ILLINOIS DEPARTMENT OF TRANSPORTATION PAGE: 1 02/28/03 12:21:45 U N I T P R I C E T A B U L A T I O N O F B I D S LETTING DATE: 01/17/2003 LETTING TYPE: SCHEDULED CONTRACT NUMBER: 83634 LETTING ITEM NUMBER: 111 RESPONSIBLE DISTRICT: 01 BIDS LOCKED: Y SECTION: 00-00068-00-RS COUNTY: COOK ESTIMATE: STATE JOB NUMBER: C-91-413-01 MUNICIPALITY: SCHAUMBURG PROJECT NUMBER: M-8003/116/000 -------------------------- SUMMARY OF CONTRACTOR BIDS -------------------------- "AS READ" SUMMATION SUMMATION OF NBR BIDR CONTR COMB ITEM CONTR BIDDER OF BIDDER CALCULATED LOW BIDR CALC BLANK NBR BIDDER NAME GROUP COMB GRP NBR GROUP TOTAL PRICE EXTENSIONS EXTENSIONS BID EXTENSION DIFF BIDS 0103 Alliance Contractors, Inc. NO ALT 4,250,543.03 4,250,543.03 4,250,543.03 0801 Capitol Cement Co., Inc. NO ALT 4,676,129.03 4,676,129.03 4,676,129.03 2191 Greco Contractors, Inc. NO ALT 4,183,663.35 4,183,663.35 4,183,663.35 3283 Harry W. Kuhn, Inc. NO ALT 4,472,752.22 4,472,752.22 4,472,752.22 3702 Martam Construction Incorporated NO ALT 4,186,642.00 4,186,642.00 4,186,642.00 4813 Plote Construction Inc. NO ALT 4,041,419.89 * 4,041,419.89 4,041,419.89 * **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT = 293 ---------------------- DETAIL CONTRACTOR BIDS ---------------------- ITEM NBR ITEM DESCRIPTION UNIT OF UNIT BIDDER CALCULATED BIDR CALC BIDR NBR BIDDER NAME QUANTITY MEASURE PRICE EXTENSION EXTENSION EXTENSION DIFF A2003524 T-FRAX AMER AP 3 13.000 EACH 0103 Alliance Contractors, Inc. 504.0000 6,552.00 6,552.00 0801 Capitol Cement Co., Inc. 644.0000 8,372.00 8,372.00 2191 Greco Contractors, Inc. 500.0000 6,500.00 6,500.00 3283 Harry W. Kuhn, Inc. 455.0000 5,915.00 5,915.00 3702 Martam Construction Incorporated 510.0000 6,630.00 6,630.00 4813 Plote Construction Inc. 450.0000 5,850.00 5,850.00 A2004220 T-FRAX PENN SUM 2-1/2 20.000 EACH 0103 Alliance Contractors, Inc. 367.5000 7,350.00 7,350.00 0801 Capitol Cement Co., Inc. 394.0000 7,880.00 7,880.00 2191 Greco Contractors, Inc. 400.0000 8,000.00 8,000.00 3283 Harry W. Kuhn, Inc. 344.0000 6,880.00 6,880.00 3702 Martam Construction Incorporated 400.0000 8,000.00 8,000.00 4813 Plote Construction Inc. 325.0000 6,500.00 6,500.00 A2004420 T-GINKGO BILOBA 2-1/2 10.000 EACH 0103 Alliance Contractors, Inc. 504.0000 5,040.00 5,040.00 0801 Capitol Cement Co., Inc. 644.0000 6,440.00 6,440.00 2191 Greco Contractors, Inc. 540.0000 5,400.00 5,400.00 3283 Harry W. Kuhn, Inc. 512.0000 5,120.00 5,120.00 3702 Martam Construction Incorporated 510.0000 5,100.00 5,100.00 4813 Plote Construction Inc. 450.0000 4,500.00 4,500.00 A2004624 T-GLEDIT TRI IN 3 24.000 EACH 0103 Alliance Contractors, Inc. 441.0000 10,584.00 10,584.00 0801 Capitol Cement Co., Inc. 484.0000 11,616.00 11,616.00 2191 Greco Contractors, Inc. 500.0000 12,000.00 12,000.00 3283 Harry W. Kuhn, Inc. 391.0000 9,384.00 9,384.00 3702 Martam Construction Incorporated 450.0000 10,800.00 10,800.00 4813 Plote Construction Inc. 400.0000 9,600.00 9,600.00 A2004720 T-GLED TRI-I SM 2-1/2 11.000 EACH 0103 Alliance Contractors, Inc. 336.0000 3,696.00 3,696.00 0801 Capitol Cement Co., Inc. 376.0000 4,136.00 4,136.00 2191 Greco Contractors, Inc. 380.0000 4,180.00 4,180.00 3283 Harry W. Kuhn, Inc. 364.0000 4,004.00 4,004.00 3702 Martam Construction Incorporated 350.0000 3,850.00 3,850.00 4813 Plote Construction Inc. 350.0000 3,850.00 3,850.00 A2005024 T-GYMNOCLA DIO 3 22.000 EACH 0103 Alliance Contractors, Inc. 459.0000 10,098.00 10,098.00 0801 Capitol Cement Co., Inc. 560.0000 12,320.00 12,320.00 2191 Greco Contractors, Inc. 560.0000 12,320.00 12,320.00 3283 Harry W. Kuhn, Inc. 364.0000 8,008.00 8,008.00 3702 Martam Construction Incorporated 470.0000 10,340.00 10,340.00 4813 Plote Construction Inc. 450.0000 9,900.00 9,900.00 A2008420 T-TILIA TOM STR 2-1/2 2.000 EACH 0103 Alliance Contractors, Inc. 413.0000 826.00 826.00 0801 Capitol Cement Co., Inc. 368.0000 736.00 736.00 2191 Greco Contractors, Inc. 450.0000 900.00 900.00 3283 Harry W. Kuhn, Inc. 364.0000 728.00 728.00 3702 Martam Construction Incorporated 440.0000 880.00 880.00 4813 Plote Construction Inc. 500.0000 1,000.00 1,000.00 C2012036 S-VIBURN DEN SYN 3' 24.000 EACH 0103 Alliance Contractors, Inc. 28.9000 693.60 693.60 0801 Capitol Cement Co., Inc. 46.0000 1,104.00 1,104.00 2191 Greco Contractors, Inc. 35.0000 840.00 840.00 3283 Harry W. Kuhn, Inc. 34.7500 834.00 834.00 3702 Martam Construction Incorporated 33.0000 792.00 792.00 4813 Plote Construction Inc. 30.0000 720.00 720.00 * C2013124 S-WEIGELA FL JR 2' 115.000 EACH 0103 Alliance Contractors, Inc. 23.0000 2,645.00 2,645.00 0801 Capitol Cement Co., Inc. 30.0000 3,450.00 3,450.00 2191 Greco Contractors, Inc. 28.5000 3,277.50 3,277.50 3283 Harry W. Kuhn, Inc. 44.0000 5,060.00 5,060.00 3702 Martam Construction Incorporated 26.0000 2,990.00 2,990.00 4813 Plote Construction Inc. 30.0000 3,450.00 3,450.00 D2C04024 E-YUCCA FILAMN 2'C 87.000 EACH 0103 Alliance Contractors, Inc. 28.3500 2,466.45 2,466.45 0801 Capitol Cement Co., Inc. 39.0000 3,393.00 3,393.00 2191 Greco Contractors, Inc. 24.0000 2,088.00 2,088.00 3283 Harry W. Kuhn, Inc. 25.0000 2,175.00 2,175.00 3702 Martam Construction Incorporated 33.0000 2,871.00 2,871.00 4813 Plote Construction Inc. 30.0000 2,610.00 2,610.00 XX002189 REL TR SIG CTRL & CAB 2.000 EACH 0103 Alliance Contractors, Inc. 555.0000 1,110.00 1,110.00 0801 Capitol Cement Co., Inc. 1,500.0000 3,000.00 3,000.00 2191 Greco Contractors, Inc. 555.0000 1,110.00 1,110.00 3283 Harry W. Kuhn, Inc. 1,500.0000 3,000.00 3,000.00 3702 Martam Construction Incorporated 600.0000 1,200.00 1,200.00 4813 Plote Construction Inc. 555.0000 1,110.00 1,110.00 XX002924 ECHNACEA PUR "MAGNUS" 68.000 EACH 0103 Alliance Contractors, Inc. 7.6000 516.80 516.80 0801 Capitol Cement Co., Inc. 6.0000 408.00 408.00 2191 Greco Contractors, Inc. 10.0000 680.00 680.00 3283 Harry W. Kuhn, Inc. 7.0000 476.00 476.00 3702 Martam Construction Incorporated 9.0000 612.00 612.00 4813 Plote Construction Inc. 8.0000 544.00 544.00 XX003170 CALAM A KARL FORESTER 41.000 EACH 0103 Alliance Contractors, Inc. 9.9000 405.90 405.90 0801 Capitol Cement Co., Inc. 10.8000 442.80 442.80 2191 Greco Contractors, Inc. 38.0000 1,558.00 1,558.00 3283 Harry W. Kuhn, Inc. 16.0000 656.00 656.00 3702 Martam Construction Incorporated 11.0000 451.00 451.00 4813 Plote Construction Inc. 15.0000 615.00 615.00 XX003174 RUDBECK F S GOLDSTRUM 154.000 EACH 0103 Alliance Contractors, Inc. 7.0000 1,078.00 1,078.00 0801 Capitol Cement Co., Inc. 6.0000 924.00 924.00 2191 Greco Contractors, Inc. 10.0000 1,540.00 1,540.00 3283 Harry W. Kuhn, Inc. 7.0000 1,078.00 1,078.00 3702 Martam Construction Incorporated 8.0000 1,232.00 1,232.00 4813 Plote Construction Inc. 8.0000 1,232.00 1,232.00 XX003192 PCC UNDERLAYMENT 10,060.000 SQ FT 0103 Alliance Contractors, Inc. 4.3000 43,258.00 43,258.00 0801 Capitol Cement Co., Inc. 5.0000 50,300.00 50,300.00 2191 Greco Contractors, Inc. 2.8400 28,570.40 28,570.40 3283 Harry W. Kuhn, Inc. 5.0000 50,300.00 50,300.00 3702 Martam Construction Incorporated 3.5000 35,210.00 35,210.00 4813 Plote Construction Inc. 4.1500 41,749.00 41,749.00 XX003205 ELECTRIC VALVE 2 25.000 EACH 0103 Alliance Contractors, Inc. 155.0000 3,875.00 3,875.00 0801 Capitol Cement Co., Inc. 155.0000 3,875.00 3,875.00 2191 Greco Contractors, Inc. 260.0000 6,500.00 6,500.00 3283 Harry W. Kuhn, Inc. 321.5000 8,037.50 8,037.50 3702 Martam Construction Incorporated 280.0000 7,000.00 7,000.00 4813 Plote Construction Inc. 260.0000 6,500.00 6,500.00 XX003209 LOW VOLTAGE WIRE 125.000 FOOT 0103 Alliance Contractors, Inc. 0.5000 62.50 62.50 0801 Capitol Cement Co., Inc. 0.5000 62.50 62.50 2191 Greco Contractors, Inc. 1.0000 125.00 125.00 3283 Harry W. Kuhn, Inc. 17.0000 2,125.00 2,125.00 3702 Martam Construction Incorporated 2.0000 250.00 250.00 4813 Plote Construction Inc. 1.0000 125.00 125.00 XX003240 MISCAN SIN GRAC 2G 31.000 EACH 0103 Alliance Contractors, Inc. 19.0000 589.00 589.00 0801 Capitol Cement Co., Inc. 22.4000 694.40 694.40 2191 Greco Contractors, Inc. 18.0000 558.00 558.00 3283 Harry W. Kuhn, Inc. 15.0000 465.00 465.00 3702 Martam Construction Incorporated 21.0000 651.00 651.00 4813 Plote Construction Inc. 15.0000 465.00 465.00 XX003710 BACKFLOW PREVENT 2 8.000 EACH 0103 Alliance Contractors, Inc. 1,900.0000 15,200.00 15,200.00 0801 Capitol Cement Co., Inc. 1,900.0000 15,200.00 15,200.00 2191 Greco Contractors, Inc. 1,700.0000 13,600.00 13,600.00 3283 Harry W. Kuhn, Inc. 2,100.0000 16,800.00 16,800.00 3702 Martam Construction Incorporated 1,800.0000 14,400.00 14,400.00 4813 Plote Construction Inc. 1,700.0000 13,600.00 13,600.00 XX003718 FIELD TRANSMITTER 1.000 EACH 0103 Alliance Contractors, Inc. 200.0000 200.00 200.00 0801 Capitol Cement Co., Inc. 200.0000 200.00 200.00 2191 Greco Contractors, Inc. 125.0000 125.00 125.00 3283 Harry W. Kuhn, Inc. 281.0000 281.00 281.00 3702 Martam Construction Incorporated 140.0000 140.00 140.00 4813 Plote Construction Inc. 125.0000 125.00 125.00 XX003782 HEUCH MIC PURP PAL 1G 78.000 EACH 0103 Alliance Contractors, Inc. 7.0000 546.00 546.00 0801 Capitol Cement Co., Inc. 8.0000 624.00 624.00 2191 Greco Contractors, Inc. 16.0000 1,248.00 1,248.00 3283 Harry W. Kuhn, Inc. 7.0000 546.00 546.00 3702 Martam Construction Incorporated 8.0000 624.00 624.00 4813 Plote Construction Inc. 8.0000 624.00 624.00 XX003868 WATER SERV CONN 2 CP 8.000 EACH 0103 Alliance Contractors, Inc. 3,900.0000 31,200.00 31,200.00 0801 Capitol Cement Co., Inc. 3,900.0000 31,200.00 31,200.00 2191 Greco Contractors, Inc. 2,000.0000 16,000.00 16,000.00 3283 Harry W. Kuhn, Inc. 2,100.0000 16,800.00 16,800.00 3702 Martam Construction Incorporated 1,500.0000 12,000.00 12,000.00 4813 Plote Construction Inc. 2,000.0000 16,000.00 16,000.00 XX004146 POLYETHELYNE P 1 5,760.000 FOOT 0103 Alliance Contractors, Inc. 1.0000 5,760.00 5,760.00 0801 Capitol Cement Co., Inc. 1.0000 5,760.00 5,760.00 2191 Greco Contractors, Inc. 1.0000 5,760.00 5,760.00 3283 Harry W. Kuhn, Inc. 1.4000 8,064.00 8,064.00 3702 Martam Construction Incorporated 1.1000 6,336.00 6,336.00 4813 Plote Construction Inc. 1.0000 5,760.00 5,760.00 XX004147 POLYETHELYNE P 1.25 1,840.000 FOOT 0103 Alliance Contractors, Inc. 1.3000 2,392.00 2,392.00 0801 Capitol Cement Co., Inc. 1.3000 2,392.00 2,392.00 2191 Greco Contractors, Inc. 1.1000 2,024.00 2,024.00 3283 Harry W. Kuhn, Inc. 1.6000 2,944.00 2,944.00 3702 Martam Construction Incorporated 1.2000 2,208.00 2,208.00 4813 Plote Construction Inc. 1.1000 2,024.00 2,024.00 XX004199 AGGREGATE BC SPEC 6 455.000 SQ YD 0103 Alliance Contractors, Inc. 4.5000 2,047.50 2,047.50 0801 Capitol Cement Co., Inc. 10.0000 4,550.00 4,550.00 2191 Greco Contractors, Inc. 7.4700 3,398.85 3,398.85 3283 Harry W. Kuhn, Inc. 12.0000 5,460.00 5,460.00 3702 Martam Construction Incorporated 8.0000 3,640.00 3,640.00 4813 Plote Construction Inc. 6.0000 2,730.00 2,730.00 XX004513 LIATRIS SPI KOBOLD 1G 72.000 EACH 0103 Alliance Contractors, Inc. 8.4000 604.80 604.80 0801 Capitol Cement Co., Inc. 6.0000 432.00 432.00 2191 Greco Contractors, Inc. 10.0000 720.00 720.00 3283 Harry W. Kuhn, Inc. 9.5000 684.00 684.00 3702 Martam Construction Incorporated 10.0000 720.00 720.00 4813 Plote Construction Inc. 8.0000 576.00 576.00 XX004527 RHUS AROM GROLO 24SPD 126.000 EACH 0103 Alliance Contractors, Inc. 31.0000 3,906.00 3,906.00 0801 Capitol Cement Co., Inc. 48.0000 6,048.00 6,048.00 2191 Greco Contractors, Inc. 34.0000 4,284.00 4,284.00 3283 Harry W. Kuhn, Inc. 34.0000 4,284.00 4,284.00 3702 Martam Construction Incorporated 35.0000 4,410.00 4,410.00 4813 Plote Construction Inc. 30.0000 3,780.00 3,780.00 XX004980 REOPTIMIZE TR SIG SYS 1.000 L SUM 0103 Alliance Contractors, Inc. 29,700.0000 29,700.00 29,700.00 0801 Capitol Cement Co., Inc. 28,500.0000 28,500.00 28,500.00 2191 Greco Contractors, Inc. 29,700.0000 29,700.00 29,700.00 3283 Harry W. Kuhn, Inc. 28,500.0000 28,500.00 28,500.00 3702 Martam Construction Incorporated 32,000.0000 32,000.00 32,000.00 4813 Plote Construction Inc. 29,700.0000 29,700.00 29,700.00 XX005136 MEDIAN SOIL 3,728.000 CU YD 0103 Alliance Contractors, Inc. 36.0000 134,208.00 134,208.00 0801 Capitol Cement Co., Inc. 14.4000 53,683.20 53,683.20 2191 Greco Contractors, Inc. 30.0000 111,840.00 111,840.00 3283 Harry W. Kuhn, Inc. 35.5000 132,344.00 132,344.00 3702 Martam Construction Incorporated 22.0000 82,016.00 82,016.00 4813 Plote Construction Inc. 22.0000 82,016.00 82,016.00 XX005137 PCC SUR RM (CM) 1-1/2" 6,480.000 SQ YD 0103 Alliance Contractors, Inc. 6.5000 42,120.00 42,120.00 0801 Capitol Cement Co., Inc. 6.6000 42,768.00 42,768.00 2191 Greco Contractors, Inc. 6.0000 38,880.00 38,880.00 3283 Harry W. Kuhn, Inc. 6.0000 38,880.00 38,880.00 3702 Martam Construction Incorporated 4.0000 25,920.00 25,920.00 4813 Plote Construction Inc. 5.0000 32,400.00 32,400.00 XX005138 CLASS B PATCHES (SPECIAL) 2,500.000 SQ YD 0103 Alliance Contractors, Inc. 58.2500 145,625.00 145,625.00 0801 Capitol Cement Co., Inc. 80.0000 200,000.00 200,000.00 2191 Greco Contractors, Inc. 93.8000 234,500.00 234,500.00 3283 Harry W. Kuhn, Inc. 90.0000 225,000.00 225,000.00 3702 Martam Construction Incorporated 83.0000 207,500.00 207,500.00 4813 Plote Construction Inc. 87.0000 217,500.00 217,500.00 XX005139 SS RG CL A 60" S 38" R 271.000 FOOT 0103 Alliance Contractors, Inc. 156.7500 42,479.25 42,479.25 0801 Capitol Cement Co., Inc. 150.0000 40,650.00 40,650.00 2191 Greco Contractors, Inc. 119.7500 32,452.25 32,452.25 3283 Harry W. Kuhn, Inc. 125.0000 33,875.00 33,875.00 3702 Martam Construction Incorporated 148.0000 40,108.00 40,108.00 * 4813 Plote Construction Inc. 140.0000 37,940.00 37,940.00 XX005140 ELECTRIC CONTROLLER 8.000 EACH 0103 Alliance Contractors, Inc. 220.0000 1,760.00 1,760.00 0801 Capitol Cement Co., Inc. 220.0000 1,760.00 1,760.00 2191 Greco Contractors, Inc. 275.0000 2,200.00 2,200.00 3283 Harry W. Kuhn, Inc. 309.0000 2,472.00 2,472.00 3702 Martam Construction Incorporated 300.0000 2,400.00 2,400.00 4813 Plote Construction Inc. 275.0000 2,200.00 2,200.00 XX005141 PVC 1-1/2" 40IPS PP 120.000 FOOT 0103 Alliance Contractors, Inc. 3.5000 420.00 420.00 0801 Capitol Cement Co., Inc. 3.5000 420.00 420.00 2191 Greco Contractors, Inc. 1.8000 216.00 216.00 3283 Harry W. Kuhn, Inc. 3.5000 420.00 420.00 3702 Martam Construction Incorporated 2.0000 240.00 240.00 4813 Plote Construction Inc. 1.8000 216.00 216.00 XX005142 COPPER WS 1.5" TRENCH 430.000 FOOT 0103 Alliance Contractors, Inc. 15.0000 6,450.00 6,450.00 0801 Capitol Cement Co., Inc. 15.0000 6,450.00 6,450.00 2191 Greco Contractors, Inc. 16.0000 6,880.00 6,880.00 3283 Harry W. Kuhn, Inc. 25.0000 10,750.00 10,750.00 3702 Martam Construction Incorporated 18.0000 7,740.00 7,740.00 4813 Plote Construction Inc. 16.0000 6,880.00 6,880.00 XX005143 COPPER WS 1.5" DIR BORE 430.000 FOOT 0103 Alliance Contractors, Inc. 32.0000 13,760.00 13,760.00 0801 Capitol Cement Co., Inc. 32.0000 13,760.00 13,760.00 2191 Greco Contractors, Inc. 18.0000 7,740.00 7,740.00 3283 Harry W. Kuhn, Inc. 29.0000 12,470.00 12,470.00 3702 Martam Construction Incorporated 20.0000 8,600.00 8,600.00 4813 Plote Construction Inc. 18.0000 7,740.00 7,740.00 XX005144 SRRY HD RB 1812-15Q 2.000 EACH 0103 Alliance Contractors, Inc. 42.0000 84.00 84.00 0801 Capitol Cement Co., Inc. 42.0000 84.00 84.00 2191 Greco Contractors, Inc. 44.0000 88.00 88.00 3283 Harry W. Kuhn, Inc. 54.0000 108.00 108.00 3702 Martam Construction Incorporated 50.0000 100.00 100.00 4813 Plote Construction Inc. 44.0000 88.00 88.00 XX005145 SRRY HD RB 1812-15H 39.000 EACH 0103 Alliance Contractors, Inc. 42.0000 1,638.00 1,638.00 0801 Capitol Cement Co., Inc. 42.0000 1,638.00 1,638.00 2191 Greco Contractors, Inc. 44.0000 1,716.00 1,716.00 3283 Harry W. Kuhn, Inc. 54.0000 2,106.00 2,106.00 3702 Martam Construction Incorporated 50.0000 1,950.00 1,950.00 4813 Plote Construction Inc. 44.0000 1,716.00 1,716.00 XX005146 SRRY HD RB 1812-15HV 10.000 EACH 0103 Alliance Contractors, Inc. 42.0000 420.00 420.00 0801 Capitol Cement Co., Inc. 42.0000 420.00 420.00 2191 Greco Contractors, Inc. 44.0000 440.00 440.00 3283 Harry W. Kuhn, Inc. 54.0000 540.00 540.00 3702 Martam Construction Incorporated 50.0000 500.00 500.00 4813 Plote Construction Inc. 44.0000 440.00 440.00 XX005147 SRRY HD RB 1812-12H 13.000 EACH 0103 Alliance Contractors, Inc. 42.0000 546.00 546.00 0801 Capitol Cement Co., Inc. 42.0000 546.00 546.00 2191 Greco Contractors, Inc. 44.0000 572.00 572.00 3283 Harry W. Kuhn, Inc. 54.0000 702.00 702.00 3702 Martam Construction Incorporated 50.0000 650.00 650.00 4813 Plote Construction Inc. 44.0000 572.00 572.00 XX005148 SRRY HD RB 1812-10Q 14.000 EACH 0103 Alliance Contractors, Inc. 42.0000 588.00 588.00 0801 Capitol Cement Co., Inc. 42.0000 588.00 588.00 2191 Greco Contractors, Inc. 44.0000 616.00 616.00 3283 Harry W. Kuhn, Inc. 54.0000 756.00 756.00 3702 Martam Construction Incorporated 50.0000 700.00 700.00 4813 Plote Construction Inc. 44.0000 616.00 616.00 XX005149 SRRY HD RB 1804-10H 80.000 EACH 0103 Alliance Contractors, Inc. 29.0000 2,320.00 2,320.00 0801 Capitol Cement Co., Inc. 29.0000 2,320.00 2,320.00 2191 Greco Contractors, Inc. 30.0000 2,400.00 2,400.00 3283 Harry W. Kuhn, Inc. 37.0000 2,960.00 2,960.00 3702 Martam Construction Incorporated 33.0000 2,640.00 2,640.00 4813 Plote Construction Inc. 30.0000 2,400.00 2,400.00 XX005150 SRRY HD RB 1812-10H 317.000 EACH 0103 Alliance Contractors, Inc. 42.0000 13,314.00 13,314.00 0801 Capitol Cement Co., Inc. 42.0000 13,314.00 13,314.00 2191 Greco Contractors, Inc. 44.0000 13,948.00 13,948.00 3283 Harry W. Kuhn, Inc. 54.0000 17,118.00 17,118.00 3702 Martam Construction Incorporated 50.0000 15,850.00 15,850.00 4813 Plote Construction Inc. 44.0000 13,948.00 13,948.00 XX005151 SRRY HD RB 1804-10HV 4.000 EACH 0103 Alliance Contractors, Inc. 29.0000 116.00 116.00 0801 Capitol Cement Co., Inc. 29.0000 116.00 116.00 2191 Greco Contractors, Inc. 30.0000 120.00 120.00 3283 Harry W. Kuhn, Inc. 37.0000 148.00 148.00 3702 Martam Construction Incorporated 33.0000 132.00 132.00 4813 Plote Construction Inc. 30.0000 120.00 120.00 XX005152 SRRY HD RB 1812-10HV 8.000 EACH 0103 Alliance Contractors, Inc. 42.0000 336.00 336.00 0801 Capitol Cement Co., Inc. 42.0000 336.00 336.00 2191 Greco Contractors, Inc. 44.0000 352.00 352.00 3283 Harry W. Kuhn, Inc. 54.0000 432.00 432.00 3702 Martam Construction Incorporated 50.0000 400.00 400.00 4813 Plote Construction Inc. 44.0000 352.00 352.00 XX005153 SRRY HD RB 1812-8H 34.000 EACH 0103 Alliance Contractors, Inc. 42.0000 1,428.00 1,428.00 0801 Capitol Cement Co., Inc. 42.0000 1,428.00 1,428.00 2191 Greco Contractors, Inc. 44.0000 1,496.00 1,496.00 3283 Harry W. Kuhn, Inc. 54.0000 1,836.00 1,836.00 3702 Martam Construction Incorporated 50.0000 1,700.00 1,700.00 4813 Plote Construction Inc. 44.0000 1,496.00 1,496.00 XX005154 SRRY HD RB 1812-8HV 2.000 EACH 0103 Alliance Contractors, Inc. 42.0000 84.00 84.00 0801 Capitol Cement Co., Inc. 42.0000 84.00 84.00 2191 Greco Contractors, Inc. 44.0000 88.00 88.00 3283 Harry W. Kuhn, Inc. 54.0000 108.00 108.00 3702 Martam Construction Incorporated 50.0000 100.00 100.00 4813 Plote Construction Inc. 44.0000 88.00 88.00 XX005155 SRRY HD RB 1812-5H 10.000 EACH 0103 Alliance Contractors, Inc. 42.0000 420.00 420.00 0801 Capitol Cement Co., Inc. 42.0000 420.00 420.00 2191 Greco Contractors, Inc. 44.0000 440.00 440.00 3283 Harry W. Kuhn, Inc. 54.0000 540.00 540.00 3702 Martam Construction Incorporated 50.0000 500.00 500.00 4813 Plote Construction Inc. 44.0000 440.00 440.00 XX005156 SRRY HD RB 1812-5HV 1.000 EACH 0103 Alliance Contractors, Inc. 42.0000 42.00 42.00 0801 Capitol Cement Co., Inc. 42.0000 42.00 42.00 2191 Greco Contractors, Inc. 44.0000 44.00 44.00 3283 Harry W. Kuhn, Inc. 54.0000 54.00 54.00 3702 Martam Construction Incorporated 50.0000 50.00 50.00 4813 Plote Construction Inc. 44.0000 44.00 44.00 XX005157 SRRY HD RB 1804-EST 4.000 EACH 0103 Alliance Contractors, Inc. 29.0000 116.00 116.00 0801 Capitol Cement Co., Inc. 29.0000 116.00 116.00 2191 Greco Contractors, Inc. 30.0000 120.00 120.00 3283 Harry W. Kuhn, Inc. 37.0000 148.00 148.00 3702 Martam Construction Incorporated 33.0000 132.00 132.00 4813 Plote Construction Inc. 30.0000 120.00 120.00 XX005158 SRRY HD RB 1804-SST 25.000 EACH 0103 Alliance Contractors, Inc. 29.0000 725.00 725.00 0801 Capitol Cement Co., Inc. 29.0000 725.00 725.00 2191 Greco Contractors, Inc. 30.0000 750.00 750.00 3283 Harry W. Kuhn, Inc. 37.0000 925.00 925.00 3702 Martam Construction Incorporated 33.0000 825.00 825.00 4813 Plote Construction Inc. 30.0000 750.00 750.00 XX005159 SRRY HD RB 1804-CST 4.000 EACH 0103 Alliance Contractors, Inc. 29.0000 116.00 116.00 0801 Capitol Cement Co., Inc. 29.0000 116.00 116.00 2191 Greco Contractors, Inc. 30.0000 120.00 120.00 3283 Harry W. Kuhn, Inc. 37.0000 148.00 148.00 3702 Martam Construction Incorporated 33.0000 132.00 132.00 4813 Plote Construction Inc. 30.0000 120.00 120.00 XX005160 ROSA CAREFRE BEAUT 5G 166.000 EACH 0103 Alliance Contractors, Inc. 65.0000 10,790.00 10,790.00 0801 Capitol Cement Co., Inc. 27.0000 4,482.00 4,482.00 2191 Greco Contractors, Inc. 38.0000 6,308.00 6,308.00 3283 Harry W. Kuhn, Inc. 40.5000 6,723.00 6,723.00 3702 Martam Construction Incorporated 75.0000 12,450.00 12,450.00 4813 Plote Construction Inc. 35.0000 5,810.00 5,810.00 XX005161 FORSY X INTERMEDIA 3' 12.000 EACH 0103 Alliance Contractors, Inc. 31.5000 378.00 378.00 0801 Capitol Cement Co., Inc. 30.0000 360.00 360.00 2191 Greco Contractors, Inc. 30.0000 360.00 360.00 3283 Harry W. Kuhn, Inc. 34.0000 408.00 408.00 3702 Martam Construction Incorporated 35.0000 420.00 420.00 4813 Plote Construction Inc. 35.0000 420.00 420.00 XX005163 SYMPHORICARPOS ORB 2' B&B 176.000 EACH 0103 Alliance Contractors, Inc. 26.2500 4,620.00 4,620.00 0801 Capitol Cement Co., Inc. 42.0000 7,392.00 7,392.00 2191 Greco Contractors, Inc. 38.0000 6,688.00 6,688.00 3283 Harry W. Kuhn, Inc. 34.0000 5,984.00 5,984.00 3702 Martam Construction Incorporated 30.0000 5,280.00 5,280.00 4813 Plote Construction Inc. 40.0000 7,040.00 7,040.00 XX005164 ROSA RUGOSA SCARLET MEIDILAND 5 GAL 106.000 EACH 0103 Alliance Contractors, Inc. 30.5000 3,233.00 3,233.00 0801 Capitol Cement Co., Inc. 35.0000 3,710.00 3,710.00 2191 Greco Contractors, Inc. 35.0000 3,710.00 3,710.00 3283 Harry W. Kuhn, Inc. 40.5000 4,293.00 4,293.00 3702 Martam Construction Incorporated 34.0000 3,604.00 3,604.00 4813 Plote Construction Inc. 35.0000 3,710.00 3,710.00 XX005165 SYRINGA PAT MS KIM 3' B&B 12.000 EACH 0103 Alliance Contractors, Inc. 66.0000 792.00 792.00 0801 Capitol Cement Co., Inc. 86.0000 1,032.00 1,032.00 2191 Greco Contractors, Inc. 30.0000 360.00 360.00 3283 Harry W. Kuhn, Inc. 57.5000 690.00 690.00 3702 Martam Construction Incorporated 72.0000 864.00 864.00 4813 Plote Construction Inc. 60.0000 720.00 720.00 XX005166 HYDRANGEA ARBOR ANNA SMOOTH 2' 62.000 EACH 0103 Alliance Contractors, Inc. 42.0000 2,604.00 2,604.00 0801 Capitol Cement Co., Inc. 67.2000 4,166.40 4,166.40 2191 Greco Contractors, Inc. 38.0000 2,356.00 2,356.00 3283 Harry W. Kuhn, Inc. 35.5000 2,201.00 2,201.00 3702 Martam Construction Incorporated 46.0000 2,852.00 2,852.00 4813 Plote Construction Inc. 35.0000 2,170.00 2,170.00 XX005167 RIBES ALPN GRMD 24" 85.000 EACH 0103 Alliance Contractors, Inc. 45.0000 3,825.00 3,825.00 0801 Capitol Cement Co., Inc. 40.0000 3,400.00 3,400.00 2191 Greco Contractors, Inc. 28.0000 2,380.00 2,380.00 3283 Harry W. Kuhn, Inc. 54.5000 4,632.50 4,632.50 3702 Martam Construction Incorporated 50.0000 4,250.00 4,250.00 4813 Plote Construction Inc. 45.0000 3,825.00 3,825.00 XX005168 VINE-EUONY FORT COLOR WC 2 GAL 186.000 EACH 0103 Alliance Contractors, Inc. 8.8000 1,636.80 1,636.80 0801 Capitol Cement Co., Inc. 9.8000 1,822.80 1,822.80 2191 Greco Contractors, Inc. 21.0000 3,906.00 3,906.00 3283 Harry W. Kuhn, Inc. 19.0000 3,534.00 3,534.00 3702 Martam Construction Incorporated 10.0000 1,860.00 1,860.00 4813 Plote Construction Inc. 15.0000 2,790.00 2,790.00 XX005169 HEMEROCALLIS 'YELLOW BUTTERCUPS' 42.000 EACH 0103 Alliance Contractors, Inc. 7.6000 319.20 319.20 0801 Capitol Cement Co., Inc. 9.0000 378.00 378.00 2191 Greco Contractors, Inc. 12.0000 504.00 504.00 3283 Harry W. Kuhn, Inc. 8.0000 336.00 336.00 3702 Martam Construction Incorporated 9.0000 378.00 378.00 4813 Plote Construction Inc. 15.0000 630.00 630.00 XX005170 LIRIOPE JOHN BIRCH 1,335.000 EACH 0103 Alliance Contractors, Inc. 10.2500 13,683.75 13,683.75 0801 Capitol Cement Co., Inc. 6.0000 8,010.00 8,010.00 2191 Greco Contractors, Inc. 7.0000 9,345.00 9,345.00 3283 Harry W. Kuhn, Inc. 10.0000 13,350.00 13,350.00 3702 Martam Construction Incorporated 11.5000 15,352.50 15,352.50 4813 Plote Construction Inc. 10.0000 13,350.00 13,350.00 XX005171 PEROVSKIA ATRIPLIC 1G 114.000 EACH 0103 Alliance Contractors, Inc. 8.9000 1,014.60 1,014.60 0801 Capitol Cement Co., Inc. 6.0000 684.00 684.00 2191 Greco Contractors, Inc. 12.5000 1,425.00 1,425.00 3283 Harry W. Kuhn, Inc. 7.0000 798.00 798.00 3702 Martam Construction Incorporated 10.0000 1,140.00 1,140.00 4813 Plote Construction Inc. 8.0000 912.00 912.00 XX005172 SYRINGA RETIC IS 2.5 TREE FORM 11.000 EACH 0103 Alliance Contractors, Inc. 420.0000 4,620.00 4,620.00 0801 Capitol Cement Co., Inc. 472.0000 5,192.00 5,192.00 2191 Greco Contractors, Inc. 350.0000 3,850.00 3,850.00 3283 Harry W. Kuhn, Inc. 364.0000 4,004.00 4,004.00 3702 Martam Construction Incorporated 450.0000 4,950.00 4,950.00 4813 Plote Construction Inc. 395.0000 4,345.00 4,345.00 XX005173 MORUS ALBA 'CHAPARRAL' 10.000 EACH 0103 Alliance Contractors, Inc. 210.0000 2,100.00 2,100.00 0801 Capitol Cement Co., Inc. 210.0000 2,100.00 2,100.00 2191 Greco Contractors, Inc. 18.0000 180.00 180.00 3283 Harry W. Kuhn, Inc. 404.0000 4,040.00 4,040.00 3702 Martam Construction Incorporated 230.0000 2,300.00 2,300.00 4813 Plote Construction Inc. 500.0000 5,000.00 5,000.00 XX005174 PYRUS CALLER CHANT CALIP 2-1/2" 8.000 EACH 0103 Alliance Contractors, Inc. 346.0000 2,768.00 2,768.00 0801 Capitol Cement Co., Inc. 324.0000 2,592.00 2,592.00 2191 Greco Contractors, Inc. 340.0000 2,720.00 2,720.00 3283 Harry W. Kuhn, Inc. 349.0000 2,792.00 2,792.00 3702 Martam Construction Incorporated 380.0000 3,040.00 3,040.00 4813 Plote Construction Inc. 350.0000 2,800.00 2,800.00 XX005175 MISCAN SIN ZEBRINUS 20.000 EACH 0103 Alliance Contractors, Inc. 12.4000 248.00 248.00 0801 Capitol Cement Co., Inc. 11.0000 220.00 220.00 2191 Greco Contractors, Inc. 18.0000 360.00 360.00 3283 Harry W. Kuhn, Inc. 10.0000 200.00 200.00 3702 Martam Construction Incorporated 15.0000 300.00 300.00 4813 Plote Construction Inc. 20.0000 400.00 400.00 XX005176 VERONICA INCANA 168.000 EACH 0103 Alliance Contractors, Inc. 10.2500 1,722.00 1,722.00 0801 Capitol Cement Co., Inc. 6.0000 1,008.00 1,008.00 2191 Greco Contractors, Inc. 14.0000 2,352.00 2,352.00 3283 Harry W. Kuhn, Inc. 8.5000 1,428.00 1,428.00 3702 Martam Construction Incorporated 12.0000 2,016.00 2,016.00 4813 Plote Construction Inc. 8.0000 1,344.00 1,344.00 XX005177 HEMEROCALLIS KNOB HILL 69.000 EACH 0103 Alliance Contractors, Inc. 8.8000 607.20 607.20 0801 Capitol Cement Co., Inc. 9.3000 641.70 641.70 2191 Greco Contractors, Inc. 12.5000 862.50 862.50 3283 Harry W. Kuhn, Inc. 11.5000 793.50 793.50 3702 Martam Construction Incorporated 10.0000 690.00 690.00 4813 Plote Construction Inc. 15.0000 1,035.00 1,035.00 XX005178 HEMEROCALLIS CHICAGO APACH DAYLILY 303.000 EACH 0103 Alliance Contractors, Inc. 12.6000 3,817.80 3,817.80 0801 Capitol Cement Co., Inc. 9.3000 2,817.90 2,817.90 2191 Greco Contractors, Inc. 12.0000 3,636.00 3,636.00 3283 Harry W. Kuhn, Inc. 11.5000 3,484.50 3,484.50 3702 Martam Construction Incorporated 15.0000 4,545.00 4,545.00 4813 Plote Construction Inc. 10.0000 3,030.00 3,030.00 XX005179 ACHILLEA X HYBRIDA PAPRIKA 328.000 EACH 0103 Alliance Contractors, Inc. 7.6000 2,492.80 2,492.80 0801 Capitol Cement Co., Inc. 6.0000 1,968.00 1,968.00 2191 Greco Contractors, Inc. 12.0000 3,936.00 3,936.00 3283 Harry W. Kuhn, Inc. 7.0000 2,296.00 2,296.00 3702 Martam Construction Incorporated 9.0000 2,952.00 2,952.00 4813 Plote Construction Inc. 8.0000 2,624.00 2,624.00 XX005180 SEDUM SPECTIBLE AUTUMN JOY 394.000 EACH 0103 Alliance Contractors, Inc. 7.6000 2,994.40 2,994.40 0801 Capitol Cement Co., Inc. 6.0000 2,364.00 2,364.00 2191 Greco Contractors, Inc. 10.5000 4,137.00 4,137.00 3283 Harry W. Kuhn, Inc. 7.0000 2,758.00 2,758.00 3702 Martam Construction Incorporated 9.0000 3,546.00 3,546.00 4813 Plote Construction Inc. 8.0000 3,152.00 3,152.00 XX005181 BERGENIA CORD EVENING GLOW 223.000 EACH 0103 Alliance Contractors, Inc. 7.6000 1,694.80 1,694.80 0801 Capitol Cement Co., Inc. 6.0000 1,338.00 1,338.00 2191 Greco Contractors, Inc. 11.0000 2,453.00 2,453.00 3283 Harry W. Kuhn, Inc. 10.0000 2,230.00 2,230.00 3702 Martam Construction Incorporated 9.0000 2,007.00 2,007.00 4813 Plote Construction Inc. 8.0000 1,784.00 1,784.00 XX005182 COREOP VERT ZAGREB 400.000 EACH 0103 Alliance Contractors, Inc. 7.6000 3,040.00 3,040.00 0801 Capitol Cement Co., Inc. 6.0000 2,400.00 2,400.00 2191 Greco Contractors, Inc. 10.5000 4,200.00 4,200.00 3283 Harry W. Kuhn, Inc. 7.0000 2,800.00 2,800.00 3702 Martam Construction Incorporated 9.0000 3,600.00 3,600.00 4813 Plote Construction Inc. 8.0000 3,200.00 3,200.00 XX005183 CHRYSANTHEMUM MAX ALASKA 178.000 EACH 0103 Alliance Contractors, Inc. 7.6000 1,352.80 1,352.80 0801 Capitol Cement Co., Inc. 6.0000 1,068.00 1,068.00 2191 Greco Contractors, Inc. 10.5000 1,869.00 1,869.00 3283 Harry W. Kuhn, Inc. 7.0000 1,246.00 1,246.00 3702 Martam Construction Incorporated 9.0000 1,602.00 1,602.00 4813 Plote Construction Inc. 8.0000 1,424.00 1,424.00 XX005184 PAVER BRICKS 8,860.000 SQ FT 0103 Alliance Contractors, Inc. 6.7000 59,362.00 59,362.00 0801 Capitol Cement Co., Inc. 12.0000 106,320.00 106,320.00 2191 Greco Contractors, Inc. 6.7000 59,362.00 59,362.00 3283 Harry W. Kuhn, Inc. 6.7000 59,362.00 59,362.00 3702 Martam Construction Incorporated 10.5000 93,030.00 93,030.00 4813 Plote Construction Inc. 6.7000 59,362.00 59,362.00 XX005185 PAVER BRICKS (FO) 500.000 SQ FT 0103 Alliance Contractors, Inc. 4.8000 2,400.00 2,400.00 0801 Capitol Cement Co., Inc. 5.0000 2,500.00 2,500.00 2191 Greco Contractors, Inc. 4.8000 2,400.00 2,400.00 3283 Harry W. Kuhn, Inc. 4.8000 2,400.00 2,400.00 3702 Martam Construction Incorporated 6.0000 3,000.00 3,000.00 4813 Plote Construction Inc. 4.8000 2,400.00 2,400.00 XX005186 HEMERO STELLA DORO 1 GAL 248.000 EACH 0103 Alliance Contractors, Inc. 2.8000 694.40 694.40 0801 Capitol Cement Co., Inc. 7.5000 1,860.00 1,860.00 2191 Greco Contractors, Inc. 10.0000 2,480.00 2,480.00 3283 Harry W. Kuhn, Inc. 8.0000 1,984.00 1,984.00 3702 Martam Construction Incorporated 4.0000 992.00 992.00 4813 Plote Construction Inc. 7.0000 1,736.00 1,736.00 X0321020 PCC SUR RM (CM) VAR D 2,750.000 SQ YD 0103 Alliance Contractors, Inc. 5.5000 15,125.00 15,125.00 0801 Capitol Cement Co., Inc. 5.0000 13,750.00 13,750.00 2191 Greco Contractors, Inc. 3.5000 9,625.00 9,625.00 3283 Harry W. Kuhn, Inc. 3.0000 8,250.00 8,250.00 3702 Martam Construction Incorporated 6.0000 16,500.00 16,500.00 4813 Plote Construction Inc. 5.0000 13,750.00 13,750.00 X0322033 STORM SEW WM REQ 12 149.000 FOOT 0103 Alliance Contractors, Inc. 100.0000 14,900.00 14,900.00 0801 Capitol Cement Co., Inc. 60.0000 8,940.00 8,940.00 2191 Greco Contractors, Inc. 35.7500 5,326.75 5,326.75 3283 Harry W. Kuhn, Inc. 55.0000 8,195.00 8,195.00 3702 Martam Construction Incorporated 56.0000 8,344.00 8,344.00 4813 Plote Construction Inc. 50.0000 7,450.00 7,450.00 X0322925 ELCBL C TRACER 14 1C 4,660.000 FOOT 0103 Alliance Contractors, Inc. 0.4000 1,864.00 1,864.00 0801 Capitol Cement Co., Inc. 0.2000 932.00 932.00 2191 Greco Contractors, Inc. 0.4000 1,864.00 1,864.00 3283 Harry W. Kuhn, Inc. 0.2000 932.00 932.00 3702 Martam Construction Incorporated 0.5000 2,330.00 2,330.00 4813 Plote Construction Inc. 0.4000 1,864.00 1,864.00 X0712400 TEMP PAVEMENT 900.000 SQ YD 0103 Alliance Contractors, Inc. 39.3000 35,370.00 35,370.00 0801 Capitol Cement Co., Inc. 26.0000 23,400.00 23,400.00 2191 Greco Contractors, Inc. 46.6500 41,985.00 41,985.00 3283 Harry W. Kuhn, Inc. 40.0000 36,000.00 36,000.00 3702 Martam Construction Incorporated 40.0000 36,000.00 36,000.00 4813 Plote Construction Inc. 25.5000 22,950.00 22,950.00 X4066490 BCSC SUPER IL9.5L LE 80.000 TON 0103 Alliance Contractors, Inc. 48.0000 3,840.00 3,840.00 0801 Capitol Cement Co., Inc. 100.0000 8,000.00 8,000.00 2191 Greco Contractors, Inc. 89.0000 7,120.00 7,120.00 3283 Harry W. Kuhn, Inc. 85.0000 6,800.00 6,800.00 3702 Martam Construction Incorporated 100.0000 8,000.00 8,000.00 4813 Plote Construction Inc. 100.0000 8,000.00 8,000.00 X4066528 P BCSC SUPER "D" N90 3,825.000 TON 0103 Alliance Contractors, Inc. 54.0000 206,550.00 206,550.00 0801 Capitol Cement Co., Inc. 45.0000 172,125.00 172,125.00 2191 Greco Contractors, Inc. 42.5000 162,562.50 162,562.50 3283 Harry W. Kuhn, Inc. 50.0000 191,250.00 191,250.00 3702 Martam Construction Incorporated 48.0000 183,600.00 183,600.00 4813 Plote Construction Inc. 43.2500 165,431.25 165,431.25 X4066616 BCBC SUP IL-19.0 N70 610.000 TON 0103 Alliance Contractors, Inc. 44.5000 27,145.00 27,145.00 0801 Capitol Cement Co., Inc. 70.0000 42,700.00 42,700.00 2191 Greco Contractors, Inc. 110.0000 67,100.00 67,100.00 3283 Harry W. Kuhn, Inc. 80.0000 48,800.00 48,800.00 3702 Martam Construction Incorporated 70.0000 42,700.00 42,700.00 4813 Plote Construction Inc. 67.0000 40,870.00 40,870.00 X4066770 LEV BIND MM SUPER N70 2,447.000 TON 0103 Alliance Contractors, Inc. 46.2000 113,051.40 113,051.40 0801 Capitol Cement Co., Inc. 43.0000 105,221.00 105,221.00 2191 Greco Contractors, Inc. 48.5000 118,679.50 118,679.50 3283 Harry W. Kuhn, Inc. 50.0000 122,350.00 122,350.00 3702 Martam Construction Incorporated 44.0000 107,668.00 107,668.00 4813 Plote Construction Inc. 41.0000 100,327.00 100,327.00 X7015000 CHANGEABLE MESSAGE SN 16.000 CAL MO 0103 Alliance Contractors, Inc. 1,800.0000 28,800.00 28,800.00 0801 Capitol Cement Co., Inc. 1,800.0000 28,800.00 28,800.00 2191 Greco Contractors, Inc. 1,800.0000 28,800.00 28,800.00 3283 Harry W. Kuhn, Inc. 1,100.0000 17,600.00 17,600.00 3702 Martam Construction Incorporated 2,000.0000 32,000.00 32,000.00 4813 Plote Construction Inc. 2,000.0000 32,000.00 32,000.00 X8050015 SERV INSTALL POLE MT 2.000 EACH 0103 Alliance Contractors, Inc. 1,184.0000 2,368.00 2,368.00 0801 Capitol Cement Co., Inc. 1,100.0000 2,200.00 2,200.00 2191 Greco Contractors, Inc. 1,184.0000 2,368.00 2,368.00 3283 Harry W. Kuhn, Inc. 1,100.0000 2,200.00 2,200.00 3702 Martam Construction Incorporated 1,300.0000 2,600.00 2,600.00 4813 Plote Construction Inc. 1,184.0000 2,368.00 2,368.00 X8710020 FOCC62.5/125 MM12SM12 4,660.000 FOOT 0103 Alliance Contractors, Inc. 2.4000 11,184.00 11,184.00 0801 Capitol Cement Co., Inc. 3.5000 16,310.00 16,310.00 2191 Greco Contractors, Inc. 2.4000 11,184.00 11,184.00 3283 Harry W. Kuhn, Inc. 3.5000 16,310.00 16,310.00 3702 Martam Construction Incorporated 2.8000 13,048.00 13,048.00 4813 Plote Construction Inc. 2.4000 11,184.00 11,184.00 X8730027 ELCBL C GROUND 6 1C 855.000 FOOT 0103 Alliance Contractors, Inc. 0.7000 598.50 598.50 0801 Capitol Cement Co., Inc. 0.5000 427.50 427.50 2191 Greco Contractors, Inc. 0.7000 598.50 598.50 3283 Harry W. Kuhn, Inc. 0.5000 427.50 427.50 3702 Martam Construction Incorporated 0.8000 684.00 684.00 4813 Plote Construction Inc. 0.7000 598.50 598.50 X8730250 ELCBL C 20 3C TW SH 1,226.000 FOOT 0103 Alliance Contractors, Inc. 0.9000 1,103.40 1,103.40 0801 Capitol Cement Co., Inc. 0.7500 919.50 919.50 2191 Greco Contractors, Inc. 0.9000 1,103.40 1,103.40 3283 Harry W. Kuhn, Inc. 0.7500 919.50 919.50 3702 Martam Construction Incorporated 1.0000 1,226.00 1,226.00 4813 Plote Construction Inc. 0.9000 1,103.40 1,103.40 X8950115 RELOC LIGHT DET 3.000 EACH 0103 Alliance Contractors, Inc. 184.0000 552.00 552.00 0801 Capitol Cement Co., Inc. 350.0000 1,050.00 1,050.00 2191 Greco Contractors, Inc. 184.0000 552.00 552.00 3283 Harry W. Kuhn, Inc. 350.0000 1,050.00 1,050.00 3702 Martam Construction Incorporated 200.0000 600.00 600.00 4813 Plote Construction Inc. 184.0000 552.00 552.00 X8950120 RELOC LIGHT DET AMP 1.000 EACH 0103 Alliance Contractors, Inc. 29.0000 29.00 29.00 0801 Capitol Cement Co., Inc. 55.0000 55.00 55.00 2191 Greco Contractors, Inc. 29.0000 29.00 29.00 3283 Harry W. Kuhn, Inc. 55.0000 55.00 55.00 3702 Martam Construction Incorporated 35.0000 35.00 35.00 4813 Plote Construction Inc. 29.0000 29.00 29.00 Z0005000 BIT MIX F PATCH (C M) 50.000 TON 0103 Alliance Contractors, Inc. 225.0000 11,250.00 11,250.00 0801 Capitol Cement Co., Inc. 165.0000 8,250.00 8,250.00 2191 Greco Contractors, Inc. 48.0000 2,400.00 2,400.00 3283 Harry W. Kuhn, Inc. 325.0000 16,250.00 16,250.00 3702 Martam Construction Incorporated 180.0000 9,000.00 9,000.00 4813 Plote Construction Inc. 165.0000 8,250.00 8,250.00 Z0013798 CONSTRUCTION LAYOUT 1.000 L SUM 0103 Alliance Contractors, Inc. 17,750.0000 17,750.00 17,750.00 0801 Capitol Cement Co., Inc. 149,000.0000 149,000.00 149,000.00 2191 Greco Contractors, Inc. 43,000.0000 43,000.00 43,000.00 3283 Harry W. Kuhn, Inc. 90,000.0000 90,000.00 90,000.00 3702 Martam Construction Incorporated 20,000.0000 20,000.00 20,000.00 4813 Plote Construction Inc. 17,750.0000 17,750.00 17,750.00 Z0018500 DRAINAGE STR CLEANED 1.000 EACH 0103 Alliance Contractors, Inc. 350.0000 350.00 350.00 0801 Capitol Cement Co., Inc. 1,250.0000 1,250.00 1,250.00 2191 Greco Contractors, Inc. 1,000.0000 1,000.00 1,000.00 3283 Harry W. Kuhn, Inc. 1,000.0000 1,000.00 1,000.00 3702 Martam Construction Incorporated 300.0000 300.00 300.00 4813 Plote Construction Inc. 1,000.0000 1,000.00 1,000.00 20100110 TREE REMOV 6-15 78.000 UNIT 0103 Alliance Contractors, Inc. 23.0000 1,794.00 1,794.00 0801 Capitol Cement Co., Inc. 30.0000 2,340.00 2,340.00 2191 Greco Contractors, Inc. 23.0000 1,794.00 1,794.00 3283 Harry W. Kuhn, Inc. 23.0000 1,794.00 1,794.00 3702 Martam Construction Incorporated 30.0000 2,340.00 2,340.00 4813 Plote Construction Inc. 23.0000 1,794.00 1,794.00 20101000 TEMPORARY FENCE 500.000 FOOT 0103 Alliance Contractors, Inc. 1.7500 875.00 875.00 0801 Capitol Cement Co., Inc. 8.0000 4,000.00 4,000.00 2191 Greco Contractors, Inc. 1.7500 875.00 875.00 3283 Harry W. Kuhn, Inc. 1.7500 875.00 875.00 3702 Martam Construction Incorporated 2.0000 1,000.00 1,000.00 4813 Plote Construction Inc. 4.0000 2,000.00 2,000.00 20101100 TREE TRUNK PROTECTION 28.000 EACH 0103 Alliance Contractors, Inc. 30.0000 840.00 840.00 0801 Capitol Cement Co., Inc. 20.0000 560.00 560.00 2191 Greco Contractors, Inc. 30.0000 840.00 840.00 3283 Harry W. Kuhn, Inc. 30.0000 840.00 840.00 3702 Martam Construction Incorporated 40.0000 1,120.00 1,120.00 4813 Plote Construction Inc. 30.0000 840.00 840.00 20101200 TREE ROOT PRUNING 30.000 EACH 0103 Alliance Contractors, Inc. 30.0000 900.00 900.00 0801 Capitol Cement Co., Inc. 120.0000 3,600.00 3,600.00 2191 Greco Contractors, Inc. 30.0000 900.00 900.00 3283 Harry W. Kuhn, Inc. 30.0000 900.00 900.00 3702 Martam Construction Incorporated 40.0000 1,200.00 1,200.00 4813 Plote Construction Inc. 30.0000 900.00 900.00 20200100 EARTH EXCAVATION 4,240.000 CU YD 0103 Alliance Contractors, Inc. 29.8000 126,352.00 126,352.00 0801 Capitol Cement Co., Inc. 35.0000 148,400.00 148,400.00 2191 Greco Contractors, Inc. 13.2500 56,180.00 56,180.00 3283 Harry W. Kuhn, Inc. 25.0000 106,000.00 106,000.00 3702 Martam Construction Incorporated 22.0000 93,280.00 93,280.00 4813 Plote Construction Inc. 30.0000 127,200.00 127,200.00 20400800 FURNISHED EXCAV 2,144.000 CU YD 0103 Alliance Contractors, Inc. 1.0000 2,144.00 2,144.00 0801 Capitol Cement Co., Inc. 25.0000 53,600.00 53,600.00 2191 Greco Contractors, Inc. 0.0000 0.00 0.00 3283 Harry W. Kuhn, Inc. 0.0100 21.44 21.44 3702 Martam Construction Incorporated 8.0000 17,152.00 17,152.00 4813 Plote Construction Inc. 5.0000 10,720.00 10,720.00 20700420 POROUS GRAN EMB SUBGR 1,030.000 CU YD 0103 Alliance Contractors, Inc. 14.0000 14,420.00 14,420.00 0801 Capitol Cement Co., Inc. 32.0000 32,960.00 32,960.00 2191 Greco Contractors, Inc. 15.8000 16,274.00 16,274.00 3283 Harry W. Kuhn, Inc. 35.0000 36,050.00 36,050.00 3702 Martam Construction Incorporated 26.0000 26,780.00 26,780.00 4813 Plote Construction Inc. 25.0000 25,750.00 25,750.00 20800150 TRENCH BACKFILL 623.000 CU YD 0103 Alliance Contractors, Inc. 32.9000 20,496.70 20,496.70 0801 Capitol Cement Co., Inc. 50.0000 31,150.00 31,150.00 2191 Greco Contractors, Inc. 28.7000 17,880.10 17,880.10 3283 Harry W. Kuhn, Inc. 37.0000 23,051.00 23,051.00 3702 Martam Construction Incorporated 32.0000 19,936.00 19,936.00 4813 Plote Construction Inc. 35.0000 21,805.00 21,805.00 21001000 GEOTECH FAB F/GR STAB 1,650.000 SQ YD 0103 Alliance Contractors, Inc. 1.5000 2,475.00 2,475.00 0801 Capitol Cement Co., Inc. 5.0000 8,250.00 8,250.00 2191 Greco Contractors, Inc. 1.1000 1,815.00 1,815.00 3283 Harry W. Kuhn, Inc. 1.5000 2,475.00 2,475.00 3702 Martam Construction Incorporated 1.0000 1,650.00 1,650.00 4813 Plote Construction Inc. 1.0000 1,650.00 1,650.00 21101615 TOPSOIL F & P 4 8,190.000 SQ YD 0103 Alliance Contractors, Inc. 2.2500 18,427.50 18,427.50 0801 Capitol Cement Co., Inc. 1.6000 13,104.00 13,104.00 2191 Greco Contractors, Inc. 2.3000 18,837.00 18,837.00 3283 Harry W. Kuhn, Inc. 2.7500 22,522.50 22,522.50 3702 Martam Construction Incorporated 2.0000 16,380.00 16,380.00 4813 Plote Construction Inc. 1.7500 14,332.50 14,332.50 21301072 EXPLOR TRENCH 72 200.000 FOOT 0103 Alliance Contractors, Inc. 5.0000 1,000.00 1,000.00 0801 Capitol Cement Co., Inc. 25.0000 5,000.00 5,000.00 2191 Greco Contractors, Inc. 20.0000 4,000.00 4,000.00 3283 Harry W. Kuhn, Inc. 35.0000 7,000.00 7,000.00 3702 Martam Construction Incorporated 2.4000 480.00 480.00 4813 Plote Construction Inc. 25.0000 5,000.00 5,000.00 25000400 NITROGEN FERT NUTR 210.000 POUND 0103 Alliance Contractors, Inc. 2.0000 420.00 420.00 0801 Capitol Cement Co., Inc. 1.0000 210.00 210.00 2191 Greco Contractors, Inc. 1.0000 210.00 210.00 3283 Harry W. Kuhn, Inc. 1.0000 210.00 210.00 3702 Martam Construction Incorporated 2.0000 420.00 420.00 4813 Plote Construction Inc. 1.0000 210.00 210.00 25000500 PHOSPHORUS FERT NUTR 210.000 POUND 0103 Alliance Contractors, Inc. 2.0000 420.00 420.00 0801 Capitol Cement Co., Inc. 1.0000 210.00 210.00 2191 Greco Contractors, Inc. 1.0000 210.00 210.00 3283 Harry W. Kuhn, Inc. 1.0000 210.00 210.00 3702 Martam Construction Incorporated 2.0000 420.00 420.00 4813 Plote Construction Inc. 1.0000 210.00 210.00 25000600 POTASSIUM FERT NUTR 210.000 POUND 0103 Alliance Contractors, Inc. 2.0000 420.00 420.00 0801 Capitol Cement Co., Inc. 1.0000 210.00 210.00 2191 Greco Contractors, Inc. 1.0000 210.00 210.00 3283 Harry W. Kuhn, Inc. 1.0000 210.00 210.00 3702 Martam Construction Incorporated 2.0000 420.00 420.00 4813 Plote Construction Inc. 1.0000 210.00 210.00 25200110 SODDING SALT TOLERANT 10,315.000 SQ YD 0103 Alliance Contractors, Inc. 3.5000 36,102.50 36,102.50 0801 Capitol Cement Co., Inc. 3.4500 35,586.75 35,586.75 2191 Greco Contractors, Inc. 2.7500 28,366.25 28,366.25 3283 Harry W. Kuhn, Inc. 3.1000 31,976.50 31,976.50 3702 Martam Construction Incorporated 3.7000 38,165.50 38,165.50 4813 Plote Construction Inc. 3.2500 33,523.75 33,523.75 25200200 SUPPLE WATERING 80.000 UNIT 0103 Alliance Contractors, Inc. 20.0000 1,600.00 1,600.00 0801 Capitol Cement Co., Inc. 0.0100 0.80 0.80 2191 Greco Contractors, Inc. 1.0000 80.00 80.00 3283 Harry W. Kuhn, Inc. 0.0100 0.80 0.80 3702 Martam Construction Incorporated 25.0000 2,000.00 2,000.00 4813 Plote Construction Inc. 0.0100 0.80 0.80 28000300 TEMP DITCH CHECKS 4.000 EACH 0103 Alliance Contractors, Inc. 100.0000 400.00 400.00 0801 Capitol Cement Co., Inc. 35.0000 140.00 140.00 2191 Greco Contractors, Inc. 80.0000 320.00 320.00 3283 Harry W. Kuhn, Inc. 125.0000 500.00 500.00 3702 Martam Construction Incorporated 110.0000 440.00 440.00 4813 Plote Construction Inc. 250.0000 1,000.00 1,000.00 28000400 PERIMETER EROS BAR 2,490.000 FOOT 0103 Alliance Contractors, Inc. 1.4500 3,610.50 3,610.50 0801 Capitol Cement Co., Inc. 1.7500 4,357.50 4,357.50 2191 Greco Contractors, Inc. 2.2500 5,602.50 5,602.50 3283 Harry W. Kuhn, Inc. 1.9000 4,731.00 4,731.00 3702 Martam Construction Incorporated 1.7000 4,233.00 4,233.00 4813 Plote Construction Inc. 1.8000 4,482.00 4,482.00 31101600 SUB GRAN MAT B 8 11,525.000 SQ YD 0103 Alliance Contractors, Inc. 12.7500 146,943.75 146,943.75 0801 Capitol Cement Co., Inc. 8.0000 92,200.00 92,200.00 2191 Greco Contractors, Inc. 10.6600 122,856.50 122,856.50 3283 Harry W. Kuhn, Inc. 10.0000 115,250.00 115,250.00 3702 Martam Construction Incorporated 7.0000 80,675.00 80,675.00 4813 Plote Construction Inc. 11.8000 135,995.00 135,995.00 35102000 AGG BASE CSE B 8 520.000 SQ YD 0103 Alliance Contractors, Inc. 12.7500 6,630.00 6,630.00 0801 Capitol Cement Co., Inc. 9.0000 4,680.00 4,680.00 2191 Greco Contractors, Inc. 8.6600 4,503.20 4,503.20 3283 Harry W. Kuhn, Inc. 18.0000 9,360.00 9,360.00 3702 Martam Construction Incorporated 7.0000 3,640.00 3,640.00 4813 Plote Construction Inc. 14.9500 7,774.00 7,774.00 35300500 PCC BSE CSE 10 3,270.000 SQ YD 0103 Alliance Contractors, Inc. 48.2500 157,777.50 157,777.50 0801 Capitol Cement Co., Inc. 42.0000 137,340.00 137,340.00 2191 Greco Contractors, Inc. 43.6100 142,604.70 142,604.70 3283 Harry W. Kuhn, Inc. 38.0000 124,260.00 124,260.00 3702 Martam Construction Incorporated 36.0000 117,720.00 117,720.00 4813 Plote Construction Inc. 40.0000 130,800.00 130,800.00 40200800 AGG SURF CSE B 200.000 TON 0103 Alliance Contractors, Inc. 13.0000 2,600.00 2,600.00 0801 Capitol Cement Co., Inc. 10.0000 2,000.00 2,000.00 2191 Greco Contractors, Inc. 25.0000 5,000.00 5,000.00 3283 Harry W. Kuhn, Inc. 25.0000 5,000.00 5,000.00 3702 Martam Construction Incorporated 30.0000 6,000.00 6,000.00 4813 Plote Construction Inc. 18.0000 3,600.00 3,600.00 40300100 BIT MATLS PR CT 9,900.000 GALLON 0103 Alliance Contractors, Inc. 1.3000 12,870.00 12,870.00 0801 Capitol Cement Co., Inc. 0.8500 8,415.00 8,415.00 2191 Greco Contractors, Inc. 0.7800 7,722.00 7,722.00 3283 Harry W. Kuhn, Inc. 0.0100 99.00 99.00 3702 Martam Construction Incorporated 1.0000 9,900.00 9,900.00 4813 Plote Construction Inc. 0.8500 8,415.00 8,415.00 40600400 MIX CR JTS FLANGEWYS 75.000 TON 0103 Alliance Contractors, Inc. 120.0000 9,000.00 9,000.00 0801 Capitol Cement Co., Inc. 300.5000 22,537.50 22,537.50 2191 Greco Contractors, Inc. 100.0000 7,500.00 7,500.00 3283 Harry W. Kuhn, Inc. 325.0000 24,375.00 24,375.00 3702 Martam Construction Incorporated 305.0000 22,875.00 22,875.00 4813 Plote Construction Inc. 275.0000 20,625.00 20,625.00 40600980 BIT SURF REM BUTT JT 1,290.000 SQ YD 0103 Alliance Contractors, Inc. 10.0000 12,900.00 12,900.00 0801 Capitol Cement Co., Inc. 9.0000 11,610.00 11,610.00 2191 Greco Contractors, Inc. 3.5000 4,515.00 4,515.00 3283 Harry W. Kuhn, Inc. 10.0000 12,900.00 12,900.00 3702 Martam Construction Incorporated 4.0000 5,160.00 5,160.00 4813 Plote Construction Inc. 9.0000 11,610.00 11,610.00 40600985 PCC SURF REM BUTT JT 2,100.000 SQ YD 0103 Alliance Contractors, Inc. 14.0000 29,400.00 29,400.00 0801 Capitol Cement Co., Inc. 13.0000 27,300.00 27,300.00 2191 Greco Contractors, Inc. 3.5000 7,350.00 7,350.00 3283 Harry W. Kuhn, Inc. 11.0000 23,100.00 23,100.00 3702 Martam Construction Incorporated 6.0000 12,600.00 12,600.00 4813 Plote Construction Inc. 12.0000 25,200.00 25,200.00 42000501 PCC PVT 10 JOINTED 1,846.000 SQ YD 0103 Alliance Contractors, Inc. 60.5000 111,683.00 111,683.00 0801 Capitol Cement Co., Inc. 70.0000 129,220.00 129,220.00 2191 Greco Contractors, Inc. 53.8500 99,407.10 99,407.10 3283 Harry W. Kuhn, Inc. 49.0000 90,454.00 90,454.00 3702 Martam Construction Incorporated 48.0000 88,608.00 88,608.00 4813 Plote Construction Inc. 46.0000 84,916.00 84,916.00 42001200 PAVEMENT FABRIC 2,200.000 SQ YD 0103 Alliance Contractors, Inc. 2.5000 5,500.00 5,500.00 0801 Capitol Cement Co., Inc. 5.0000 11,000.00 11,000.00 2191 Greco Contractors, Inc. 2.7500 6,050.00 6,050.00 3283 Harry W. Kuhn, Inc. 8.0000 17,600.00 17,600.00 3702 Martam Construction Incorporated 3.8000 8,360.00 8,360.00 4813 Plote Construction Inc. 4.1500 9,130.00 9,130.00 42001300 PROTECTIVE COAT 9,080.000 SQ YD 0103 Alliance Contractors, Inc. 0.1000 908.00 908.00 0801 Capitol Cement Co., Inc. 1.0000 9,080.00 9,080.00 2191 Greco Contractors, Inc. 1.0000 9,080.00 9,080.00 3283 Harry W. Kuhn, Inc. 1.0000 9,080.00 9,080.00 3702 Martam Construction Incorporated 0.8000 7,264.00 7,264.00 4813 Plote Construction Inc. 0.6500 5,902.00 5,902.00 42300400 PCC DRIVEWAY PAVT 8 684.000 SQ YD 0103 Alliance Contractors, Inc. 34.4000 23,529.60 23,529.60 0801 Capitol Cement Co., Inc. 42.0000 28,728.00 28,728.00 2191 Greco Contractors, Inc. 31.5000 21,546.00 21,546.00 3283 Harry W. Kuhn, Inc. 45.0000 30,780.00 30,780.00 3702 Martam Construction Incorporated 36.0000 24,624.00 24,624.00 4813 Plote Construction Inc. 37.0000 25,308.00 25,308.00 42400200 PC CONC SIDEWALK 5 14,875.000 SQ FT 0103 Alliance Contractors, Inc. 3.1500 46,856.25 46,856.25 0801 Capitol Cement Co., Inc. 6.0000 89,250.00 89,250.00 2191 Greco Contractors, Inc. 3.2500 48,343.75 48,343.75 3283 Harry W. Kuhn, Inc. 3.5000 52,062.50 52,062.50 3702 Martam Construction Incorporated 3.8000 56,525.00 56,525.00 4813 Plote Construction Inc. 4.0000 59,500.00 59,500.00 44000006 BIT SURF REM 1 1/2 1,500.000 SQ YD 0103 Alliance Contractors, Inc. 3.5000 5,250.00 5,250.00 0801 Capitol Cement Co., Inc. 3.4000 5,100.00 5,100.00 2191 Greco Contractors, Inc. 3.5000 5,250.00 5,250.00 3283 Harry W. Kuhn, Inc. 4.0000 6,000.00 6,000.00 3702 Martam Construction Incorporated 3.5000 5,250.00 5,250.00 4813 Plote Construction Inc. 3.2500 4,875.00 4,875.00 44000100 PAVEMENT REM 3,051.000 SQ YD 0103 Alliance Contractors, Inc. 17.7000 54,002.70 54,002.70 0801 Capitol Cement Co., Inc. 15.0000 45,765.00 45,765.00 2191 Greco Contractors, Inc. 23.2200 70,844.22 70,844.22 3283 Harry W. Kuhn, Inc. 12.0000 36,612.00 36,612.00 3702 Martam Construction Incorporated 11.0000 33,561.00 33,561.00 4813 Plote Construction Inc. 15.0000 45,765.00 45,765.00 44000200 DRIVE PAVEMENT REM 1,708.000 SQ YD 0103 Alliance Contractors, Inc. 12.0000 20,496.00 20,496.00 0801 Capitol Cement Co., Inc. 12.0000 20,496.00 20,496.00 2191 Greco Contractors, Inc. 10.0800 17,216.64 17,216.64 3283 Harry W. Kuhn, Inc. 9.0000 15,372.00 15,372.00 3702 Martam Construction Incorporated 8.0000 13,664.00 13,664.00 4813 Plote Construction Inc. 10.0000 17,080.00 17,080.00 44000300 CURB REM 380.000 FOOT 0103 Alliance Contractors, Inc. 12.0000 4,560.00 4,560.00 0801 Capitol Cement Co., Inc. 5.0000 1,900.00 1,900.00 2191 Greco Contractors, Inc. 5.8000 2,204.00 2,204.00 3283 Harry W. Kuhn, Inc. 5.0000 1,900.00 1,900.00 3702 Martam Construction Incorporated 5.0000 1,900.00 1,900.00 4813 Plote Construction Inc. 3.0000 1,140.00 1,140.00 44000400 GUTTER REM 500.000 FOOT 0103 Alliance Contractors, Inc. 12.0000 6,000.00 6,000.00 0801 Capitol Cement Co., Inc. 5.0000 2,500.00 2,500.00 2191 Greco Contractors, Inc. 5.5000 2,750.00 2,750.00 3283 Harry W. Kuhn, Inc. 5.0000 2,500.00 2,500.00 3702 Martam Construction Incorporated 5.0000 2,500.00 2,500.00 4813 Plote Construction Inc. 3.0000 1,500.00 1,500.00 44000500 COMB CURB GUTTER REM 14,989.000 FOOT 0103 Alliance Contractors, Inc. 15.7000 235,327.30 235,327.30 0801 Capitol Cement Co., Inc. 4.0000 59,956.00 59,956.00 2191 Greco Contractors, Inc. 5.2000 77,942.80 77,942.80 3283 Harry W. Kuhn, Inc. 4.5000 67,450.50 67,450.50 3702 Martam Construction Incorporated 4.5000 67,450.50 67,450.50 4813 Plote Construction Inc. 3.6500 54,709.85 54,709.85 44000600 SIDEWALK REM 14,150.000 SQ FT 0103 Alliance Contractors, Inc. 2.5000 35,375.00 35,375.00 0801 Capitol Cement Co., Inc. 1.0000 14,150.00 14,150.00 2191 Greco Contractors, Inc. 0.5800 8,207.00 8,207.00 3283 Harry W. Kuhn, Inc. 1.2500 17,687.50 17,687.50 3702 Martam Construction Incorporated 1.0000 14,150.00 14,150.00 4813 Plote Construction Inc. 1.4000 19,810.00 19,810.00 44002020 CONC MEDIAN SURF REM 2,760.000 SQ FT 0103 Alliance Contractors, Inc. 1.0000 2,760.00 2,760.00 0801 Capitol Cement Co., Inc. 3.0000 8,280.00 8,280.00 2191 Greco Contractors, Inc. 2.6700 7,369.20 7,369.20 3283 Harry W. Kuhn, Inc. 0.7500 2,070.00 2,070.00 3702 Martam Construction Incorporated 1.5000 4,140.00 4,140.00 4813 Plote Construction Inc. 1.8500 5,106.00 5,106.00 44003100 MEDIAN REMOVAL 42,493.000 SQ FT 0103 Alliance Contractors, Inc. 1.0000 42,493.00 42,493.00 0801 Capitol Cement Co., Inc. 3.0000 127,479.00 127,479.00 2191 Greco Contractors, Inc. 3.8500 163,598.05 163,598.05 3283 Harry W. Kuhn, Inc. 1.0000 42,493.00 42,493.00 3702 Martam Construction Incorporated 2.0000 84,986.00 84,986.00 4813 Plote Construction Inc. 2.1500 91,359.95 91,359.95 44003510 MEDIAN REMOVAL (PD) 3,400.000 SQ FT 0103 Alliance Contractors, Inc. 1.8000 6,120.00 6,120.00 0801 Capitol Cement Co., Inc. 1.0000 3,400.00 3,400.00 2191 Greco Contractors, Inc. 2.2500 7,650.00 7,650.00 3283 Harry W. Kuhn, Inc. 1.7500 5,950.00 5,950.00 3702 Martam Construction Incorporated 1.1000 3,740.00 3,740.00 * 4813 Plote Construction Inc. 1.0000 3,400.00 3,400.00 44200970 CL B PATCH T2 10 4,831.000 SQ YD 0103 Alliance Contractors, Inc. 47.4500 229,230.95 229,230.95 0801 Capitol Cement Co., Inc. 45.0000 217,395.00 217,395.00 2191 Greco Contractors, Inc. 85.3600 412,374.16 412,374.16 3283 Harry W. Kuhn, Inc. 80.0000 386,480.00 386,480.00 3702 Martam Construction Incorporated 82.0000 396,142.00 396,142.00 4813 Plote Construction Inc. 80.0000 386,480.00 386,480.00 44200974 CL B PATCH T3 10 329.000 SQ YD 0103 Alliance Contractors, Inc. 47.4500 15,611.05 15,611.05 0801 Capitol Cement Co., Inc. 75.0000 24,675.00 24,675.00 2191 Greco Contractors, Inc. 77.4000 25,464.60 25,464.60 3283 Harry W. Kuhn, Inc. 75.0000 24,675.00 24,675.00 3702 Martam Construction Incorporated 76.0000 25,004.00 25,004.00 4813 Plote Construction Inc. 70.0000 23,030.00 23,030.00 44200976 CL B PATCH T4 10 2,471.000 SQ YD 0103 Alliance Contractors, Inc. 47.4500 117,248.95 117,248.95 0801 Capitol Cement Co., Inc. 75.0000 185,325.00 185,325.00 2191 Greco Contractors, Inc. 72.6500 179,518.15 179,518.15 3283 Harry W. Kuhn, Inc. 65.0000 160,615.00 160,615.00 3702 Martam Construction Incorporated 72.0000 177,912.00 177,912.00 4813 Plote Construction Inc. 64.0000 158,144.00 158,144.00 44201294 CL B PATCH-EXPAN JT 840.000 FOOT 0103 Alliance Contractors, Inc. 7.5000 6,300.00 6,300.00 0801 Capitol Cement Co., Inc. 25.0000 21,000.00 21,000.00 2191 Greco Contractors, Inc. 54.0000 45,360.00 45,360.00 3283 Harry W. Kuhn, Inc. 85.0000 71,400.00 71,400.00 3702 Martam Construction Incorporated 18.0000 15,120.00 15,120.00 4813 Plote Construction Inc. 7.0000 5,880.00 5,880.00 44300100 AREA REF CR CON TREAT 40,000.000 SQ YD 0103 Alliance Contractors, Inc. 0.5700 22,800.00 22,800.00 0801 Capitol Cement Co., Inc. 1.0000 40,000.00 40,000.00 2191 Greco Contractors, Inc. 0.6800 27,200.00 27,200.00 3283 Harry W. Kuhn, Inc. 0.5600 22,400.00 22,400.00 3702 Martam Construction Incorporated 0.7000 28,000.00 28,000.00 4813 Plote Construction Inc. 0.5600 22,400.00 22,400.00 50104400 CONC HDWL REM 4.000 EACH 0103 Alliance Contractors, Inc. 350.0000 1,400.00 1,400.00 0801 Capitol Cement Co., Inc. 1,000.0000 4,000.00 4,000.00 2191 Greco Contractors, Inc. 200.0000 800.00 800.00 3283 Harry W. Kuhn, Inc. 350.0000 1,400.00 1,400.00 3702 Martam Construction Incorporated 800.0000 3,200.00 3,200.00 4813 Plote Construction Inc. 450.0000 1,800.00 1,800.00 542D0265 P CUL CL D 1 60 912.000 FOOT 0103 Alliance Contractors, Inc. 171.1500 156,088.80 156,088.80 0801 Capitol Cement Co., Inc. 150.0000 136,800.00 136,800.00 2191 Greco Contractors, Inc. 113.5500 103,557.60 103,557.60 3283 Harry W. Kuhn, Inc. 110.0000 100,320.00 100,320.00 3702 Martam Construction Incorporated 108.0000 98,496.00 98,496.00 4813 Plote Construction Inc. 120.0000 109,440.00 109,440.00 55019500 SS 1 RCP CL 4 12 552.000 FOOT 0103 Alliance Contractors, Inc. 87.7000 48,410.40 48,410.40 0801 Capitol Cement Co., Inc. 100.0000 55,200.00 55,200.00 2191 Greco Contractors, Inc. 27.2500 15,042.00 15,042.00 3283 Harry W. Kuhn, Inc. 44.0000 24,288.00 24,288.00 3702 Martam Construction Incorporated 38.0000 20,976.00 20,976.00 4813 Plote Construction Inc. 38.0000 20,976.00 20,976.00 55020300 SS 1 RCP CL 3 36 50.000 FOOT 0103 Alliance Contractors, Inc. 120.8500 6,042.50 6,042.50 0801 Capitol Cement Co., Inc. 125.0000 6,250.00 6,250.00 2191 Greco Contractors, Inc. 73.7000 3,685.00 3,685.00 3283 Harry W. Kuhn, Inc. 90.0000 4,500.00 4,500.00 3702 Martam Construction Incorporated 130.0000 6,500.00 6,500.00 4813 Plote Construction Inc. 80.0000 4,000.00 4,000.00 55021600 SS 2 RCP CL 3 12 145.000 FOOT 0103 Alliance Contractors, Inc. 87.7000 12,716.50 12,716.50 0801 Capitol Cement Co., Inc. 95.0000 13,775.00 13,775.00 2191 Greco Contractors, Inc. 34.2500 4,966.25 4,966.25 3283 Harry W. Kuhn, Inc. 50.0000 7,250.00 7,250.00 3702 Martam Construction Incorporated 43.0000 6,235.00 6,235.00 4813 Plote Construction Inc. 38.0000 5,510.00 5,510.00 55034800 SS 1 RCEP S60 R38 68.000 FOOT 0103 Alliance Contractors, Inc. 156.7000 10,655.60 10,655.60 0801 Capitol Cement Co., Inc. 150.0000 10,200.00 10,200.00 2191 Greco Contractors, Inc. 111.2500 7,565.00 7,565.00 3283 Harry W. Kuhn, Inc. 145.0000 9,860.00 9,860.00 3702 Martam Construction Incorporated 185.0000 12,580.00 12,580.00 4813 Plote Construction Inc. 130.0000 8,840.00 8,840.00 55100500 STORM SEWER REM 12 376.000 FOOT 0103 Alliance Contractors, Inc. 6.0000 2,256.00 2,256.00 0801 Capitol Cement Co., Inc. 10.0000 3,760.00 3,760.00 2191 Greco Contractors, Inc. 8.0000 3,008.00 3,008.00 3283 Harry W. Kuhn, Inc. 13.0000 4,888.00 4,888.00 3702 Martam Construction Incorporated 4.0000 1,504.00 1,504.00 4813 Plote Construction Inc. 10.0000 3,760.00 3,760.00 55100700 STORM SEWER REM 15 15.000 FOOT 0103 Alliance Contractors, Inc. 6.0000 90.00 90.00 0801 Capitol Cement Co., Inc. 12.0000 180.00 180.00 2191 Greco Contractors, Inc. 8.0000 120.00 120.00 3283 Harry W. Kuhn, Inc. 14.0000 210.00 210.00 3702 Martam Construction Incorporated 8.0000 120.00 120.00 4813 Plote Construction Inc. 10.0000 150.00 150.00 55100900 STORM SEWER REM 18 20.000 FOOT 0103 Alliance Contractors, Inc. 6.0000 120.00 120.00 0801 Capitol Cement Co., Inc. 15.0000 300.00 300.00 2191 Greco Contractors, Inc. 8.0000 160.00 160.00 3283 Harry W. Kuhn, Inc. 15.0000 300.00 300.00 3702 Martam Construction Incorporated 10.0000 200.00 200.00 4813 Plote Construction Inc. 10.0000 200.00 200.00 55101900 STORM SEWER REM 48 340.000 FOOT 0103 Alliance Contractors, Inc. 12.0000 4,080.00 4,080.00 0801 Capitol Cement Co., Inc. 25.0000 8,500.00 8,500.00 2191 Greco Contractors, Inc. 10.3000 3,502.00 3,502.00 3283 Harry W. Kuhn, Inc. 20.0000 6,800.00 6,800.00 3702 Martam Construction Incorporated 19.0000 6,460.00 6,460.00 4813 Plote Construction Inc. 20.0000 6,800.00 6,800.00 56400400 FIRE HYDNTS RELOCATED 5.000 EACH 0103 Alliance Contractors, Inc. 3,200.0000 16,000.00 16,000.00 0801 Capitol Cement Co., Inc. 3,000.0000 15,000.00 15,000.00 2191 Greco Contractors, Inc. 3,075.0000 15,375.00 15,375.00 3283 Harry W. Kuhn, Inc. 1,750.0000 8,750.00 8,750.00 3702 Martam Construction Incorporated 1,900.0000 9,500.00 9,500.00 4813 Plote Construction Inc. 3,100.0000 15,500.00 15,500.00 60107600 PIPE UNDERDRAINS 4 1,600.000 FOOT 0103 Alliance Contractors, Inc. 11.5500 18,480.00 18,480.00 0801 Capitol Cement Co., Inc. 20.0000 32,000.00 32,000.00 2191 Greco Contractors, Inc. 14.6000 23,360.00 23,360.00 3283 Harry W. Kuhn, Inc. 14.5000 23,200.00 23,200.00 3702 Martam Construction Incorporated 13.0000 20,800.00 20,800.00 4813 Plote Construction Inc. 16.0000 25,600.00 25,600.00 60109510 P UNDR FAB LINE TR 4 3,011.000 FOOT 0103 Alliance Contractors, Inc. 11.5500 34,777.05 34,777.05 0801 Capitol Cement Co., Inc. 25.0000 75,275.00 75,275.00 2191 Greco Contractors, Inc. 16.7000 50,283.70 50,283.70 3283 Harry W. Kuhn, Inc. 13.5000 40,648.50 40,648.50 3702 Martam Construction Incorporated 15.0000 45,165.00 45,165.00 4813 Plote Construction Inc. 16.0000 48,176.00 48,176.00 60200105 CB TA 4 DIA T1F OL 3.000 EACH 0103 Alliance Contractors, Inc. 1,930.0000 5,790.00 5,790.00 0801 Capitol Cement Co., Inc. 2,500.0000 7,500.00 7,500.00 2191 Greco Contractors, Inc. 1,470.0000 4,410.00 4,410.00 3283 Harry W. Kuhn, Inc. 2,100.0000 6,300.00 6,300.00 3702 Martam Construction Incorporated 1,600.0000 4,800.00 4,800.00 4813 Plote Construction Inc. 1,600.0000 4,800.00 4,800.00 60200805 CB TA 4 DIA T8G 2.000 EACH 0103 Alliance Contractors, Inc. 1,830.0000 3,660.00 3,660.00 0801 Capitol Cement Co., Inc. 2,050.0000 4,100.00 4,100.00 2191 Greco Contractors, Inc. 1,405.0000 2,810.00 2,810.00 3283 Harry W. Kuhn, Inc. 2,000.0000 4,000.00 4,000.00 3702 Martam Construction Incorporated 1,600.0000 3,200.00 3,200.00 4813 Plote Construction Inc. 1,550.0000 3,100.00 3,100.00 60201105 CB TA 4 DIA T11F&G 4.000 EACH 0103 Alliance Contractors, Inc. 1,930.0000 7,720.00 7,720.00 0801 Capitol Cement Co., Inc. 2,500.0000 10,000.00 10,000.00 2191 Greco Contractors, Inc. 1,490.0000 5,960.00 5,960.00 3283 Harry W. Kuhn, Inc. 2,150.0000 8,600.00 8,600.00 3702 Martam Construction Incorporated 1,700.0000 6,800.00 6,800.00 4813 Plote Construction Inc. 1,650.0000 6,600.00 6,600.00 60201340 CB TA 4 DIA T24F&G 6.000 EACH 0103 Alliance Contractors, Inc. 1,930.0000 11,580.00 11,580.00 0801 Capitol Cement Co., Inc. 2,400.0000 14,400.00 14,400.00 2191 Greco Contractors, Inc. 1,430.0000 8,580.00 8,580.00 3283 Harry W. Kuhn, Inc. 2,100.0000 12,600.00 12,600.00 3702 Martam Construction Incorporated 1,700.0000 10,200.00 10,200.00 4813 Plote Construction Inc. 1,500.0000 9,000.00 9,000.00 60204505 CB TA 5 DIA T8G 2.000 EACH 0103 Alliance Contractors, Inc. 2,175.0000 4,350.00 4,350.00 0801 Capitol Cement Co., Inc. 2,750.0000 5,500.00 5,500.00 2191 Greco Contractors, Inc. 1,690.0000 3,380.00 3,380.00 3283 Harry W. Kuhn, Inc. 2,450.0000 4,900.00 4,900.00 3702 Martam Construction Incorporated 2,200.0000 4,400.00 4,400.00 4813 Plote Construction Inc. 2,000.0000 4,000.00 4,000.00 60205040 CB TA 5 DIA T24F&G 4.000 EACH 0103 Alliance Contractors, Inc. 2,275.0000 9,100.00 9,100.00 0801 Capitol Cement Co., Inc. 3,200.0000 12,800.00 12,800.00 2191 Greco Contractors, Inc. 1,980.0000 7,920.00 7,920.00 3283 Harry W. Kuhn, Inc. 2,550.0000 10,200.00 10,200.00 3702 Martam Construction Incorporated 2,200.0000 8,800.00 8,800.00 4813 Plote Construction Inc. 2,200.0000 8,800.00 8,800.00 60207005 CB TC T1F CL 2.000 EACH 0103 Alliance Contractors, Inc. 1,225.0000 2,450.00 2,450.00 0801 Capitol Cement Co., Inc. 2,000.0000 4,000.00 4,000.00 2191 Greco Contractors, Inc. 935.0000 1,870.00 1,870.00 3283 Harry W. Kuhn, Inc. 1,375.0000 2,750.00 2,750.00 3702 Martam Construction Incorporated 1,000.0000 2,000.00 2,000.00 4813 Plote Construction Inc. 1,000.0000 2,000.00 2,000.00 60218400 MAN TA 4 DIA T1F CL 4.000 EACH 0103 Alliance Contractors, Inc. 1,660.0000 6,640.00 6,640.00 0801 Capitol Cement Co., Inc. 2,250.0000 9,000.00 9,000.00 2191 Greco Contractors, Inc. 1,395.0000 5,580.00 5,580.00 3283 Harry W. Kuhn, Inc. 1,950.0000 7,800.00 7,800.00 3702 Martam Construction Incorporated 1,800.0000 7,200.00 7,200.00 4813 Plote Construction Inc. 1,400.0000 5,600.00 5,600.00 60221100 MAN TA 5 DIA T1F CL 1.000 EACH 0103 Alliance Contractors, Inc. 1,955.0000 1,955.00 1,955.00 0801 Capitol Cement Co., Inc. 2,900.0000 2,900.00 2,900.00 2191 Greco Contractors, Inc. 2,030.0000 2,030.00 2,030.00 3283 Harry W. Kuhn, Inc. 2,225.0000 2,225.00 2,225.00 3702 Martam Construction Incorporated 2,450.0000 2,450.00 2,450.00 4813 Plote Construction Inc. 1,600.0000 1,600.00 1,600.00 60224446 MAN TA 7 DIA T1F CL 9.000 EACH 0103 Alliance Contractors, Inc. 3,490.0000 31,410.00 31,410.00 0801 Capitol Cement Co., Inc. 5,500.0000 49,500.00 49,500.00 2191 Greco Contractors, Inc. 4,285.0000 38,565.00 38,565.00 3283 Harry W. Kuhn, Inc. 4,650.0000 41,850.00 41,850.00 3702 Martam Construction Incorporated 4,100.0000 36,900.00 36,900.00 4813 Plote Construction Inc. 4,200.0000 37,800.00 37,800.00 60234200 INLETS TA T1F OL 1.000 EACH 0103 Alliance Contractors, Inc. 1,180.0000 1,180.00 1,180.00 0801 Capitol Cement Co., Inc. 2,200.0000 2,200.00 2,200.00 2191 Greco Contractors, Inc. 750.0000 750.00 750.00 3283 Harry W. Kuhn, Inc. 850.0000 850.00 850.00 3702 Martam Construction Incorporated 700.0000 700.00 700.00 4813 Plote Construction Inc. 840.0000 840.00 840.00 60236200 INLETS TA T8G 4.000 EACH 0103 Alliance Contractors, Inc. 1,080.0000 4,320.00 4,320.00 0801 Capitol Cement Co., Inc. 2,200.0000 8,800.00 8,800.00 2191 Greco Contractors, Inc. 670.0000 2,680.00 2,680.00 3283 Harry W. Kuhn, Inc. 775.0000 3,100.00 3,100.00 3702 Martam Construction Incorporated 700.0000 2,800.00 2,800.00 4813 Plote Construction Inc. 800.0000 3,200.00 3,200.00 60236825 INLETS TA T11V F&G 2.000 EACH 0103 Alliance Contractors, Inc. 1,220.0000 2,440.00 2,440.00 0801 Capitol Cement Co., Inc. 2,200.0000 4,400.00 4,400.00 2191 Greco Contractors, Inc. 805.0000 1,610.00 1,610.00 3283 Harry W. Kuhn, Inc. 925.0000 1,850.00 1,850.00 3702 Martam Construction Incorporated 800.0000 1,600.00 1,600.00 4813 Plote Construction Inc. 900.0000 1,800.00 1,800.00 * 60237470 INLETS TA T24F&G 11.000 EACH 0103 Alliance Contractors, Inc. 1,180.0000 12,980.00 12,980.00 0801 Capitol Cement Co., Inc. 2,100.0000 23,100.00 23,100.00 2191 Greco Contractors, Inc. 725.0000 7,975.00 7,975.00 3283 Harry W. Kuhn, Inc. 850.0000 9,350.00 9,350.00 3702 Martam Construction Incorporated 800.0000 8,800.00 8,800.00 4813 Plote Cons