BDE Special Provisions
Bureau of Design & Environment  Special Provisions for use
For The July 31 and September 18, 2009 Lettings

HOW TO USE PDF FILES: View a file: click the link with the left mouse button. Download a file: click the link with the right mouse button, then choose "save target as.

Name

Effective
Date
Revised
Date
July 31 and September 18, 2009 Check Sheet (743k)    
Above Grade Inlet Protection (13k) 07/01/09  
Accessible Pedestrian Signals (APS) (27k)
04/01/03
01/01/07
American Recovery and Reinvestment Act Provisions (10k) 04/01/09  
American Recovery and Reinvestment Act Signing (959k) 04/01/09 04/15/09
Alkali-Silica Reaction for Cast-in-Place Concrete (60k) 08/01/07 01/01/09
Alkali-Silica Reaction for Precast and Precast Prestressed Concrete (60k) 01/01/09  
Approval of Proposed Borrow Areas, Use Areas, and/or Waste Areas Inside Illinois State Borders (9k) 11/01/08  
Automated Flagger Assistance Device (12k) 01/01/08  
Bituminous Materials Cost Adjustments (22k) 11/02/06 04/01/09
Bridge Demolition Debris (9k) 07/01/09  
Building Removal – Case I (Non-Friable and Friable Asbestos) (34k)
09/01/90
01/01/07
Building Removal – Case II (Non-Friable Asbestos) (20k)
09/01/90
01/01/07
Building Removal – Case III (Friable Asbestos) (19k)
09/01/90
01/01/07
Building Removal – Case IV (No Asbestos) (11k)
09/01/90
01/01/07
Cement (50k) 01/01/07 04/01/09
Completion Date (via calendar days) (9k) 04/01/08  
Completion Date (via calendar days) Plus Working Days (9k) 04/01/08  
Concrete Admixtures (49k) 01/01/03 04/01/09
Concrete Barrier (9k) 01/01/08  
Concrete Gutter, Type A (9k) 01/01/09  
Concrete Joint Sealer (11k) 01/01/09  
Concrete Mix Designs (34k) 04/01/09  
Construction Air Quality – Diesel Vehicle Emissions Control (11k) 04/01/09 07/01/09
Construction Air Quality – Idling Restrictions (12k) 04/01/09  
Determination of Thickness (167k) 04/01/09  
Digital Terrain Modeling for Earthwork Calculations (11k) 04/01/07  
Disadvantaged Business Enterprise Participation (31k)
09/01/00

11/01/08

Dowel Bars (8k) 04/01/07 01/01/08
Engineer’s Field Office Type A (14k) 04/01/07 08/01/08
Engineer’s Field Office Type B (12k) 08/01/08  
Epoxy Pavement Markings (20k) 01/01/07  
Equipment Rental Rates (11k) 08/02/07 01/02/08
Flagger at Side Roads and Entrances (33k) 04/01/09  
Fuel Cost Adjustment (71k) 04/01/09  
High Tension Cable Median Barrier (13k) 01/01/07 04/01/09
HMA - Hauling on Partially Completed Full-Depth Pavement (13k) 01/01/08  
Hot-Mix Asphalt – Field Voids in the Mineral Aggregate (64k) 04/01/07 04/01/08
Hot-Mix Asphalt - Plant Test Frequency (63k) 04/01/08  
Hot-Mix Asphalt - Transportation (10k) 04/01/08  
Hot Mix Asphalt Mixture IL-4.75 (80k) 11/01/04 01/01/08
Hot Mix Asphalt Mixture IL-9.5L (10k) 01/01/08  
Impact Attenuators (12k)
11/01/03

11/01/08

Impact Attenuators, Temporary (13k)
11/01/03
01/01/07
Liquidated Damages (30k) 04/01/09  
Mast Arm Assembly and Pole (11k) 01/01/08 01/01/09
Material Transfer Device (12k)
06/15/99
01/01/09
Metal Hardware Cast into Concrete (32k) 04/01/08 04/01/09
Moisture Cured Urethane Paint System (25k)

11/01/06

01/01/07
Monthly Employment Report (24k) 04/01/09  
Multilane Pavement Patching (6k)
11/01/02
 
National Pollutant Discharge Elimination System / Erosion and Sediment Control Deficiency Deduction (10k) 04/01/07 11/01/08
Nighttime Work Zone Lighting (14k) 11/01/08  
Notched Wedge Longitudinal Joint (14k)
07/01/04
01/01/07
Notification of Reduced Width (8k) 04/01/07  
Organic Zinc-Rich Paint System (26k)
11/01/01
01/01/08
Partial Exit Ramp Closure for Freeway/Expressway (9k) 01/01/09  
Pavement Marking Removal (31k) 04/01/09  
Payments to Subcontractors (45k)
06/01/00

01/01/06

Payrolls and Payroll Records (12k) 03/01/09 07/01/09
Personal Protective Equipment (8k) 11/01/08  
Pipe Culverts (151k) 04/01/09  
Plastic Blockouts for Guardrail (8k)
11/01/04
01/01/07
Polyurea Pavement Marking (36k)
04/01/04
01/01/09
Portland Cement Concrete Inlay or Overlay (14k) 11/01/08  
Portland Cement Concrete Plants (10k) 01/01/07  
Post Clips for Extruded Aluminum Signs (9k) 01/01/09  
Precast Handling Holes (11k) 01/01/07  
Preventive Maintenance – Bituminous Surface Treatment (71k) 01/01/09 04/01/09
Preventive Maintenance – Cape Seal (142k) 01/01/09 04/01/09
Preventive Maintenance – Micro-Surfacing (45k) 01/01/09  
Preventive Maintenance – Slurry Seal (41k) 01/01/09  
Prismatic Curb Reflectors (10k) 11/01/08  
Public Convenience and Safety (5k)
01/01/00
 
Railroad Protective Liability Insurance (37k)
12/01/86
01/01/06
Railroad Protective Liability Insurance (5 and 10) (51k)

01/01/06

 
Ramp Closure for Freeway/Expressway (10k) 01/01/09  
Reclaimed Asphalt Pavement (RAP) (85k) 01/01/07 04/01/09
Reflective Sheeting on Channelizing Devices (11k) 04/01/07 11/01/08
Reinforcement Bars (40k)
11/01/05

04/01/09

Reinforcement Bars - Storage and Protection (26k) 08/01/08 04/01/09
Restoring Bridge Approach Pavements Using High-Density Foam (16k) 01/01/09  
Retro-reflective Sheeting, Non-reflective Sheeting, and Translucent Overlay Film for Highway Signs (36k) 04/01/07  
Seeding(17k)
07/01/04

07/01/09

Self-Consolidating Concrete For Cast-In-Place Construction (19k)
11/01/05
01/01/09
Self-Consolidating Concrete For Precast Products (11k)
07/01/04

01/01/07

Sign Panels and Sign Panel Overlays (9k) 11/01/08  
Silt Filter Fence (9k) 01/01/08  
Steel Cost Adjustment (74k)
04/02/04
04/01/09
Steel Plate Beam Guardrail (9k)
11/01/05

08/01/07

Stone Gradation Testing (9k) 11/01/07  
Storm Sewers (318k) 04/01/09  
Subcontractor Mobilization Payments (68k)

04/02/05

 
Surface Testing of Pavements (29k)
04/01/02

01/01/07

Temporary Erosion Control (10k)
11/01/02
01/01/08
Temporary Raised Pavement Marker (10k) 01/01/09  
Thermoplastic Pavement Markings (19k) 01/01/07  
Training Special Provisions (9k)
10/15/75
 
Type ZZ Retro-reflective Sheeting, Non-reflective Sheeting, and Translucent Overlay Film for Highway Signs (32k) 04/01/07  
Variable Spaced Tining (11k)

08/01/05

01/01/07
Working Days (35k)
01/01/02
 
Woven Wire Fence (8k)

04/01/08

 
Download all Special Provisions (.pdf file)( 5.5 mb)