|
Memo |
Subject |
Issued |
Status
|
|
Index
|
Index of
BDE Procedure Memos |
5/19/08 |
A
|
|
63-08 |
Local Agency Agreements- Municipality Reimbursement |
3/01/08 |
A |
|
62-08 |
Control of Emerald Ash Borer on Department Owned Lands |
3/01/08 |
A |
|
61-08 |
Meeting SAFETEA-LU Section 6002, Context Sensitive Solutions,
and NEPA/404 Merger process requirements for Environmental
Impact Statements |
3/01/08 |
A |
|
60-08 |
Transportation Conformity Project-Level Qualitative Hot-Spot
Analysis in PM2.5 and PM10 Nonattainment and Maintenance Areas |
3/01/08 |
A |
|
59-08 |
Selecting Contract Time and Project Letting Dates |
1/01/08 |
A |
|
58-08 |
Existing Public Educational Facility Entrances |
1/01/08 |
A |
|
57-07 |
Administration of Wetland Bank Credits |
4/21/07 |
A |
|
56-08A |
Borrow, Use, and Waste Site, and Excess Material Disposition Documentation, Review and Approval (BDE 2289) |
3/1/08 |
A |
|
55-07 |
Wetland Impact
Accumulation |
2/23/07 |
A |
|
54-07 |
Categorical Exclusion
Group II Approval Documentation |
1/08/07 |
A |
|
53-06 |
Design Guidance for
Median and Curb Treatments at Railroad Grade
Crossings |
11/15/06 |
A |
|
52-06 |
Mobile Source Air Toxics |
7/11/06 |
A |
|
51-06 |
Plan, Specification, and
Quantity Changes |
4/21/06 |
A |
|
50-06 |
Final Rule for 23 CFR 772
"Procedures for Abatement of Highway Traffic Noise
and Construction Noise" |
4/21/06 |
A |
|
49-06 |
Guidance for Determining
De Minimis Impacts to Section 4(f) Resources |
4/21/06 |
A |
|
48-06 |
Design flexibility and
the Stakeholder Involvement Process for Context
Sensitive Solutions (CSS) |
3/01/06 |
A |
|
47-05 |
Guidelines for Pavement
Preservation |
9/19/05 |
A |
|
46-05 |
FHWA Section 4(f) Policy
Paper and Final Nationwide Programmatic Section 4(f)
Evaluation and Determination for Federal-Aid
Transportation Projects That Have a Net Benefit to a
Section 4(f) Property |
7/1/05 |
A |
|
45-05 |
Design Guidance for
Pre-signals at Railroad Grade Crossings near
Signalized Highway Intersections |
6/1/05 |
A |
|
44-05 |
Timeframes for
Environmental Impact Statements and Environmental
Assessments |
6/1/05 |
A |
|
43-04 |
Coordination with IDNR on
Natural Resource Issues |
10/08/04 |
A |
|
42-04 |
Changes in the BDE Manual
Guidance on Air Quality and Related Subjects |
8/31/04 |
A |
|
41-05 |
Delegation of Approval
Authorities to Districts |
6/1/05 |
A |
|
40-04 |
Addressing Impaired
Waters/TMDLs in project Environmental Documentation |
6/30/04 |
A |
|
39-08 |
Median Barriers |
3/1/08 |
A |
|
38-04 |
Errata for the BDE Manual
2002 Edition |
1/2/04 |
A |
|
37-03 |
Documenting Microscale
Analysis Information |
10/14/03 |
A |
|
36-08 |
Roadside Barriers |
3/1/08 |
A |
|
35-05 |
Detectable Warnings for
Curb Ramps and Other Locations |
6/1/05 |
A |
|
34-08 |
Impact Attenuators (Crash
Cushions) |
4/25/08 |
A |
|
33-03 |
Wetlands Compliance
Procedures |
7/11/03 |
A |
|
32-03 |
Changes in 4(f)
Applicability for Actions Involving U.S. Coast Guard
Permits |
3/19/03 |
A |
|
31-03 |
Incidental Taking
Authorization Procedures |
3/19/03 |
A |
|
30-02A |
Roadside
Barriers, Median Barriers, and Terminals |
9/17/02 |
I |
|
29-02 |
Policy
Resurfacing Program |
7/1/02
|
I
|
|
28-02 |
Validity of
Special Waste Assessment Results |
7/1/02 |
A |
|
27-02
|
Temporary
Concrete Barrier |
7/1/02
|
A
|
|
26-02A |
Compliance
with Asbestos Requirements for Highway Bridges |
6/7/02 |
A |
|
25-01 |
In-Stream
Work and Erosion Control for Bridges/Culverts |
9/19/01
|
I
|
|
24-02 |
Earthwork Quantities |
4/19/02 |
|
|
23-01
|
Pavement
Patching for Multilane Jointed Plain Concrete
Pavement (JPCP), Jointed Reinforced Concrete
Pavement (JRCP), Asphaltic Concrete (AC) Overlaid
JPCP and AC Overlaid JRCP |
7/24/01
|
A
|
|
22-01 |
Documentation of Congestion Management System
Alternatives |
2/1/01 |
I |
|
21-01 |
Air Quality Information for the "Affected
Environment" Section |
2/1/01 |
I |
|
20-00 |
FHWA Interstate Access Approval |
11/1/00 |
I |
|
19-08 |
Procedures for Concurrent/NEPA 404 Processes |
5/19/08 |
A |
|
19-00 |
Procedures for Concurrent NEPA/404 Processes |
11/1/00 |
I |
|
18-00
|
Procedures for Highway Project Noise Analyses |
4/3/00 |
I |
|
17-07 |
Architectural and Engineering Report and Negotiation
Guidelines for Engineering Agreements and
Supplements |
10/15/07 |
A
|
|
16-00
|
Quality Assurance/Quality Control Guidelines for
Work By Consulting Engineers |
4/3/00 |
A |
|
15-02
|
Procedures to Minimize Motorists’ Costs and
Inconvenience |
4/19/02
|
A
|
|
14-00
|
Roadside Seeding in Areas Disturbed By
Construction
|
4/3/00 |
I |
|
13-00
|
Pipe
Culverts and Storm Sewers |
4/3/00
|
I
|
|
12-00
|
Policy for the Use of Bituminous Surfaces |
4/3/00 |
I |
|
11-00
|
Selection
of Full Depth Asphalt Pavement Surface Course
Thickness and Asphalt Cement Grade |
4/3/00
|
I
|
|
10-00
|
Subgrade Construction Under Rigid Pavements |
4/3/00 |
I |
|
9-00
|
Surplus
Excavation Disposal |
4/3/00
|
A
|
|
8-00
|
Federal Participation in Stockpiling of Salvage
Materials |
4/3/00 |
A |
|
7-00
|
FHWA
Oversight & Involvement on Federal-Aid Projects |
4/3/00
|
I
|
|
6-00
|
Local Participation in Spot Safety Improvement
Projects |
4/3/00 |
A |
|
5-07
|
Value
Engineering Program |
6/18/07
|
A
|
|
4-00
|
Rules and Regulations Governing Sealing of
Abandoned Water Wells |
4/3/00 |
I |
|
3-00
|
Land
Survey Monuments |
4/3/00
|
I
|
|
2-00
|
Project Files Documentation |
4/3/00 |
A |
|
1-00
|
New Series of BDE
Procedure Memorandums |
4/3/00
|
A |
"A" Indicates Active Status
"I" Indicates the content has been
incorporated in the BDE Manual |