ILLINOIS DEPARTMENT OF TRANSPORTATION PAGE: 1 02/08/02 08:28:16 U N I T P R I C E T A B U L A T I O N O F B I D S LETTING DATE: 01/18/2002 LETTING TYPE: SCHEDULED CONTRACT NUMBER: 64689 LETTING ITEM NUMBER: 067 RESPONSIBLE DISTRICT: 02 BIDS LOCKED: Y SECTION: 73BR-1,74BR-3 COUNTY: LEE ESTIMATE: -------------------------- SUMMARY OF CONTRACTOR BIDS -------------------------- "AS READ" SUMMATION SUMMATION OF NBR BIDR CONTR COMB ITEM CONTR BIDDER OF BIDDER CALCULATED LOW BIDR CALC BLANK NBR BIDDER NAME GROUP COMB GRP NBR GROUP TOTAL PRICE EXTENSIONS EXTENSIONS BID EXTENSION DIFF BIDS 0049 Advanced Asphalt Co. NO ALT 2,202,504.80 2,202,504.80 2,202,504.80 1045 Civil Constructors, Inc. of Illinois NO ALT 2,741,317.10 2,741,317.10 2,741,317.10 3330 Ladd Construction Co. NO ALT 2,055,627.77 * 2,055,627.77 2,055,627.77 * 4887 Bob Propheter Construction, L.L.C. NO ALT 2,313,601.83 2,313,601.83 2,313,232.83 369.00- 6085 Len Trovero Construction NO ALT 2,351,760.51 2,351,760.51 2,351,760.51 **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT = 149 ---------------------- DETAIL CONTRACTOR BIDS ---------------------- ITEM NBR ITEM DESCRIPTION UNIT OF UNIT BIDDER CALCULATED BIDR CALC BIDR NBR BIDDER NAME QUANTITY MEASURE PRICE EXTENSION EXTENSION EXTENSION DIFF A2003814 T-FRAXINUS PENN 1-3/4 10.000 EACH 0049 Advanced Asphalt Co. 259.6500 2,596.50 2,596.50 1045 Civil Constructors, Inc. of Illinois 400.0000 4,000.00 4,000.00 3330 Ladd Construction Co. 250.0000 2,500.00 2,500.00 4887 Bob Propheter Construction, L.L.C. 400.0000 4,000.00 4,000.00 6085 Len Trovero Construction 390.0000 3,900.00 3,900.00 C2001624 S-CORNUS SERICEA 2' 34.000 EACH 0049 Advanced Asphalt Co. 163.6300 5,563.42 5,563.42 1045 Civil Constructors, Inc. of Illinois 60.0000 2,040.00 2,040.00 3330 Ladd Construction Co. 165.0000 5,610.00 5,610.00 4887 Bob Propheter Construction, L.L.C. 60.0000 2,040.00 2,040.00 6085 Len Trovero Construction 75.0000 2,550.00 2,550.00 MX406H15 LEV BIND HM SUPER N50 9.100 M TON 0049 Advanced Asphalt Co. 155.9700 1,419.33 1,419.33 1045 Civil Constructors, Inc. of Illinois 155.9700 1,419.33 1,419.33 3330 Ladd Construction Co. 156.0000 1,419.60 1,419.60 4887 Bob Propheter Construction, L.L.C. 101.4700 923.38 923.38 6085 Len Trovero Construction 100.0000 910.00 910.00 MX406M15 LEV BIND MM SUPER N50 1,143.300 M TON 0049 Advanced Asphalt Co. 36.2000 41,387.46 41,387.46 1045 Civil Constructors, Inc. of Illinois 36.2000 41,387.46 41,387.46 3330 Ladd Construction Co. 36.5000 41,730.45 41,730.45 4887 Bob Propheter Construction, L.L.C. 41.6200 47,584.15 47,584.15 6085 Len Trovero Construction 37.0000 42,302.10 42,302.10 MX406012 BC SC SUPER "C" N50 2,584.300 M TON 0049 Advanced Asphalt Co. 36.6000 94,585.38 94,585.38 1045 Civil Constructors, Inc. of Illinois 36.6000 94,585.38 94,585.38 3330 Ladd Construction Co. 37.0000 95,619.10 95,619.10 4887 Bob Propheter Construction, L.L.C. 44.1200 114,019.32 114,019.32 6085 Len Trovero Construction 37.0000 95,619.10 95,619.10 MX406214 BCBC SUP IL-19.0 N50 2,548.800 M TON 0049 Advanced Asphalt Co. 36.3100 92,546.93 92,546.93 1045 Civil Constructors, Inc. of Illinois 36.3100 92,546.93 92,546.93 3330 Ladd Construction Co. 36.5000 93,031.20 93,031.20 4887 Bob Propheter Construction, L.L.C. 31.9700 81,485.14 81,485.14 6085 Len Trovero Construction 37.0000 94,305.60 94,305.60 MX406300 BIT C SC CLI T3 "CL" 667.000 M TON 0049 Advanced Asphalt Co. 52.3400 34,910.78 34,910.78 1045 Civil Constructors, Inc. of Illinois 52.3400 34,910.78 34,910.78 3330 Ladd Construction Co. 52.5000 35,017.50 35,017.50 4887 Bob Propheter Construction, L.L.C. 40.7600 27,186.92 27,186.92 6085 Len Trovero Construction 55.0000 36,685.00 36,685.00 MZ014800 CULVERT TO BE CLEANED 14.700 METER 0049 Advanced Asphalt Co. 201.6500 2,964.26 2,964.26 1045 Civil Constructors, Inc. of Illinois 50.0000 735.00 735.00 3330 Ladd Construction Co. 60.0000 882.00 882.00 4887 Bob Propheter Construction, L.L.C. 203.1600 2,986.45 2,986.45 6085 Len Trovero Construction 110.0000 1,617.00 1,617.00 MZ065752 SLOT DR 300 W/150 SL 40.000 METER 0049 Advanced Asphalt Co. 164.9500 6,598.00 6,598.00 1045 Civil Constructors, Inc. of Illinois 475.0000 19,000.00 19,000.00 3330 Ladd Construction Co. 200.0000 8,000.00 8,000.00 4887 Bob Propheter Construction, L.L.C. 262.2400 10,489.60 10,489.60 6085 Len Trovero Construction 195.0000 7,800.00 7,800.00 M2010110 TREE REMOV 6-15 271.000 UNIT 0049 Advanced Asphalt Co. 21.6400 5,864.44 5,864.44 1045 Civil Constructors, Inc. of Illinois 20.0000 5,420.00 5,420.00 3330 Ladd Construction Co. 20.0000 5,420.00 5,420.00 4887 Bob Propheter Construction, L.L.C. 20.0000 5,420.00 5,420.00 6085 Len Trovero Construction 14.0000 3,794.00 3,794.00 M2010210 TREE REMOV OVER 15 253.000 UNIT 0049 Advanced Asphalt Co. 27.0500 6,843.65 6,843.65 1045 Civil Constructors, Inc. of Illinois 24.0000 6,072.00 6,072.00 3330 Ladd Construction Co. 24.0000 6,072.00 6,072.00 4887 Bob Propheter Construction, L.L.C. 25.0000 6,325.00 6,325.00 6085 Len Trovero Construction 18.0000 4,554.00 4,554.00 M2010500 TREE REMOV HECTARES .180 HA 0049 Advanced Asphalt Co. 18,932.6100 3,407.87 3,407.87 1045 Civil Constructors, Inc. of Illinois 25,000.0000 4,500.00 4,500.00 3330 Ladd Construction Co. 25,000.0000 4,500.00 4,500.00 4887 Bob Propheter Construction, L.L.C. 20,000.0000 3,600.00 3,600.00 6085 Len Trovero Construction 15,000.0000 2,700.00 2,700.00 M2020010 EARTH EXCAVATION 20,674.000 CU M 0049 Advanced Asphalt Co. 6.3900 132,106.86 132,106.86 1045 Civil Constructors, Inc. of Illinois 7.2500 149,886.50 149,886.50 3330 Ladd Construction Co. 8.0000 165,392.00 165,392.00 4887 Bob Propheter Construction, L.L.C. 10.9100 225,553.34 225,553.34 6085 Len Trovero Construction 7.0000 144,718.00 144,718.00 M2030100 CHANNEL EXCAV 115.000 CU M 0049 Advanced Asphalt Co. 14.0600 1,616.90 1,616.90 1045 Civil Constructors, Inc. of Illinois 12.0000 1,380.00 1,380.00 3330 Ladd Construction Co. 13.0000 1,495.00 1,495.00 4887 Bob Propheter Construction, L.L.C. 13.0000 1,495.00 1,495.00 6085 Len Trovero Construction 10.0000 1,150.00 1,150.00 M2070220 POROUS GRAN EMBANK 209.000 CU M 0049 Advanced Asphalt Co. 30.2900 6,330.61 6,330.61 1045 Civil Constructors, Inc. of Illinois 40.0000 8,360.00 8,360.00 3330 Ladd Construction Co. 28.0000 5,852.00 5,852.00 4887 Bob Propheter Construction, L.L.C. 28.0000 5,852.00 5,852.00 6085 Len Trovero Construction 42.0000 8,778.00 8,778.00 M2101000 GEOTECH FAB F/GR STAB 1,682.700 SQ M 0049 Advanced Asphalt Co. 0.9800 1,649.05 1,649.05 1045 Civil Constructors, Inc. of Illinois 3.5000 5,889.45 5,889.45 3330 Ladd Construction Co. 2.0000 3,365.40 3,365.40 4887 Bob Propheter Construction, L.L.C. 1.2300 2,438.72 2,069.72 369.00- 6085 Len Trovero Construction 1.0500 1,766.84 1,766.84 M2500310 SEEDING CL 4 1.720 HA 0049 Advanced Asphalt Co. 1,785.0700 3,070.32 3,070.32 1045 Civil Constructors, Inc. of Illinois 1,500.0000 2,580.00 2,580.00 3330 Ladd Construction Co. 1,700.0000 2,924.00 2,924.00 4887 Bob Propheter Construction, L.L.C. 1,500.0000 2,580.00 2,580.00 6085 Len Trovero Construction 1,730.0000 2,975.60 2,975.60 M2500320 SEEDING CL 5 .020 HA 0049 Advanced Asphalt Co. 28,723.5000 574.47 574.47 1045 Civil Constructors, Inc. of Illinois 30,000.0000 600.00 600.00 3330 Ladd Construction Co. 27,000.0000 540.00 540.00 4887 Bob Propheter Construction, L.L.C. 30,000.0000 600.00 600.00 6085 Len Trovero Construction 30,000.0000 600.00 600.00 M2500400 NITROGEN FERT NUTR 538.000 KG 0049 Advanced Asphalt Co. 1.0800 581.04 581.04 1045 Civil Constructors, Inc. of Illinois 3.0000 1,614.00 1,614.00 3330 Ladd Construction Co. 1.0500 564.90 564.90 4887 Bob Propheter Construction, L.L.C. 3.0000 1,614.00 1,614.00 6085 Len Trovero Construction 1.0000 538.00 538.00 M2500500 PHOSPHORUS FERT NUTR 538.000 KG 0049 Advanced Asphalt Co. 1.0800 581.04 581.04 1045 Civil Constructors, Inc. of Illinois 3.0000 1,614.00 1,614.00 3330 Ladd Construction Co. 1.0500 564.90 564.90 4887 Bob Propheter Construction, L.L.C. 3.0000 1,614.00 1,614.00 6085 Len Trovero Construction 1.0000 538.00 538.00 M2500600 POTASSIUM FERT NUTR 538.000 KG 0049 Advanced Asphalt Co. 1.0800 581.04 581.04 1045 Civil Constructors, Inc. of Illinois 3.0000 1,614.00 1,614.00 3330 Ladd Construction Co. 1.0500 564.90 564.90 4887 Bob Propheter Construction, L.L.C. 3.0000 1,614.00 1,614.00 6085 Len Trovero Construction 1.0000 538.00 538.00 M2500750 MOWING 3.420 HA 0049 Advanced Asphalt Co. 405.7000 1,387.49 1,387.49 1045 Civil Constructors, Inc. of Illinois 248.5400 850.01 850.01 3330 Ladd Construction Co. 400.0000 1,368.00 1,368.00 4887 Bob Propheter Construction, L.L.C. 248.5400 850.01 850.01 6085 Len Trovero Construction 390.0000 1,333.80 1,333.80 M2500910 SEEDING CL 1 MOD .400 HA 0049 Advanced Asphalt Co. 1,401.0000 560.40 560.40 1045 Civil Constructors, Inc. of Illinois 1,250.0000 500.00 500.00 3330 Ladd Construction Co. 1,300.0000 520.00 520.00 4887 Bob Propheter Construction, L.L.C. 1,250.0000 500.00 500.00 6085 Len Trovero Construction 1,400.0000 560.00 560.00 M2501830 SEEDING CL 6 MOD 3.240 HA 0049 Advanced Asphalt Co. 1,325.2800 4,293.91 4,293.91 1045 Civil Constructors, Inc. of Illinois 1,000.0000 3,240.00 3,240.00 3330 Ladd Construction Co. 1,300.0000 4,212.00 4,212.00 4887 Bob Propheter Construction, L.L.C. 1,000.0000 3,240.00 3,240.00 6085 Len Trovero Construction 1,300.0000 4,212.00 4,212.00 M2510115 MULCH METHOD 2 5.380 HA 0049 Advanced Asphalt Co. 2,028.4900 10,913.28 10,913.28 1045 Civil Constructors, Inc. of Illinois 1,000.0000 5,380.00 5,380.00 3330 Ladd Construction Co. 1,900.0000 10,222.00 10,222.00 4887 Bob Propheter Construction, L.L.C. 1,000.0000 5,380.00 5,380.00 6085 Len Trovero Construction 2,000.0000 10,760.00 10,760.00 M2510630 EROSION CONTR BLANKET 1,950.000 SQ M 0049 Advanced Asphalt Co. 1.6800 3,276.00 3,276.00 1045 Civil Constructors, Inc. of Illinois 1.5000 2,925.00 2,925.00 3330 Ladd Construction Co. 1.6000 3,120.00 3,120.00 4887 Bob Propheter Construction, L.L.C. 1.5000 2,925.00 2,925.00 6085 Len Trovero Construction 1.6500 3,217.50 3,217.50 M2800250 TEMP EROS CONTR SEED 526.000 KG 0049 Advanced Asphalt Co. 2.1600 1,136.16 1,136.16 1045 Civil Constructors, Inc. of Illinois 2.0500 1,078.30 1,078.30 3330 Ladd Construction Co. 21.0000 11,046.00 11,046.00 4887 Bob Propheter Construction, L.L.C. 10.0000 5,260.00 5,260.00 6085 Len Trovero Construction 7.0000 3,682.00 3,682.00 M2800400 PERIMETER EROS BAR 908.000 METER 0049 Advanced Asphalt Co. 25.6800 23,317.44 23,317.44 1045 Civil Constructors, Inc. of Illinois 11.0800 10,060.64 10,060.64 3330 Ladd Construction Co. 10.0000 9,080.00 9,080.00 4887 Bob Propheter Construction, L.L.C. 6.9500 6,310.60 6,310.60 6085 Len Trovero Construction 7.0000 6,356.00 6,356.00 M2810107 STONE RIPRAP CL A4 77.000 SQ M 0049 Advanced Asphalt Co. 28.4200 2,188.34 2,188.34 1045 Civil Constructors, Inc. of Illinois 36.0000 2,772.00 2,772.00 3330 Ladd Construction Co. 29.0000 2,233.00 2,233.00 4887 Bob Propheter Construction, L.L.C. 29.1600 2,245.32 2,245.32 6085 Len Trovero Construction 39.0000 3,003.00 3,003.00 M2810109 STONE RIPRAP CL A5 1,562.000 SQ M 0049 Advanced Asphalt Co. 33.5400 52,389.48 52,389.48 1045 Civil Constructors, Inc. of Illinois 50.0000 78,100.00 78,100.00 3330 Ladd Construction Co. 31.0000 48,422.00 48,422.00 4887 Bob Propheter Construction, L.L.C. 35.4800 55,419.76 55,419.76 6085 Len Trovero Construction 43.0000 67,166.00 67,166.00 M2820100 FILTER FAB FOR RIPRAP 1,639.000 SQ M 0049 Advanced Asphalt Co. 3.8000 6,228.20 6,228.20 1045 Civil Constructors, Inc. of Illinois 3.5000 5,736.50 5,736.50 3330 Ladd Construction Co. 3.6000 5,900.40 5,900.40 4887 Bob Propheter Construction, L.L.C. 1.8600 3,048.54 3,048.54 6085 Len Trovero Construction 2.7500 4,507.25 4,507.25 M3510010 AGG BASE CSE A 2,660.000 M TON 0049 Advanced Asphalt Co. 12.5800 33,462.80 33,462.80 1045 Civil Constructors, Inc. of Illinois 11.5000 30,590.00 30,590.00 3330 Ladd Construction Co. 12.0000 31,920.00 31,920.00 4887 Bob Propheter Construction, L.L.C. 18.9900 50,513.40 50,513.40 6085 Len Trovero Construction 12.6000 33,516.00 33,516.00 M3511010 AGG BASE CSE B 1,389.000 M TON 0049 Advanced Asphalt Co. 12.5800 17,473.62 17,473.62 1045 Civil Constructors, Inc. of Illinois 11.0000 15,279.00 15,279.00 3330 Ladd Construction Co. 11.5000 15,973.50 15,973.50 4887 Bob Propheter Construction, L.L.C. 17.5400 24,363.06 24,363.06 6085 Len Trovero Construction 12.4000 17,223.60 17,223.60 M3530175 PCC BSE CSE 175 162.200 SQ M 0049 Advanced Asphalt Co. 45.4400 7,370.37 7,370.37 1045 Civil Constructors, Inc. of Illinois 80.0000 12,976.00 12,976.00 3330 Ladd Construction Co. 36.0000 5,839.20 5,839.20 4887 Bob Propheter Construction, L.L.C. 64.8300 10,515.43 10,515.43 6085 Len Trovero Construction 48.0000 7,785.60 7,785.60 M4060200 BIT MATLS PR CT 18.100 M TON 0049 Advanced Asphalt Co. 471.4700 8,533.61 8,533.61 1045 Civil Constructors, Inc. of Illinois 471.4700 8,533.61 8,533.61 3330 Ladd Construction Co. 475.0000 8,597.50 8,597.50 4887 Bob Propheter Construction, L.L.C. 275.0000 4,977.50 4,977.50 6085 Len Trovero Construction 400.0000 7,240.00 7,240.00 M4060300 AGG PR CT 42.200 M TON 0049 Advanced Asphalt Co. 10.8500 457.87 457.87 1045 Civil Constructors, Inc. of Illinois 10.8500 457.87 457.87 3330 Ladd Construction Co. 11.0000 464.20 464.20 4887 Bob Propheter Construction, L.L.C. 1.0000 42.20 42.20 6085 Len Trovero Construction 17.0000 717.40 717.40 M4060895 CONSTRUC TEST STRIP 1.000 EACH 0049 Advanced Asphalt Co. 1,641.7700 1,641.77 1,641.77 1045 Civil Constructors, Inc. of Illinois 1,641.7700 1,641.77 1,641.77 3330 Ladd Construction Co. 1,650.0000 1,650.00 1,650.00 4887 Bob Propheter Construction, L.L.C. 1,649.9000 1,649.90 1,649.90 6085 Len Trovero Construction 1,500.0000 1,500.00 1,500.00 M4060980 BIT SURF REM BUTT JT 299.500 SQ M 0049 Advanced Asphalt Co. 13.9100 4,166.05 4,166.05 1045 Civil Constructors, Inc. of Illinois 13.9100 4,166.05 4,166.05 3330 Ladd Construction Co. 14.0000 4,193.00 4,193.00 4887 Bob Propheter Construction, L.L.C. 22.1700 6,639.92 6,639.92 6085 Len Trovero Construction 10.0000 2,995.00 2,995.00 M4060990 TEMPORARY RAMP 178.000 SQ M 0049 Advanced Asphalt Co. 12.2900 2,187.62 2,187.62 1045 Civil Constructors, Inc. of Illinois 12.2900 2,187.62 2,187.62 3330 Ladd Construction Co. 12.3000 2,189.40 2,189.40 4887 Bob Propheter Construction, L.L.C. 17.5600 3,125.68 3,125.68 6085 Len Trovero Construction 9.0000 1,602.00 1,602.00 M4061000 BIT REPL OVER PATCH 271.000 M TON 0049 Advanced Asphalt Co. 80.9900 21,948.29 21,948.29 1045 Civil Constructors, Inc. of Illinois 80.9900 21,948.29 21,948.29 3330 Ladd Construction Co. 81.0000 21,951.00 21,951.00 4887 Bob Propheter Construction, L.L.C. 58.6000 15,880.60 15,880.60 6085 Len Trovero Construction 82.0000 22,222.00 22,222.00 M4080400 INCIDENTAL BIT SURF 153.000 M TON 0049 Advanced Asphalt Co. 84.5900 12,942.27 12,942.27 1045 Civil Constructors, Inc. of Illinois 84.5900 12,942.27 12,942.27 3330 Ladd Construction Co. 85.0000 13,005.00 13,005.00 4887 Bob Propheter Construction, L.L.C. 73.0000 11,169.00 11,169.00 6085 Len Trovero Construction 85.0000 13,005.00 13,005.00 M4205000 BR APPR PAVT 382.000 SQ M 0049 Advanced Asphalt Co. 162.0000 61,884.00 61,884.00 1045 Civil Constructors, Inc. of Illinois 200.0000 76,400.00 76,400.00 3330 Ladd Construction Co. 162.0000 61,884.00 61,884.00 4887 Bob Propheter Construction, L.L.C. 162.0000 61,884.00 61,884.00 6085 Len Trovero Construction 192.0000 73,344.00 73,344.00 M4205200 PROTECTIVE COAT 783.000 SQ M 0049 Advanced Asphalt Co. 1.6200 1,268.46 1,268.46 1045 Civil Constructors, Inc. of Illinois 1.2500 978.75 978.75 3330 Ladd Construction Co. 3.6000 2,818.80 2,818.80 4887 Bob Propheter Construction, L.L.C. 1.0000 783.00 783.00 6085 Len Trovero Construction 1.4000 1,096.20 1,096.20 M4206200 BR APPR PVT CON (FLX) 76.000 SQ M 0049 Advanced Asphalt Co. 35.7600 2,717.76 2,717.76 1045 Civil Constructors, Inc. of Illinois 80.0000 6,080.00 6,080.00 3330 Ladd Construction Co. 180.0000 13,680.00 13,680.00 4887 Bob Propheter Construction, L.L.C. 65.6800 4,991.68 4,991.68 6085 Len Trovero Construction 85.0000 6,460.00 6,460.00 M4400500 BIT REM OV PATCH 200 567.000 SQ M 0049 Advanced Asphalt Co. 31.6500 17,945.55 17,945.55 1045 Civil Constructors, Inc. of Illinois 31.6500 17,945.55 17,945.55 3330 Ladd Construction Co. 32.0000 18,144.00 18,144.00 4887 Bob Propheter Construction, L.L.C. 53.3200 30,232.44 30,232.44 6085 Len Trovero Construction 36.0000 20,412.00 20,412.00 M4402000 PAVEMENT REM 639.770 SQ M 0049 Advanced Asphalt Co. 18.6500 11,931.71 11,931.71 1045 Civil Constructors, Inc. of Illinois 13.5000 8,636.90 8,636.90 3330 Ladd Construction Co. 12.0000 7,677.24 7,677.24 4887 Bob Propheter Construction, L.L.C. 7.4600 4,772.68 4,772.68 6085 Len Trovero Construction 7.5000 4,798.28 4,798.28 M4402030 GUTTER REM 120.000 METER 0049 Advanced Asphalt Co. 18.9700 2,276.40 2,276.40 1045 Civil Constructors, Inc. of Illinois 6.5000 780.00 780.00 3330 Ladd Construction Co. 7.0000 840.00 840.00 4887 Bob Propheter Construction, L.L.C. 12.2600 1,471.20 1,471.20 6085 Len Trovero Construction 15.0000 1,800.00 1,800.00 M4420250 PAVT PATCH T1 250 15.000 SQ M 0049 Advanced Asphalt Co. 168.9700 2,534.55 2,534.55 1045 Civil Constructors, Inc. of Illinois 168.9700 2,534.55 2,534.55 3330 Ladd Construction Co. 169.0000 2,535.00 2,535.00 4887 Bob Propheter Construction, L.L.C. 62.1100 931.65 931.65 6085 Len Trovero Construction 82.0000 1,230.00 1,230.00 M4422250 PAVT PATCH T2 250 13.000 SQ M 0049 Advanced Asphalt Co. 171.5500 2,230.15 2,230.15 1045 Civil Constructors, Inc. of Illinois 171.5500 2,230.15 2,230.15 3330 Ladd Construction Co. 172.0000 2,236.00 2,236.00 4887 Bob Propheter Construction, L.L.C. 63.9700 831.61 831.61 6085 Len Trovero Construction 82.0000 1,066.00 1,066.00 M4423250 PAVT PATCH T3 250 20.000 SQ M 0049 Advanced Asphalt Co. 171.6500 3,433.00 3,433.00 1045 Civil Constructors, Inc. of Illinois 171.6500 3,433.00 3,433.00 3330 Ladd Construction Co. 172.0000 3,440.00 3,440.00 4887 Bob Propheter Construction, L.L.C. 60.7400 1,214.80 1,214.80 6085 Len Trovero Construction 80.0000 1,600.00 1,600.00 M4424250 PAVT PATCH T4 250 24.000 SQ M 0049 Advanced Asphalt Co. 171.0200 4,104.48 4,104.48 1045 Civil Constructors, Inc. of Illinois 171.0200 4,104.48 4,104.48 3330 Ladd Construction Co. 172.0000 4,128.00 4,128.00 4887 Bob Propheter Construction, L.L.C. 59.9800 1,439.52 1,439.52 6085 Len Trovero Construction 78.0000 1,872.00 1,872.00 M4430010 AREA REF CR CON TREAT 22,808.100 SQ M 0049 Advanced Asphalt Co. 0.9300 21,211.53 21,211.53 1045 Civil Constructors, Inc. of Illinois 0.8600 19,614.97 19,614.97 3330 Ladd Construction Co. 1.0000 22,808.10 22,808.10 4887 Bob Propheter Construction, L.L.C. 0.6800 15,509.51 15,509.51 6085 Len Trovero Construction 1.0000 22,808.10 22,808.10 M4810000 AGGREGATE SHLDS A 5,903.900 M TON 0049 Advanced Asphalt Co. 13.4200 79,230.34 79,230.34 1045 Civil Constructors, Inc. of Illinois 13.4200 79,230.34 79,230.34 3330 Ladd Construction Co. 14.5000 85,606.55 85,606.55 4887 Bob Propheter Construction, L.L.C. 12.9000 76,160.31 76,160.31 6085 Len Trovero Construction 13.5000 79,702.65 79,702.65 M4820160 BIT SHOULDERS 160 2,280.000 SQ M 0049 Advanced Asphalt Co. 16.9100 38,554.80 38,554.80 1045 Civil Constructors, Inc. of Illinois 16.9100 38,554.80 38,554.80 3330 Ladd Construction Co. 17.0000 38,760.00 38,760.00 4887 Bob Propheter Construction, L.L.C. 17.5300 39,968.40 39,968.40 6085 Len Trovero Construction 17.0000 38,760.00 38,760.00 M5020100 STRUCTURE EXCAVATION 427.000 CU M 0049 Advanced Asphalt Co. 11.3600 4,850.72 4,850.72 1045 Civil Constructors, Inc. of Illinois 40.0000 17,080.00 17,080.00 3330 Ladd Construction Co. 10.5000 4,483.50 4,483.50 4887 Bob Propheter Construction, L.L.C. 10.5000 4,483.50 4,483.50 6085 Len Trovero Construction 26.0000 11,102.00 11,102.00 M5030350 CONC STRUCT 215.500 CU M 0049 Advanced Asphalt Co. 551.7500 118,902.13 118,902.13 1045 Civil Constructors, Inc. of Illinois 850.0000 183,175.00 183,175.00 3330 Ladd Construction Co. 510.0000 109,905.00 109,905.00 4887 Bob Propheter Construction, L.L.C. 510.0000 109,905.00 109,905.00 6085 Len Trovero Construction 660.0000 142,230.00 142,230.00 M5030360 CONC SUP-STR 274.900 CU M 0049 Advanced Asphalt Co. 654.5300 179,930.30 179,930.30 1045 Civil Constructors, Inc. of Illinois 850.0000 233,665.00 233,665.00 3330 Ladd Construction Co. 605.0000 166,314.50 166,314.50 4887 Bob Propheter Construction, L.L.C. 605.0000 166,314.50 166,314.50 6085 Len Trovero Construction 832.0000 228,716.80 228,716.80 M5030390 BR DECK GROOVING 593.000 SQ M 0049 Advanced Asphalt Co. 10.3900 6,161.27 6,161.27 1045 Civil Constructors, Inc. of Illinois 6.0000 3,558.00 3,558.00 3330 Ladd Construction Co. 6.0000 3,558.00 3,558.00 4887 Bob Propheter Construction, L.L.C. 9.6000 5,692.80 5,692.80 6085 Len Trovero Construction 8.0000 4,744.00 4,744.00 M5050105 F & E STRUCT STEEL 1.000 L SUM 0049 Advanced Asphalt Co. 94,000.0000 94,000.00 94,000.00 1045 Civil Constructors, Inc. of Illinois 130,000.0000 130,000.00 130,000.00 3330 Ladd Construction Co. 90,000.0000 90,000.00 90,000.00 4887 Bob Propheter Construction, L.L.C. 94,000.0000 94,000.00 94,000.00 6085 Len Trovero Construction 130,000.0000 130,000.00 130,000.00 M5080105 REINFORCEMENT BARS 77.100 KG 0049 Advanced Asphalt Co. 3.1600 243.64 243.64 1045 Civil Constructors, Inc. of Illinois 6.0000 462.60 462.60 3330 Ladd Construction Co. 5.5000 424.05 424.05 4887 Bob Propheter Construction, L.L.C. 1.5000 115.65 115.65 6085 Len Trovero Construction 1.9200 148.03 148.03 M5080205 REINF BARS, EPOXY CTD 48,230.000 KG 0049 Advanced Asphalt Co. 2.0600 99,353.80 99,353.80 1045 Civil Constructors, Inc. of Illinois 2.5000 120,575.00 120,575.00 3330 Ladd Construction Co. 1.9000 91,637.00 91,637.00 4887 Bob Propheter Construction, L.L.C. 1.9000 91,637.00 91,637.00 6085 Len Trovero Construction 2.0000 96,460.00 96,460.00 M5120115 F MET PILE SHELL 356 1,001.000 METER 0049 Advanced Asphalt Co. 80.6400 80,720.64 80,720.64 1045 Civil Constructors, Inc. of Illinois 100.0000 100,100.00 100,100.00 3330 Ladd Construction Co. 74.5400 74,614.54 74,614.54 4887 Bob Propheter Construction, L.L.C. 74.5400 74,614.54 74,614.54 6085 Len Trovero Construction 106.0000 106,106.00 106,106.00 M5120340 DRIV & FILLING SHELLS 1,001.000 METER 0049 Advanced Asphalt Co. 3.2500 3,253.25 3,253.25 1045 Civil Constructors, Inc. of Illinois 0.1000 100.10 100.10 3330 Ladd Construction Co. 3.0000 3,003.00 3,003.00 4887 Bob Propheter Construction, L.L.C. 3.0000 3,003.00 3,003.00 6085 Len Trovero Construction 10.0000 10,010.00 10,010.00 M5120900 TEMP SHT PILING 217.600 SQ M 0049 Advanced Asphalt Co. 227.1900 49,436.54 49,436.54 1045 Civil Constructors, Inc. of Illinois 200.0000 43,520.00 43,520.00 3330 Ladd Construction Co. 210.0000 45,696.00 45,696.00 4887 Bob Propheter Construction, L.L.C. 210.0000 45,696.00 45,696.00 6085 Len Trovero Construction 230.0000 50,048.00 50,048.00 M542E012 END SECTIONS 300 2.000 EACH 0049 Advanced Asphalt Co. 109.5500 219.10 219.10 1045 Civil Constructors, Inc. of Illinois 90.0000 180.00 180.00 3330 Ladd Construction Co. 75.0000 150.00 150.00 4887 Bob Propheter Construction, L.L.C. 87.8700 175.74 175.74 6085 Len Trovero Construction 110.0000 220.00 220.00 M542E016 END SECTIONS 375 12.000 EACH 0049 Advanced Asphalt Co. 114.6200 1,375.44 1,375.44 1045 Civil Constructors, Inc. of Illinois 120.0000 1,440.00 1,440.00 3330 Ladd Construction Co. 84.0000 1,008.00 1,008.00 4887 Bob Propheter Construction, L.L.C. 98.4600 1,181.52 1,181.52 6085 Len Trovero Construction 120.0000 1,440.00 1,440.00 M542E020 END SECTIONS 450 18.000 EACH 0049 Advanced Asphalt Co. 124.8900 2,248.02 2,248.02 1045 Civil Constructors, Inc. of Illinois 150.0000 2,700.00 2,700.00 3330 Ladd Construction Co. 104.0000 1,872.00 1,872.00 4887 Bob Propheter Construction, L.L.C. 113.1300 2,036.34 2,036.34 6085 Len Trovero Construction 135.0000 2,430.00 2,430.00 M542E028 END SECTIONS 600 6.000 EACH 0049 Advanced Asphalt Co. 152.4800 914.88 914.88 1045 Civil Constructors, Inc. of Illinois 200.0000 1,200.00 1,200.00 3330 Ladd Construction Co. 135.0000 810.00 810.00 4887 Bob Propheter Construction, L.L.C. 145.0000 870.00 870.00 6085 Len Trovero Construction 200.0000 1,200.00 1,200.00 M542F012 MET END SEC 300 2.000 EACH 0049 Advanced Asphalt Co. 109.5500 219.10 219.10 1045 Civil Constructors, Inc. of Illinois 90.0000 180.00 180.00 3330 Ladd Construction Co. 76.0000 152.00 152.00 4887 Bob Propheter Construction, L.L.C. 87.8700 175.74 175.74 6085 Len Trovero Construction 110.0000 220.00 220.00 M542H420 P CUL CL D 1 300 3.000 METER 0049 Advanced Asphalt Co. 75.3800 226.14 226.14 1045 Civil Constructors, Inc. of Illinois 78.0000 234.00 234.00 3330 Ladd Construction Co. 100.0000 300.00 300.00 4887 Bob Propheter Construction, L.L.C. 63.9600 191.88 191.88 6085 Len Trovero Construction 90.0000 270.00 270.00 M542H425 P CUL CL D 1 375 106.000 METER 0049 Advanced Asphalt Co. 77.6200 8,227.72 8,227.72 1045 Civil Constructors, Inc. of Illinois 86.0000 9,116.00 9,116.00 3330 Ladd Construction Co. 59.0000 6,254.00 6,254.00 4887 Bob Propheter Construction, L.L.C. 51.3700 5,445.22 5,445.22 6085 Len Trovero Construction 65.0000 6,890.00 6,890.00 M542H430 P CUL CL D 1 450 195.000 METER 0049 Advanced Asphalt Co. 81.6800 15,927.60 15,927.60 1045 Civil Constructors, Inc. of Illinois 93.0000 18,135.00 18,135.00 3330 Ladd Construction Co. 66.0000 12,870.00 12,870.00 4887 Bob Propheter Construction, L.L.C. 55.1500 10,754.25 10,754.25 6085 Len Trovero Construction 80.0000 15,600.00 15,600.00 M542H440 P CUL CL D 1 600 48.000 METER 0049 Advanced Asphalt Co. 93.6700 4,496.16 4,496.16 1045 Civil Constructors, Inc. of Illinois 97.0000 4,656.00 4,656.00 3330 Ladd Construction Co. 80.0000 3,840.00 3,840.00 4887 Bob Propheter Construction, L.L.C. 69.9900 3,359.52 3,359.52 6085 Len Trovero Construction 90.0000 4,320.00 4,320.00 M5422120 P CUL 1 RC-A ERS 600 4.400 METER 0049 Advanced Asphalt Co. 611.3600 2,689.98 2,689.98 1045 Civil Constructors, Inc. of Illinois 120.0000 528.00 528.00 3330 Ladd Construction Co. 400.0000 1,760.00 1,760.00 4887 Bob Propheter Construction, L.L.C. 285.6100 1,256.68 1,256.68 6085 Len Trovero Construction 250.0000 1,100.00 1,100.00 M5429910 CONCRETE COLLAR 2.300 CU M 0049 Advanced Asphalt Co. 473.4800 1,089.00 1,089.00 1045 Civil Constructors, Inc. of Illinois 175.0000 402.50 402.50 3330 Ladd Construction Co. 1,450.0000 3,335.00 3,335.00 4887 Bob Propheter Construction, L.L.C. 835.3600 1,921.33 1,921.33 6085 Len Trovero Construction 650.0000 1,495.00 1,495.00 M6010125 PIPE DRAINS 300 30.000 METER 0049 Advanced Asphalt Co. 54.5600 1,636.80 1,636.80 1045 Civil Constructors, Inc. of Illinois 86.0000 2,580.00 2,580.00 3330 Ladd Construction Co. 28.0000 840.00 840.00 4887 Bob Propheter Construction, L.L.C. 75.0000 2,250.00 2,250.00 6085 Len Trovero Construction 83.0000 2,490.00 2,490.00 M6010605 PIPE UNDERDRAINS 100 121.000 METER 0049 Advanced Asphalt Co. 20.1400 2,436.94 2,436.94 1045 Civil Constructors, Inc. of Illinois 25.0000 3,025.00 3,025.00 3330 Ladd Construction Co. 29.0000 3,509.00 3,509.00 4887 Bob Propheter Construction, L.L.C. 55.0000 6,655.00 6,655.00 6085 Len Trovero Construction 20.0000 2,420.00 2,420.00 M6010615 PIPE UNDERDRAINS 200 430.000 METER 0049 Advanced Asphalt Co. 28.4600 12,237.80 12,237.80 1045 Civil Constructors, Inc. of Illinois 30.0000 12,900.00 12,900.00 3330 Ladd Construction Co. 34.0000 14,620.00 14,620.00 4887 Bob Propheter Construction, L.L.C. 40.0000 17,200.00 17,200.00 6085 Len Trovero Construction 27.0000 11,610.00 11,610.00 M6010705 PIPE UNDERDRN 100 SP 8.000 METER 0049 Advanced Asphalt Co. 26.0900 208.72 208.72 1045 Civil Constructors, Inc. of Illinois 41.0000 328.00 328.00 3330 Ladd Construction Co. 31.0000 248.00 248.00 4887 Bob Propheter Construction, L.L.C. 55.0000 440.00 440.00 6085 Len Trovero Construction 38.0000 304.00 304.00 M6060010 CLASS SI CONC OUTLET 10.300 CU M 0049 Advanced Asphalt Co. 433.6100 4,466.18 4,466.18 1045 Civil Constructors, Inc. of Illinois 475.0000 4,892.50 4,892.50 3330 Ladd Construction Co. 450.0000 4,635.00 4,635.00 4887 Bob Propheter Construction, L.L.C. 814.0800 8,385.02 8,385.02 6085 Len Trovero Construction 400.0000 4,120.00 4,120.00 M6060270 CONC GUTTER TA MOD 80.000 METER 0049 Advanced Asphalt Co. 70.5900 5,647.20 5,647.20 1045 Civil Constructors, Inc. of Illinois 90.0000 7,200.00 7,200.00 3330 Ladd Construction Co. 60.0000 4,800.00 4,800.00 4887 Bob Propheter Construction, L.L.C. 115.3800 9,230.40 9,230.40 6085 Len Trovero Construction 53.0000 4,240.00 4,240.00 M6110050 EXPLOR TRENCH 1.3 686.000 METER 0049 Advanced Asphalt Co. 4.8300 3,313.38 3,313.38 1045 Civil Constructors, Inc. of Illinois 6.0000 4,116.00 4,116.00 3330 Ladd Construction Co. 6.0000 4,116.00 4,116.00 4887 Bob Propheter Construction, L.L.C. 7.1800 4,925.48 4,925.48 6085 Len Trovero Construction 5.0000 3,430.00 3,430.00 M6110070 FLD TILE JUN VLT 600 10.000 EACH 0049 Advanced Asphalt Co. 286.0600 2,860.60 2,860.60 1045 Civil Constructors, Inc. of Illinois 450.0000 4,500.00 4,500.00 3330 Ladd Construction Co. 450.0000 4,500.00 4,500.00 4887 Bob Propheter Construction, L.L.C. 788.6000 7,886.00 7,886.00 6085 Len Trovero Construction 700.0000 7,000.00 7,000.00 M6110310 STORM SEW SPEC 150 100.000 METER 0049 Advanced Asphalt Co. 25.6300 2,563.00 2,563.00 1045 Civil Constructors, Inc. of Illinois 35.0000 3,500.00 3,500.00 3330 Ladd Construction Co. 38.0000 3,800.00 3,800.00 4887 Bob Propheter Construction, L.L.C. 70.8600 7,086.00 7,086.00 6085 Len Trovero Construction 36.0000 3,600.00 3,600.00 M6110315 STORM SEW SPEC 200 686.000 METER 0049 Advanced Asphalt Co. 21.5000 14,749.00 14,749.00 1045 Civil Constructors, Inc. of Illinois 35.0000 24,010.00 24,010.00 3330 Ladd Construction Co. 38.0000 26,068.00 26,068.00 4887 Bob Propheter Construction, L.L.C. 72.5500 49,769.30 49,769.30 6085 Len Trovero Construction 43.0000 29,498.00 29,498.00 M6110320 STORM SEW SPEC 250 100.000 METER 0049 Advanced Asphalt Co. 24.6900 2,469.00 2,469.00 1045 Civil Constructors, Inc. of Illinois 35.0000 3,500.00 3,500.00 3330 Ladd Construction Co. 38.0000 3,800.00 3,800.00 4887 Bob Propheter Construction, L.L.C. 75.9000 7,590.00 7,590.00 6085 Len Trovero Construction 46.0000 4,600.00 4,600.00 M6300100 SPBGR TY A 469.000 METER 0049 Advanced Asphalt Co. 47.6000 22,324.40 22,324.40 1045 Civil Constructors, Inc. of Illinois 38.0000 17,822.00 17,822.00 3330 Ladd Construction Co. 39.9000 18,713.10 18,713.10 4887 Bob Propheter Construction, L.L.C. 38.0000 17,822.00 17,822.00 6085 Len Trovero Construction 40.0000 18,760.00 18,760.00 M6330700 REM RE-E SPBGR TY A 549.000 METER 0049 Advanced Asphalt Co. 24.8800 13,659.12 13,659.12 1045 Civil Constructors, Inc. of Illinois 20.0000 10,980.00 10,980.00 3330 Ladd Construction Co. 21.0000 11,529.00 11,529.00 4887 Bob Propheter Construction, L.L.C. 20.0000 10,980.00 10,980.00 6085 Len Trovero Construction 21.0000 11,529.00 11,529.00 M6643400 TEMP FENCE 165.000 METER 0049 Advanced Asphalt Co. 22.4500 3,704.25 3,704.25 1045 Civil Constructors, Inc. of Illinois 9.3000 1,534.50 1,534.50 3330 Ladd Construction Co. 35.0000 5,775.00 5,775.00 4887 Bob Propheter Construction, L.L.C. 10.0000 1,650.00 1,650.00 6085 Len Trovero Construction 13.0000 2,145.00 2,145.00 M7030100 SHORT-TERM PAVT MKING 973.000 METER 0049 Advanced Asphalt Co. 1.3800 1,342.74 1,342.74 1045 Civil Constructors, Inc. of Illinois 2.0000 1,946.00 1,946.00 3330 Ladd Construction Co. 3.0000 2,919.00 2,919.00 4887 Bob Propheter Construction, L.L.C. 1.8400 1,790.32 1,790.32 6085 Len Trovero Construction 2.0000 1,946.00 1,946.00 M7030620 TEMP PT PM LINE 100 6,820.000 METER 0049 Advanced Asphalt Co. 1.2400 8,456.80 8,456.80 1045 Civil Constructors, Inc. of Illinois 0.3500 2,387.00 2,387.00 3330 Ladd Construction Co. 0.3600 2,455.20 2,455.20 4887 Bob Propheter Construction, L.L.C. 0.3500 2,387.00 2,387.00 6085 Len Trovero Construction 0.5000 3,410.00 3,410.00 M7031000 WORK ZONE PAVT MK REM 32.400 SQ M 0049 Advanced Asphalt Co. 21.6400 701.14 701.14 1045 Civil Constructors, Inc. of Illinois 20.0000 648.00 648.00 3330 Ladd Construction Co. 40.0000 1,296.00 1,296.00 4887 Bob Propheter Construction, L.L.C. 20.0000 648.00 648.00 6085 Len Trovero Construction 21.0000 680.40 680.40 M7040100 TEMP CONC BARRIER 240.470 METER 0049 Advanced Asphalt Co. 54.0900 13,007.02 13,007.02 1045 Civil Constructors, Inc. of Illinois 55.0000 13,225.85 13,225.85 3330 Ladd Construction Co. 50.0000 12,023.50 12,023.50 4887 Bob Propheter Construction, L.L.C. 50.0000 12,023.50 12,023.50 6085 Len Trovero Construction 52.0000 12,504.44 12,504.44 M7040200 REL TEMP CONC BARRIER 227.990 METER 0049 Advanced Asphalt Co. 28.4000 6,474.92 6,474.92 1045 Civil Constructors, Inc. of Illinois 25.0000 5,699.75 5,699.75 3330 Ladd Construction Co. 26.2500 5,984.74 5,984.74 4887 Bob Propheter Construction, L.L.C. 26.2500 5,984.74 5,984.74 6085 Len Trovero Construction 13.0000 2,963.87 2,963.87 M7800120 THPL PVT MK LINE 200 15.000 METER 0049 Advanced Asphalt Co. 27.0500 405.75 405.75 1045 Civil Constructors, Inc. of Illinois 25.0000 375.00 375.00 3330 Ladd Construction Co. 26.0000 390.00 390.00 4887 Bob Propheter Construction, L.L.C. 25.0000 375.00 375.00 6085 Len Trovero Construction 26.0000 390.00 390.00 M7800125 THPL PVT MK LINE 300 18.000 METER 0049 Advanced Asphalt Co. 19.4700 350.46 350.46 1045 Civil Constructors, Inc. of Illinois 30.0000 540.00 540.00 3330 Ladd Construction Co. 32.0000 576.00 576.00 4887 Bob Propheter Construction, L.L.C. 30.0000 540.00 540.00 6085 Len Trovero Construction 32.0000 576.00 576.00 M7800140 THPL PVT MK LINE 600 34.000 METER 0049 Advanced Asphalt Co. 37.8700 1,287.58 1,287.58 1045 Civil Constructors, Inc. of Illinois 35.0000 1,190.00 1,190.00 3330 Ladd Construction Co. 37.0000 1,258.00 1,258.00 4887 Bob Propheter Construction, L.L.C. 35.0000 1,190.00 1,190.00 6085 Len Trovero Construction 36.0000 1,224.00 1,224.00 M7801005 POLYUREA PM LINE 100 9,005.000 METER 0049 Advanced Asphalt Co. 3.7300 33,588.65 33,588.65 1045 Civil Constructors, Inc. of Illinois 3.4500 31,067.25 31,067.25 3330 Ladd Construction Co. 3.5000 31,517.50 31,517.50 4887 Bob Propheter Construction, L.L.C. 3.4500 31,067.25 31,067.25 6085 Len Trovero Construction 3.5500 31,967.75 31,967.75 M7830100 PAVT MARKING REMOVAL 13.600 SQ M 0049 Advanced Asphalt Co. 22.1800 301.65 301.65 1045 Civil Constructors, Inc. of Illinois 20.5000 278.80 278.80 3330 Ladd Construction Co. 40.0000 544.00 544.00 4887 Bob Propheter Construction, L.L.C. 20.0000 272.00 272.00 6085 Len Trovero Construction 21.0000 285.60 285.60 X0322352 SEEDING MOBILIZATION 4.000 EACH 0049 Advanced Asphalt Co. 540.9300 2,163.72 2,163.72 1045 Civil Constructors, Inc. of Illinois 500.0000 2,000.00 2,000.00 3330 Ladd Construction Co. 525.0000 2,100.00 2,100.00 4887 Bob Propheter Construction, L.L.C. 500.0000 2,000.00 2,000.00 6085 Len Trovero Construction 650.0000 2,600.00 2,600.00 X4021000 TEMP ACCESS- PRIV ENT 18.000 EACH 0049 Advanced Asphalt Co. 736.8200 13,262.76 13,262.76 1045 Civil Constructors, Inc. of Illinois 400.0000 7,200.00 7,200.00 3330 Ladd Construction Co. 450.0000 8,100.00 8,100.00 4887 Bob Propheter Construction, L.L.C. 1,804.0100 32,472.18 32,472.18 6085 Len Trovero Construction 120.0000 2,160.00 2,160.00 X4022000 TEMP ACCESS- COM ENT 2.000 EACH 0049 Advanced Asphalt Co. 1,935.7000 3,871.40 3,871.40 1045 Civil Constructors, Inc. of Illinois 500.0000 1,000.00 1,000.00 3330 Ladd Construction Co. 650.0000 1,300.00 1,300.00 4887 Bob Propheter Construction, L.L.C. 1,804.1700 3,608.34 3,608.34 6085 Len Trovero Construction 350.0000 700.00 700.00 X4023000 TEMP ACCESS- ROAD 4.000 EACH 0049 Advanced Asphalt Co. 2,512.0100 10,048.04 10,048.04 1045 Civil Constructors, Inc. of Illinois 1,000.0000 4,000.00 4,000.00 3330 Ladd Construction Co. 1,100.0000 4,400.00 4,400.00 4887 Bob Propheter Construction, L.L.C. 1,804.0000 7,216.00 7,216.00 6085 Len Trovero Construction 600.0000 2,400.00 2,400.00 X5020501 UNWAT STR EX PROT L1 2.000 EACH 0049 Advanced Asphalt Co. 2,704.6600 5,409.32 5,409.32 1045 Civil Constructors, Inc. of Illinois 45,000.0000 90,000.00 90,000.00 3330 Ladd Construction Co. 2,500.0000 5,000.00 5,000.00 4887 Bob Propheter Construction, L.L.C. 2,500.0000 5,000.00 5,000.00 6085 Len Trovero Construction 3,250.0000 6,500.00 6,500.00 X5020502 UNWAT STR EX PROT L2 2.000 EACH 0049 Advanced Asphalt Co. 2,704.6600 5,409.32 5,409.32 1045 Civil Constructors, Inc. of Illinois 45,000.0000 90,000.00 90,000.00 3330 Ladd Construction Co. 2,500.0000 5,000.00 5,000.00 4887 Bob Propheter Construction, L.L.C. 2,500.0000 5,000.00 5,000.00 6085 Len Trovero Construction 3,250.0000 6,500.00 6,500.00 X6330103 R&R TRB TM T1 SPL TAN 1.000 EACH 0049 Advanced Asphalt Co. 1,081.8600 1,081.86 1,081.86 1045 Civil Constructors, Inc. of Illinois 800.0000 800.00 800.00 3330 Ladd Construction Co. 850.0000 850.00 850.00 4887 Bob Propheter Construction, L.L.C. 800.0000 800.00 800.00 6085 Len Trovero Construction 850.0000 850.00 850.00 X6330104 R&R TRB TM T1 SPL FLR 8.000 EACH 0049 Advanced Asphalt Co. 108.1900 865.52 865.52 1045 Civil Constructors, Inc. of Illinois 700.0000 5,600.00 5,600.00 3330 Ladd Construction Co. 750.0000 6,000.00 6,000.00 4887 Bob Propheter Construction, L.L.C. 700.0000 5,600.00 5,600.00 6085 Len Trovero Construction 750.0000 6,000.00 6,000.00 Z0002600 BAR SPLICERS 778.000 EACH 0049 Advanced Asphalt Co. 21.6400 16,835.92 16,835.92 1045 Civil Constructors, Inc. of Illinois 19.0000 14,782.00 14,782.00 3330 Ladd Construction Co. 20.0000 15,560.00 15,560.00 4887 Bob Propheter Construction, L.L.C. 20.0000 15,560.00 15,560.00 6085 Len Trovero Construction 10.5000 8,169.00 8,169.00 Z0013798 CONSTRUCTION LAYOUT 1.000 L SUM 0049 Advanced Asphalt Co. 19,500.0000 19,500.00 19,500.00 1045 Civil Constructors, Inc. of Illinois 35,000.0000 35,000.00 35,000.00 3330 Ladd Construction Co. 21,500.0000 21,500.00 21,500.00 4887 Bob Propheter Construction, L.L.C. 19,500.0000 19,500.00 19,500.00 6085 Len Trovero Construction 40,000.0000 40,000.00 40,000.00 Z0018000 DRAINAGE SCUPPERS SPL 2.000 EACH 0049 Advanced Asphalt Co. 1,027.7700 2,055.54 2,055.54 1045 Civil Constructors, Inc. of Illinois 1,200.0000 2,400.00 2,400.00 3330 Ladd Construction Co. 950.0000 1,900.00 1,900.00 4887 Bob Propheter Construction, L.L.C. 950.0000 1,900.00 1,900.00 6085 Len Trovero Construction 1,000.0000 2,000.00 2,000.00 Z0040315 PILOT CAR 5.000 DAY 0049 Advanced Asphalt Co. 62.6600 313.30 313.30 1045 Civil Constructors, Inc. of Illinois 375.0000 1,875.00 1,875.00 3330 Ladd Construction Co. 400.0000 2,000.00 2,000.00 4887 Bob Propheter Construction, L.L.C. 445.2500 2,226.25 2,226.25 6085 Len Trovero Construction 300.0000 1,500.00 1,500.00 Z0056200 SAND MOD IMP ATT REL 48.000 EACH 0049 Advanced Asphalt Co. 64.9100 3,115.68 3,115.68 1045 Civil Constructors, Inc. of Illinois 60.0000 2,880.00 2,880.00 3330 Ladd Construction Co. 60.0000 2,880.00 2,880.00 4887 Bob Propheter Construction, L.L.C. 60.0000 2,880.00 2,880.00 6085 Len Trovero Construction 50.0000 2,400.00 2,400.00 Z0056250 SAND MOD IMP ATT REPL 5.000 EACH 0049 Advanced Asphalt Co. 10.8200 54.10 54.10 1045 Civil Constructors, Inc. of Illinois 10.0000 50.00 50.00 3330 Ladd Construction Co. 10.0000 50.00 50.00 4887 Bob Propheter Construction, L.L.C. 10.0000 50.00 50.00 6085 Len Trovero Construction 475.0000 2,375.00 2,375.00 Z0056400 SAND MOD IMP ATT TEMP 55.000 EACH 0049 Advanced Asphalt Co. 302.9200 16,660.60 16,660.60 1045 Civil Constructors, Inc. of Illinois 280.0000 15,400.00 15,400.00 3330 Ladd Construction Co. 280.0000 15,400.00 15,400.00 4887 Bob Propheter Construction, L.L.C. 280.0000 15,400.00 15,400.00 6085 Len Trovero Construction 300.0000 16,500.00 16,500.00 25000775 SELECT MOWING STAKES 8.000 EACH 0049 Advanced Asphalt Co. 32.4600 259.68 259.68 1045 Civil Constructors, Inc. of Illinois 20.0000 160.00 160.00 3330 Ladd Construction Co. 25.0000 200.00 200.00 4887 Bob Propheter Construction, L.L.C. 50.0000 400.00 400.00 6085 Len Trovero Construction 15.0000 120.00 120.00 28000300 TEMP DITCH CHECKS 99.000 EACH 0049 Advanced Asphalt Co. 53.5100 5,297.49 5,297.49 1045 Civil Constructors, Inc. of Illinois 75.0000 7,425.00 7,425.00 3330 Ladd Construction Co. 85.0000 8,415.00 8,415.00 4887 Bob Propheter Construction, L.L.C. 81.5800 8,076.42 8,076.42 6085 Len Trovero Construction 80.0000 7,920.00 7,920.00 28000500 INLET & PIPE PROTECT 1.000 EACH 0049 Advanced Asphalt Co. 116.7800 116.78 116.78 1045 Civil Constructors, Inc. of Illinois 75.0000 75.00 75.00 3330 Ladd Construction Co. 150.0000 150.00 150.00 4887 Bob Propheter Construction, L.L.C. 81.5600 81.56 81.56 6085 Len Trovero Construction 120.0000 120.00 120.00 50100100 REM EXIST STRUCT 2.000 EACH 0049 Advanced Asphalt Co. 19,473.5200 38,947.04 38,947.04 1045 Civil Constructors, Inc. of Illinois 60,000.0000 120,000.00 120,000.00 3330 Ladd Construction Co. 18,000.0000 36,000.00 36,000.00 4887 Bob Propheter Construction, L.L.C. 18,000.0000 36,000.00 36,000.00 6085 Len Trovero Construction 29,000.0000 58,000.00 58,000.00 50100200 REM EXIST STRUCT 1.000 L SUM 0049 Advanced Asphalt Co. 19,473.5200 19,473.52 19,473.52 1045 Civil Constructors, Inc. of Illinois 25,000.0000 25,000.00 25,000.00 3330 Ladd Construction Co. 18,000.0000 18,000.00 18,000.00 4887 Bob Propheter Construction, L.L.C. 18,000.0000 18,000.00 18,000.00 6085 Len Trovero Construction 7,500.0000 7,500.00 7,500.00 50104400 CONC HDWL REM 2.000 EACH 0049 Advanced Asphalt Co. 506.1400 1,012.28 1,012.28 1045 Civil Constructors, Inc. of Illinois 300.0000 600.00 600.00 3330 Ladd Construction Co. 350.0000 700.00 700.00 4887 Bob Propheter Construction, L.L.C. 249.8600 499.72 499.72 6085 Len Trovero Construction 480.0000 960.00 960.00 50300100 FLOOR DRAINS 6.000 EACH 0049 Advanced Asphalt Co. 189.3300 1,135.98 1,135.98 1045 Civil Constructors, Inc. of Illinois 300.0000 1,800.00 1,800.00 3330 Ladd Construction Co. 175.0000 1,050.00 1,050.00 4887 Bob Propheter Construction, L.L.C. 175.0000 1,050.00 1,050.00 6085 Len Trovero Construction 200.0000 1,200.00 1,200.00 50500505 STUD SHEAR CONNECTORS 2,358.000 EACH 0049 Advanced Asphalt Co. 2.0000 4,716.00 4,716.00 1045 Civil Constructors, Inc. of Illinois 3.0000 7,074.00 7,074.00 3330 Ladd Construction Co. 1.8500 4,362.30 4,362.30 4887 Bob Propheter Construction, L.L.C. 1.8500 4,362.30 4,362.30 6085 Len Trovero Construction 2.5000 5,895.00 5,895.00 51203200 TEST PILE MET SHELLS 4.000 EACH 0049 Advanced Asphalt Co. 1,622.7900 6,491.16 6,491.16 1045 Civil Constructors, Inc. of Illinois 3,500.0000 14,000.00 14,000.00 3330 Ladd Construction Co. 1,500.0000 6,000.00 6,000.00 4887 Bob Propheter Construction, L.L.C. 1,500.0000 6,000.00 6,000.00 6085 Len Trovero Construction 5,000.0000 20,000.00 20,000.00 51500100 NAME PLATES 2.000 EACH 0049 Advanced Asphalt Co. 324.5600 649.12 649.12 1045 Civil Constructors, Inc. of Illinois 275.0000 550.00 550.00 3330 Ladd Construction Co. 300.0000 600.00 600.00 4887 Bob Propheter Construction, L.L.C. 300.0000 600.00 600.00 6085 Len Trovero Construction 350.0000 700.00 700.00 54215400 CIP RC END SEC 2.000 EACH 0049 Advanced Asphalt Co. 3,571.5900 7,143.18 7,143.18 1045 Civil Constructors, Inc. of Illinois 5,250.0000 10,500.00 10,500.00 3330 Ladd Construction Co. 1,600.0000 3,200.00 3,200.00 4887 Bob Propheter Construction, L.L.C. 8,263.6300 16,527.26 16,527.26 6085 Len Trovero Construction 3,150.0000 6,300.00 6,300.00 60100060 CONC HDWL FOR P DRAIN 1.000 EACH 0049 Advanced Asphalt Co. 156.2400 156.24 156.24 1045 Civil Constructors, Inc. of Illinois 135.0000 135.00 135.00 3330 Ladd Construction Co. 125.0000 125.00 125.00 4887 Bob Propheter Construction, L.L.C. 200.0000 200.00 200.00 6085 Len Trovero Construction 150.0000 150.00 150.00 60238620 INLETS TA W/SPL FR CL 2.000 EACH 0049 Advanced Asphalt Co. 1,310.2700 2,620.54 2,620.54 1045 Civil Constructors, Inc. of Illinois 1,500.0000 3,000.00 3,000.00 3330 Ladd Construction Co. 1,000.0000 2,000.00 2,000.00 4887 Bob Propheter Construction, L.L.C. 1,206.3000 2,412.60 2,412.60 6085 Len Trovero Construction 775.0000 1,550.00 1,550.00 60900315 TY D INLET BOX 609006 2.000 EACH 0049 Advanced Asphalt Co. 1,298.2400 2,596.48 2,596.48 1045 Civil Constructors, Inc. of Illinois 2,400.0000 4,800.00 4,800.00 3330 Ladd Construction Co. 1,200.0000 2,400.00 2,400.00 4887 Bob Propheter Construction, L.L.C. 1,200.0000 2,400.00 2,400.00 6085 Len Trovero Construction 2,000.0000 4,000.00 4,000.00 60900515 CONC THRUST BLOCKS 2.000 EACH 0049 Advanced Asphalt Co. 86.8600 173.72 173.72 1045 Civil Constructors, Inc. of Illinois 275.0000 550.00 550.00 3330 Ladd Construction Co. 250.0000 500.00 500.00 4887 Bob Propheter Construction, L.L.C. 400.0000 800.00 800.00 6085 Len Trovero Construction 150.0000 300.00 300.00 63100085 TRAF BAR TERM T6 8.000 EACH 0049 Advanced Asphalt Co. 3,981.2500 31,850.00 31,850.00 1045 Civil Constructors, Inc. of Illinois 1,300.0000 10,400.00 10,400.00 3330 Ladd Construction Co. 1,350.0000 10,800.00 10,800.00 4887 Bob Propheter Construction, L.L.C. 1,300.0000 10,400.00 10,400.00 6085 Len Trovero Construction 1,360.0000 10,880.00 10,880.00 63100169 TR BAR TRM T1 SPL FLR 9.000 EACH 0049 Advanced Asphalt Co. 1,730.9800 15,578.82 15,578.82 1045 Civil Constructors, Inc. of Illinois 1,525.0000 13,725.00 13,725.00 3330 Ladd Construction Co. 1,575.0000 14,175.00 14,175.00 4887 Bob Propheter Construction, L.L.C. 1,525.0000 13,725.00 13,725.00 6085 Len Trovero Construction 1,600.0000 14,400.00 14,400.00 63301990 REM RE-E T B TERM T1 8.000 EACH 0049 Advanced Asphalt Co. 108.1900 865.52 865.52 1045 Civil Constructors, Inc. of Illinois 500.0000 4,000.00 4,000.00 3330 Ladd Construction Co. 550.0000 4,400.00 4,400.00 4887 Bob Propheter Construction, L.L.C. 500.0000 4,000.00 4,000.00 6085 Len Trovero Construction 525.0000 4,200.00 4,200.00 66600105 FUR ERECT ROW MARKERS 1.000 EACH 0049 Advanced Asphalt Co. 162.2800 162.28 162.28 1045 Civil Constructors, Inc. of Illinois 150.0000 150.00 150.00 3330 Ladd Construction Co. 100.0000 100.00 100.00 4887 Bob Propheter Construction, L.L.C. 63.1600 63.16 63.16 6085 Len Trovero Construction 100.0000 100.00 100.00 66700205 PERM SURV MKRS T1 2.000 EACH 0049 Advanced Asphalt Co. 108.1900 216.38 216.38 1045 Civil Constructors, Inc. of Illinois 135.0000 270.00 270.00 3330 Ladd Construction Co. 100.0000 200.00 200.00 4887 Bob Propheter Construction, L.L.C. 100.0000 200.00 200.00 6085 Len Trovero Construction 150.0000 300.00 300.00 67000400 ENGR FIELD OFFICE A 16.000 CAL MO 0049 Advanced Asphalt Co. 1,464.1100 23,425.76 23,425.76 1045 Civil Constructors, Inc. of Illinois 1,000.0000 16,000.00 16,000.00 3330 Ladd Construction Co. 1,200.0000 19,200.00 19,200.00 4887 Bob Propheter Construction, L.L.C. 1,419.3800 22,710.08 22,710.08 6085 Len Trovero Construction 800.0000 12,800.00 12,800.00 67100100 MOBILIZATION 1.000 L SUM 0049 Advanced Asphalt Co. 115,795.0000 115,795.00 115,795.00 1045 Civil Constructors, Inc. of Illinois 164,500.0000 164,500.00 164,500.00 3330 Ladd Construction Co. 18,000.0000 18,000.00 18,000.00 4887 Bob Propheter Construction, L.L.C. 138,816.0000 138,816.00 138,816.00 6085 Len Trovero Construction 98,000.0000 98,000.00 98,000.00 70100405 TRAF CONT-PROT 701321 2.000 EACH 0049 Advanced Asphalt Co. 8,530.4900 17,060.98 17,060.98 1045 Civil Constructors, Inc. of Illinois 7,884.0000 15,768.00 15,768.00 3330 Ladd Construction Co. 9,000.0000 18,000.00 18,000.00 4887 Bob Propheter Construction, L.L.C. 7,884.0000 15,768.00 15,768.00 6085 Len Trovero Construction 9,250.0000 18,500.00 18,500.00 70100450 TRAF CONT-PROT 701201 1.000 L SUM 0049 Advanced Asphalt Co. 1,081.8600 1,081.86 1,081.86 1045 Civil Constructors, Inc. of Illinois 500.0000 500.00 500.00 3330 Ladd Construction Co. 1,500.0000 1,500.00 1,500.00 4887 Bob Propheter Construction, L.L.C. 500.0000 500.00 500.00 6085 Len Trovero Construction 4,500.0000 4,500.00 4,500.00 70100460 TRAF CONT-PROT 701306 1.000 L SUM 0049 Advanced Asphalt Co. 540.9300 540.93 540.93 1045 Civil Constructors, Inc. of Illinois 500.0000 500.00 500.00 3330 Ladd Construction Co. 1,500.0000 1,500.00 1,500.00 4887 Bob Propheter Construction, L.L.C. 500.0000 500.00 500.00 6085 Len Trovero Construction 3,000.0000 3,000.00 3,000.00 70100500 TRAF CONT-PROT 701326 1.000 L SUM 0049 Advanced Asphalt Co. 2,412.5500 2,412.55 2,412.55 1045 Civil Constructors, Inc. of Illinois 2,230.0000 2,230.00 2,230.00 3330 Ladd Construction Co. 2,800.0000 2,800.00 2,800.00 4887 Bob Propheter Construction, L.L.C. 2,230.0000 2,230.00 2,230.00 6085 Len Trovero Construction 3,700.0000 3,700.00 3,700.00 70100600 TRAF CONT-PROT 701336 1.000 L SUM 0049 Advanced Asphalt Co. 1,081.8600 1,081.86 1,081.86 1045 Civil Constructors, Inc. of Illinois 500.0000 500.00 500.00 3330 Ladd Construction Co. 1,500.0000 1,500.00 1,500.00 4887 Bob Propheter Construction, L.L.C. 500.0000 500.00 500.00 6085 Len Trovero Construction 2,900.0000 2,900.00 2,900.00 70101830 TRAF CONT-PROT BLR 21 1.000 L SUM 0049 Advanced Asphalt Co. 4,868.3800 4,868.38 4,868.38 1045 Civil Constructors, Inc. of Illinois 4,500.0000 4,500.00 4,500.00 3330 Ladd Construction Co. 5,500.0000 5,500.00 5,500.00 4887 Bob Propheter Construction, L.L.C. 4,500.0000 4,500.00 4,500.00 6085 Len Trovero Construction 5,000.0000 5,000.00 5,000.00 70103815 TR CONT SURVEILLANCE 52.000 CAL DA 0049 Advanced Asphalt Co. 270.4700 14,064.44 14,064.44 1045 Civil Constructors, Inc. of Illinois 250.0000 13,000.00 13,000.00 3330 Ladd Construction Co. 250.0000 13,000.00 13,000.00 4887 Bob Propheter Construction, L.L.C. 250.0000 13,000.00 13,000.00 6085 Len Trovero Construction 300.0000 15,600.00 15,600.00 70106500 TEMP BR TRAF SIGNALS 2.000 EACH 0049 Advanced Asphalt Co. 13,496.2300 26,992.46 26,992.46 1045 Civil Constructors, Inc. of Illinois 12,472.0000 24,944.00 24,944.00 3330 Ladd Construction Co. 12,750.0000 25,500.00 25,500.00 4887 Bob Propheter Construction, L.L.C. 12,472.0000 24,944.00 24,944.00 6085 Len Trovero Construction 15,000.0000 30,000.00 30,000.00 70106700 TEMP RUMBLE STRIP 12.000 EACH 0049 Advanced Asphalt Co. 540.9300 6,491.16 6,491.16 1045 Civil Constructors, Inc. of Illinois 500.0000 6,000.00 6,000.00 3330 Ladd Construction Co. 500.0000 6,000.00 6,000.00 4887 Bob Propheter Construction, L.L.C. 500.0000 6,000.00 6,000.00 6085 Len Trovero Construction 680.0000 8,160.00 8,160.00 70400300 TEMP CON BAR TERM SEC 4.000 EACH 0049 Advanced Asphalt Co. 324.5600 1,298.24 1,298.24 1045 Civil Constructors, Inc. of Illinois 275.0000 1,100.00 1,100.00 3330 Ladd Construction Co. 300.0000 1,200.00 1,200.00 4887 Bob Propheter Construction, L.L.C. 300.0000 1,200.00 1,200.00 6085 Len Trovero Construction 260.0000 1,040.00 1,040.00 78100100 RAISED REFL PAVT MKR 2.000 EACH 0049 Advanced Asphalt Co. 1,541.6600 3,083.32 3,083.32 1045 Civil Constructors, Inc. of Illinois 1,425.0000 2,850.00 2,850.00 3330 Ladd Construction Co. 325.0000 650.00 650.00 4887 Bob Propheter Construction, L.L.C. 1,425.0000 2,850.00 2,850.00 6085 Len Trovero Construction 250.0000 500.00 500.00 78200410 GUARDRAIL MKR TYPE A 29.000 EACH 0049 Advanced Asphalt Co. 8.6500 250.85 250.85 1045 Civil Constructors, Inc. of Illinois 7.0000 203.00 203.00 3330 Ladd Construction Co. 7.0000 203.00 203.00 4887 Bob Propheter Construction, L.L.C. 7.0000 203.00 203.00 6085 Len Trovero Construction 8.0000 232.00 232.00 78201000 TERMINAL MARKER - DA 9.000 EACH 0049 Advanced Asphalt Co. 32.4600 292.14 292.14 1045 Civil Constructors, Inc. of Illinois 25.0000 225.00 225.00 3330 Ladd Construction Co. 25.0000 225.00 225.00 4887 Bob Propheter Construction, L.L.C. 25.0000 225.00 225.00 6085 Len Trovero Construction 27.0000 243.00 243.00