Illinois Department of Transportation, Ann L. Schneider, Acting Secretary
Loading
Patrick J. Quinn, Governor
Traveling PublicMapsProjectsRoad ClosuresNewsDoing BusinessLetting & BiddingCareers@IDOTGeneral Info


BDE Special Provisions
 
Bureau of Design & Environment  Special Provisions for use
For The April 27 and June 15, 2012 Letting

HOW TO USE PDF FILES: View a file: click the link with the left mouse button. Download a file: click the link with the right mouse button, then choose "save target as.

Name

Effective
Date
Revised
Date
April 27 and June 15, 2012 Check Sheet    
Above Grade Inlet Protection 07/01/09 01/01/12
Accessible Pedestrian Signals (APS)
04/01/03
01/01/07
Agreement to Plan Quantity 01/01/12  
Aggregate Subgrade Improvement 04/01/12  
Automated Flagger Assistance Device 01/01/08  
Bituminous Materials Cost Adjustments 11/02/06 01/01/12
Bridge Demolition Debris 07/01/09  
Bridge Relief Joint Sealer 01/01/12  
Building Removal – Case I (Non-Friable and Friable Asbestos)
09/01/90
04/01/10
Building Removal – Case II (Non-Friable Asbestos)
09/01/90
04/01/10
Building Removal – Case III (Friable Asbestos) 
09/01/90
04/01/10
Building Removal – Case IV (No Asbestos)
09/01/90
04/01/10
Calcium Chloride Accelerator for Class PP-2 Concrete 04/01/12  
Coarse Aggregate in Bridge Approach Slabs/Footings 04/01/12  
Completion Date (via calendar days) 04/01/08  
Completion Date (via calendar days) Plus Working Days 04/01/08  
Concrete Box Culverts with Skews > 30 Degrees and Design Fills ≤ 5 Feet 04/01/12  
Concrete Box Culverts with Skews ≤ 30 Degrees Regardless of Design Fill and Skews > 30 Degrees with Design Fills > 5 Feet 04/01/12  
Concrete Mix Design – Department Provided 01/01/12  
Construction Air Quality – Diesel Retrofit 07/01/10  
Construction Air Quality – Diesel Vehicle Emissions Control 04/01/09 01/02/12
Construction Air Quality – Idling Restrictions 04/01/09  
Digital Terrain Modeling for Earthwork Calculations 04/01/07  
Disadvantaged Business Enterprise Participation
09/01/00

08/02/11

Drainage and Inlet Protection Under Traffic 04/01/11 01/01/12
Errata for the 2012 Standard Specifications 04/01/12  
Flagger at Side Roads and Entrances 04/01/09  
Friction Aggregate 01/01/11  
Fuel Cost Adjustment 04/01/09 07/07/09
High Tension Cable Median Barrier 01/01/07 04/01/09
Hot-Mix Asphalt – Density Testing of Longitudinal Joints 01/01/10 04/01/12
Impact Attenuators
11/01/03

01/01/12

Impact Attenuators, Temporary
11/01/03
01/01/12
Material Transfer Device
06/15/99
01/01/09
Metal Hardware Cast into Concrete 04/01/08 01/01/12
Modified Urethane Pavement Marking 04/01/12  
Moisture Cured Urethane Paint System

11/01/06

01/01/10
Movable Traffic Barrier System 01/01/10 01/01/12
Pavement Marking Removal 04/01/09  
Pavement Marking Tape Type IV 04/01/12
Pavement Patching 01/01/10
Payments to Subcontractors
06/01/00

01/01/06

Payrolls and Payroll Records 01/02/12  
Planting Woody Plants 01/01/12  
Portland Cement Concrete 01/01/12  
Portland Cement Concrete Inlay or Overlay 04/01/12  
Portland Cement Concrete Sidewalk 01/01/12  
Preformed Plastic Pavement Marking Type D - Inlaid 04/01/12  
Preventive Maintenance – Bituminous Surface Treatment 01/01/09 04/01/12
Preventive Maintenance – Cape Seal 01/01/09 04/01/12
Preventive Maintenance – Micro-Surfacing 01/01/09 04/01/12
Preventive Maintenance – Slurry Seal 01/01/09 04/01/12
Quality Control/Quality Assurance of Concrete Mixtures 01/01/12
Railroad Protective Liability Insurance
12/01/86
01/01/06
Railroad Protective Liability Insurance (5 and 10)

01/01/06

 
Reclaimed Asphalt Pavement (RAP) 01/01/07 01/01/12
Reclaimed Asphalt Shingles (RAS) 01/01/12  
Removal and Disposal of Regulated Substances 01/01/12  
Restoring Bridge Approach Pavements Using High-Density Foam 01/01/09 01/01/12
Safety Edge 04/01/11  
Self-Consolidating Concrete For Cast-In-Place Construction
11/01/05
04/01/12
Self-Consolidating Concrete for Precast and Precast Prestressed Products
07/01/04

04/01/12

Shoulder Rumble Strips 01/01/12
Sidewalk, Corner or Crosswalk Closure 01/01/12  
Steel Cost Adjustment
04/02/04
04/01/09
Stone Matrix Asphalt 01/01/10 01/01/12
Subcontractor Mobilization Payments

04/02/05

04/01/11
Surface Testing of Pavements
04/01/02

01/01/07

Temporary Erosion and Sediment Control 01/01/12  
Temporary Raised Pavement Marker 01/01/09  
Temporary Water Filled Barrier 01/01/10 01/01/12
Type G Inlet Box 01/01/12  
Traffic Control Deficiency Deduction 08/01/11  
Training Special Provisions
10/15/75
 
Utility Coordination and Conflicts 04/01/11 01/01/12
Warm Mix Asphalt 01/01/12  
Wet Reflective Thermoplastic Pavement Marking 01/01/12  
Working Days
01/01/02
 
Download all Special Provisions (.pdf file)(10.3 mb)

Technical Support: 217-524-1642 null

IDOT Privacy Statement | Illinois Privacy Information | Kids Privacy | Web Accessibility  | FOIA