|
U.S. 20 (FAP
301)
Jo Davies and Stephenson Counties, Illinois
Draft Environmental Impact Statement (May, 2003)
This Draft Environmental Impact Statement
discusses the proposed construction of U.S. Route 20
(FAP 301) from Illinois Route 84 northwest of the city
of Galena in Jo Daviess County to Bolton Road northwest
of the city of Freeport in Stephenson County. The
proposed project will integrate the needs of increased
development, system capacity, travel safety, community
access, and system continuity. The proposed action will
provide a high-type highway with an appropriate
connection to the four-lane facility west of Illinois
Route 84, and extending 75.6 km (47 miles) to the east,
connecting to a previously approved four lane facility
east of Bolton Road, northwest of Freeport.
Important issues and socio-economic and environmental
concerns related to the proposed action include
displacement of residences, right-of-way, traffic
generated noise, agricultural impacts, visual resources,
impacts to Section 106 properties, wetlands, and
threatened and endangered species habitat.
Adobe Reader is required to view environmental
documents.
The draft document will be available for review on
IDOT’s website until The Final Environmental Impact
Statement is available for public review .
Draft EIS (May,
2003)
Comments
EIS Library
List
CD Orders
Final EIS
Preparation
|