ILLINOIS DEPARTMENT OF TRANSPORTATION PAGE: 1 07/18/03 09:56:27 U N I T P R I C E T A B U L A T I O N O F B I D S LETTING DATE: 06/13/2003 LETTING TYPE: SCHEDULED CONTRACT NUMBER: 64917 LETTING ITEM NUMBER: 244 RESPONSIBLE DISTRICT: 02 BIDS LOCKED: Y SECTION: D2 MRS 2003-12 COUNTY: HENRY ESTIMATE: -------------------------- SUMMARY OF CONTRACTOR BIDS -------------------------- "AS READ" SUMMATION SUMMATION OF NBR BIDR CONTR COMB ITEM CONTR BIDDER OF BIDDER CALCULATED LOW BIDR CALC BLANK NBR BIDDER NAME GROUP COMB GRP NBR GROUP TOTAL PRICE EXTENSIONS EXTENSIONS BID EXTENSION DIFF BIDS 0049 Advanced Asphalt Co. NO ALT 90,112.51 * 90,112.51 90,112.51 * 4887 Bob Propheter Construction, L.L.C. NO ALT 99,801.18 99,801.18 99,801.18 **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT = 11 ---------------------- DETAIL CONTRACTOR BIDS ---------------------- ITEM NBR ITEM DESCRIPTION UNIT OF UNIT BIDDER CALCULATED BIDR CALC BIDR NBR BIDDER NAME QUANTITY MEASURE PRICE EXTENSION EXTENSION EXTENSION DIFF X4066424 BC SC SUPER "D" N50 540.000 TON 0049 Advanced Asphalt Co. 52.7500 28,485.00 28,485.00 4887 Bob Propheter Construction, L.L.C. 67.9700 36,703.80 36,703.80 X4066765 LEV BIND MM SUPER N50 432.000 TON 0049 Advanced Asphalt Co. 52.4500 22,658.40 22,658.40 4887 Bob Propheter Construction, L.L.C. 67.2100 29,034.72 29,034.72 40600200 BIT MATLS PR CT 4.400 TON 0049 Advanced Asphalt Co. 589.5500 2,594.02 2,594.02 4887 Bob Propheter Construction, L.L.C. 225.0000 990.00 990.00 40600300 AGG PR CT 12.000 TON 0049 Advanced Asphalt Co. 25.1000 301.20 301.20 4887 Bob Propheter Construction, L.L.C. 1.0000 12.00 12.00 40600990 TEMPORARY RAMP 231.000 SQ YD 0049 Advanced Asphalt Co. 16.4900 3,809.19 3,809.19 4887 Bob Propheter Construction, L.L.C. 18.3200 4,231.92 4,231.92 44000007 BIT SURF REM 2 7,707.000 SQ YD 0049 Advanced Asphalt Co. 3.1600 24,354.12 24,354.12 4887 Bob Propheter Construction, L.L.C. 2.4300 18,728.01 18,728.01 67100100 MOBILIZATION 1.000 L SUM 0049 Advanced Asphalt Co. 0.0000 0.00 0.00 4887 Bob Propheter Construction, L.L.C. 5,988.0000 5,988.00 5,988.00 70102620 TR CONT & PROT 701501 1.000 L SUM 0049 Advanced Asphalt Co. 2,740.1300 2,740.13 2,740.13 4887 Bob Propheter Construction, L.L.C. 575.0000 575.00 575.00 70300100 SHORT-TERM PAVT MKING 867.000 FOOT 0049 Advanced Asphalt Co. 1.4000 1,213.80 1,213.80 4887 Bob Propheter Construction, L.L.C. 0.6900 598.23 598.23 70301000 WORK ZONE PAVT MK REM 95.000 SQ FT 0049 Advanced Asphalt Co. 0.0100 0.95 0.95 4887 Bob Propheter Construction, L.L.C. 1.2000 114.00 114.00 78001110 PAINT PVT MK LINE 4 11,302.000 FOOT 0049 Advanced Asphalt Co. 0.3500 3,955.70 3,955.70 4887 Bob Propheter Construction, L.L.C. 0.2500 2,825.50 2,825.50