| FOR IMMEDIATE RELEASE | CONTACT: 217/782-6953 |
| APRIL 28, 2002 | TTY: 217/524-487 |
SPRINGFIELD, IL -- The Illinois Department of Transportation will open
bids on April 26, 2002 for various road and bridge
improvement projects throughout the state. Also included are
16 aeronautics projects and one water resource project.
Following is a list of the projects by county:
1. Bureau County, I-80, District 2, Removal and
replacement of the bridge deck wearing surfaces along with new expansion joints
on structures along Interstate 80 north of Sheffield. Completion Date August 31,
2002.
1P. Madison County, IL 255, District 8, 3.07 km of widening and resurfacing
IL 111 to four lanes from just south of Jackson Drive to north of Airline Drive
in Wood River and Bethalto and the reconstruction of Airline Drive from two
lanes to four lanes. Also includes the construction of a 2 span, continuous
composite concrete and steel welded plate girder structure to carry Airline
Drive over IL 255 in Bethalto. Completion Date October 15, 2003 Plus 20 Working
Days.
2. Cook County, Central Avenue, District 1, 0.80 mile of milling and
bituminous concrete surface on Central Avenue from Elston Avenue to Devon Avenue
in Chicago. 25 Working Days.
2P. Madison County, IL 255, District 8, 0.66 kilometer of grading, paving and
signing for the reconstruction of IL 140 at Bethalto including right and left
turn lanes and the installation of traffic signals at the Point Diamond
Interchange. Also included is the construction of 0.16 kilometer of a two-lane
service road north of IL 140. Completion Date July 15, 2002.
3. Cook County, IL 1 (Halsted Street), District 1, 4.46 miles of milling and
bituminous concrete surface on IL 1 (Halsted Street) from 87th Street to 123rd
Street in Chicago. Completion Date October 31, 2002 Plus 05 Working Days.
3P. Madison County, IL 255, District 8, The construction of a 3 span,
continuous composite concrete and steel welded plate girder structure with 13.25
m width roadways carrying IL 255 over IL 140 at Bethalto. Completion Date June
15, 2003.
4. Cook County, Green Bay Road, District 1, 0.03 mile of drainage correction
consisting of partial removal of pavement, milling and bituminous concrete
surface on Green Bay Road located south of Tower Road in Winnetka. 30 Working
Days.
5. Cook County, Kean Avenue, District 1, 0.83 km of milling and bituminous
concrete surface on Kean Avenue from 119th Street to IL 83 (Calumet Sag Rd.)
near Palos Park. 20 Working Days.
6. Cook-DuPage Counties, I-290, District 1, 6.72 km of removal and
replacement of the existing median with temporary bituminous pavement and
construction of a temporary structure along the Higgins Road Bridge all located
on I-290 from IL 72 (Higgins Road) to Devon Avenue in Schaumburg and Elk Grove
Village. Completion Date October 31, 2002 Plus 20 Working Days.
7. McHenry County, IL 120, District 1, 0.37 mile of milling and bituminous
concrete surface on IL 120 from IL 31 to Riverside Drive in McHenry. 25 Working
Days.
8. DuPage County, I-290 (Thorndale Avenue), District 1, 0.29 mile of milling
and bituminous concrete surface on I-290 at Thorndale Avenue in Itasca.
Completion Date June 28, 2002 Plus 05 Working Days.
9. Henry County, South Street, District 2, bituminous concrete widening and
resurfacing on South Street from Midland Road to US 34/ IL 28 Midland Road will
be realigned to "tee" into South Street. Located in Kewanee. 75 Working Days.
10. Lake County, US 45, District 1, Intersection improvement at US 45 and
Dada Drive consisting of variable width widening, milling and bituminous
concrete surface and realignment and reconstruction of approximately 700' of
pavement on Sunshine Avenue and approximately 600' of pavement on Grant Avenue
all in Gurnee. Completion Date September 06, 2002 Plus 05 Working Days.
11. Lake County, IL 83, District 1, 0.80 mile of milling and bituminous
concrete surface on IL 83 from Rollins Road to Hook Drive and from Nielson Drive
to Engle Dr in Round Lake Beach. 30 Working Days.
12. Marion County, I-57, District 7, Pavement patching, bituminous concrete
binder and surface courses, 12 ft and 8 ft width bituminous shoulders, pipe
underdrains and guardrail on I-57 from Salem south 5.64 miles to 0.8 mile north
of IL 161. Also, included is the reconstruction of the Post Oak Rest Areas
located approximately 2 miles south of US 50 in Salem. Completion Date November
26, 2002.
13. Winnebago-Ogle Counties, I-39, District 2, 20.70 miles of patching,
bituminous concrete resurfacing and bridge rehabilitation on Interstate 39 from
the Lee County line to 0.4 mile north of Baxter Road, north of New Milford.
Completion Date November 15, 2002.
14. Cook County, Joe Orr Road & I-94, District 1, Beam replacement on the
structure carrying Joe Orr Road over IL 394 in Lynwood and the structure
carrying I-94 over Dolton Avenue in Dolton. 20 Working Days.
15. Cook County, Lake Cook Road, District 1, Beam replacement and beam
straightening on the structure carrying Lake-Cook Road over US 41 (Edens
Expressway) in Highland Park and Northbrook. 20 Working Days.
16. Cook County, Harrison Street, District 1, Beam replacement and beam
straightening on the structure carrying Harrison Street over northbound I-90/94
(Dan Ryan Expressway) in Chicago. 15 Working Days.
17. Cook County, IL 68 (Dundee Rd.), District 1, Deck beam replacement on the
structure carrying IL 68 (Dundee Road) over Union Pacific Railroad in Palatine.
40 Working Days.
18. Peoria County, I-74, District 4, Removal and reconstruction of the North
Street structure located 0.1 km north of Interstate 74 in Peoria. Completion
Date November 01, 2002.
19. Will County, US 45/52, District 1, Deck beam replacement on the structure
carrying US 45/52 over small stream near Peotone. 30 Working Days.
20. Cook County, US 12 (Rand Road), District 1, Traffic signal modernization
at the intersections along US 12 (Rand Road) from Wolf Road to IL 58 (Golf Road)
in Des Plaines. 45 Working Days.
21. Cook County, IL 68, District 1, Traffic signal installation at the
intersection of IL 68 (Dundee Road) and Sterling Avenue at Wheeling. 35 Working
Days.
22. Crawford-Fayette Counties, Various Routes, District 7, The installation
of flashing beacon systems at the following intersections: (1) IL 185 with
Janette Drive and (Zent Road) at the north edge of Vandalia (2) IL 1 with IL 33
east of Robinson and (3) at Trimble Road with Robinwood Drive at the north edge
of Robinson. 20 Working Days.
23. DeKalb County, US 34, District 2, Installation of traffic signals at the
intersection of US 34 with Gletty Road in Sandwich. 30 Working Days.
24. Effingham-Clay Counties, Various Routes, District 7, Highway lighting at
the following intersections: (1) IL 128 with Mocassin Road 3.60 miles south of
Beecher City (2) US 40 with IL 128, 2.50 miles southwest of Altamont (3) US 45
with Dutch Lane 1.0 mile south of Effingham and (4) US 50 with Clay City Road in
Clay City Completion Date December 31, 2002.
25. Winnebago County, IL 251, District 2, Replacement of the existing
lighting system at the interchange of IL 251 with Whitman Street in Rockford. 75
Working Days.
26. Cook County, Various Routes, District 1, Curb and gutter removal and
replacement at various locations. 20 Working Days.
27. Cook-DuPage Counties, Various Routes, District 1, Bridge painting at 5
locations in Cook and DuPage Counties. 60 Working Days.
28. DuPage County, I-290 (Eisenhower Expwy), District 1, Bridge painting at 4
locations along I-290 (Eisenhower Expressway) from IL 83 to York Road in DuPage
County. 75 Working Days.
29. Cook-DuPage Counties, I-290 (Eisenhower Expwy), District 1, Bridge
painting at 5 locations along I-290 (Eisenhower Expressway) from North Avenue to
Electric Avenue in Cook and DuPage counties. 75 Working Days.
30. Jasper County, IL 33, District 7, Construction of concrete box culvert
extensions at 12 locations on IL 33 between Newton and Willow Hill. 50 Working
Days.
31. Lake-Kane-Cook Counties, Various Routes, District 1, Bridge painting at 5
locations in Lake, Kane and Cook Counties. 55 Working Days.
32. LaSalle County, I-39, District 3, Cleaning and painting the structure
carrying TR 309A over Interstate 39 one mile north of US 6 near LaSalle. 30
Working Days.
33. McHenry County, Various Routes, District 1, Removal and replacement of
damaged raised reflective pavement markers and castings at various locations.
Completion Date October 31, 2002.
34. Richland County, US 50, District 7, The addition of left turn lanes on US
50 at the intersection with IL 250 one mile west of Noble. 50 Working Days.
35. Various Counties, Various Routes, District 1, Wetland management
consisting of planting, mowing and weed spraying at 7 various locations in the
district. Completion Date October 15, 2002.
36. Various Counties, Various Routes, Districts 6 & 7, The repair of
thermoplastic preformed plastic, preformed thermoplastic, epoxy, hot spray
thermoplastic and polyurea pavement marking lines, letters and symbols and the
removal of existing pavement markings on various routes throughout Districts 6
and 7. Completion Date June 30, 2003.
37. Vermilion County, Unmarked Route, District 5, 2.84 miles of resurfacing
and parking improvements on the roads in Middle Fork Fish and Wildlife Area
northwest of Danville. 60 Working Days.
38. Williamson County, CH 2, District 9, reconstructing the expansion joints
at both pin and link locations with silicone joints, deck repairs, scarification
of the deck and a microsilica concrete overlay on the structure carrying CH 2
over I-57 just west of Johnson City. 60 Working Days.
39. Champaign County, CH 17, District 5, 4.4 miles of resurfacing CH 17 from
CH 19 to US 45 southwest of Tolono. 40 Working Days.
40. Cook County, Forest Avenue, District 1, 0.35 mile of milling and
resurfacing, driveway, sidewalk, curb and gutter and pavement marking on Forest
Avenue from First Street to Longcommon Road in Riverside. 25 Working Days.
41. Cook County, Wilmette Avenue, District 1, 0.86 mile bituminous pavement
reconstruction, combination concrete curb and gutter, drainage structures,
traffic signals and pavement markings on Wilmette Avenue from Ridge Avenue to
Green Bay Road in Wilmette. Completion Date November 22, 2002 Plus 10 Working
Days.
42. Cook County, Sibley Blvd. & State Line Rd, District 1, 0.11 mile of
pavement reconstruction, combination concrete curb and gutter, storm sewers,
drainage structures, lighting, traffic signals and pavement marking on Sibley
Boulevard from Douglas Avenue to east of State Line Road and on State Line Road
from Memorial/Rimbach north to State Street in Calumet City. 65 Working Days.
43. Cook County, Unmarked Route, District 1, 1.53 miles bituminous
resurfacing, concrete curb and gutter, drainage structures, concrete and brick
sidewalks, street lighting and pavement marking on Chicago Avenue from Austin
Boulevard to Harlem Avenue (IL 43) in Oak Park. 50 Working Days.
44. DeWitt County, CH 14, District 5, pavement resurfacing, reconstruction,
shoulders and guardrail on CH 14 from IL 10 to IL 54 south of DeWitt. 80 Working
Days.
45. Effingham County, Police Station Road, District 7, 1.74 miles of
bituminous surfacing and aggregate shoulders on Police Station Road from US 45
east for 1.7 miles. 35 Working Days.
46. Effingham County, Grove Avenue, District 7, 0.15 mile of the
reconstruction of one city block and new construction of one city block to
include two 13-ft wide lanes with combination curb and gutter, storm sewers and
sidewalks. 55 Working Days.
47. Effingham County, Unmarked Route, District 7, 0.75 mile reinforced
concrete pavement, combination concrete curb and gutter, drainage structures,
landscaping, highway lighting and pavement marking on Technology Drive from east
of Althoff Drive to east of Willenborg Street; and the extension of Network
Centre Drive to Technology Drive; and on Willenborg Street north and south of
Technology Drive in Effingham. 130 Working Days.
48. Iroquois County, CH 43, District 3, 3.859 miles of aggregate base course
widening and bituminous resurfacing on CH 43 from CH 40 to the south city limits
of Watseka. 30 Working Days.
49. Iroquois County, CH 15, District 3, 4.015 miles of bituminous resurfacing
of CH 15, from US 52 to Beaverville. 15 Working Days.
50. Madison County, Pierce Lane, District 8, 0.74 mile of pavement
reconstruction and vertical realignment on (Pierce Lane from IL 3 to north of
Enos Lane in Godfrey. Work includes PCC pavement, precast concrete box culvert,
concrete modular retaining walls, storm sewers, traffic signals, concrete curb
and gutter, sidewalk and pavement marking. 155 Working Days.
51. McHenry County, Huntington Drive, District 1, pavement widening,
resurfacing and reconstruction on Huntington Drive and Harnish Drive from Hanson
Road easterly to IL 31 in Algonquin. Work includes lighting, drainage and
pavement marking. 80 Working Days.
52. Montgomery County, State & Sallee streets, District 6, pavement
reconstruction on State Street from Ferdon Street to Sallee Street; and
resurfacing on Sallee Street from State Street to Washington Street in
Litchfield. Completion Date October 11, .
53. Ogle County, Ridge Road, District 2, 5.77 miles of 5" recycled hot mix
asphalt base by milling the existing surface and injecting emulsified asphalt
into the mix and a 22' wide bituminous surface mix, with 4' shoulders on Ridge
Road, from Pines Road to the north village limits of Grand Detour. 35 Working
Days.
54. Pike County, Old IL 79, District 6, 0.47 mile of leveling binder and
bituminous concrete surface course and 3 ft width aggregate wedge shoulders on
Old IL 79 approximately 6 miles south of Fall Creek. 15 Working Days.
55. Randolph County, Broad Street, District 8, 0.31 mile of reconstruction,
widening, concrete driveway, aprons, curb and gutter, sidewalks and related
improvements on Broad Street from Cherry Street to Sixth Street in Evansville.
50 Working Days.
56. Rock Island County, I-280, District 2, 4.56 miles of patching and
bituminous concrete resurfacing on Interstate 280 from the Mississippi River to
Airport Road in Milan. Completion Date October 15, 2002 Plus 05 Working Days.
57. Saline County, Old IL 13, District 9, Bituminous surface removal and
bituminous concrete resurfacing on Old IL 13 from the intersection with the new
IL 13 alignment in Harrisburg west 5.93 miles to Lighthouse Road. 20 Working
Days.
58. Sangamon County, Ridge Avenue, District 6, Pavement patching, bituminous
surface removal, leveling binder and bituminous concrete surface course and 3 ft
width aggregate shoulders on Ridge Avenue in Springfield from Dirksen Parkway
southwest 0.35 mile to the Illinois Central Railroad. 15 Working Days.
59. Sangamon County, Lincoln Street, District 6, 0.89 mile of pavement
patching, bituminous surface removal, bituminous concrete resurfacing and 2 ft
width aggregate wedge shoulders on Lincoln Street in Riverton from just west of
Old US 36 west to 7th Street. Completion Date July 29, 2002.
60. Sangamon County, I-55, District 6, 7.61 miles of pavement patching,
bituminous surface removal, bituminous concrete resurfacing, 10 ft and 8 ft
width bituminous shoulders and repairs to 7 structures along I-55 from 0.4 mile
north of I-72 east of Springfield north to 0.5 mile north of Sherman including
work at the Clear Lake Avenue and South Grand Avenue interchanges. Also,
included is the resurfacing Sangamon Avenue and the replacement of the two
structures carrying Sangamon Avenue over the I.C. Railroad. Completion Date
November 26, 2002.
61. Schuyler County, County Farm & Horney Branch, District 6, 1.12 miles of
pavement widening and resurfacing, new pavement and aggregate shoulders on
County Farm Road from US 67 west to Horney Branch Road and Horney Branch Road
west of Rushville. 70 Working Days.
62. Shelby County, Neoga Road, District 5, 1.8 miles of pavement
reconstruction on Neoga Road from one mile west of Trowbridge Road west to 3
miles northeast of Stewardson. 130 Working Days.
63. St Clair County, Carol Street, District 8, 0.54 mile of bituminous
paving, concrete curb and gutters, and concrete driveway aprons on Carol Street
from Mousette Lane to IL 157 in Cahokia. 30 Working Days.
64. Whiteside County, Pilgrim Road, District 2, 2.523 miles of 2.5"
bituminous resurfacing with an aggregate shoulder wedge along Pilgrim Road from
Lyndon Road to Yorktown Road, 3 miles west of Coleta. Completion Date August 30,
2002.
65. Winnebago County, Latham And Ralston Road, District 2, 1.90 miles of
bituminous resurfacing, adjusting inlet, manholes and other related work on
Latham Road and on Ralston Road from IL 2 to IL 251 near Machesney Park. 30
Working Days.
66. Adams County, Planville Road, District 6, Construction of a 2 span,
precast, prestressed concrete deck beam bridge and approaches carrying Planville
Road over Tourmeal Creek, 4.0 miles west of Liberty. 55 Working Days.
67. Bureau County, US 6, District 2, Removal and replacement of a double box
culvert on US 6 located approximately 1.3 miles east of IL 26 in Princeton. 20
Working Days.
68. Christian County, CH 8, District 6, removal of existing structure and
construction of a 4 span, precast, prestressed concrete deck beam bridge and
approaches carrying CH 8 over Lake Taylorville, 3.5 miles west of Owaneco. 50
Working Days.
69. Cook County, 143rd Street, District 1, Construction of a new dry land
bridge carrying 143rd Street over a sewer east of US 45 in Orland Park.
Completion Date August 31, 2002 Plus 05 Working Days.
70. DuPage County, Gartner Road, District 1, complete superstructure
replacement with a three span, continuous wide flange steel beam superstructure
with a composite concrete deck and approaches carrying Gartner Road over West
Branch of DuPage River in Naperville. Completion Date October 15, 2002 Plus 10
Working Days.
71. Effingham County, Crystal Club Road, District 7, removal of existing
structure and construction of a three span, precast, prestressed concrete deck
beam bridge and approaches carrying Crystal Club Road over Salt Creek one mile
west of Teutoplis 35 Working Days.
72. Fayette County, US 51, District 7, removal and replacement of the
superstructures, approach pavement and guardrail at the bridges carrying US 51
over the Kaskaskia River at the Conrail Railroad in Vandalia. 130 Working Days.
73. Fayette County, TR 518, District 7, removal of existing structure and the
construction of a single span, precast prestressed concrete deck beam bridge and
aggregate approaches carrying TR 518 over Little Moccasin Creek, two miles east
of Wrights Corner. 25 Working Days.
74. Gallatin County, Saline Mine Road, District 9, Construction of a single
span, precast, prestressed, concrete deck beam bridge carrying CH 8, Saline Mine
Road, over tributary to Ohio River, 3.5 miles south of Shawneetown. 30 Working
Days.
75. Jackson-Perry Counties, North Mudline Road, District 9, Construction of a
two span, precast, prestressed concrete deck beam bridge with aggregate
approaches carrying CH2, North Mudline Road over tributary to Beaucoup Creek
approximately 1.5 miles south of IL 13/127. 50 Working Days.
76. Lee County, Lost Nation Road, District 2, replacing the bridge deck beams
and repair the substructure elements, railing and guardrail on the structure
carrying Lost Nation Road over Franklin Creek, 3 miles N.E. of Dixon. Completion
Date July 31, 2002.
77. Piatt County, TR 39, District 5, removal of existing structure and
construction of a single span, precast, prestressed concrete deck beam bridge
and aggregate approaches carrying TR 39 over Goose Creek approximately 2 miles
northeast of Deland. 25 Working Days.
78. Stephenson County, IL 73, District 2, Removal and replacement of the
structure carrying IL 73 over a tributary to Yellow Creek in Pearl City. 65
Working Days.
79. White County, TR 413, District 7, Construction of a 3 span, precast
concrete bridge slab, aggregate surface course and earthwork carrying TR 413
over Sandy Slough 2.5 miles east of New Haven. 30 Working Days.
80. Winnebago County, Riverside Boulevard, District 2, replacement of pin and
link connections, sidewalk removal, reinforced concrete deck and a jersey
barrier type parapet on a six span bridge carrying Riverside Boulevard over the
Rock River in Loves Park. 150 Working Days.
81. Winnebago County, IL 251, District 2, Removal and replacement of the
structure carrying IL 251 over Spring Creek located in Rockford. Completion Date
August 16, 2002.
82. Winnebago County, Blomberg Road, District 2, removal of existing
structure and construction of a three span, steel I-beam structure and
approaches carrying Blomberg Road over Kishwaukee River, approximately 3 miles
south of Cherry Valley. 180 Working Days.
83. Woodford County, CH 5, District 3, Construction of a 3 span, precast,
prestressed concrete deck beam bridge carrying CH 5 over branch of Panther
Creek, 0.5 mile north of Secor. 30 Working Days.
84. Cook County, Schaumburg Road, District 1, modernization of pedestrian
signals at 11 locations on Schaumburg Road from Knollwood Drive to Meacham Road
in Schaumburg. Work also includes pavement marking, sidewalk and reoptimization
of traffic signal timing. 45 Working Days.
85. Cook County, Willow Springs Road, District 1, Traffic signal
modernization at the intersections along Willow Springs Road from 75th Street to
German Church Road in Willow Springs. 35 Working Days.
86. Cook County, IL 58 (Golf Road), District 1, Traffic signal modernization
at the intersection of IL 58 (Golf Road) and Mt. Prospect Road in Des Plaines.
35 Working Days.
87. Cook County, US 12/45 & IL 72, District 1, Traffic signal modernization
at the intersection of US 12/45 and IL 72 in Rosemont. 35 Working Days.
88. Cook County, Halsted Street, District 1, new street lighting along
Halsted Street, from Joe Orr Road to Holbrook Road in Chicago Heights. 55
Working Days.
89. DuPage County, Butterfield & York Rds, District 1, intersection
improvement at York Rd at Lexington Street; and traffic signal modernization on
Butterfield Road and Commonwealth Lane in Elmhurst. Work includes roadway
widening, resurfacing, storm sewers and pavement marking. Completion Date
September 30, 2002 Plus 10 Working Days.
90. Ford County, IL 115, District 3, Installation of two flashing beacons on
existing stop signs at the intersection of IL 115 and IL 54 in Roberts (two
locations). 20 Working Days.
91. Lake County, IL 21, District 1, Traffic signal modernization at the
intersection of IL 21 at IL 60 (Town Line Road) in Vernon Hills. 35 Working
Days.
92. Madison County, I-255, District 8, The replacement of light poles along
I-255 and I-270 at IL 111 at Pontoon Beach. 20 Working Days.
93. McLean County, College Avenue, District 3, widening and rehabilitating
the existing pavement, installing new traffic signals and equipment, and other
miscellaneous work at the intersection of College Avenue FAU Route 6352 and
University Street in Normal. Completion Date August 14, 2002 Plus 05 Working
Days.
94. Sangamon County, MacArthur Blvd & South Grand Ave, District 6,
Interconnect and traffic signal modernization of the traffic signals along
MacArthur Boulevard from Highland Avenue to South Grand Avenue and on South
Grand Avenue from MacArthur Boulevard to Walnut and Holmes Avenue in
Springfield. 90 Working Days.
95. Will County, ILL 53, District 1, installation of ornamental light poles
and luminaries on Historic Route 66 (IL 53 Bridge) over the East Channel of the
Kankakee River in Wilmington. 15 Working Days.
96. Champaign-Vermilion Counties, Various Routes, District 5, 9.65 miles of
routing and sealing of longitudinal joints and traverse crack various locations
in Champaign and Vermilion Counties. 35 Working Days.
97. Livingston County, IL 23, District 3, Removal and replacement of the
wearing surface on the structure carrying IL 23 over Long Point Creek 3.5 miles
south of IL 17 near Long Point. 25 Working Days.
98. Cook County, Lemoyne And Hirsch Streets, District 1, removal and
replacement of curb and gutter and PCC sidewalk, drainage structures and related
work on LeMoyne Street from Wolf Road to 43rd Street; on Hirsch Street from Carl
to Mannheim Road; and on Dodd/Morse Drive from Victoria Road to Harold Avenue in
Northlake. 45 Working Days.
99. Marion County, Various Routes, District 7, 0.27 mile of removal and
replacement of bituminous concrete wearing surface at 6 locations on IL 161
between Centralia and I-57; 0.35 mile of bituminous concrete surface and binder
courses and 3 ft width aggregate shoulders on Kinoka Road north of Patoka; and
0.60 mile of bituminous surface removal and bituminous concrete resurfacing on
Old US 51 in Patoka. 25 Working Days.
100. Peoria County, I-74, District 4, Supplying tangent piles for the
construction of retaining walls along I-74 from Knoxville through Adams Street
in Peoria. Completion Date January 06, 2003.
101. DeWitt-Piatt-Macon Counties, Various Routes, District 5, 12.2 miles of
routing and sealing longitudinal joints and tranverse cracks at various
locations in DeWitt, Macon and Piatt Counties. 35 Working Days.
102. Coles-Douglas-Edgar Counties, Various Routes, District 5, 39.3 miles of
routing and sealing longitudinal joints and tranverse cracks various locations
in Coles, Douglas and Edgar Counties. 30 Working Days.
103. Various Counties, Various Routes, District 6, repair of thermoplastic,
hot spray, thermoplastic a polyurea pavement marking lines, letters and symbols
and the removal of existing pavement markings on various throughout District 6.
Completion Date November 30, 2002.
104. Various Counties, Various Routes, District 7, Variable width bituminous
concrete overlays at the following locations: (1) on I-70 between the Kaskaskia
and Camp Creek Bridges east of Vandalia (2) on IL 33 in Wheeler and (3) on US 50
west and east of the Richland/Lawrence County line. 40 Working Days.
105. Various Counties, Various Routes, District 7, replacing reflectorized
guardrail markers, bridge rail markers, barrier wall markers and terminal
markers on various routes throughout District 7. Completion Date December 31,
2002.
106. Effingham-Fayette-Jefferson Counties, I-57, I-64, I-70, District 7,
Pavement patching at 6 locations on interstates 57/70, 57,70 and 64 in
Effingham, Fayette and Jefferson Counties. 75 Working Days.
107. Various Counties, Various Routes, District 8, replacing reflectorized
guardrail markers, bridge rail markers, barrier wall markers and terminal
markers on various routes throughout District 8. Completion Date December 31,
2002.
108. Various Counties, Various Routes, Repairing or replacing damaged or
deteriorated overhead sign structure components and supports on various
throughout Districts 1, 2, 4, 7 and 8. Completion Date May 31, 2003.
109. Various Counties, Various Routes, Statewide, repairing or replacing
damaged sign components, furnishing, or furnishing and installing new signs and
supports or replacing damaged overhead sign structure components and end
supports on various routes statewide. Completion Date June 30, 2003.
110. Vermilion County, Various Routes, District 5, Cleaning and painting of
seven structures located on various routes in Vermilion County. 110 Working
Days.
111. Champaign County, US 150, District 5, 2.14 km of bituminous concrete
widening and resurfacing with bi-directional lanes on US 150 from University
Avenue to IL 1 in Urbana. Includes improvements to the intersections and
railroad approach Completion Date October 31, 2003 Plus 10 Working Days.
112. Cook-DuPage Counties, I-55, District 1, 7.10 miles of milling and
bituminous concrete surface on I-55 from Lemont Road to I-294 in Burr Ridge,
Indian Head Park and Darien. Completion Date June 15, 2003 Plus 10 Working Days.
113. DuPage County, I-55 Frontage Roads, District 1, 7.93 miles of milling
and bituminous concrete surface on I-55 Frontage Roads at 4 locations in Damien,
Lemont, Willowbrook and Burr Ridge 50 Working Days.
114. DuPage County, IL 38, District 1, 3.22 miles of milling and bituminous
concrete surface on IL 38 from Finley Road to Villa Avenue in Lombard and Villa
Park. 50 Working Days.
115. Jersey County, Otterville Road, District 8, 3.583 miles of bituminous
resurfacing, widening of aggregate shoulders, drainage corrections and related
work on Otterville Road from Otterville to IL 3. 110 Working Days.
116. JoDaviess County, US 20 (EB), District 2, 0.142 mile of upgrading the
existing roadway by providing a right turn lane on US 20 eastbound as well as
widening the returns on Frentress Lake Road located near East Dubuque. 25
Working Days.
117. Kendall County, US 34, District 3, 2.33 km of reconstruction of US 34
from east of the Douglas Road intersection of US 30 in Oswego. Includes
construction from two lanes to four thru lanes and a bi-directional lane.
Completion Date June 15, 2003 Plus 15 Working Days.
118. Logan County, Bl I-55 (Kickapoo Street), District 6, 1.65 miles of
pavement patching, bituminous surface removal, variable width PCC base course,
bituminous concrete resurfacing and combination concrete curb and gutter on
Kickapoo Street in Lincoln from Lincoln Parkway to Keokuk Street. Also included
is the modernization of the traffic signals at the intersection of Kickapoo
Street and Keokuk Street. Completion Date October 15, 2002.
119. Madison County, Governors' Parkway, District 8, In Glen Carbon, 0.5
kilometer of new pavement with curb an gutter for Governor's Highway beginning
at relocated IL 159 and extends to the east. 95 Working Days.
120. Madison County, Relocated IL 159, District 8, 3.27 kilometers of new
pavement construction for relocated IL 159 and the construction of a nature/bike
trail from Center Grove Road to Vandalia Street in Edwardsville and Glen Carbon.
Also, included is traffic signal work at the intersections of relocated IL 159
with Schwarz and Vandalia Street. Completion Date July 31, 2004.
121. Ogle County, IL 72, District 2, 7.42 miles of bituminous concrete
resurfacing and a culvert replacement on IL 72 between Mount Morris Road and IL
2, west of Byron. 85 Working Days.
122. Peoria County, IL 8 & Farmington Rd., District 4, 3.1 miles of surface
maintenance of IL 8 from west of Pottstown Road Main Street in Peoria, including
1,800 feet on Farmington Road. 25 Working Days.
123. Peoria County, Airport Road, District 4, Improvement consists of a four
lane PCC pavement median, storm sewers, combination concrete curb and gutter and
pavement marking on Airport Road from Garfield Avenue to Smithville Road near
Greater Peoria Airport. 225 Working Days.
124. Peoria County, Airport Road, District 4, 0.332 kilometers of grading,
clearing, storm sewers, traffic signals and a four lane PCC pavement on Airport
Road and Garfield Avenue in Peoria. 160 Working Days.
125. Pike County, IL 96, District 6, Pavement patching, bituminous surface
removal, bituminous concrete resurfacing, 1 ft width bituminous shoulders and 3
ft width aggregate wedge shoulders on IL 96 from Pleasant Hill northwest 12
miles to Dutch Creek. Completion Date October 04, 2002.
126. Rock Island County, 23rd Avenue, District 2, pavement removal and
replacement, curb and gutter, sidewalks, driveway and storm sewers on 23rd
Avenue from 44th Street to 48th Street in Moline. 120 Working Days.
127. Saline County, US 45, District 9, On US 45 from south of Public Street
in Muddy and extending 4.41 miles northeast to north of Trolley Road in
Eldorado. Construction of two additional through lanes, the removal of eight
existing structures and the construction of six new structures, pavement
patching and the resurfacing of the existing pavement. Completion Date November
15, 2003.
128. Stephenson-Winnebago Counties, IL 75, District 2, 19.0 miles of
bituminous concrete resurfacing at two locations on IL 75 between Freeport and
IL 70 near Freeport. 15 Working Days.
129. Vermilion County, IL 1, District 5, Intersection improvement at the
intersection of IL 1 and Bismarck Road north of Danville. Completion Date
October 01, 2002 Plus 10 Working Days.
130. Vermilion County, IL 49, District 5, 0.40 mile of patching on IL 49
north of TR 69 near Ellis. 15 Working Days.
131. Will-DuPage Counties, I-55, District 1, 9.30 miles of milling and
bituminous concrete surface on I-55 from IL 126 to Lemont Road in Bolingbrook,
Romeoville Woodbridge, Darien, Lemont, Downers Grove and Lockport. Completion
Date August 29, 2002 Plus 05 Working Days.
132. Will County, Van Dyke Boulevard, District 1, 0.51 miles of pavement
reconstruction, widening, resurfacing, storm sewers and landscaping on Van Dyke
Boulevard from 143rd Street north to West Norman Drain in Plainfield.
Completion Date November 15, 2002
133. Winnebago County, I-39 & US 20, District 2, 0.75 mile of milling and
bituminous concrete resurfacing on the I-39 northbound off ramp onto US 20
Bypass westbound, the Harrison Avenue ramp onto I-39 northbound/US 20 westbound
near Rockford. 15 Working Days.
134. Winnebago County, US 20 frontage road. District 2, 1.0 mile of
bituminous resurfacing of the north frontage road along US 20 between Weldon
Road and Falconer Road, west of Rockford. 15 Working Days.
135. Bureau County, I-80, District 2, Removal and replacement of three
structures carrying Interstate 80 over Kin Creek, Barbara Ditch and Abbott Ditch
near Mineral. 175 Working Days.
136. Carroll, IL-Jackson, IA Counties, US 52/IL 64, District 2, Removal of
the paint and painting of the steel elements on the structure carrying US 52/IL
64 over the Mississippi River at Savanna. Completion Date December 31, 2002 Plus
05 Working Days.
137. Henry County, IL 78, District 2, Removal and replacement of the
structure carrying IL 78 over an unnamed creek located south of IL 92 north of
Hooppole. 50 Working Days.
138. Iroquois County, US 45, District 3, Removal and replacement of the
structure carrying US 45 over Spring Creek located 0.3 mile south of Del Rey
Road near Del Rey. Completion Date December 15, 2002 Plus 15 Working Days.
139. Knox County, Prairie Street, District 4, The removal and replacement of
the existing superstructure, modifications to the existing abutments and 43
lineal feet of approach roadway reconstruction at the bridge carrying Prairie
Street over Cedar Creek in Galesburg. 30 Working Days.
140. Knox County, Unmarked Route, District 4, removal and replacement of
existing bridge superstructure with a precast, prestressed concrete deck beam
and bituminous concrete overlay on Chambers Street between Peck Street and E
Grove Street Cedar Creek in Galesburg. 40 Working Days.
141. Ogle County, IL 64, District 2, Removal and replacement of the structure
carrying IL 64 over Elkhorn Creek located east of Brookville. Completion Date
November 15, 2002 Plus 05 Working Days.
142. Peoria County, CH 40, District 4, Construction of 10' x 9' double box
culvert, approach roadway realignment and other collateral work carrying CH 40
over Prince Run Creek, 0.5 mile south of Princeville. 75 Working Days.
143. Sangamon County, Old IL 4, District 6, The removal of the existing
single span structures carrying Old IL 4 over Panther Creek located 1.0 mile and
1.2 miles north Auburn and the replacement with four cell 3.0 m x 3.6 m concrete
box culverts. Completion Date October 04, 2002.
144. Madison County, IL 159, District 8, Traffic signal modifications at the
intersection of IL 159 and Wickliff Avenue in Collinsville. 30 Working Days.
145. Tazewell-Woodford Counties, Various Routes, District 4, Installation of
new LED sections in existing signal heads in Creve Coeur, East Peoria, Metamora,
Morton, North Pekin, Pekin and Washington. 40 Working Days.
146. Carroll County, US 52/IL 64, District 2, full depth bituminous patching
near the intersection of US 52/IL 64 and IL 73 south of Lanark. 15 Working Days.
147. Cook-DuPage-McHenry Counties, Various Routes, District 1, Scour
countermeasures at 7 various locations. 55 Working Days.
148. Clark County, Archer Avenue, District 5, Construction of period type
lighting, storm sewers and reconstruct of sidewalks along Archer Avenue from 4th
Street to Michigan in Marshall. 65 Working Days.
149. DuPage County, IL 64 (North Ave.), District 1, Landscaping improvement
consisting of planting trees, shrubs and perennials along 12.7 miles of IL 64
(North Avenue) in Carol Stream and West Chicago. Completion Date October 31,
2004.
150. Edgar County, Clinton Road, District 5, 8.03 miles patching on Clinton
Road from TR 227B to the Indiana State Line. 20 Working Days.
151. Effingham County, US 40, District 7, One mile west of Effingham on US 40
the work will consist of constructing a corrugated steel pipe culvert with steel
end sections. 15 Working Days.
152. Henry County, IL 17, District 2, 0.5 mile of pavement patching, milling
and bituminous resurfacing on IL 17 and on the IL 17 service road at the
intersection with Interstate 74. 20 Working Days.
153. JoDaviess County, US 20, District 2, 10.1 miles of pavement patching on
US 20 between East Dubuque and IL 84. 15 Working Days.
154. McDonough County, IL 61, District 4, .03 mile of concrete pavement with
subbase granular French drain and pipe underdrains on IL 61 located 1.9 miles
south of Colmar. 20 Working Days.
155. Peoria County, I-74, District 4, Demolition of a house (1416 N. Linn
St.) near I-74 in Peoria. 15 Working Days.
156. Peoria-Tazewell Counties, Various Roads, District 4, Demolition of three
houses; 10226 N. Knoxville Avenue, 1623 N. Valley Avenue includes a garage and
1976 E. Washington Street in Peoria and East Peoria. 25 Working Days.
157. Rock Island County, 27th Street, District 2, Cleaning and painting the
27th Street bridge over the Rock River in Moline. Completion Date August 31,
2002 Plus 05 Working Days.
158. Rock Island County, Friedens Road & IL 5 frontage road, District 2, 1.4
miles of patching and resurfacing on Friedens Road (a frontage road) and on IL 5
Frontage Road near the interchange of Interstate 80 and IL 5. 15 Working Days.
159. Rock Island County, I-74 frontage roads, District 2, 0.76 mile of
patching and bituminous resurfacing on 19th Street, 27th Street and 7th Avenue
in Moline. 40 Working Days.
160. Tazewell County, I-74, District 4, Supplying tangent and HP piles for
the construction of various structures located along Interstate 74 from the
Illinois River to Pinecrest Drive in East Peoria. Completion Date January 07,
2003.
161. Tazewell County, Various Routes, District 4, 10.88 miles of routing and
sealing on Interstate 74 from the bridge over the railroad tracks east of Morton
to mile marker 105, IL 9 from Pekin to Chestnut Street in Tremon,t and IL 29
from Manito Road to Hurt Road. 15 Working Days.
162. Various Counties, Various Routes, Districts 2 & 3, Repairing various
widths of thermoplastic, preformed plastic, preformed thermoplastic, epoxy, hot
spray thermoplastic and polyurea pavement marking lines, letters and symbols and
the removal of existing markings on various routes throughout Districts 2 and 3.
Completion Date June 30, 2003.
163. Various Counties, Various Routes, District 4, Washing of six bridges at
four different locations on various routes over the Illinois River. 25 Working
Days.
164. Various Counties, Various Routes, Districts 8 & 9, The repairing of
various widths of thermoplastic, preformed plastic, preformed thermoplastic,
epoxy, hot spray thermoplastic and polyurea pavement marking lines, letters and
symbols and the removal of existing pavement markings on various routes in
Districts 8 and 9. Completion Date June 30, 2003 Working Days.
165. Peoria-Henderson Counties, Various, District 4, Cleaning and painting of
the structural steel on 5 structures on various routes. 65 Working Days.
166. Various Counties, Various Routes, District 4, Scour mitigation at
various structures in Knox, Peoria and Tazewell Counties 120 Working Days.
167. Various Counties, Various Routes, Districts 4 & 5, Repairing various
widths of thermoplastic, preformed plastic, preformed thermoplastic, epoxy, hot
spray thermoplastic and polyurea pavement marking lines, letters and symbols and
the removal of existing markings on various routes throughout District 4 and 5.
Completion Date June 30, 2003.
168. Edwards-Wabash-Clay Counties, Various Routes, District 7, 0.75 mile of
bituminous surface removal and bituminous concrete resurfacing on Old IL 130 in
Grayville; 0.68 mile bituminous concrete surface course and 3 ft width aggregate
shoulders on Old IL 15 north of Browns; 0.64 mile of bituminous concrete surface
and 3 ft width aggregate shoulders on Old IL 15 approximately 1.5 miles west of
Albion; 0.09 mile of bituminous surface removal and bituminous concrete
resurfacing on US 45 west of Flora; and 0.20 mile of bituminous surface removal
and bituminous concrete resurfacing on US 50 west of Flora. 35 Working Days.
169. Various Counties, Various Routes, District 7, The routing, cleaning and
sealing of transverse and longitudinal reflected cracks and joints in the
existing pavements on various routes throughout District 7. 65 Working Days.
170. Various Counties, Various Routes, District 7, The placement of a
bituminous surface treatment, class A-1 at 9 locations on various routes
throughout District 7. 25 Working Days.
171. Various Counties, Various Routes, District 9, The cleaning and painting
portions of the structural steel on eleven bridges on various routes throughout
District 9. 105 Working Days.
172. Whiteside County, Garden Plain Road, District 2, 10.4 miles of
intermittent bituminous resurfacing on Garden Plain Road between IL 84 and US 30
in Morrison. 15 Working Days.
173. Winnebago County, IL 2, District 2, Drainage correction/storm sewer
improvements at IL 2 and Kelley Creek 0.1 mile south of IL 75 in South Beloit.
40 Working Days.
174. Winnebag0 County, I-39, District 2, Cleaning and painting of three
structures on Interstate 39, northbound over US 20, southbound ramp over US 20
from westbound US 20 and southbound on-ramp over Linden Road from eastbound US
20. Completion Date August 31, 2002 Plus 05 Working Days.
175. Winnebago County, IL 2, District 2, Cleaning and painting bridges at two
locations: IL 2 over the Rock River near Rockton and Interstate 39 (northbound)
Linden Road at the US 20 Bypass interchange. Completion Date August 15, 2002
Plus 05 Working Days.
176. Champaign-Vermilion Counties, US 150, District 5, 7.5 miles of
bituminous resurfacing on US 150 from Main Street in Saint Joseph to IL 49 in
Saint Joseph and Ogden. Completion Date September 30, 2002.
1A. Lansing Municipal Airport, Lansing, Cook County, Construct, Light and
Mark Runway 18/36 (4000' x 75'); Partial Parallel Taxiway And Connecting
Taxiways (Phase 2); Install Airfield Lighting Vault Building And Equipment;
Install PAPI System Runway 18/36.
2A. Quad-City International Airport, Moline, Rock Island County, GA Ramp
Expansion - Phase 1.
3A. Southern Illinois Airport, Carbondale, Jackson County, Hangar 6 Apron
Rehabilitation.
4A. DELETED
5A. Decatur Airport, Decatur, Macon County, Install Security Fencing In
Frontal Area.
6A. Pinckneyville-DuQuoin Airport, Pinckneyville, Perry County, Rehab. &
Expand Apron, Replace Beacon.
7A. Aurora Municipal Airport, Aurora, Kane County, Construct Partial Parallel
Taxiway to Runway 9/27; Rehabilitate Terminal (Contract 1).
8A. Southern Illinois Airport, Carbondale, Jackson County, Runway 6/24
Overlay.
9A. Pekin Municipal Airport, Pekin, Tazewell County, Rehabilitate and Mark
Runway 9/27.
10A. Greater Peoria Regional Airport, Peoria, Peoria County, Rehabilitate
T-Hangar Taxiways.
11A. Tri-Township Airport, Savanna, Carroll County, Rehabilitate Runway
13/31, Taxiway And Apron.
12A. Kewanee Municipal Airport, Kewanee, Henry County, , Bituminous Overlay
to Runway 1/19.
13A. DELETED
14A. Freeport-Albertus Airport, Freeport, Stephenson County, Rehabilitate,
Mark And Groove Runway 6/24.
15A. Whiteside County Airport, Sterling, Whiteside County, Rehabilitate and
Mark the North Terminal Apron.
16A. DeKalb-Taylor Municipal Airport, DeKalb, DeKalb County, Reconstruction
Of Taxiway "B".
1W. Lake County, Site L-10 Storage Yard, , Construct an 8 acre storage yard
with seawall and boat ramp located off of Grass Lake Road, south of Oak Avenue
and north of Elm Tree Road and adjacent to Grass Lake. The work includes but is
not limited to the following major items of work: 10.56 acres of tree removal,
40,631 cubic yards of earth excavation, 4,850 sq ft of permanent steel sheet
piling, 152 cu yds of concrete structures, 1,450 sq yds of reinforced concrete
pavement, 8", 582 tons of asphalt paving, 5,545 sq yds of aggregate base
course,Type B, 12", 1,065 ft of storm sewer (various sizes), and 4,698 ft of
chain link fence, 6’high (Completion date of July 31, 2002 with 85 guaranteed
working days)
###
|