ILLINOIS DEPARTMENT OF TRANSPORTATION PAGE: 1 07/12/02 10:01:38 U N I T P R I C E T A B U L A T I O N O F B I D S LETTING DATE: 06/14/2002 LETTING TYPE: SCHEDULED CONTRACT NUMBER: 64502 LETTING ITEM NUMBER: 173 RESPONSIBLE DISTRICT: 02 BIDS LOCKED: Y SECTION: (6-1-15D,6-2MFT)W&RS COUNTY: HENRY ESTIMATE: -------------------------- SUMMARY OF CONTRACTOR BIDS -------------------------- "AS READ" SUMMATION SUMMATION OF NBR BIDR CONTR COMB ITEM CONTR BIDDER OF BIDDER CALCULATED LOW BIDR CALC BLANK NBR BIDDER NAME GROUP COMB GRP NBR GROUP TOTAL PRICE EXTENSIONS EXTENSIONS BID EXTENSION DIFF BIDS 0049 Advanced Asphalt Co. NO ALT 1,832,868.28 1,832,868.28 1,832,868.28 4887 Bob Propheter Construction, L.L.C. NO ALT 1,694,611.10 * 1,694,611.10 1,694,611.10 * **** TOTAL GROUP NO ALT PAY ITEMS FOR THIS CONTRACT = 107 ---------------------- DETAIL CONTRACTOR BIDS ---------------------- ITEM NBR ITEM DESCRIPTION UNIT OF UNIT BIDDER CALCULATED BIDR CALC BIDR NBR BIDDER NAME QUANTITY MEASURE PRICE EXTENSION EXTENSION EXTENSION DIFF A2001714 T-ACER SACR 1-3/4 15.000 EACH 0049 Advanced Asphalt Co. 285.8600 4,287.90 4,287.90 4887 Bob Propheter Construction, L.L.C. 250.0000 3,750.00 3,750.00 A2003514 T-FRAX AMER AP 1-3/4 15.000 EACH 0049 Advanced Asphalt Co. 285.8600 4,287.90 4,287.90 4887 Bob Propheter Construction, L.L.C. 250.0000 3,750.00 3,750.00 A2006714 T-QUERCUS MACR 1-3/4 15.000 EACH 0049 Advanced Asphalt Co. 314.4400 4,716.60 4,716.60 4887 Bob Propheter Construction, L.L.C. 250.0000 3,750.00 3,750.00 A2007814 T-TILIA AMER 1-3/4 15.000 EACH 0049 Advanced Asphalt Co. 285.8600 4,287.90 4,287.90 4887 Bob Propheter Construction, L.L.C. 250.0000 3,750.00 3,750.00 B2000562 T-AMELAN CAN SF 4' 20.000 EACH 0049 Advanced Asphalt Co. 171.5100 3,430.20 3,430.20 4887 Bob Propheter Construction, L.L.C. 100.0000 2,000.00 2,000.00 XX001860 BIT BASE CSE 3 13,322.000 SQ YD 0049 Advanced Asphalt Co. 7.2000 95,918.40 95,918.40 4887 Bob Propheter Construction, L.L.C. 6.9900 93,120.78 93,120.78 X0322263 CULVERT DROP BOX 1.000 EACH 0049 Advanced Asphalt Co. 19,368.3800 19,368.38 19,368.38 4887 Bob Propheter Construction, L.L.C. 16,074.4900 16,074.49 16,074.49 X0322352 SEEDING MOBILIZATION 2.000 EACH 0049 Advanced Asphalt Co. 1,143.4200 2,286.84 2,286.84 4887 Bob Propheter Construction, L.L.C. 500.0000 1,000.00 1,000.00 X2800110 TEMP DITCH CHECK AGG 30.000 EACH 0049 Advanced Asphalt Co. 128.2900 3,848.70 3,848.70 4887 Bob Propheter Construction, L.L.C. 317.0000 9,510.00 9,510.00 X4021000 TEMP ACCESS- PRIV ENT 2.000 EACH 0049 Advanced Asphalt Co. 899.1400 1,798.28 1,798.28 4887 Bob Propheter Construction, L.L.C. 557.6400 1,115.28 1,115.28 X4022000 TEMP ACCESS- COM ENT 1.000 EACH 0049 Advanced Asphalt Co. 633.6400 633.64 633.64 4887 Bob Propheter Construction, L.L.C. 1,355.0000 1,355.00 1,355.00 X4023000 TEMP ACCESS- ROAD 1.000 EACH 0049 Advanced Asphalt Co. 1,429.0000 1,429.00 1,429.00 4887 Bob Propheter Construction, L.L.C. 4,367.9000 4,367.90 4,367.90 X4066414 BC SC SUPER "C" N50 3,171.000 TON 0049 Advanced Asphalt Co. 41.0000 130,011.00 130,011.00 4887 Bob Propheter Construction, L.L.C. 41.1800 130,581.78 130,581.78 X4066614 BCBC SUP IL-19.0 N50 2,708.000 TON 0049 Advanced Asphalt Co. 39.3400 106,532.72 106,532.72 4887 Bob Propheter Construction, L.L.C. 35.0200 94,834.16 94,834.16 X4066735 LEV BIND HM SUPER N50 14.000 TON 0049 Advanced Asphalt Co. 226.5400 3,171.56 3,171.56 4887 Bob Propheter Construction, L.L.C. 95.8400 1,341.76 1,341.76 X4066765 LEV BIND MM SUPER N50 1,619.000 TON 0049 Advanced Asphalt Co. 42.6200 69,001.78 69,001.78 4887 Bob Propheter Construction, L.L.C. 40.4000 65,407.60 65,407.60 X6063600 COMB CC&G TM4.24 2,392.000 FOOT 0049 Advanced Asphalt Co. 11.5500 27,627.60 27,627.60 4887 Bob Propheter Construction, L.L.C. 17.9500 42,936.40 42,936.40 Z0005400 BREAKER-RUN CR STONE 209.000 TON 0049 Advanced Asphalt Co. 19.3700 4,048.33 4,048.33 4887 Bob Propheter Construction, L.L.C. 19.8300 4,144.47 4,144.47 Z0013798 CONSTRUCTION LAYOUT 1.000 L SUM 0049 Advanced Asphalt Co. 18,294.7500 18,294.75 18,294.75 4887 Bob Propheter Construction, L.L.C. 16,000.0000 16,000.00 16,000.00 Z0023500 FILL EXIST CULVERTS 14.000 CU YD 0049 Advanced Asphalt Co. 285.6500 3,999.10 3,999.10 4887 Bob Propheter Construction, L.L.C. 715.0000 10,010.00 10,010.00 Z0028415 GEOTECHNICAL REINF 15,379.000 SQ YD 0049 Advanced Asphalt Co. 2.1900 33,680.01 33,680.01 4887 Bob Propheter Construction, L.L.C. 1.7000 26,144.30 26,144.30 20100110 TREE REMOV 6-15 688.000 UNIT 0049 Advanced Asphalt Co. 22.8700 15,734.56 15,734.56 4887 Bob Propheter Construction, L.L.C. 15.0700 10,368.16 10,368.16 20100310 TREE REMOV SP 6-15 81.000 UNIT 0049 Advanced Asphalt Co. 28.5900 2,315.79 2,315.79 4887 Bob Propheter Construction, L.L.C. 15.0700 1,220.67 1,220.67 20100500 TREE REMOV ACRES .300 ACRE 0049 Advanced Asphalt Co. 5,717.1000 1,715.13 1,715.13 4887 Bob Propheter Construction, L.L.C. 3,864.0000 1,159.20 1,159.20 20200100 EARTH EXCAVATION 43,452.000 CU YD 0049 Advanced Asphalt Co. 8.3900 364,562.28 364,562.28 4887 Bob Propheter Construction, L.L.C. 6.2700 272,444.04 272,444.04 20400800 FURNISHED EXCAV 5,228.000 CU YD 0049 Advanced Asphalt Co. 3.1400 16,415.92 16,415.92 4887 Bob Propheter Construction, L.L.C. 7.0100 36,648.28 36,648.28 20700600 NON-POROUS GRAN EMB 2,801.000 CU YD 0049 Advanced Asphalt Co. 27.8800 78,091.88 78,091.88 4887 Bob Propheter Construction, L.L.C. 32.8500 92,012.85 92,012.85 20800150 TRENCH BACKFILL 10.000 CU YD 0049 Advanced Asphalt Co. 38.1900 381.90 381.90 4887 Bob Propheter Construction, L.L.C. 15.3300 153.30 153.30 21301052 EXPLOR TRENCH 52 43.000 FOOT 0049 Advanced Asphalt Co. 4.5300 194.79 194.79 4887 Bob Propheter Construction, L.L.C. 3.7600 161.68 161.68 25000750 MOWING 13.470 ACRE 0049 Advanced Asphalt Co. 114.3400 1,540.16 1,540.16 4887 Bob Propheter Construction, L.L.C. 100.0000 1,347.00 1,347.00 25000910 SEEDING CL 1 MOD .970 ACRE 0049 Advanced Asphalt Co. 1,692.1400 1,641.38 1,641.38 4887 Bob Propheter Construction, L.L.C. 1,000.0000 970.00 970.00 25001830 SEEDING CL 6 MOD 12.500 ACRE 0049 Advanced Asphalt Co. 571.7100 7,146.38 7,146.38 4887 Bob Propheter Construction, L.L.C. 500.0000 6,250.00 6,250.00 25100115 MULCH METHOD 2 13.470 ACRE 0049 Advanced Asphalt Co. 514.5400 6,930.85 6,930.85 4887 Bob Propheter Construction, L.L.C. 500.0000 6,735.00 6,735.00 25100630 EROSION CONTR BLANKET 8,285.000 SQ YD 0049 Advanced Asphalt Co. 1.1400 9,444.90 9,444.90 4887 Bob Propheter Construction, L.L.C. 0.9000 7,456.50 7,456.50 28000250 TEMP EROS CONTR SEED 11,000.000 POUND 0049 Advanced Asphalt Co. 0.5700 6,270.00 6,270.00 4887 Bob Propheter Construction, L.L.C. 0.8000 8,800.00 8,800.00 28000300 TEMP DITCH CHECKS 100.000 EACH 0049 Advanced Asphalt Co. 109.4800 10,948.00 10,948.00 4887 Bob Propheter Construction, L.L.C. 75.0000 7,500.00 7,500.00 28000400 PERIMETER EROS BAR 8,326.000 FOOT 0049 Advanced Asphalt Co. 9.1600 76,266.16 76,266.16 4887 Bob Propheter Construction, L.L.C. 2.1000 17,484.60 17,484.60 28000500 INLET & PIPE PROTECT 22.000 EACH 0049 Advanced Asphalt Co. 178.1300 3,918.86 3,918.86 4887 Bob Propheter Construction, L.L.C. 100.0000 2,200.00 2,200.00 28100107 STONE RIPRAP CL A4 130.000 SQ YD 0049 Advanced Asphalt Co. 33.6600 4,375.80 4,375.80 4887 Bob Propheter Construction, L.L.C. 28.3800 3,689.40 3,689.40 28200100 FILTER FAB FOR RIPRAP 130.000 SQ YD 0049 Advanced Asphalt Co. 5.5500 721.50 721.50 4887 Bob Propheter Construction, L.L.C. 2.0000 260.00 260.00 31100900 SUB GRAN MAT A 10 15,379.000 SQ YD 0049 Advanced Asphalt Co. 10.9800 168,861.42 168,861.42 4887 Bob Propheter Construction, L.L.C. 9.3900 144,408.81 144,408.81 35101400 AGG BASE CSE B 3,010.000 TON 0049 Advanced Asphalt Co. 17.2200 51,832.20 51,832.20 4887 Bob Propheter Construction, L.L.C. 21.3800 64,353.80 64,353.80 35102400 AGG BASE CSE B 12 581.000 SQ YD 0049 Advanced Asphalt Co. 15.7100 9,127.51 9,127.51 4887 Bob Propheter Construction, L.L.C. 7.5400 4,380.74 4,380.74 40600200 BIT MATLS PR CT 9.480 TON 0049 Advanced Asphalt Co. 443.1500 4,201.06 4,201.06 4887 Bob Propheter Construction, L.L.C. 225.0000 2,133.00 2,133.00 40600300 AGG PR CT 38.540 TON 0049 Advanced Asphalt Co. 16.3300 629.36 629.36 4887 Bob Propheter Construction, L.L.C. 1.0000 38.54 38.54 40600980 BIT SURF REM BUTT JT 624.000 SQ YD 0049 Advanced Asphalt Co. 14.5200 9,060.48 9,060.48 4887 Bob Propheter Construction, L.L.C. 22.0400 13,752.96 13,752.96 40600985 PCC SURF REM BUTT JT 44.000 SQ YD 0049 Advanced Asphalt Co. 20.7900 914.76 914.76 4887 Bob Propheter Construction, L.L.C. 49.2200 2,165.68 2,165.68 40600990 TEMPORARY RAMP 200.000 SQ YD 0049 Advanced Asphalt Co. 18.0800 3,616.00 3,616.00 4887 Bob Propheter Construction, L.L.C. 15.0100 3,002.00 3,002.00 40800040 INCIDENTAL BIT SURF 163.000 TON 0049 Advanced Asphalt Co. 69.4300 11,317.09 11,317.09 4887 Bob Propheter Construction, L.L.C. 72.5600 11,827.28 11,827.28 42300300 PCC DRIVEWAY PAVT 7 340.000 SQ YD 0049 Advanced Asphalt Co. 55.8500 18,989.00 18,989.00 4887 Bob Propheter Construction, L.L.C. 31.7300 10,788.20 10,788.20 44000400 GUTTER REM 2,255.000 FOOT 0049 Advanced Asphalt Co. 3.7700 8,501.35 8,501.35 4887 Bob Propheter Construction, L.L.C. 3.6600 8,253.30 8,253.30 44000600 SIDEWALK REM 165.000 SQ FT 0049 Advanced Asphalt Co. 4.5600 752.40 752.40 4887 Bob Propheter Construction, L.L.C. 2.2500 371.25 371.25 44201329 CL C PATCH T2 8 6.000 SQ YD 0049 Advanced Asphalt Co. 73.5800 441.48 441.48 4887 Bob Propheter Construction, L.L.C. 56.8600 341.16 341.16 44201333 CL C PATCH T3 8 15.000 SQ YD 0049 Advanced Asphalt Co. 75.3400 1,130.10 1,130.10 4887 Bob Propheter Construction, L.L.C. 58.6800 880.20 880.20 44201335 CL C PATCH T4 8 103.000 SQ YD 0049 Advanced Asphalt Co. 73.8400 7,605.52 7,605.52 4887 Bob Propheter Construction, L.L.C. 56.0400 5,772.12 5,772.12 44300100 AREA REF CR CON TREAT 14,962.000 SQ YD 0049 Advanced Asphalt Co. 0.7400 11,071.88 11,071.88 4887 Bob Propheter Construction, L.L.C. 0.5900 8,827.58 8,827.58 48100500 AGGREGATE SHLDS A 6 6,864.000 SQ YD 0049 Advanced Asphalt Co. 6.3600 43,655.04 43,655.04 4887 Bob Propheter Construction, L.L.C. 3.9300 26,975.52 26,975.52 48202400 BIT SHLD SUPER 6 2,669.000 SQ YD 0049 Advanced Asphalt Co. 14.3500 38,300.15 38,300.15 4887 Bob Propheter Construction, L.L.C. 14.7400 39,341.06 39,341.06 50100100 REM EXIST STRUCT 15.000 EACH 0049 Advanced Asphalt Co. 378.6600 5,679.90 5,679.90 4887 Bob Propheter Construction, L.L.C. 200.0000 3,000.00 3,000.00 50100300 REM EXIST STRUCT N1 1.000 EACH 0049 Advanced Asphalt Co. 3,786.5700 3,786.57 3,786.57 4887 Bob Propheter Construction, L.L.C. 3,847.3400 3,847.34 3,847.34 50100400 REM EXIST STRUCT N2 1.000 EACH 0049 Advanced Asphalt Co. 757.3100 757.31 757.31 4887 Bob Propheter Construction, L.L.C. 1,200.0000 1,200.00 1,200.00 50104400 CONC HDWL REM 4.000 EACH 0049 Advanced Asphalt Co. 243.6900 974.76 974.76 4887 Bob Propheter Construction, L.L.C. 200.0000 800.00 800.00 50105200 REM EXIST CULVERTS 105.000 EACH 0049 Advanced Asphalt Co. 21.6400 2,272.20 2,272.20 4887 Bob Propheter Construction, L.L.C. 10.5000 1,102.50 1,102.50 54001000 BOX CUL END SECT 2.000 EACH 0049 Advanced Asphalt Co. 3,476.0700 6,952.14 6,952.14 4887 Bob Propheter Construction, L.L.C. 15,093.1400 30,186.28 30,186.28 54011006 PCBC 10X6 109.000 FOOT 0049 Advanced Asphalt Co. 407.5100 44,418.59 44,418.59 4887 Bob Propheter Construction, L.L.C. 513.6300 55,985.67 55,985.67 542D0220 P CUL CL D 1 15 719.000 FOOT 0049 Advanced Asphalt Co. 18.3800 13,215.22 13,215.22 4887 Bob Propheter Construction, L.L.C. 15.5000 11,144.50 11,144.50 542D0223 P CUL CL D 1 18 180.000 FOOT 0049 Advanced Asphalt Co. 20.8000 3,744.00 3,744.00 4887 Bob Propheter Construction, L.L.C. 19.0000 3,420.00 3,420.00 542D0229 P CUL CL D 1 24 389.000 FOOT 0049 Advanced Asphalt Co. 20.9300 8,141.77 8,141.77 4887 Bob Propheter Construction, L.L.C. 27.0000 10,503.00 10,503.00 542D0235 P CUL CL D 1 30 66.000 FOOT 0049 Advanced Asphalt Co. 36.2400 2,391.84 2,391.84 4887 Bob Propheter Construction, L.L.C. 34.0000 2,244.00 2,244.00 542D0241 P CUL CL D 1 36 46.000 FOOT 0049 Advanced Asphalt Co. 39.8500 1,833.10 1,833.10 4887 Bob Propheter Construction, L.L.C. 40.0000 1,840.00 1,840.00 54200433 P CUL 1 RCCP 18 32.000 FOOT 0049 Advanced Asphalt Co. 27.3800 876.16 876.16 4887 Bob Propheter Construction, L.L.C. 48.0000 1,536.00 1,536.00 54200439 P CUL 1 RCCP 24 50.000 FOOT 0049 Advanced Asphalt Co. 32.8700 1,643.50 1,643.50 4887 Bob Propheter Construction, L.L.C. 57.5000 2,875.00 2,875.00 54200445 P CUL 1 RCCP 30 62.000 FOOT 0049 Advanced Asphalt Co. 40.7600 2,527.12 2,527.12 4887 Bob Propheter Construction, L.L.C. 68.0000 4,216.00 4,216.00 54213450 END SECTIONS 15 22.000 EACH 0049 Advanced Asphalt Co. 144.3700 3,176.14 3,176.14 4887 Bob Propheter Construction, L.L.C. 112.5000 2,475.00 2,475.00 54213453 END SECTIONS 18 6.000 EACH 0049 Advanced Asphalt Co. 113.2500 679.50 679.50 4887 Bob Propheter Construction, L.L.C. 130.0000 780.00 780.00 54213459 END SECTIONS 24 6.000 EACH 0049 Advanced Asphalt Co. 160.7100 964.26 964.26 4887 Bob Propheter Construction, L.L.C. 200.0000 1,200.00 1,200.00 54213465 END SECTIONS 30 2.000 EACH 0049 Advanced Asphalt Co. 235.8900 471.78 471.78 4887 Bob Propheter Construction, L.L.C. 320.0000 640.00 640.00 54213471 END SECTIONS 36 2.000 EACH 0049 Advanced Asphalt Co. 372.2300 744.46 744.46 4887 Bob Propheter Construction, L.L.C. 475.0000 950.00 950.00 54213657 PRC FLAR END SEC 12 2.000 EACH 0049 Advanced Asphalt Co. 392.5700 785.14 785.14 4887 Bob Propheter Construction, L.L.C. 523.0000 1,046.00 1,046.00 54213663 PRC FLAR END SEC 18 2.000 EACH 0049 Advanced Asphalt Co. 415.4400 830.88 830.88 4887 Bob Propheter Construction, L.L.C. 569.0000 1,138.00 1,138.00 54213669 PRC FLAR END SEC 24 2.000 EACH 0049 Advanced Asphalt Co. 534.5200 1,069.04 1,069.04 4887 Bob Propheter Construction, L.L.C. 624.0000 1,248.00 1,248.00 54213675 PRC FLAR END SEC 30 2.000 EACH 0049 Advanced Asphalt Co. 614.5600 1,229.12 1,229.12 4887 Bob Propheter Construction, L.L.C. 723.0000 1,446.00 1,446.00 550A0050 STORM SEW CL A 1 12 68.000 FOOT 0049 Advanced Asphalt Co. 24.8700 1,691.16 1,691.16 4887 Bob Propheter Construction, L.L.C. 33.0000 2,244.00 2,244.00 60100060 CONC HDWL FOR P DRAIN 2.000 EACH 0049 Advanced Asphalt Co. 362.7200 725.44 725.44 4887 Bob Propheter Construction, L.L.C. 174.3800 348.76 348.76 60107600 PIPE UNDERDRAINS 4 1,660.000 FOOT 0049 Advanced Asphalt Co. 1.1800 1,958.80 1,958.80 4887 Bob Propheter Construction, L.L.C. 7.9700 13,230.20 13,230.20 60108100 PIPE UNDERDRAIN 4 SP 50.000 FOOT 0049 Advanced Asphalt Co. 3.6000 180.00 180.00 4887 Bob Propheter Construction, L.L.C. 7.9700 398.50 398.50 60242400 INLETS SPL 2.000 EACH 0049 Advanced Asphalt Co. 1,038.9900 2,077.98 2,077.98 4887 Bob Propheter Construction, L.L.C. 1,700.0000 3,400.00 3,400.00 60600095 CLASS SI CONC OUTLET 16.000 CU YD 0049 Advanced Asphalt Co. 378.4400 6,055.04 6,055.04 4887 Bob Propheter Construction, L.L.C. 371.0700 5,937.12 5,937.12 61100605 MISC CONCRETE .700 CU YD 0049 Advanced Asphalt Co. 522.6600 365.86 365.86 4887 Bob Propheter Construction, L.L.C. 734.5300 514.17 514.17 61101013 STORM SEW PROT A 12 103.000 FOOT 0049 Advanced Asphalt Co. 23.4900 2,419.47 2,419.47 4887 Bob Propheter Construction, L.L.C. 32.0000 3,296.00 3,296.00 61133200 FLD TILE JUN VAULT 3D 1.000 EACH 0049 Advanced Asphalt Co. 872.8500 872.85 872.85 4887 Bob Propheter Construction, L.L.C. 1,970.0000 1,970.00 1,970.00 63000000 SPBGR TY A 738.000 FOOT 0049 Advanced Asphalt Co. 13.1500 9,704.70 9,704.70 4887 Bob Propheter Construction, L.L.C. 11.5000 8,487.00 8,487.00 63100045 TRAF BAR TERM T2 1.000 EACH 0049 Advanced Asphalt Co. 571.7100 571.71 571.71 4887 Bob Propheter Construction, L.L.C. 550.0000 550.00 550.00 63100085 TRAF BAR TERM T6 4.000 EACH 0049 Advanced Asphalt Co. 1,486.4500 5,945.80 5,945.80 4887 Bob Propheter Construction, L.L.C. 1,300.0000 5,200.00 5,200.00 63100169 TR BAR TRM T1 SPL FLR 7.000 EACH 0049 Advanced Asphalt Co. 1,715.1300 12,005.91 12,005.91 4887 Bob Propheter Construction, L.L.C. 1,500.0000 10,500.00 10,500.00 63200310 GUARDRAIL REMOV 877.000 FOOT 0049 Advanced Asphalt Co. 3.4300 3,008.11 3,008.11 4887 Bob Propheter Construction, L.L.C. 2.0000 1,754.00 1,754.00 63300445 REM REIN T B TERM T5A 4.000 EACH 0049 Advanced Asphalt Co. 457.3700 1,829.48 1,829.48 4887 Bob Propheter Construction, L.L.C. 525.0000 2,100.00 2,100.00 66600105 FUR ERECT ROW MARKERS 63.000 EACH 0049 Advanced Asphalt Co. 57.1700 3,601.71 3,601.71 4887 Bob Propheter Construction, L.L.C. 63.8700 4,023.81 4,023.81 66700095 PERM SURV MKRS 1.000 EACH 0049 Advanced Asphalt Co. 114.3400 114.34 114.34 4887 Bob Propheter Construction, L.L.C. 750.0000 750.00 750.00 67000400 ENGR FIELD OFFICE A 6.000 CAL MO 0049 Advanced Asphalt Co. 1,705.6500 10,233.90 10,233.90 4887 Bob Propheter Construction, L.L.C. 1,408.7300 8,452.38 8,452.38 67100100 MOBILIZATION 1.000 L SUM 0049 Advanced Asphalt Co. 104,521.0000 104,521.00 104,521.00 4887 Bob Propheter Construction, L.L.C. 101,928.0000 101,928.00 101,928.00 70100450 TRAF CONT-PROT 701201 1.000 L SUM 0049 Advanced Asphalt Co. 2,608.9200 2,608.92 2,608.92 4887 Bob Propheter Construction, L.L.C. 5,000.0000 5,000.00 5,000.00 70101830 TRAF CONT-PROT BLR 21 1.000 L SUM 0049 Advanced Asphalt Co. 4,324.0500 4,324.05 4,324.05 4887 Bob Propheter Construction, L.L.C. 4,434.0000 4,434.00 4,434.00 70300100 SHORT-TERM PAVT MKING 4,107.000 FOOT 0049 Advanced Asphalt Co. 0.3900 1,601.73 1,601.73 4887 Bob Propheter Construction, L.L.C. 0.5000 2,053.50 2,053.50 78001110 PAINT PVT MK LINE 4 23,989.000 FOOT 0049 Advanced Asphalt Co. 0.2300 5,517.47 5,517.47 4887 Bob Propheter Construction, L.L.C. 0.1300 3,118.57 3,118.57 78200410 GUARDRAIL MKR TYPE A 32.000 EACH 0049 Advanced Asphalt Co. 8.0000 256.00 256.00 4887 Bob Propheter Construction, L.L.C. 10.0000 320.00 320.00 78201000 TERMINAL MARKER - DA 8.000 EACH 0049 Advanced Asphalt Co. 28.5900 228.72 228.72 4887 Bob Propheter Construction, L.L.C. 45.0000 360.00 360.00