ILLINOIS DEPARTMENT OF TRANSPORTATION PAGE: 1 08/09/02 13:13:20 U N I T P R I C E T A B U L A T I O N O F B I D S LETTING DATE: 06/14/2002 LETTING TYPE: SCHEDULED CONTRACT NUMBER: 64348 LETTING ITEM NUMBER: 227 RESPONSIBLE DISTRICT: 02 BIDS LOCKED: Y SECTION: 10RS-5 COUNTY: HENRY ESTIMATE: -------------------------- SUMMARY OF CONTRACTOR BIDS -------------------------- "AS READ" SUMMATION SUMMATION OF NBR BIDR CONTR COMB ITEM CONTR BIDDER OF BIDDER CALCULATED LOW BIDR CALC BLANK NBR BIDDER NAME GROUP COMB GRP NBR GROUP TOTAL PRICE EXTENSIONS EXTENSIONS BID EXTENSION DIFF BIDS 0049 Advanced Asphalt Co. NO ALT 2,907,455.22 2,907,455.22 2,907,455.22 4887 Bob Propheter Construction, L.L.C. NO ALT 2,703,079.78 * 2,703,079.78 2,703,079.78 * **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT = 119 ---------------------- DETAIL CONTRACTOR BIDS ---------------------- ITEM NBR ITEM DESCRIPTION UNIT OF UNIT BIDDER CALCULATED BIDR CALC BIDR NBR BIDDER NAME QUANTITY MEASURE PRICE EXTENSION EXTENSION EXTENSION DIFF A2001714 T-ACER SACR 1-3/4 10.000 EACH 0049 Advanced Asphalt Co. 289.5600 2,895.60 2,895.60 4887 Bob Propheter Construction, L.L.C. 240.0000 2,400.00 2,400.00 A2003514 T-FRAX AMER AP 1-3/4 5.000 EACH 0049 Advanced Asphalt Co. 289.5600 1,447.80 1,447.80 4887 Bob Propheter Construction, L.L.C. 250.0000 1,250.00 1,250.00 A2006514 T-QUERCUS BICOL 1-3/4 5.000 EACH 0049 Advanced Asphalt Co. 318.5200 1,592.60 1,592.60 4887 Bob Propheter Construction, L.L.C. 260.0000 1,300.00 1,300.00 A2007814 T-TILIA AMER 1-3/4 5.000 EACH 0049 Advanced Asphalt Co. 289.5600 1,447.80 1,447.80 4887 Bob Propheter Construction, L.L.C. 250.0000 1,250.00 1,250.00 B2000562 T-AMELAN CAN SF 4' 10.000 EACH 0049 Advanced Asphalt Co. 231.6500 2,316.50 2,316.50 4887 Bob Propheter Construction, L.L.C. 210.0000 2,100.00 2,100.00 B2001164 T-CERCIS CAN CL 5' 10.000 EACH 0049 Advanced Asphalt Co. 231.6500 2,316.50 2,316.50 4887 Bob Propheter Construction, L.L.C. 225.0000 2,250.00 2,250.00 B2004114 T-MALUS PF TF 1-3/4 10.000 EACH 0049 Advanced Asphalt Co. 289.5600 2,895.60 2,895.60 4887 Bob Propheter Construction, L.L.C. 225.0000 2,250.00 2,250.00 X0322352 SEEDING MOBILIZATION 4.000 EACH 0049 Advanced Asphalt Co. 579.1300 2,316.52 2,316.52 4887 Bob Propheter Construction, L.L.C. 300.0000 1,200.00 1,200.00 X3550700 BIT BC SUPER 10 3,086.000 SQ YD 0049 Advanced Asphalt Co. 23.7200 73,199.92 73,199.92 4887 Bob Propheter Construction, L.L.C. 27.8600 85,975.96 85,975.96 X3560140 BC BC WIDE SUPER 10 2,023.000 SQ YD 0049 Advanced Asphalt Co. 23.2800 47,095.44 47,095.44 4887 Bob Propheter Construction, L.L.C. 29.3000 59,273.90 59,273.90 X4021000 TEMP ACCESS- PRIV ENT 10.000 EACH 0049 Advanced Asphalt Co. 260.5000 2,605.00 2,605.00 4887 Bob Propheter Construction, L.L.C. 300.0000 3,000.00 3,000.00 X4022000 TEMP ACCESS- COM ENT 14.000 EACH 0049 Advanced Asphalt Co. 579.3800 8,111.32 8,111.32 4887 Bob Propheter Construction, L.L.C. 600.0000 8,400.00 8,400.00 X4023000 TEMP ACCESS- ROAD 2.000 EACH 0049 Advanced Asphalt Co. 978.5900 1,957.18 1,957.18 4887 Bob Propheter Construction, L.L.C. 600.0000 1,200.00 1,200.00 X4024000 TEMP ACCESS- FLD ENT 14.000 EACH 0049 Advanced Asphalt Co. 494.6500 6,925.10 6,925.10 4887 Bob Propheter Construction, L.L.C. 400.0000 5,600.00 5,600.00 X4066414 BC SC SUPER "C" N50 1,616.000 TON 0049 Advanced Asphalt Co. 41.5700 67,177.12 67,177.12 4887 Bob Propheter Construction, L.L.C. 44.5700 72,025.12 72,025.12 X4066526 P BCSC SUPER "D" N70 3,830.000 TON 0049 Advanced Asphalt Co. 44.0000 168,520.00 168,520.00 4887 Bob Propheter Construction, L.L.C. 51.0800 195,636.40 195,636.40 X4066810 POL LB HM SUPER N70 29.000 TON 0049 Advanced Asphalt Co. 129.9600 3,768.84 3,768.84 4887 Bob Propheter Construction, L.L.C. 108.0700 3,134.03 3,134.03 X4066910 POL LB MM SUPER N70 2,383.000 TON 0049 Advanced Asphalt Co. 44.8000 106,758.40 106,758.40 4887 Bob Propheter Construction, L.L.C. 44.7900 106,734.57 106,734.57 Z0005305 BOX CUL TO BE CLEANED 618.000 FOOT 0049 Advanced Asphalt Co. 38.1100 23,551.98 23,551.98 4887 Bob Propheter Construction, L.L.C. 13.9300 8,608.74 8,608.74 Z0017100 DOWEL BARS 118.000 EACH 0049 Advanced Asphalt Co. 18.2600 2,154.68 2,154.68 4887 Bob Propheter Construction, L.L.C. 7.9800 941.64 941.64 Z0023600 FILL EXIST CULVERTS 2.000 EACH 0049 Advanced Asphalt Co. 12,767.0100 25,534.02 25,534.02 4887 Bob Propheter Construction, L.L.C. 1,500.0000 3,000.00 3,000.00 Z0028415 GEOTECHNICAL REINF 2,408.000 SQ YD 0049 Advanced Asphalt Co. 2.2000 5,297.60 5,297.60 4887 Bob Propheter Construction, L.L.C. 3.5000 8,428.00 8,428.00 Z0040315 PILOT CAR 2.000 DAY 0049 Advanced Asphalt Co. 314.0100 628.02 628.02 4887 Bob Propheter Construction, L.L.C. 460.3800 920.76 920.76 Z0075300 TIE BARS 73.000 EACH 0049 Advanced Asphalt Co. 9.2800 677.44 677.44 4887 Bob Propheter Construction, L.L.C. 7.9800 582.54 582.54 20100110 TREE REMOV 6-15 382.000 UNIT 0049 Advanced Asphalt Co. 20.8500 7,964.70 7,964.70 4887 Bob Propheter Construction, L.L.C. 18.0000 6,876.00 6,876.00 20100210 TREE REMOV OVER 15 596.000 UNIT 0049 Advanced Asphalt Co. 28.9600 17,260.16 17,260.16 4887 Bob Propheter Construction, L.L.C. 25.0000 14,900.00 14,900.00 20101100 TREE TRUNK PROTECTION 19.000 EACH 0049 Advanced Asphalt Co. 491.0400 9,329.76 9,329.76 4887 Bob Propheter Construction, L.L.C. 200.0000 3,800.00 3,800.00 20200100 EARTH EXCAVATION 123,765.000 CU YD 0049 Advanced Asphalt Co. 7.5500 934,425.75 934,425.75 4887 Bob Propheter Construction, L.L.C. 6.6600 824,274.90 824,274.90 20700600 NON-POROUS GRAN EMB 394.000 CU YD 0049 Advanced Asphalt Co. 27.6300 10,886.22 10,886.22 4887 Bob Propheter Construction, L.L.C. 38.6200 15,216.28 15,216.28 21301052 EXPLOR TRENCH 52 60.000 FOOT 0049 Advanced Asphalt Co. 3.9500 237.00 237.00 4887 Bob Propheter Construction, L.L.C. 3.0000 180.00 180.00 21400100 GRADING & SHAP DITCH 500.000 FOOT 0049 Advanced Asphalt Co. 11.7100 5,855.00 5,855.00 4887 Bob Propheter Construction, L.L.C. 7.2400 3,620.00 3,620.00 25000310 SEEDING CL 4 3.100 ACRE 0049 Advanced Asphalt Co. 694.9500 2,154.35 2,154.35 4887 Bob Propheter Construction, L.L.C. 690.0000 2,139.00 2,139.00 25000400 NITROGEN FERT NUTR 1,397.000 POUND 0049 Advanced Asphalt Co. 1.1600 1,620.52 1,620.52 4887 Bob Propheter Construction, L.L.C. 1.0000 1,397.00 1,397.00 25000500 PHOSPHORUS FERT NUTR 1,397.000 POUND 0049 Advanced Asphalt Co. 1.1600 1,620.52 1,620.52 4887 Bob Propheter Construction, L.L.C. 1.0000 1,397.00 1,397.00 25000600 POTASSIUM FERT NUTR 1,397.000 POUND 0049 Advanced Asphalt Co. 1.1600 1,620.52 1,620.52 4887 Bob Propheter Construction, L.L.C. 1.0000 1,397.00 1,397.00 25000910 SEEDING CL 1 MOD 3.600 ACRE 0049 Advanced Asphalt Co. 579.1300 2,084.87 2,084.87 4887 Bob Propheter Construction, L.L.C. 670.0000 2,412.00 2,412.00 25001830 SEEDING CL 6 MOD 8.800 ACRE 0049 Advanced Asphalt Co. 579.1300 5,096.34 5,096.34 4887 Bob Propheter Construction, L.L.C. 520.0000 4,576.00 4,576.00 25100115 MULCH METHOD 2 15.500 ACRE 0049 Advanced Asphalt Co. 579.1300 8,976.52 8,976.52 4887 Bob Propheter Construction, L.L.C. 660.0000 10,230.00 10,230.00 25100630 EROSION CONTR BLANKET 33,725.000 SQ YD 0049 Advanced Asphalt Co. 1.2700 42,830.75 42,830.75 4887 Bob Propheter Construction, L.L.C. 0.7500 25,293.75 25,293.75 28000250 TEMP EROS CONTR SEED 4,658.000 POUND 0049 Advanced Asphalt Co. 1.7400 8,104.92 8,104.92 4887 Bob Propheter Construction, L.L.C. 1.0000 4,658.00 4,658.00 28000300 TEMP DITCH CHECKS 337.000 EACH 0049 Advanced Asphalt Co. 77.1700 26,006.29 26,006.29 4887 Bob Propheter Construction, L.L.C. 75.0000 25,275.00 25,275.00 28000400 PERIMETER EROS BAR 3,005.000 FOOT 0049 Advanced Asphalt Co. 7.4500 22,387.25 22,387.25 4887 Bob Propheter Construction, L.L.C. 2.5000 7,512.50 7,512.50 28000500 INLET & PIPE PROTECT 42.000 EACH 0049 Advanced Asphalt Co. 180.4300 7,578.06 7,578.06 4887 Bob Propheter Construction, L.L.C. 100.0000 4,200.00 4,200.00 28100107 STONE RIPRAP CL A4 1,052.000 SQ YD 0049 Advanced Asphalt Co. 39.3000 41,343.60 41,343.60 4887 Bob Propheter Construction, L.L.C. 31.4100 33,043.32 33,043.32 28200100 FILTER FAB FOR RIPRAP 1,052.000 SQ YD 0049 Advanced Asphalt Co. 1.8100 1,904.12 1,904.12 4887 Bob Propheter Construction, L.L.C. 1.0000 1,052.00 1,052.00 31100100 SUB GRAN MAT A 3,558.000 TON 0049 Advanced Asphalt Co. 19.6600 69,950.28 69,950.28 4887 Bob Propheter Construction, L.L.C. 18.5100 65,858.58 65,858.58 35100100 AGG BASE CSE A 4,327.000 TON 0049 Advanced Asphalt Co. 17.6700 76,458.09 76,458.09 4887 Bob Propheter Construction, L.L.C. 26.0000 112,502.00 112,502.00 35101400 AGG BASE CSE B 3,135.000 TON 0049 Advanced Asphalt Co. 17.4400 54,674.40 54,674.40 4887 Bob Propheter Construction, L.L.C. 24.2100 75,898.35 75,898.35 40600200 BIT MATLS PR CT 18.600 TON 0049 Advanced Asphalt Co. 443.1600 8,242.78 8,242.78 4887 Bob Propheter Construction, L.L.C. 225.0000 4,185.00 4,185.00 40600300 AGG PR CT 65.000 TON 0049 Advanced Asphalt Co. 17.6000 1,144.00 1,144.00 4887 Bob Propheter Construction, L.L.C. 1.0000 65.00 65.00 40600895 CONSTRUC TEST STRIP 1.000 EACH 0049 Advanced Asphalt Co. 1,411.1900 1,411.19 1,411.19 4887 Bob Propheter Construction, L.L.C. 1,705.9900 1,705.99 1,705.99 40600980 BIT SURF REM BUTT JT 232.000 SQ YD 0049 Advanced Asphalt Co. 17.0400 3,953.28 3,953.28 4887 Bob Propheter Construction, L.L.C. 28.0500 6,507.60 6,507.60 40600990 TEMPORARY RAMP 39.000 SQ YD 0049 Advanced Asphalt Co. 16.6200 648.18 648.18 4887 Bob Propheter Construction, L.L.C. 15.7200 613.08 613.08 40800040 INCIDENTAL BIT SURF 541.000 TON 0049 Advanced Asphalt Co. 73.1700 39,584.97 39,584.97 4887 Bob Propheter Construction, L.L.C. 71.5800 38,724.78 38,724.78 42001200 PAVEMENT FABRIC 368.000 SQ YD 0049 Advanced Asphalt Co. 7.2100 2,653.28 2,653.28 4887 Bob Propheter Construction, L.L.C. 4.6200 1,700.16 1,700.16 42300300 PCC DRIVEWAY PAVT 7 265.000 SQ YD 0049 Advanced Asphalt Co. 43.6200 11,559.30 11,559.30 4887 Bob Propheter Construction, L.L.C. 42.9900 11,392.35 11,392.35 44000200 DRIVE PAVEMENT REM 265.000 SQ YD 0049 Advanced Asphalt Co. 7.6300 2,021.95 2,021.95 4887 Bob Propheter Construction, L.L.C. 10.0300 2,657.95 2,657.95 44000400 GUTTER REM 2,109.000 FOOT 0049 Advanced Asphalt Co. 4.8800 10,291.92 10,291.92 4887 Bob Propheter Construction, L.L.C. 4.1300 8,710.17 8,710.17 44003100 MEDIAN REMOVAL 110.000 SQ FT 0049 Advanced Asphalt Co. 7.6300 839.30 839.30 4887 Bob Propheter Construction, L.L.C. 1.5000 165.00 165.00 44004250 PAVED SHLD REMOVAL 4,903.000 SQ YD 0049 Advanced Asphalt Co. 4.5000 22,063.50 22,063.50 4887 Bob Propheter Construction, L.L.C. 6.8000 33,340.40 33,340.40 44201013 CL B PATCH T4 13 368.000 SQ YD 0049 Advanced Asphalt Co. 72.4700 26,668.96 26,668.96 4887 Bob Propheter Construction, L.L.C. 82.4600 30,345.28 30,345.28 44213200 SAW CUTS 138.000 FOOT 0049 Advanced Asphalt Co. 6.3900 881.82 881.82 4887 Bob Propheter Construction, L.L.C. 7.8100 1,077.78 1,077.78 44300200 STRIP REF CR CON TR 8,791.000 FOOT 0049 Advanced Asphalt Co. 0.4500 3,955.95 3,955.95 4887 Bob Propheter Construction, L.L.C. 0.3900 3,428.49 3,428.49 48100100 AGGREGATE SHLDS A 6,516.000 TON 0049 Advanced Asphalt Co. 17.0800 111,293.28 111,293.28 4887 Bob Propheter Construction, L.L.C. 17.7000 115,333.20 115,333.20 48101200 AGGREGATE SHLDS B 51.000 TON 0049 Advanced Asphalt Co. 17.0300 868.53 868.53 4887 Bob Propheter Construction, L.L.C. 20.5900 1,050.09 1,050.09 48202310 BIT SHLD SUPER 5 1/2 1,594.000 SQ YD 0049 Advanced Asphalt Co. 14.5900 23,256.46 23,256.46 4887 Bob Propheter Construction, L.L.C. 16.7700 26,731.38 26,731.38 48202315 BIT SHLD SUPER 5 3/4 7,490.000 SQ YD 0049 Advanced Asphalt Co. 13.3800 100,216.20 100,216.20 4887 Bob Propheter Construction, L.L.C. 16.5200 123,734.80 123,734.80 50100100 REM EXIST STRUCT 9.000 EACH 0049 Advanced Asphalt Co. 1,118.1800 10,063.62 10,063.62 4887 Bob Propheter Construction, L.L.C. 1,200.0000 10,800.00 10,800.00 50105200 REM EXIST CULVERTS 6.000 EACH 0049 Advanced Asphalt Co. 472.7200 2,836.32 2,836.32 4887 Bob Propheter Construction, L.L.C. 200.0000 1,200.00 1,200.00 50800105 REINFORCEMENT BARS 933.000 POUND 0049 Advanced Asphalt Co. 2.3200 2,164.56 2,164.56 4887 Bob Propheter Construction, L.L.C. 4.9700 4,637.01 4,637.01 54001005 BOX CUL END SEC C5 2.000 EACH 0049 Advanced Asphalt Co. 28,739.4000 57,478.80 57,478.80 4887 Bob Propheter Construction, L.L.C. 4,487.9600 8,975.92 8,975.92 54001006 BOX CUL END SEC C6 2.000 EACH 0049 Advanced Asphalt Co. 18,234.0600 36,468.12 36,468.12 4887 Bob Propheter Construction, L.L.C. 2,243.9800 4,487.96 4,487.96 54001008 BOX CUL END SEC C8 2.000 EACH 0049 Advanced Asphalt Co. 39,181.5500 78,363.10 78,363.10 4887 Bob Propheter Construction, L.L.C. 8,975.9300 17,951.86 17,951.86 54001010 BOX CUL END SEC C10 2.000 EACH 0049 Advanced Asphalt Co. 12,516.5200 25,033.04 25,033.04 4887 Bob Propheter Construction, L.L.C. 2,243.9800 4,487.96 4,487.96 54002020 EXPAN BOLTS 3/4 124.000 EACH 0049 Advanced Asphalt Co. 10.3000 1,277.20 1,277.20 4887 Bob Propheter Construction, L.L.C. 7.9800 989.52 989.52 542A0235 P CUL CL A 1 30 216.000 FOOT 0049 Advanced Asphalt Co. 65.4200 14,130.72 14,130.72 4887 Bob Propheter Construction, L.L.C. 81.1700 17,532.72 17,532.72 542D0220 P CUL CL D 1 15 2,120.000 FOOT 0049 Advanced Asphalt Co. 21.2400 45,028.80 45,028.80 4887 Bob Propheter Construction, L.L.C. 15.0000 31,800.00 31,800.00 542D0223 P CUL CL D 1 18 111.000 FOOT 0049 Advanced Asphalt Co. 21.6200 2,399.82 2,399.82 4887 Bob Propheter Construction, L.L.C. 18.0000 1,998.00 1,998.00 54213450 END SECTIONS 15 72.000 EACH 0049 Advanced Asphalt Co. 127.9700 9,213.84 9,213.84 4887 Bob Propheter Construction, L.L.C. 106.0000 7,632.00 7,632.00 54213453 END SECTIONS 18 4.000 EACH 0049 Advanced Asphalt Co. 75.8500 303.40 303.40 4887 Bob Propheter Construction, L.L.C. 137.0000 548.00 548.00 54213675 PRC FLAR END SEC 30 8.000 EACH 0049 Advanced Asphalt Co. 558.0700 4,464.56 4,464.56 4887 Bob Propheter Construction, L.L.C. 725.0000 5,800.00 5,800.00 54215430 CIP RC END SEC 30 2.000 EACH 0049 Advanced Asphalt Co. 5,212.1300 10,424.26 10,424.26 4887 Bob Propheter Construction, L.L.C. 1,600.0000 3,200.00 3,200.00 5422D030 P CUL CL D 2 30 TEMP 30.000 FOOT 0049 Advanced Asphalt Co. 38.6600 1,159.80 1,159.80 4887 Bob Propheter Construction, L.L.C. 37.0000 1,110.00 1,110.00 54248510 CONCRETE COLLAR 13.700 CU YD 0049 Advanced Asphalt Co. 289.0800 3,960.40 3,960.40 4887 Bob Propheter Construction, L.L.C. 567.4200 7,773.65 7,773.65 60100060 CONC HDWL FOR P DRAIN 1.000 EACH 0049 Advanced Asphalt Co. 199.9400 199.94 199.94 4887 Bob Propheter Construction, L.L.C. 120.0000 120.00 120.00 60107600 PIPE UNDERDRAINS 4 785.000 FOOT 0049 Advanced Asphalt Co. 4.6800 3,673.80 3,673.80 4887 Bob Propheter Construction, L.L.C. 16.0000 12,560.00 12,560.00 60600095 CLASS SI CONC OUTLET 25.200 CU YD 0049 Advanced Asphalt Co. 427.1200 10,763.42 10,763.42 4887 Bob Propheter Construction, L.L.C. 279.6500 7,047.18 7,047.18 60602600 CONC GUTTER TA MOD 439.300 FOOT 0049 Advanced Asphalt Co. 14.1900 6,233.67 6,233.67 4887 Bob Propheter Construction, L.L.C. 37.9400 16,667.04 16,667.04 60622400 CONC MED TSM6.06 174.000 SQ FT 0049 Advanced Asphalt Co. 12.2200 2,126.28 2,126.28 4887 Bob Propheter Construction, L.L.C. 10.9100 1,898.34 1,898.34 61133200 FLD TILE JUN VAULT 3D 3.000 EACH 0049 Advanced Asphalt Co. 818.4000 2,455.20 2,455.20 4887 Bob Propheter Construction, L.L.C. 700.0000 2,100.00 2,100.00 61140000 STORM SEWER SPEC 8 16.000 FOOT 0049 Advanced Asphalt Co. 11.7200 187.52 187.52 4887 Bob Propheter Construction, L.L.C. 25.0000 400.00 400.00 61140100 STORM SEWER SPEC 10 16.000 FOOT 0049 Advanced Asphalt Co. 12.8100 204.96 204.96 4887 Bob Propheter Construction, L.L.C. 31.0000 496.00 496.00 61140400 STORM SEWER SPEC 15 16.000 FOOT 0049 Advanced Asphalt Co. 19.9400 319.04 319.04 4887 Bob Propheter Construction, L.L.C. 40.0000 640.00 640.00 63200310 GUARDRAIL REMOV 2,287.000 FOOT 0049 Advanced Asphalt Co. 3.4700 7,935.89 7,935.89 4887 Bob Propheter Construction, L.L.C. 3.0000 6,861.00 6,861.00 63500105 DELINEATORS 12.000 EACH 0049 Advanced Asphalt Co. 34.7500 417.00 417.00 4887 Bob Propheter Construction, L.L.C. 30.0000 360.00 360.00 66600105 FUR ERECT ROW MARKERS 157.000 EACH 0049 Advanced Asphalt Co. 55.6000 8,729.20 8,729.20 4887 Bob Propheter Construction, L.L.C. 66.5400 10,446.78 10,446.78 67000400 ENGR FIELD OFFICE A 12.000 CAL MO 0049 Advanced Asphalt Co. 1,943.5100 23,322.12 23,322.12 4887 Bob Propheter Construction, L.L.C. 1,467.6300 17,611.56 17,611.56 67100100 MOBILIZATION 1.000 L SUM 0049 Advanced Asphalt Co. 164,431.0000 164,431.00 164,431.00 4887 Bob Propheter Construction, L.L.C. 162,246.0000 162,246.00 162,246.00 70100450 TRAF CONT-PROT 701201 1.000 L SUM 0049 Advanced Asphalt Co. 3,207.9900 3,207.99 3,207.99 4887 Bob Propheter Construction, L.L.C. 5,500.0000 5,500.00 5,500.00 70100460 TRAF CONT-PROT 701306 1.000 L SUM 0049 Advanced Asphalt Co. 1,901.4800 1,901.48 1,901.48 4887 Bob Propheter Construction, L.L.C. 8,500.0000 8,500.00 8,500.00 70100500 TRAF CONT-PROT 701326 1.000 L SUM 0049 Advanced Asphalt Co. 10,935.8400 10,935.84 10,935.84 4887 Bob Propheter Construction, L.L.C. 15,000.0000 15,000.00 15,000.00 70101830 TRAF CONT-PROT BLR 21 1.000 L SUM 0049 Advanced Asphalt Co. 3,133.8600 3,133.86 3,133.86 4887 Bob Propheter Construction, L.L.C. 9,000.0000 9,000.00 9,000.00 70103815 TR CONT SURVEILLANCE 80.000 CAL DA 0049 Advanced Asphalt Co. 363.4300 29,074.40 29,074.40 4887 Bob Propheter Construction, L.L.C. 300.0000 24,000.00 24,000.00 70300100 SHORT-TERM PAVT MKING 5,420.000 FOOT 0049 Advanced Asphalt Co. 0.4300 2,330.60 2,330.60 4887 Bob Propheter Construction, L.L.C. 0.5000 2,710.00 2,710.00 70300610 TEMP PT PAVT MK L&S 140.000 SQ FT 0049 Advanced Asphalt Co. 0.0100 1.40 1.40 4887 Bob Propheter Construction, L.L.C. 2.0500 287.00 287.00 70300625 TEMP PT PVT M LINE 4 51,083.000 FOOT 0049 Advanced Asphalt Co. 0.0100 510.83 510.83 4887 Bob Propheter Construction, L.L.C. 0.1500 7,662.45 7,662.45 70300640 TEMP PT PVT M LINE 8 1,224.000 FOOT 0049 Advanced Asphalt Co. 0.0100 12.24 12.24 4887 Bob Propheter Construction, L.L.C. 0.3500 428.40 428.40 70300645 TEMP PT PVT M LINE 12 611.000 FOOT 0049 Advanced Asphalt Co. 0.0100 6.11 6.11 4887 Bob Propheter Construction, L.L.C. 0.7500 458.25 458.25 70300660 TEMP PT PVT M LINE 24 95.000 FOOT 0049 Advanced Asphalt Co. 0.0100 0.95 0.95 4887 Bob Propheter Construction, L.L.C. 1.9500 185.25 185.25 70301000 WORK ZONE PAVT MK REM 452.000 SQ FT 0049 Advanced Asphalt Co. 1.7400 786.48 786.48 4887 Bob Propheter Construction, L.L.C. 2.9700 1,342.44 1,342.44 78000100 THPL PVT MK LTR & SYM 140.000 SQ FT 0049 Advanced Asphalt Co. 6.1300 858.20 858.20 4887 Bob Propheter Construction, L.L.C. 3.2500 455.00 455.00 78000200 THPL PVT MK LINE 4 10,521.000 FOOT 0049 Advanced Asphalt Co. 0.8000 8,416.80 8,416.80 4887 Bob Propheter Construction, L.L.C. 0.5500 5,786.55 5,786.55 78000500 THPL PVT MK LINE 8 1,224.000 FOOT 0049 Advanced Asphalt Co. 1.4900 1,823.76 1,823.76 4887 Bob Propheter Construction, L.L.C. 0.9500 1,162.80 1,162.80 78000600 THPL PVT MK LINE 12 611.000 FOOT 0049 Advanced Asphalt Co. 2.5400 1,551.94 1,551.94 4887 Bob Propheter Construction, L.L.C. 1.4500 885.95 885.95 78000650 THPL PVT MK LINE 24 59.000 FOOT 0049 Advanced Asphalt Co. 5.6600 333.94 333.94 4887 Bob Propheter Construction, L.L.C. 2.9500 174.05 174.05 78001110 PAINT PVT MK LINE 4 40,562.000 FOOT 0049 Advanced Asphalt Co. 0.1200 4,867.44 4,867.44 4887 Bob Propheter Construction, L.L.C. 0.1000 4,056.20 4,056.20 78001180 PAINT PVT MK LINE 24 36.000 FOOT 0049 Advanced Asphalt Co. 2.2600 81.36 81.36 4887 Bob Propheter Construction, L.L.C. 1.9500 70.20 70.20 78100100 RAISED REFL PAVT MKR 159.000 EACH 0049 Advanced Asphalt Co. 52.1200 8,287.08 8,287.08 4887 Bob Propheter Construction, L.L.C. 45.0000 7,155.00 7,155.00 78300200 RAISED REF PVT MK REM 90.000 EACH 0049 Advanced Asphalt Co. 4.9700 447.30 447.30 4887 Bob Propheter Construction, L.L.C. 13.8100 1,242.90 1,242.90