRD TL3 2.000 EACH 2323 Halverson Construction Co., Inc. 1,425.0000 2,850.00 2,850.00 5310 Sangamo Construction Company 647.1500 1,294.30 1,294.30 Z0076600 TRAINEES 500.000 HOUR 2323 Halverson Construction Co., Inc. 0.8000 400.00 400.00 5310 Sangamo Construction Company 0.8000 400.00 400.00 20100500 TREE REMOV ACRES .600 ACRE 2323 Halverson Construction Co., Inc. 6,400.0000 3,840.00 3,840.00 5310 Sangamo Construction Company 28,277.0300 16,966.22 16,966.22 20200100 EARTH EXCAVATION 4,769.000 CU YD 2323 Halverson Construction Co., Inc. 9.0000 42,921.00 42,921.00 5310 Sangamo Construction Company 23.1800 110,545.42 110,545.42 20300100 CHANNEL EXCAV 12,964.000 CU YD 2323 Halverson Construction Co., Inc. 10.4000 134,825.60 134,825.60 5310 Sangamo Construction Company 13.9100 180,329.24 180,329.24 20600110 GRAN EMBANK SPEC 3,230.000 TON 2323 Halverson Construction Co., Inc. 25.7500 83,172.50 83,172.50 5310 Sangamo Construction Company 34.4700 111,338.10 111,338.10 20700400 POROUS GRAN EMB SPEC 191.000 CU YD 2323 Halverson Construction Co., Inc. 20.0000 3,820.00 3,820.00 5310 Sangamo Construction Company 75.8300 14,483.53 14,483.53 21101505 TOPSOIL EXC & PLAC 1,602.000 CU YD 2323 Halverson Construction Co., Inc. 18.5000 29,637.00 29,637.00 5310 Sangamo Construction Company 18.8200 30,149.64 30,149.64 25000200 SEEDING CL 2 2.800 ACRE 2323 Halverson Construction Co., Inc. 1,117.7900 3,129.81 3,129.81 5310 Sangamo Construction Company 1,185.7800 3,320.18 3,320.18 25000400 NITROGEN FERT NUTR 252.000 POUND 2323 Halverson Construction Co., Inc. 1.1000 277.20 277.20 5310 Sangamo Construction Company 1.1700 294.84 294.84 25000500 PHOSPHORUS FERT NUTR 252.000 POUND 2323 Halverson Construction Co., Inc. 1.1000 277.20 277.20 5310 Sangamo Construction Company 1.1700 294.84 294.84 25000600 POTASSIUM FERT NUTR 252.000 POUND 2323 Halverson Construction Co., Inc. 1.1000 277.20 277.20 5310 Sangamo Construction Company 1.1700 294.84 294.84 25000700 AGR GROUND LIMESTONE 5.600 TON 2323 Halverson Construction Co., Inc. 100.0000 560.00 560.00 5310 Sangamo Construction Company 106.0800 594.05 594.05 25100115 MULCH METHOD 2 2.800 ACRE 2323 Halverson Construction Co., Inc. 900.0000 2,520.00 2,520.00 5310 Sangamo Construction Company 954.7400 2,673.27 2,673.27 25100630 EROSION CONTR BLANKET 670.000 SQ YD 2323 Halverson Construction Co., Inc. 1.5000 1,005.00 1,005.00 5310 Sangamo Construction Company 1.5900 1,065.30 1,065.30 28000250 TEMP EROS CONTR SEED 900.000 POUND 2323 Halverson Construction Co., Inc. 2.5000 2,250.00 2,250.00 5310 Sangamo Construction Company 2.2500 2,025.00 2,025.00 28000300 TEMP DITCH CHECKS 20.000 EACH 2323 Halverson Construction Co., Inc. 250.0000 5,000.00 5,000.00 5310 Sangamo Construction Company 164.9100 3,298.20 3,298.20 28000400 PERIMETER EROS BAR 1,200.000 FOOT 2323 Halverson Construction Co., Inc. 5.0000 6,000.00 6,000.00 5310 Sangamo Construction Company 4.2600 5,112.00 5,112.00 28100105 STONE RIPRAP CL A3 180.000 SQ YD 2323 Halverson Construction Co., Inc. 27.5000 4,950.00 4,950.00 5310 Sangamo Construction Company 29.3100 5,275.80 5,275.80 28100109 STONE RIPRAP CL A5 3,098.000 SQ YD 2323 Halverson Construction Co., Inc. 48.5000 150,253.00 150,253.00 5310 Sangamo Construction Company 55.5500 172,093.90 172,093.90 28200200 FILTER FABRIC 3,298.000 SQ YD 2323 Halverson Construction Co., Inc. 2.2500 7,420.50 7,420.50 5310 Sangamo Construction Company 3.2400 10,685.52 10,685.52 31101900 SUB GRAN MAT C 670.000 TON 2323 Halverson Construction Co., Inc. 38.0000 25,460.00 25,460.00 5310 Sangamo Construction Company 43.3200 29,024.40 29,024.40 35650700 BASE CSE WID 590.000 SQ YD 2323 Halverson Construction Co., Inc. 70.0000 41,300.00 41,300.00 5310 Sangamo Construction Company 73.2900 43,241.10 43,241.10 40600100 BIT MATLS PR CT 1,680.000 GALLON 2323 Halverson Construction Co., Inc. 1.9000 3,192.00 3,192.00 5310 Sangamo Construction Company 2.0200 3,393.60 3,393.60 40600300 AGG PR CT 3.000 TON 2323 Halverson Construction Co., Inc. 0.0100 0.03 0.03 5310 Sangamo Construction Company 0.0100 0.03 0.03 40600982 HMA SURF REM BUTT JT 440.000 SQ YD 2323 Halverson Construction Co., Inc. 9.0000 3,960.00 3,960.00 5310 Sangamo Construction Company 12.6100 5,548.40 5,548.40 40600990 TEMPORARY RAMP 84.000 SQ YD 2323 Halverson Construction Co., Inc. 20.0000 1,680.00 1,680.00 5310 Sangamo Construction Company 21.2200 1,782.48 1,782.48 40603090 HMA BC IL-19.0 N90 140.000 TON 2323 Halverson Construction Co., Inc. 147.9200 20,708.80 20,708.80 5310 Sangamo Construction Company 156.9200 21,968.80 21,968.80 40603345 HMA SC "D" N90 110.000 TON 2323 Halverson Construction Co., Inc. 151.5000 16,665.00 16,665.00 5310 Sangamo Construction Company 160.7100 17,678.10 17,678.10 40701961 HMA PAVT FD 14 2,090.000 SQ YD 2323 Halverson Construction Co., Inc. 81.6200 170,585.80 170,585.80 5310 Sangamo Construction Company 86.5800 180,952.20 180,952.20 44000100 PAVEMENT REM 770.000 SQ YD 2323 Halverson Construction Co., Inc. 26.5000 20,405.00 20,405.00 5310 Sangamo Construction Company 24.6400 18,972.80 18,972.80 44000151 HMA SURF REM 1/2 950.000 SQ YD 2323 Halverson Construction Co., Inc. 4.2500 4,037.50 4,037.50 5310 Sangamo Construction Company 9.6600 9,177.00 9,177.00 44000700 APPROACH SLAB REM 230.000 SQ YD 2323 Halverson Construction Co., Inc. 22.0000 5,060.00 5,060.00 5310 Sangamo Construction Company 34.4800 7,930.40 7,930.40 44004000 PAVED DITCH REMOVAL 510.000 FOOT 2323 Halverson Construction Co., Inc. 6.5000 3,315.00 3,315.00 5310 Sangamo Construction Company 11.2800 5,752.80 5,752.80 44004250 PAVED SHLD REMOVAL 520.000 SQ YD 2323 Halverson Construction Co., Inc. 13.0000 6,760.00 6,760.00 5310 Sangamo Construction Company 24.5400 12,760.80 12,760.80 48101200 AGGREGATE SHLDS B 90.000 TON 2323 Halverson Construction Co., Inc. 44.0000 3,960.00 3,960.00 5310 Sangamo Construction Company 39.3100 3,537.90 3,537.90 48101600 AGGREGATE SHLDS B 8 520.000 SQ YD 2323 Halverson Construction Co., Inc. 19.7500 10,270.00 10,270.00 5310 Sangamo Construction Company 16.2100 8,429.20 8,429.20 48101620 AGGREGATE SHLDS B 10 230.000 SQ YD 2323 Halverson Construction Co., Inc. 24.7500 5,692.50 5,692.50 5310 Sangamo Construction Company 26.0100 5,982.30 5,982.30 48203029 HMA SHOULDERS 8 330.000 SQ YD 2323 Halverson Construction Co., Inc. 57.5900 19,004.70 19,004.70 5310 Sangamo Construction Company 61.0900 20,159.70 20,159.70 48203045 HMA SHOULDERS 12 850.000 SQ YD 2323 Halverson Construction Co., Inc. 66.5300 56,550.50 56,550.50 5310 Sangamo Construction Company 70.5800 59,993.00 59,993.00 48203100 HMA SHOULDERS 42.000 TON 2323 Halverson Construction Co., Inc. 200.0000 8,400.00 8,400.00 5310 Sangamo Construction Company 212.1600 8,910.72 8,910.72 50100100 REM EXIST STRUCT 1.000 EACH 2323 Halverson Construction Co., Inc. 300,000.0000 300,000.00 300,000.00 5310 Sangamo Construction Company 369,752.3200 369,752.32 369,752.32 50105220 PIPE CULVERT REMOV 41.000 FOOT 2323 Halverson Construction Co., Inc. 17.5000 717.50 717.50 5310 Sangamo Construction Company 10.7900 442.39 442.39 50200100 STRUCTURE EXCAVATION 192.000 CU YD 2323 Halverson Construction Co., Inc. 25.0000 4,800.00 4,800.00 5310 Sangamo Construction Company 25.0900 4,817.28 4,817.28 50200300 COFFERDAM EXCAVATION 270.000 CU YD 2323 Halverson Construction Co., Inc. 25.0000 6,750.00 6,750.00 5310 Sangamo Construction Company 62.7400 16,939.80 16,939.80 50200400 ROCK EXC STRUCT 149.000 CU YD 2323 Halverson Construction Co., Inc. 110.0000 16,390.00 16,390.00 5310 Sangamo Construction Company 94.1100 14,022.39 14,022.39 50200500 COFFERDAMS 2.000 EACH 2323 Halverson Construction Co., Inc. 100,000.0000 200,000.00 200,000.00 5310 Sangamo Construction Company 90,360.2800 180,720.56 180,720.56 50300100 FLOOR DRAINS 24.000 EACH 2323 Halverson Construction Co., Inc. 300.0000 7,200.00 7,200.00 5310 Sangamo Construction Company 353.2600 8,478.24 8,478.24 50300225 CONC STRUCT 583.900 CU YD 2323 Halverson Construction Co., Inc. 550.0000 321,145.00 321,145.00 5310 Sangamo Construction Company 886.7300 517,761.65 517,761.65 50300255 CONC SUP-STR 624.700 CU YD 2323 Halverson Construction Co., Inc. 830.0000 518,501.00 518,501.00 5310 Sangamo Construction Company 1,099.9700 687,151.26 687,151.26 50300260 BR DECK GROOVING 1,907.000 SQ YD 2323 Halverson Construction Co., Inc. 5.0000 9,535.00 9,535.00 5310 Sangamo Construction Company 4.3200 8,238.24 8,238.24 50300265 SEAL COAT CONC 19.200 CU YD 2323 Halverson Construction Co., Inc. 625.0000 12,000.00 12,000.00 5310 Sangamo Construction Company 388.6800 7,462.66 7,462.66 50300280 CONCRETE ENCASEMENT 8.800 CU YD 2323 Halverson Construction Co., Inc. 750.0000 6,600.00 6,600.00 5310 Sangamo Construction Company 735.1800 6,469.58 6,469.58 50300300 PROTECTIVE COAT 2,430.000 SQ YD 2323 Halverson Construction Co., Inc. 1.5000 3,645.00 3,645.00 5310 Sangamo Construction Company 2.1900 5,321.70 5,321.70 50500105 F & E STRUCT STEEL 1.000 L SUM 2323 Halverson Construction Co., Inc. 1,220,385.0000 1,220,385.00 1,220,385.00 5310 Sangamo Construction Company 1,303,427.2600 1,303,427.26 1,303,427.26 50500505 STUD SHEAR CONNECTORS 4,464.000 EACH 2323 Halverson Construction Co., Inc. 2.2500 10,044.00 10,044.00 5310 Sangamo Construction Company 2.1200 9,463.68 9,463.68 50800105 REINFORCEMENT BARS 312.000 POUND 2323 Halverson Construction Co., Inc. 2.5000 780.00 780.00 5310 Sangamo Construction Company 1.3700 427.44 427.44 50800205 REINF BARS, EPOXY CTD 254,330.000 POUND 2323 Halverson Construction Co., Inc. 1.3200 335,715.60 335,715.60 5310 Sangamo Construction Company 1.3000 330,629.00 330,629.00 * 50800515 BAR SPLICERS 1,920.000 EACH 2323 Halverson Construction Co., Inc. 17.5000 33,600.00 33,600.00 5310 Sangamo Construction Company 16.3500 31,392.00 31,392.00 51201610 FUR STL PILE HP12X63 660.000 FOOT 2323 Halverson Construction Co., Inc. 45.0000 29,700.00 29,700.00 5310 Sangamo Construction Company 86.0600 56,799.60 56,799.60 51202305 DRIVING PILES 660.000 FOOT 2323 Halverson Construction Co., Inc. 1.0000 660.00 660.00 5310 Sangamo Construction Company 0.0200 13.20 13.20 51203610 TEST PILE ST HP12X63 2.000 EACH 2323 Halverson Construction Co., Inc. 5,500.0000 11,000.00 11,000.00 5310 Sangamo Construction Company 4,843.3600 9,686.72 9,686.72 51204650 PILE SHOES 13.000 EACH 2323 Halverson Construction Co., Inc. 125.0000 1,625.00 1,625.00 5310 Sangamo Construction Company 144.4400 1,877.72 1,877.72 51500100 NAME PLATES 1.000 EACH 2323 Halverson Construction Co., Inc. 350.0000 350.00 350.00 5310 Sangamo Construction Company 343.3200 343.32 343.32 52000110 PREF JT STRIP SEAL 86.000 FOOT 2323 Halverson Construction Co., Inc. 200.0000 17,200.00 17,200.00 5310 Sangamo Construction Company 231.8400 19,938.24 19,938.24 52100020 ELAST BEARING ASSY T2 12.000 EACH 2323 Halverson Construction Co., Inc. 1,275.0000 15,300.00 15,300.00 5310 Sangamo Construction Company 1,547.7700 18,573.24 18,573.24 52100530 ANCHOR BOLTS 1 1/4 72.000 EACH 2323 Halverson Construction Co., Inc. 100.0000 7,200.00 7,200.00 5310 Sangamo Construction Company 84.2700 6,067.44 6,067.44 58700300 CONCRETE SEALER 1,227.000 SQ FT 2323 Halverson Construction Co., Inc. 2.0000 2,454.00 2,454.00 5310 Sangamo Construction Company 2.5300 3,104.31 3,104.31 59100100 GEOCOMPOSITE WALL DR 82.000 SQ YD 2323 Halverson Construction Co., Inc. 17.5000 1,435.00 1,435.00 5310 Sangamo Construction Company 24.9900 2,049.18 2,049.18 60109580 P UNDR FOR STRUCT 4 120.000 FOOT 2323 Halverson Construction Co., Inc. 37.5000 4,500.00 4,500.00 5310 Sangamo Construction Company 18.1800 2,181.60 2,181.60 63000000 SPBGR TY A 400.000 FOOT 2323 Halverson Construction Co., Inc. 19.9500 7,980.00 7,980.00 5310 Sangamo Construction Company 21.1600 8,464.00 8,464.00 63100085 TRAF BAR TERM T6 4.000 EACH 2323 Halverson Construction Co., Inc. 2,000.0000 8,000.00 8,000.00 5310 Sangamo Construction Company 2,121.6400 8,486.56 8,486.56 63100167 TR BAR TRM T1 SPL TAN 4.000 EACH 2323 Halverson Construction Co., Inc. 2,290.0000 9,160.00 9,160.00 5310 Sangamo Construction Company 2,429.2800 9,717.12 9,717.12 63200310 GUARDRAIL REMOV 686.000 FOOT 2323 Halverson Construction Co., Inc. 8.5000 5,831.00 5,831.00 5310 Sangamo Construction Company 5.8200 3,992.52 3,992.52 63500105 DELINEATORS 12.000 EACH 2323 Halverson Construction Co., Inc. 38.0000 456.00 456.00 5310 Sangamo Construction Company 73.6000 883.20 883.20 67000400 ENGR FIELD OFFICE A 18.000 CAL MO 2323 Halverson Construction Co., Inc. 1,400.0000 25,200.00 25,200.00 5310 Sangamo Construction Company 1,137.4500 20,474.10 20,474.10 67100100 MOBILIZATION 1.000 L SUM 2323 Halverson Construction Co., Inc. 275,000.0000 275,000.00 275,000.00 5310 Sangamo Construction Company 326,218.5100 326,218.51 326,218.51 70100405 TRAF CONT-PROT 701321 1.000 EACH 2323 Halverson Construction Co., Inc. 30,000.0000 30,000.00 30,000.00 5310 Sangamo Construction Company 35,310.2400 35,310.24 35,310.24 70100450 TRAF CONT-PROT 701201 1.000 L SUM 2323 Halverson Construction Co., Inc. 1,650.0000 1,650.00 1,650.00 5310 Sangamo Construction Company 17,165.4900 17,165.49 17,165.49 70100500 TRAF CONT-PROT 701326 1.000 L SUM 2323 Halverson Construction Co., Inc. 1,650.0000 1,650.00 1,650.00 5310 Sangamo Construction Company 6,852.7300 6,852.73 6,852.73 70103815 TR CONT SURVEILLANCE 4.000 CAL DA 2323 Halverson Construction Co., Inc. 350.0000 1,400.00 1,400.00 5310 Sangamo Construction Company 216.6600 866.64 866.64 70106500 TEMP BR TRAF SIGNALS 1.000 EACH 2323 Halverson Construction Co., Inc. 10,600.0000 10,600.00 10,600.00 5310 Sangamo Construction Company 28,629.0600 28,629.06 28,629.06 70300100 SHORT-TERM PAVT MKING 400.000 FOOT 2323 Halverson Construction Co., Inc. 2.2000 880.00 880.00 5310 Sangamo Construction Company 1.8900 756.00 756.00 70301000 WORK ZONE PAVT MK REM 60.000 SQ FT 2323 Halverson Construction Co., Inc. 3.0000 180.00 180.00 5310 Sangamo Construction Company 6.1300 367.80 367.80 70400100 TEMP CONC BARRIER 1,525.000 FOOT 2323 Halverson Construction Co., Inc. 33.0000 50,325.00 50,325.00 5310 Sangamo Construction Company 49.7100 75,807.75 75,807.75 70400200 REL TEMP CONC BARRIER 1,475.000 FOOT 2323 Halverson Construction Co., Inc. 5.5000 8,112.50 8,112.50 5310 Sangamo Construction Company 7.5300 11,106.75 11,106.75 72400730 RELOC SIGN PANEL T3 54.000 SQ FT 2323 Halverson Construction Co., Inc. 10.2500 553.50 553.50 5310 Sangamo Construction Company 8.9200 481.68 481.68 72700100 STR STL SIN SUP BA 120.000 POUND 2323 Halverson Construction Co., Inc. 6.5000 780.00 780.00 5310 Sangamo Construction Company 4.3200 518.40 518.40 73400100 CONC FOUNDATION 2.800 CU YD 2323 Halverson Construction Co., Inc. 1,100.0000 3,080.00 3,080.00 5310 Sangamo Construction Company 767.7700 2,149.76 2,149.76 73700200 REM CONC FDN-GR MT 4.000 EACH 2323 Halverson Construction Co., Inc. 335.0000 1,340.00 1,340.00 5310 Sangamo Construction Company 661.0200 2,644.08 2,644.08 78001110 PAINT PVT MK LINE 4 4,390.000 FOOT 2323 Halverson Construction Co., Inc. 0.5000 2,195.00 2,195.00 5310 Sangamo Construction Company 0.5300 2,326.70 2,326.70 78100100 RAISED REFL PAVT MKR 18.000 EACH 2323 Halverson Construction Co., Inc. 100.0000 1,800.00 1,800.00 5310 Sangamo Construction Company 106.0800 1,909.44 1,909.44 78100105 RAISED REF PVT MKR BR 8.000 EACH 2323 Halverson Construction Co., Inc. 100.0000 800.00 800.00 5310 Sangamo Construction Company 106.0800 848.64 848.64 78200410 GUARDRAIL MKR TYPE A 11.000 EACH 2323 Halverson Construction Co., Inc. 8.0000 88.00 88.00 5310 Sangamo Construction Company 8.4900 93.39 93.39 78201000 TERMINAL MARKER - DA 4.000 EACH 2323 Halverson Construction Co., Inc. 30.0000 120.00 120.00 5310 Sangamo Construction Company 31.8300 127.32 127.32 78300100 PAVT MARKING REMOVAL 1,090.000 SQ FT 2323 Halverson Construction Co., Inc. 3.0000 3,270.00 3,270.00 5310 Sangamo Construction Company 2.7300 2,975.70 2,975.70 * - PAY ITEM UNIT PRICE AND/OR BIDDER TOTAL PRICE WAS OMITTED