| FOR IMMEDIATE RELEASE | CONTACT: 217-782-6953 |
| JUNE 17, 2002 | TTY: 217-524-4875 |
SPRINGFIELD, IL, -- The Illinois Department of Transportation opened bids
on June 14, 2002 for various road and bridge
improvement projects located throughout the state. Also included were
12 aeronautics projects and 5 land reclamation projects.
Following is a list of the projects by county and the apparent low
bidder:
1. Christian County, IL 48, District 6, Pavement
patching, intermittent bituminous surface removal and bituminous concrete
resurfacing on IL 48 from Taylorville northeasterly 11.12 miles to the Macon
County Line. 15 Working Days. Merrill's Contractors, Inc., Springfield,
$158,414.
2. Clinton County, IL 161, District 8, 5.11 miles of pavement patching,
bituminous surface removal and bituminous concrete resurfacing on IL 161 from
Hanover Street in Germantown easterly to the Bartelso Spur. 45 Working Days. The
Kilian Corp. & Asphalt Sales and Products, Inc., Mascoutah, $404,482.
3. Cook County, 111th Street, District 1, 1.49 miles of milling and
bituminous concrete surface on 111th Street from IL 7 (Southwest Highway) to IL
43 (Harlem Avenue) and from Harlem Ave to Ridgeland Ave, in Worth. 40 Working
Days. K-Five Construction Corp., Lemont, $494,961.
4. Cook County, IL 83/147th Street, District 1, 0.39 mile of bituminous
concrete surface and pavement patching on IL 83/147th Street from I-57 to Dixie
Highway in Posen and Harvey. 25 Working Days. K-Five Construction Corp., Lemont,
$432,997.
5. Cook County, Chicago Road, District 1, 0.24 mile of milling, patching and
bituminous concrete surface on Chicago Road from IL 1 to Parkside Lane in
Chicago Heights. 15 Working Days. Gallagher Asphalt Corp., Thornton, $180,702.
6. Cook County, US 6 (159th Street), District 1, 5.42 miles of milling and
bituminous concrete surface on US 6 (159th Street) from Wolf Road (IL 7/US 6) to
Harlem Avenue (IL 43) in Orland Park, Orland Hills and Tinley Park 45 Working
Days. Central Backtop Co., Inc., LaGrange, $3,177,667.
7. Fulton County, US 24, District 4, 6.49 miles of milling, bituminous
concrete surface patching and shoulder work on US 24 from IL 97/IL 100 (Main
Street) in Lewistown to Little America. 30 Working Days. United Paving &
Construction, Inc., Canton, $1,024,400.
8. Gallatin County, IL 13 & IL 142, District 9, The reconstruction of the
intersection of IL 13 and IL 142 northwest of Shawneetown. The work will consist
of the removal of the existing concrete pavement, construction of new PCC
pavement, bituminous shoulders, grading and seeding. 50 Working Days. E.T.
Simonds Construction Co., Carbondale, $483,214.
9. Grundy County, IL 47, District 3, Construction of a left turn lane and
radius improvements on IL 47 at the east leg of the Northbrook Drive
intersection south of I-55 in Dwight. 30 Working Days. Johnson Blacktop, Inc.,
Elburn, $154,622.
10. Grundy County, I-55 & OR 66, District 3, 5.39 miles of bituminous
concrete resurfacing on Interstate 55 and Old Route 66 from one mile northeast
of the IL 47/I-55 interchange at Dwight northeasterly to the Gardner
interchange. Completion Date June 01, 2003 Plus 15 Working Days. D.
Construction, Inc., Coal City, $8,310,731.
11. Jefferson County, IL 37, District 7, Pavement patching, bituminous
surface removal, bituminous concrete resurfacing and th aggregate wedge shoulder
on IL 37 from TR 298 north of Mt. Vernon extending 3.5 miles north to the South
Railroad. 30 Working Days. Southern Illinois Asphalt Co., Inc., Marion,
$394,281.
12. Johnson County, IL 146, District 9, 2.39 miles of pavement patching,
bituminous surface removal, bituminous concrete resurfacing, bituminous
shoulders and aggregate wedge shoulders on IL 146 from the west edge of Vienna
east to east of I-24. 40 Working Days. Southern Illinois Asphalt Co., Inc.,
Marion, $741,500.
13. Lake County, IL 21 (Milwaukee Avenue), District 1, 1.48 miles of milling
and bituminous concrete surface on IL 21 (Milwaukee Avenue) from US 41 (Skokie
Highway) to north of Washington Street in Gurnee. 30 Working Days. Peter Baker &
Son Co., Lake Bluff, $496,602.
14. LaSalle County, US 52 & I-39, District 3, Bridge rehabilitation of a
structure on US 52 at I-39 and a structure on I-39 located 1.30 miles north of
US 52, all west of Troy Grove. 140 Working Days. Central Illinois Contracting
Corp., LaSalle, $598,128.
15. Livingston County, I-55, District 3, 6.98 miles of bituminous concrete
resurfacing and structure repairs on I-55 from the McLean County line to 1.7
miles south of IL 116 at Pontiac. Completion Date July 01, 2003. Tobey's
Construction & Cargage, Inc. & T&T Cartage, Inc., Herscher, $9,757,864.
16. Macoupin County, IL 111, District 6, Pavement patching, bituminous
surface removal, bituminous concrete resurfacing and aggregate wedge shoulders
on IL 111 from US 267 in Medora northeast 11.19 miles. 60 Working Days. Charles
E. Mahoney, Belleville, $1,528,273.
17. Marion County, Patoka Road, District 7, 0.87 mile of bituminous concrete
binder and surface courses and aggregate wedge shoulders on Patoka Road west of
Kinmundy. 15 Working Days. Howell Paving, Inc., & General Contractors, Inc.,
Mattoon, $105,502.
18. Mason County, IL 97, District 6, 4.23 miles of pavement patching,
bituminous surface removal, bituminous concrete resurfacing, bituminous shoulder
and aggregate wedge shoulders on IL 97 from north of Long Branch Road (TR 165)
to north of the Menard County line, southeast of Kilbourne. 40 Working Days.
Valley Improvement Construction Co., Bluffs, $629,371.
19. WITHDRAWN
20. McLean County, US 150, District 3, 5.35 miles of milling and bituminous
resurfacing on US 150 from 0 south of Leroy to the McLean/DeWitt County line.
Completion Date October 15, 2002 Plus 05 Working Days. Rowe Construction Co.,
Bloomington, $576,304.
21. McLean County, I-55, District 3, 9.85 miles of patching and bituminous
concrete resurfacing on I-55 from just south of the Lexington interchange to the
Livingston County Line near Chenoa. Completion Date October 01, 2003. Rowe
Construction Co., Bloomington, $18,848,778.
22. McLean County, US 24, District 3, Intersection improvement including
right turn lanes, raised islands, milling and bituminous concrete surface on US
24 from I-55 to Old Route 66 to Chenoa. 25 Working Days. H.J. Eppel & Co.,
Pontiac, $209,360.
23. Montgomery County, I-55, District 6, 12.20 miles of pavement patching,
bituminous surface removal, bituminous concrete resurfacing and resurfacing the
shoulders, grading ditches and aggregate wedge shoulders on I-55 between
Farmersville and Litchfield. Also included in the project is the rehabilitation
of three bridges. Completion Date August 15, 2003. The Kilian Corp. & Asphalt
Sales & Products, Inc., Mascoutah, $9,976,126.
24. Scott-Morgan Counties, IL 100, District 6, 3.87 miles of pavement
patching, bituminous surface removal, bituminous concrete resurfacing and
aggregate shoulders on IL 100 between Bluffs and IL 104. 30 Working Days.
Illinois Valley Paving Co., Springfield, $598,082.
25. Morgan County, Old US 36, District 6, 0.63 mile of pavement patching,
leveling binder and bituminous concrete surface course and aggregate wedge
shoulders on Old US 36, approximately 4.25 miles east of Jacksonville. 15
Working Days. Illinois Valley Paving Co., Springfield, $73,215.
26. Sangamon County, West Frontage Road, District 6, 0.63 mile of bituminous
surface plant mix and aggregate wedge shoulders on the west frontage road of Old
US 66 between St. Joseph Street and Hazel Dell Road on the south side of
Springfield. 15 Working Days. P.H. Broughton & Sons, Inc., Springfield, $92,309.
27. Whiteside County, Moline Road, District 2, 9.27 miles of milling and
bituminous concrete surface on Moline Road from IL 78 to I-88 near Rock Falls.
50 Working Days. Northwest Illinois Construction Co., Rock Falls, $1,205,659.
28. Will County, Manhattan-Monee Road, District 1, 1.28 miles of milling and
bituminous concrete surface on Manhattan-Monee Road from US 52 to Cedar Road in
Manhattan 30 Working Days. Gallagher Asphalt Corp., Thornton. $294,222.
29. White-Gallatin Counties, IL 141 & US 45, District 7, pavement patching,
bituminous surface removal, bituminous concrete resurfacing and aggregate wedge
shoulders on IL 141 from US 45 to IL 1. 60 Working Days. E.T. Simonds
Construction Co., Carbondale, $965,523.
30. Cook County, I-55, District 1, Bridge repairs consisting of concrete deck
and steel beam removal and replacement and beam straightening on the Harlem
Avenue bridge over I-55 in Forest View, and First Avenue over I-55 in Summit 55
Working Days. Herlihy Mid-Continent Co., Romeoville, $444,819.
31. Cook County, Western Avenue, District 1, Longitudinal bridge joint
closure at the structure carrying Western Avenue over I-290 and the CTA Railroad
in Chicago. 20 Working Days. Lorig Construction Co., Des Plaines, $121,080.
32. Jackson County, IL 3, District 9, The removal of the IL 3 structure over
a drainage ditch 1.25 miles south of Gorham and replacement with a single span,
composite concrete and steel wide flange beam bridge with a 36 ft width roadway.
100 Working Days. E.T. Simonds Construction Co., Carbondale, $668,884.
33. Livingston County, IL 116, District 3, milling and bituminous concrete
surface on IL 116 located 9.40 miles west of I-55 at Pontiac. 40 Working Days.
Tobey's Construction & Cartage, Inc., Herscher, $106,171.
34. Piatt County, I-72, District 5, Repairing the deck on the I-72 bridge
over the Sangamon River, north of Monticello. 60 Working Days. Sangamo
Construction Co., Springfield, $1,140,154.
35. Various Counties, Various routes, District 6, replacing existing signal
heads with new LED heads at the following intersections: (1) IL 99/West Cross
and US 24 in Mt. Sterling (2) Clinton Street and US 67 in Rushville. (3) US 136
and IL 96 in Hamilton (4) US 136 and War Road in Hamilton (5) Jackson Street and
Washington Street in Pittsfield (6) Memorial Street and Washington Street in
Pittsfield (7) Washington Street a Madison Street in Pittsfield, (8) and US 36
and Shetland Drive in Pittsfield. Completion Date November 01, 2002. Supreme
Electric Co., Quincy, $98,379.
36. Madison County, IL 3, District 8, Traffic signal modifications at the
intersection of IL 3 and Hawthorne Street in Hartford. 15 Working Days. RL
Electrical Service, Inc., Staunton, $13,074.
37. Marion County, US 50, District 7, The installation of traffic signals on
US 50 at the I-57 interchange at Salem. Completion Date June 01, 2003. J.H.
Moore, Inc., Effingham, $180,657.
38. Various Counties, Various Routes, District 6, The replacement of the
existing traffic signal heads with new LED heads at the following intersections:
(1) Dearborn Street and Water Street in Havana, (2) Dearborn and US
136/Promenade Street in Havana, (3) IL 29 and Andrew Road north of Springfield,
(4) IL 97 and Bradfordton Road west Springfield, (5) IL 97 and IL 123 in
Petersburg, and (6) Seyborn Avenue/IL 185 in Taylor Springs. Completion Date
November 01, 2002. Egizii Electric, Inc., Springfield, $78,305.
39. St. Clair County, IL 158/177, District 8, The installation of fiber-optic
signs on the traffic signal mast arms at the intersection of Greenmount Road and
IL 158/177 at the east edge of Swansea. 15 Working Days. Electrico, Inc.,
Columbia, $11,695.
40. Carroll County, IL 84, District 2, Raising the pavement with multiple
bituminous overlays on IL 84 for 0.54 mile, located north of Savanna near
Mississippi Palisades State Park. 15 Working Days. Civil Constructors, Inc. of
Illinois, Freeport, $179,490.
41. Cook County, IL 50 (Cicero Avenue), District 1, Landscaping improvements
along IL 50 (Cicero Avenue) at 127th Street/I-294 in Alsip. Completion Date
October 31, 2004. Del Torro Landscaping, Inc., Dundee, $634,950.
42. Cook County, Various Routes, District 1, Crack and joint sealing at
various locations in Cook County. 20 Working Days. Kenneth R. Hartman, Inc.,
Kankakee, $175,566.
43. Cook County, Chicago Road, District 1, Concrete pavement patching on
Chicago Road from Parkside Avenue to north of Joe Orr Road in Chicago Heights.
35 Working Days. Seven-D Construction Co., Chicago, $233,286.
44. Fayette County, Ramsey State Park, District 7, 5.50 miles of work on the
internal roads at the Ramsey Lake State Park northwest of Ramsey. Includes
culvert replacement, ditch cleaning, base preparation, bituminous resurfacing,
aggregate wedge shoulders, campground work, PCC sidewalks, guard posts, lighting
and pavement marking. Completion Date November 27, 2002 Plus 15 Working Days.
Howell Asphalt Co. & Howell Paving, Inc., Mattoon, $1,023,445.
45. Iroquois County, I-57, District 3, Slurry seal the existing shoulder
along the northbound and southbound lanes of I-57 for approximately 2.5 miles,
between Clifton and Ashkum. 15 Working Days. Kenneth R. Hartman, Inc., Kankakee,
$77,632.
46. Lake County, US 45, District 1, Landscape improvements along US 45 from
Buckley Road to Maple Avenue in Mundelin and Libertyville. Completion Date
October 31, 2005. Tree and Land, Inc., Sheridan, $320,043.
47. Livingston County, I-55, District 3, Cleaning and painting the existing
structure carrying CH 1 over I-55 at Odell. 30 Working Days. Venus Painting Co.,
Lake Station, IN, $143,000.
48. Rock Island County, IL 5, District 2, Drainage improvements near the IL 5
pedestrian overpass from 16th Street to 7th Street in Moline. 15 Working Days.
Valley Construction Co., Rock Island, $183,405.
49. Union County, I-57, District 9, widening of the truck parking areas to
provide for more trucks, a new car lane, new lighting and picnic areas, new
storm sewers and landscaping at the northbound and southbound Trail of Tears
Rest Areas on I-57 east of Anna. Completion Date December 01, 2003. E.T. Simonds
Construction Co., Carbondale, $1,922,423.
50. Union County, IL 3, District 9, On the IL 3 bridge over the Big Muddy
River northwest of Jonesboro, construction of a waterproofing membrane system
and a bituminous concrete overlay on the bridge deck and the replacement of the
existing neoprene expansion joints. 25 Working Days. Sangamo Construction Co.,
Springfield, $98,376.
51. Union County, IL 146, District 9, On the IL 146 bridge over Clear Creek
west of Jonesboro, joint replacement, drain extension and elimination,
replacement of the structural steel diaphragms at the abutments and the
replacement of existing bearings. 35 Working Days. Perry County Construction
Co., Herrin, $136,790.
52. Union County, IL 146, District 9, Pavement patching, bituminous surface
removal and bituminous concrete resurfacing on IL 146 from the east side of the
Jonesboro square extending northwest 2.53 miles to the junction with IL 127. 25
Working Days. E.T. Simonds Construction Co., Carbondale, $350,697.
53. Various Counties, Various Routes, District 1, Repairing various types,
sizes and widths of pavement marking lines at various locations in the district.
Completion Date June 30, 2003. A.C. Pavement Striping Co., Elgin, $492,685.
54. Various County, Various, District 8, The installation of raised
reflective pavement markers, removing reflectors placing new reflectors and
removing damaged raised reflective pavement mark castings on various routes
throughout District 8. Completion Date June 30, 2003. P&P Construction Co.,
Riverton, $108,310.
55. Various Counties, Various Routes, District 9, The installation of raised
reflective pavement markers, removing reflectors, placing new reflectors, and
removing damaged raised pavement marker castings on various routes throughout
District 9. Completion Date June 30, 2003. P&P Construction Co., Riverton,
$60,501.
56. Alexander County, IL 146, District 9, 1.71 km of full-depth bituminous
pavement for the relocated segment and widening and resurfacing of the existing
pavement on IL 146 from the new Mississippi River Bridge near East Cape
Girardeau east to Bader Lane in East Cape Girardeau. Completion Date June 30,
2003. Southern Illinois Asphalt Co., Inc., Marion, $3,022,090.
57. Bond County, US 40, District 8, Pavement patching, bituminous surface
removal, bituminous concrete resurfacing and h aggregate wedge shoulders on US
40 from IL 127 in Greenville northeast 4.30 miles. 45 Working Days. The Kilian
Corp. & Asphalt Sales & Products, Inc., Mascoutah, $369,999.
58. Bond County, 2nd Street, District 8, 0.26 mile of leveling binder,
bituminous concrete surface course and aggregate wedge shoulders on 2nd Street
from Main Street to US 40 in Smithboro. Completion Date October 15, 2002. Mounds
Construction Co., Inc., Collinsville, $35,273.
59. Champaign County, Staley Road, District 5, 3.0 miles of milling,
bituminous concrete surface and patching on Staley Road from US 150 to IL 10
near Champaign. 15 Working Days. University Construction, Urbana, $191,902.
60. Clark County, I-70, District 5, 10.83 miles of reconstruction of
Interstate 70 from North Fork Embarras River at Martinsville to IL 1 at
Marshall. Completion Date October 31, 2003 Plus 10 Working Days. Howell Paving,
Inc., Champaign Asphalt Co. & Howell Asphalt Co., Mattoon, $44,816,472.
61. Effingham County, IL 37, District 7, 0.77 mile of bituminous surface
removal and bituminous concrete surfacing on IL 37 in Edgewood. 15 Working Days.
Howell Asphalt Co. & Howell Paving, Inc., Mattoon, $59,062.
62. Greene County, Eldred-Hillview Road, District 8, resurfacing and
aggregate wedge shoulders on Eldred-Hillview Road beginning approximately 2.0
miles south of Eldred and extending south 4.0 miles to the Jersey County Line.
Completion Date October 31, 2002. Illinois Valley Paving Co., Springfield,
$338.010.
63. Henry County, I-80, District 2, 7.96 miles of patching, bituminous
concrete resurfacing and structure rehabilitation from I-74 to west of IL 82
near Geneseo. Completion Date November 15, 2002. McCarthy Improvement Co.,
Davenport, IA, $6,138,298.
64. JoDaviess County, US 20/IL 84, District 2, 1.2 miles of reconstruction
and partial realignment on US 20/IL 84 between Gear Road and Industrial Park
Road in Galena. Completion Date October 01, 2003. Bids to be opened June 28.
65. LaSalle County, East Main Street, District 3, 0.520 mile of bituminous
surface removal and replacement, curb and gutter, sidewalk and inlets along East
Main Street from Shabbona Street to Grafton Street in Ottawa. 35 Working Days.
Len Trovero Construction, LaSalle, $210,200.
66. Logan County, IL 10, District 6, Intersection reconstruction at three
intersections on IL 10 with relocated 740th Avenue, relocated 757th Avenue,
relocated 560th Avenue and TR 85 from north of New Holland nding easterly to 2
miles west of I-55 west of Lincoln. Completion Date September 27, 2002. Illinois
Valley Paving Co., Springfield, $551,111.
67. Macon County, IL 105, District 5, 0.62 mile of bituminous concrete
resurfacing on IL 105 from 22nd Street to 26th Street in Decatur. 25 Working
Days. Dunn Co., Decatur, $188,141.
68. WITHDRAWN
69. Madison County, I-270, District 8, 5.96 miles of pavement patching,
bituminous surface removal, bituminous concrete resurfacing, bituminous shoulder
replacement and adjusting the existing guardrail on I-270 from County Ditch
Bridge west of Glen Carbon east to the interchange with I-55/70 north of Troy.
Completion Date November 01, 2002. Mounds Construction Co., Inc., Collinsville,
$2,784,782.
70. Madison County, West Delmar Avenue, District 8, 0.67 miles of pavement
patching, bituminous surface removal, leveling binder, bituminous concrete
resurfacing and aggregate wedge shoulders on West Delmar Avenue from State
Street to IL 3 in Godfrey. Completion Date October 31, 2002. Charles E. Mahoney
Co., Belleville, $133,022.
71. Madison County, Old US 66, Old 16, Williamson Rd, District 8, Resurfacing
with leveling binder and bituminous concrete surface courses and providing
aggregate wedge shoulders at the following locations: (1) Old US 66 from IL 140
in Hamel northerly 0.65 miles (2) Williamson Road from Williamson extending to
the west 1.09 miles and (3) Old Route 16 from the Madison/Macoupin County Line
extending to the south 1.2 miles. Completion Date October 31, 2002. Charles E.
Mahoney Co., Belleville, $225,859.
72. Marion County, IL 37, District 7, 11.46 miles of pavement patching,
bituminous surface removal, bituminous concrete resurfacing and aggregate wedge
shoulders on IL 37 from Cherry Street in Kinmundy to Madison Street in Salem. 60
Working Days. Howell Paving Inc. & General Contractors, Inc., Mattoon,
$1,117,557.
73. Mason County, US 136, District 6, Pavement patching, bituminous surface
removal, leveling binder, bituminous concrete resurfacing, bituminous shoulders
and aggregate shoulders on US 136 from First Street in San Jose to 0.10 mile
west of IL 29. 60 Working Days. R.A. Cullinan & Son, Inc., Tremont, $1,126,575.
74. McHenry County, IL 120, District 1, 0.37 mile of milling and bituminous
concrete surface on IL 120 from IL 31 to Riverside Drive in McHenry. 25 Working
Days. Peter Baker & Son Co., Lake Bluff, $311,170.
75. Pulaski-Alexander Counties, IL 37, District 9, Pavement patching,
bituminous surface removal, bituminous concrete resurfacing and aggregate wedge
shoulders on IL 37 from west of Mound City south 2.99 miles to IL 3. 30 Working
Days. E.T. Simonds Construction Co., Carbondale, $417,509.
76. Randolph County, Water Street, District 8, 0.61 mile of bituminous
surface removal, leveling binder, bituminous concrete resurfacing and aggregate
wedge shoulders on Water Street from Rock Bridge Road to the railroad overpass
in Chester. Completion Date October 15, 2002. Mounds Construction Co., Inc.,
Collinsville, $68,009.
77. Saline County, US 45, District 9, Pavement patching, bituminous surface
removal, bituminous concrete resurfacing, bituminous shoulders and aggregate
wedge shoulders on US 45 from the IL 34/145 intersection in Harrisburg to
Railroad Street in Carrier Mills. 50 Working Days. Southern Illinois Asphalt
Co., Inc., Marion, $755,352.
78. Sangamon County, IL 4, District 6, 0.04 mile of bituminous surface
removal, bituminous concrete resurfacing, bituminous shoulders and aggregate
shoulders on IL 4 from the Spring Creek bridges northward on the north side of
Springfield. 15 Working Days. P.H. Broughton & Sons, Inc., Springfield, $57,198.
79. Sangamon County, I-72, District 6, 0.41 mile of bituminous surface
removal, bituminous concrete resurfacing, bituminous shoulders and aggregate
wedge shoulders on I-72 (eastbound), to I-55 (southbound) interchange ramp at
the south edge of Springfield 15 Working Days. Merrill's Contractors, Inc.,
Springfield, $104,143.
80. St. Clair-Madison Counties, Forest Blvd., I-70, Collinsville Road,
District 8, The work will be at the following locations: (1) pavement patching,
leveling binder, bituminous concrete surface course and aggregate wedge
shoulders on Forest Boulevard from Washington Park to Clock Lane (2) on I-55/70
eastbound exit ramp at IL 157 in Collinsville, milling, bituminous concrete
resurfacing and aggregate wedge shoulder (3) pavement patching, leveling binder,
bituminous concrete surface course and aggregate wedge shoulders on Collinsville
Road from Harvard Avenue to the Cahokia Mounds entrance west of Collinsville 55
Working Days. Mounds Construction Co., Inc., Collinsville, $250,899.
81. St. Clair County, Greenmount Rd., Summerfield Rd, District 8, 0.93 mile
of pavement patching and joint or crack filling on Greenmount Road between IL
177 and IL 161 in Belleville; and bituminous surface removal, leveling binder,
bituminous concrete resurfacing and aggregate wedge shoulders on Summerfield
Road from Casad Street in Summerfield to just south of Old US 50. Completion
Date October 31, 2002. The Kilian Corp. & Asphalt Sales and Products, Inc.,
Mascoutah, $199,803.
82. St. Clair County, I-70, District 8, The milling and bituminous concrete
resurfacing of the eastbound mainline pavement and shoulders and the removal and
replacement of the bridge approach pavement at the structure carrying I-70 over
Trendly Avenue in East St. Louis. Completion Date September 15, 2002. Keeley &
Sons, Inc., East St. Louis, $198,778.
83. St. Clair County, IL 15, District 8, 0.08 mile of bituminous surface
removal and bituminous concrete resurfacing on 26th Street at IL 15 (Missouri
Avenue) in East St. Louis Completion Date October 15, 2002. Mounds Construction
Co., Inc., Collinsville, $37,112.
84. Washington County, IL 127, District 8, Pavement patching, bituminous
surface removal, bituminous concrete resurfacing and aggregate wedge shoulders
on IL 127 from IL 177 at New Minden south 3.16 miles. Completion Date October
31, 2002. Southern Illinois Asphalt Co., Inc., Marion, $265,785.
85. White County, IL 1, District 7, 0.21 mile of leveling binder and
bituminous concrete surface course on IL 1 between the CSX Railroad and the
Little Wabash River in Carmi. 15 Working Days. E.T. Simonds Construction Co.,
Carbondale, $71,115.
86. Williamson County, IL 13, District 9, Pavement patching, bituminous
concrete surface course, bituminous concrete binder course, bituminous shoulders
and aggregate wedge shoulder on the westbound lanes of IL 13 from Marion
easterly 2.54 miles. Also included is work on the bridges over Crab Orchard
Creek consisting of a concrete overlay and retrofitting tubular beam bridge
rails. 70 Working Days. Southern Illinois Asphalt Co., Inc., Marion, $987,997.
87. DELETED
88. Fayette County, CH 2, District 7, Construction consists of a 3 span,
precast, prestressed concrete deck beam bridge carrying CH 2 over Wolf Creek,
0.5 mile east of Wrights Corner. 40 Working Days. Depew and Owen Builders, Inc.,
Centralia, $269,785.
89. Madison County, I-70, District 8, 0.02 mile of milling and bituminous
concrete resurfacing of the I-70 westbound mainline pavement and shoulders,
repair portions of the bridge piers, repair guardrail, and install new sand
module impact attenuators at the structure carrying Black Lane ramp over I-70
west of Collinsville. 25 Working Days. Keeley & Sons, Inc., East St. Louis,
$119,246.
90. Mason-Morgan Counties, IL 78 & I-72, District 6, repair of the
substructures on the IL 78 bridge over Wolf Lake approximately 1.8 miles north
of Chandlerville, and on the dual bridges carrying I-72 over the North Fork of
Mauvaise Terre Creek east of Jacksonville. 60 Working Days. Keeley & Sons, Inc.,
East St. Louis, $104,166.
91. Peoria County, I-474, District 4, Removal of the bituminous surface and
waterproofing membrane and replacement with a latex concrete overlay along with
bridge deck patching on the structures carrying I-474 over Kickapoo Creek,
Kickapoo Creek Road and the Union Pacific Railroad located 0.5 mile north of US
24 near Bartonville. Completion Date October 31, 2002. Halverson Construction
Co., Inc., Springfield, $1,435,056.
92. Pope County, IL 146, District 9, removal of the IL 146 bridge over Miller
Creek 0.1 miles west of Golconda, and replacement with a 3 span, composite
concrete and steel web plate girder structure with a 35'-11" width roadway, and
repairs and the placement of a concrete overlay on the IL 146 bridge over Lust
Creek 0.1 mile north of Golconda. Completion Date November 15, 2003. E.T.
Simonds Construction Co., Carbondale, $2,613,023.
93. WITHDRAWN
94. LaSalle County, IL 23, District 3, Traffic signal modernization at 6
intersections along IL 23 near the north limits of Ottawa. 40 Working Days.
Van-Mack Electric, Joliet, $230,815.
95. Bond County, I-70, District 8, Spot cleaning and painting the structure
carrying TR 161 over I-70 at Smithboro. 30 Working Days. Tom Crist Paint Co.,
Inc., Calumet City, $69,900.
96. DuPage County, IL 64 (North Ave.), District 1, Landscaping consisting of
planting trees, shrubs and perennials along 12.7 miles of IL 64 (North Ave) in
Carol Stream and West Chicago. Completion Date October 31, 2004. Del Toro
Landscaping, Inc., Dundee, $934,695.
97. Madison County, Various Routes, District 8, work will be at the following
locations: (1) construction of bituminous shoulders on Horseshoe Lake Road from
east of IL 111 at Stallings southeast to IL 157 at Collinsville; (2) the
installation of guardrail on IL 3/111 from US 67 east 0.10 mile; and (3)
pavement patching on IL 111/140 from IL 3 in Alton east to IL 111 in Bethalto.
Completion Date October 15, 2002. Mounds Construction Co., Inc., Collinsville,
$183,648.
98. Mercer County, US 67, District 4, Culvert repairs, guardrail improvement
and gutter removal along US 67 from 1.0 mile north of Preemption to just south
of the Rock Island County line. 30 Working Days. Valley Construction Co., Rock
Island, $211,974.
99. Morgan-Sangamon Counties, Various Routes, District 6, The cleaning and
painting of six bridges at the following locations: (1) I-72 over TR 128 (Massey
Lane) south of Jacksonville (2) IL 4 over I-72 on the south side of Springfield
and (3) IL 29 over Sugar Creek southeast of Springfield. 65 Working Days. Tom
Crist Paint Co., Inc., Calumet City, $623,000.
100. Peoria County, I-74, District 4, Supplying steel beams for the
reconstruction of various structures on I-74 from IL 6 to the Illinois River in
Peoria. Completion Date June 02, 2003. Stupp Bridge Co., St. Louis, MO,
$736,062.
101. Sangamon County, Old US 36, District 6, 1.0 mile of guardrail removal
and replacement and aggregate shoulders on Old US 36 west of Riverton. 40
Working Days. Lovewell Fencing, Inc., Davenport, IA. $205,782.
102. Sangamon-Scott Counties, I-72, District 6, The cleaning and painting of
4 bridges at the following locations: (1) TR 156 over I-72 1.0 mile north of
Curren (2) CH 15 over I-72 2.0 miles northwest of Curren and (3) dual bridges
carrying I-72 over a drainage ditch southeast of Valley City. 25 Working Days.
ERA-Valdivia Contractors, Inc., Chicago, $241,000.
103. Schuyler County, Weinberg-King State Park, District 6, 2.05 miles of
reconstruction and new construction of internal roads in Weinberg-King State
Park adjacent to IL 101 east of Augusta. Completion Date November 01, 2002. W.L.
Miuller Co., Hamilton, $693,115.
104. St. Clair County, I-255, District 8, replacement of two pumps and motors
at the Hytla Ditch storm water pump station along southbound I-255 east of
Washington Park. 20 Working Days. Missouri Machinery & Engineering Co., St.
Louis, MO, $66,151.
105. Union-Johnson Counties, IL 146, District 9, 8.96 miles of pavement
patching, bituminous surface removal, bituminous concrete resurfacing and
aggregate wedge shoulders on IL 146 from 0.5 miles east of I-57 east to IL 37 at
West Vienna. 65 Working Days. E.T. Simonds Construction Co., Carbondale,
$807,673.
106. Various Counties, Various Routes, District 8, Various type pavement
patching on various routes throughout District 8. Completion Date June 30, 2003.
Keeley & Sons, Inc., East St. Louis, $370,574.
107. Various Counties, Various Routes, District 8, Various type pavement
patching on various routes throughout District 8. Completion Date June 30, 2003.
Keeley & Sons, Inc., East St. Louis, $384,743.
108. Washington County, I-64, District 8, cleaning and painting of four
bridges carrying I-64 over the Kaskaskia River and the Kaskaskia River Overflow
southeast of Damiansville. 65 Working Days. Tom Crist Paint Co., Inc., Calumet
City, $168,000.
109. Champaign-Edgar-Vermilion Counties, IL 49, District 5, 11.73 miles of
milling and bituminous concrete resurfacing on IL 49 from Homer to 0.6 mile
south of the Vermilion Co line. 60 Working Days. University Construction,
Urbana, $1,894,996.
110. Christian County, Grand Avenue, District 6, 1.01 kilometers of pavement
patching bituminous surface removal, bituminous concrete resurfacing and
aggregate wedge shoulders on Grand Avenue from IL 29 to Mill Street in Owaneco.
50 Working Days. Merrill's Contractors, Inc., Springfield, $324,384.
111. Clay County, CH 7, District 7, 3.18 miles of soil-cement base course on
CH 7 from Iola west to the Fayette County line. 30 Working Days. Mt. Carmel Sand
& Gravel Co., Inc., Mt. Carmel, $222,815.
112. Clay County, CH 2, District 7, 2.97 miles reconstruction on CH 2 from
Bible Grove to 2100 N. 30 Working Days. Mt. Carmel Sand & Gravel Co., Inc., Mt.
Carmel, $208,355.
113. Cook County, 142nd Street, District 1, 0.50 mile bituminous resurfacing,
curb and gutter, drainage structures on 142nd Street from Dearborn Street to
Wentworth Avenue; and on 142nd Street from Parnell Avenue to Halsted Street in
Riverdale. 40 Working Days. Alpha Construction Co., Hazel Crest, $282,503.
114. Cook County, Chicago Ave., District 1, 1.01 miles of pavement milling,
patching and resurfacing, replacement of existing traffic signals on Chicago
Avenue from Thatcher Avenue to Harlem Avenue in River Forest. 55 Working Days.
Plote Construction, Inc., Elgin, $1,222,087.
115. Cook County, IL 64 (North Ave.), District 1, 3.60 miles of milling and
bituminous concrete surface on IL 64 (North Avenue) from IL 50 (Cicero Avenue)
to Damen Avenue in Chicago. Completion Date October 31, 2002 Plus 05 Working
Days. Plote Construction, Inc., Elgin, $2,770,710.
116. DeWitt County, IL 10, District 5, 8.8 miles of bituminous concrete
resurfacing on IL 10 from the Logan County line to Clinton. 45 Working Days.
Illinois Valley Paving Co., Springfield, $1,333,072.
117. DuPage County, IL 38 (Roosevelt Rd.), District 1, 7.37 km of milling and
bituminous concrete surface widening and intersection reconstruction on IL 38
(Roosevelt Road) from Myrtlewood Lane to IL 53 all in Glen Ellyn and Wheaton.
Completion Date May 31, 2003 Plus 05 Working Days. Bids to be opened June 28.
118. Edgar-Douglas Counties, IL 49, District 5, 9.61 miles of bituminous
concrete resurfacing on IL 49 from 0.6 mile south of the Champaign County line
to one mile north of Brocton. 55 Working Days. Champaign Asphalt Co., Champaign,
$1,364,080.
119. Edgar County, IL 49, District 5, 11.68 miles of milling and bituminous
resurfacing on IL 49 from one mile north of Brocton to IL 16 near Kansas. 60
Working Days. Howell Asphalt Co. & Howell Paving, Inc., Mattoon, $1,541,367.
120. Ford County, Tri Ag Road, District 3, 4.032 miles of bituminous
resurfacing on Tri Ag Road from IL 24 north to 2800N, 2 miles east of Piper
City. 20 Working Days. H.J. Eppel & Co., Pontiac, $354,792.
121. Franklin County, Ewing Road, District 9, 7.28 miles bituminous
resurfacing, aggregate shoulders, and pavement marking Ewing Road from the west
limits of Ewing to IL 14 near Odum Spur. 25 Working Days. E.T. Simonds
Construction Co., Carbondale, $931,165.
122. Grundy County, Old Stage Road, District 3, 0.96 miles of bituminous
concrete resurfacing on Old Stage Road from Saratoga Road to Morris city limits.
15 Working Days. D. Construction, Inc., Coal City, $103,862.
123. Iroquois County, I-57, District 3, Reconstruction of the structure
carrying US 24 over I-57 at the Gilman interchange. Completion Date July 01,
2003 Plus 20 Working Days. Iroquois Paving Corp., Watseka, $2,738,536.
124. Jasper County, CH 6, District 7, 6.32 miles of bituminous concrete
resurfacing and aggregate shoulders along CH 6 from IL 130 to IL 49. 20 Working
Days. Howell Asphalt Co. & Howell Paving, Inc., Mattoon, $777,728.
125. Lake County, Kilbourne Road, District 1, 0.68 miles of bituminous base
course, concrete widening, bituminous surface course, combination concrete curb
and gutter, storm sewer, and landscaping on Kilbourne Road from IL 132 (Grand
Avenue) to US 41 (Skokie Highway) east of Gurnee. 50 Working Days. Lake County
Grading Co., Libertyville, $1,097,000.
126. LaSalle County, Edwards Avenue, District 3, 0.17 mile of bituminous
pavement on an aggregate base, curb and gutter, drainage structures on Edwards
Avenue from Chartres Street to Malcolm Avenue in LaSalle. 40 Working Days. Len
Trovero Construction, LaSalle, $186,990.
127. Livingston County, Fairbury Blacktop, District 3, bituminous concrete
resurfacing with aggregate shoulders on Fairbury Blacktop from Cherry Road in
Fairbury, 10 miles north to IL 16. Completion Date November 15, 2002. Trico
Paving, Inc., Pontiac, $899,833.
128. Logan County, I-55, District 6, 15.3 miles of pavement patching,
bituminous surface removal, bituminous concrete resurfacing, bituminous
shoulders & aggregate wedge shoulders, and structure repairs on 11 structures on
I-55 from the Sangamon County line to I-155 northwest of Lincoln. Completion
Date August 01, 2003. Bids to be opened June 28.
129. Madison County, Renken Road, District 8, 6.45 miles of milling and
resurfacing on Ranken Road from Prairietown northeasterly to the Madison County
line. 40 Working Days. The Kilian Corp. & Asphalt Sales and Products, Inc.,
Mascoutah, $791,486.
130. Marion County, Walnut Hill Road, District 7, 5.25 miles bituminous
resurfacing, aggregate shoulders, and pavement marking on Walnut Hill Road from
US 51 in Wamac to the east village limits of Walnut Hill. 25 Working Days.
Howell Paving, Inc. & General Contractors, Inc., Mattoon, $506,743.
131. McHenry County, Moraine Hills State Park, District 1, 1.09 miles of
widening of River Road and McHenry Dam Road, bituminous concrete surface,
parking lot reconstruction, and wetland mitigation at the Moraine Hills State
Park south of Lakemoor. Completion Date October 30, 2002 Plus 15 Working Days.
Berger Excavating Contractors, Inc., Wauconda, $1,685,586.
132. Morgan County, IL 104 & IL 78, District 6, In Jacksonville on IL 104
from Morton Avenue to IL 78, and IL 78 from with IL 104 to Oak Street, the
improvement will consist of 8.92 km of bituminous surface removal, bituminous
concrete resurfacing, bituminous and aggregate shoulders, storm sewer, deck
replacement on the IL 104 bridge over the Norfolk and Western Railroad, and
traffic signal improvements. Completion Date December 01, 2002 Plus 20 Working
Days. Bids to be opened June 28.
133. Randolph County, IL 3, District 8, Pavement patching, bituminous surface
removal and bituminous concrete resurfacing on IL 3 from IL 154 in Red Bud south
1.04 miles to Kaskaskia Drive. Completion Date October 31, 2002. Mounds
Construction Co., Inc., Collinsville, $183,725.
134. Sangamon County, Various Routes, District 6, resurfacing Ash St.
from-5th to 11th; Laurel Ave. from Lowell to Spring; Lawrence Ave.,
from MacArthur to Walnut; Oberlin Ave., from 4th to 6th; Outer Park
Dr. from MacArthur west to concrete pavement; Washington St. from Amos to
Chatham Road; 2nd St. from Trevi Gardens south to Cruikshank; 5th
St. from South Grand to Spruce; 11th St. form Madison to Reynolds;
and 11th St. from Ash to South Grand, all in Springfield. 45 Working
Days. Merrill's Contractors, Inc., Springfield, $751,412.
135. Sangamon County, Old US 36, District 6, 1.57 miles of pavement patching,
bituminous surface removal, bituminous concrete resurfacing, and bituminous and
aggregate shoulders at the following locations in Illiopolis: (1) Dye Road from
the Norfolk and Western Railroad to Matilda Street and (2) Matilda Street from
Old Route 36 to Dye Road. 30 Working Days. P.H. Broughton & Sons, Inc.,
Springfield, $638,908.
136. Stark County, West Jersey Blacktop, District 4, 3.2 miles of bituminous
resurfacing, aggregate shoulders and guardrail on West Jersey Blacktop from IL
78 at West Jersey to Knox County line. 30 Working Days. Advanced Asphalt Co.,
Princeton, $453,207.
137. Tazewell County, Unmarked Route, District 4, 2.09 miles of PCC pavement,
traffic signals, lighting, earthwork, seeding, milling, resurfacing and other
collateral work on Veterans Drive extension from north of IL 9 to Broadway Road
in Pekin. 225 Working Days. R.A. Cullinan & Son, Inc., Tremont, $4,846,079.
138. Wabash County, CH 11, District 7, 5.16 miles of bituminous concrete
surface, aggregate shoulders and pavement marking on CH 11 from Lancaster to the
Edwards County line. 20 Working Days. Howell Paving, Inc. &Wabash Asphalt Co.,
Inc., Mattoon, $685,675.
139. Winnebago County, Forest Hills Road, District 2, 1.53 miles bituminous
resurfacing, aggregate shoulders and pavement marking on Forest Hills Road from
Harlem Road to IL 173 (West Lane Road) in Loves Park/Machesney Park. 20 Working
Days. Rockford Blacktop Construction Co., Loves Park, $243,042.
140. Winnebago County, Harrison Avenue, District 2, concrete pavement and
traffic signals on Harrison Avenue at the intersection of Preston Street near
Rockford. 60 Working Days. Rockford Blacktop Construction Co., Loves Park,
$359,989.
141. Cass County, Old State Road, District 6, Construction of a 3 span,
precast, prestressed concrete deck beam bridge carrying TR 59 (Old State Road)
over Lost Creek on the west edge of Bluff Springs. 50 Working Days. Sparks &
Wiewel Construction Co., Quincy, $291,195.
142. Christian County, Unmarked Route, District 6, Construction of a 5 span,
precast prestressed concrete deck beam bridge carrying TR 296 over Flat Bridge
Creek 2.0 miles SW of Moweaqua. 60 Working Days. Schmidt Construction, Inc., Mt.
Zion, $546,909.
143. Douglas County, Unmarked Route, District 5, Construction of a three
span, precast, prestressed concrete deck beam bridge with aggregate approaches,
carrying TR 11 over the Kaskaskia River, 6 miles northeast of Atwood. 40 Working
Days. Schmidt Construction, Inc., Mt. Zion, $245,861.
144. Edwards County, CH 5, District 7, Construction of a single span,
precast, prestressed concrete deck beam bridge carrying CH 5 over West Village
Creek 5.5 miles north west of Albion. 35 Working Days. Allendale Gravel Co.,
Inc., Allendale, $132,454.
145. Hamilton County, CH 5, District 7, Construction of a 3 span, precast,
prestressed concrete deck beam bridge carrying CH 5 over Rector Creek, 4.5 miles
west of Walpole. 30 Working Days. Perry County Construction Co., Herrin,
$131,358.
146. Hamilton County, CH 6, District 7, Construction of a single span,
precast, prestressed concrete deck beam bridge carrying CH 6 over tributary to
Rector Creek, 6.5 miles west of Broughton. 30 Working Days. Perry County
Construction Co. Herrin, $107,953.
147. Marshall County, Larose Road, District 3, Construction of a three span,
precast, prestressed concrete deck beam bridge and approaches carrying LaRose
Road over North Branch of Crow Creek, one mile east of LaRose. 40 Working Days.
N.E. Finch Co., Peoria, $251,169.
148. McDonough County, Unmarked Route, District 4, Construction of a 3 span,
precast concrete bridge slab structure carrying TR 390 over Crooked Creek, 3.0
miles southwest of Bushnell. 35 Working Days. Hillyer, Inc., Macomb, $237,111.
149. Warren County, Old US 34, District 4, Removal and replacement of the
structure carrying Old US 34 over Cedar Creek Tributary near Monmouth. 60
Working Days. Hillyer, Inc., Macomb, $350,022.
150. Lake County, IL 131, District 1, Traffic signal modernization at the
intersection of IL 131 (Green Bay Road) and Yorkhouse Road near the north limits
of Waukegan. 35 Working Days. Home Towne Electric, Inc., Lake Villa, $89,873.
151. LaSalle County, IL 18 & IL 23, District 3, Removal and replacement of
traffic signals at 10 intersections along IL 18 and IL 23 in Streator. 110
Working Days. J.H. Moore, Inc., Effingham, $868,212.
152. WITHDRAWN
153. Carroll County, Scenic Ridge Road, District 2, installation of new steel
plate beam guardrail and traffic barrier terminal sections along Scenic Ridge
Road from Mill Hollow Road northerly to JoDaviess County line. 15 Working Days.
Lovewell Fencing, Inc., Davenport, IA, $55,310.
154. Cook County, 31st Street, District 1, 0.64 mile of streetscaping and
lighting on 31st Street from LaGrange Road to Kemman Avenue in LaGrange Park. 60
Working Days. Vixen Construction, Inc., Bridgeview, $1,157,054.
155. DuPage County, Unmarked Route, District 1, 11,717 ft of sidewalk
improvements in various locations in Westmont. 40 Working Days. Seven-D
Construction Co., Chicago, $388,416.
156. WITHDRAWN
157. Lake-Cook Counties, Main Street, District 1, tree planting, decorative
lighting, sidewalks, brick pavers along Main Street from the Elgin, Joliet, and
Eastern Railroad to Hough Street in Barrington. 60 Working Days. Sumit
Construction Co., Inc., Skokie, $759,929.
158. Perry County, IL 13, District 9, 10 miles of pavement patching,
bituminous surface removal, bituminous concrete resurfacing and aggregate wedge
shoulders on IL 13 from 0.2 mile east of Swanwick southeast to Walnut Street in
Pinckneyville. 50 Working Days. Southern Illinois Asphalt Co., Inc., Marion,
$785,449.
159. Tazewell County, I-74, District 4, 1.26k of earthwork consisting of new
embankment, grading, building of two retaining walls and surcharging of the area
on and around the Industrial Spur interchange on I-74 in East Peoria. Completion
Date November 15, 2002. Freesen, Inc., Springfield, $5,345,229.
160. Various Counties, Various Routes, District 8, cleaning and painting of
six bridges at the following locations: (1) IL 143 over I-70 northwest of
Highland (2) Damiansville Road over I-64 at Damiansville (3) dual bridges
carrying I-64 over Sugar Creek Overflow west of Damiansville and (4) dual
bridges carrying I-64 over Sugar Creek west of Damiansville. 65 Working Days.
ERA-Valdivia Contractors, Inc., Chicago, $330,000.
161. Wayne County, CH 2 & 16, District 7, removal and replacement of
guardrail and shoulder widening for guardrail along CH 2 and CH 16, from the
Marion County line to the Edwards County line. 50 Working Days. Midwest Fence
Corp., Chicago, $395,813.
162. Winnebago County, Shirland Spur, District 2, Adding inlets and storm
sewer along Shirland Spur to correct drainage problems in Shirland. 15 Working
Days. Rockford Blacktop Construction Co., Loves Park, $58,157.
163. Woodford County, US 24 (Cruger Rd.), District 4, drainage corrections to
the area around US Business 24 and Cruger Road near Eureka. 50 Working Days.
Otto Baum Co., Inc., Morton, $633,468.
164. Bureau County, Kentville Road, District 2, 13.48 miles of bituminous
overlay with an aggregate shoulder wedge on Kentville Road from Henry/Bureau
County line easterly to 1300E. 60 Working Days. Advanced Asphalt Co., Princeton,
$2,320,585.
165. Cook County, IL 83, District 1, 1.81 miles of roadway reconstruction,
variable width widening, replacement of the structure carrying IL 83 over
Buffalo Creek and new traffic signals, all on IL 83 from Dundee Road to
Lake-Cook Road in Wheeling. Completion Date October 31, 2003 Plus 10 Working
Days. Bids to be opened June 28.
166. Cook County, 103rd Street, District 1, 0.98 mile bituminous resurfacing,
concrete curb and gutter, drainage structures, traffic signals, lighting and
landscaping on 103rd Street from Cicero Avenue to Pulaski Avenue in Oak Lawn.
Completion Date October 01, 2003. K-Five Construction Corp., Lemont, $3,919,412.
167. Cook County, Kedzie Avenue, District 1, Intersection improvements, at
Kedzie Avenue and 94th Street ,and at Kedzie Avenue and 95th Street, consist of
pavement widening or narrowing, traffic signals, drainage structures, concrete
sidewalks, and pavement markings in Evergreen Park. 60 Working Days. Seven-D
Construction Co., Chicago, $529,966.
168. Cook-DuPage Counties, Busse Road, District 1, roadway widening and
resurfacing, retaining wall, storm sewers, combination concrete curb and gutter,
concrete sidewalks and traffic signal modification on Busse Road at the
intersection of Devon Avenue in Elk Grove Village. 160 Working Days. R.W.
Dunteman Co., Addison, $3,682,165.
169. DeWitt-Piatt Counties, US 150, District 5, 10.0 miles of milling and
bituminous concrete surface on US 150 from west of Norfolk Southern Railroad at
Mansfield to the McLean County line. 35 Working Days. Freesen, Inc.,
Springfield, $1,069,157.
170. DuPage County, St Charles Road, District 1, roadway reconstruction,
resurfacing, storm sewers, drainage structures, sidewalks, pavement marking,
traffic signal modification and street lighting on St. Charles Road at the
intersection of Grace Street and Parkside Avenue in Lombard. 95 Working Days.
R.W. Dunteman Co., Addison, $1,755,495.
171. Effingham County, Maple Street, District 7, 0.17 mile of pavement
removal and replacement with PCC pavement, subbase, curb and gutter, storm sewer
and sidewalk on Maple Street from Grove Avenue to Edgar Avenue in Effingham. 85
Working Days. Mautz & Oren, Inc., Effingham, $438,176.
172. Franklin County, IL 37 & Petroff Rd/East IL St, District 9, The addition
of left turn lanes on IL 37 at the intersection with Petroff Road/East Illinois
Street in Benton along with the installation of traffic signals. Completion Date
December 20, 2002. George E. Jones Excavating, LLC, Marion, $960,093.
173. Henry County, Ulah Road, District 2, 2.04 miles of bituminous concrete
widening and resurfacing on Ulah Road from IL 81 to Ulah. 70 Working Days. Bob
Propheter Construction, LLC, Sterling, $1,694,611.
174. Iroquois County, US 52, District 3, 14.4 miles of milling and bituminous
concrete resurfacing on US 52 from IL 1 to US 24 at Sheldon. Completion Date
June 15, 2003. Iroquois Paving Corp., Watseka, $1,494,301.
175. Jackson County, IL 13, District 9, addition of right turn lanes at three
of the four approaches to the intersection of IL 13 and Williams Street in
Murphysboro along with the installation of traffic signals Completion Date
December 20, 2002. E.T. Simonds Construction Co., Carbondale, $517,171.
176. Kane County, Aucutt Road, District 1, 1.30 miles of bituminous concrete
superpave with various areas of pavement patching and other related work on
Aucutt Road from Orchard Road to IL 31 in Montgomery. 30 Working Days. Aurora
Blacktop, Inc., Montgomery, $334,957.
177. Lake County, Peterson Road, District 1, installation of new traffic
signals, pavement widening and resurfacing on Peterson Road at IL 83 in Lake
County. 70 Working Days. Peter Baker & Son Co., Lake Bluff, $1,093,586.
178. LaSalle County, IL 351, District 3, 0.28 mile of intersection
reconstruction/realignment 11th Street, and concrete widening between 9th Street
and MacArthur Street in LaSalle. Completion Date December 01, 2002 Plus 20
Working Days. Len Trovero Construction, LaSalle, $1,520,580.
179. LaSalle County, US 52 & IL 251, District 3, 2,58 m of new curb and
gutter, pavement overlay and storm sewer construction on IL 251 from the
railroad underpass to Burlington Street. Also, milling and resurfacing the
pavement on US 52 from Burlington Street to IL 251, includes traffic signals at
US 34 in Mendota. Completion Date October 01, 2003. Bids to be opened June 28.
180. McDonough County, IL 9, District 4, 3.88 miles of milling and bituminous
concrete resurfacing on IL 9 from Sciota Road to US 67, north of Macomb. 20
Working Days. R.A. Cullinan & Son, Inc., Tremont, $367,396.
181. McLean County, US 136, District 3, 7.04 miles of milling and bituminous
concrete resurfacing on US 136 from US 150 to IL 54 near LeRoy. Completion Date
October 15, 2002 Plus 05 Working Days. Rowe Construction Co., Bloomington,
$896,133.
182. Morgan County, US 67, District 6, 9.22 miles of PCC pavement with
bituminous shoulders and aggregate wedge shoulders for US 67 from 2 miles
northeast of Manchester at the Scott County line to north of I-72 southwest of
Jacksonville. Included in the project is the construction of dual bridges over
Sandy Creek, Brushy Fork Creek, Spoon Creek and a single bridge carrying an
access road over Sandy Creek, and the construction of 5 concrete box culverts.
Completion Date October 01, 2004. Illinois Valley Paving Co., Springfield,
$37,539,518.
183. Ogle County, IL 38 (Lincoln Avenue), District 2, 0.85 mile of bituminous
concrete resurfacing and reconstruction on IL 38 (Lincoln Avenue) from the BN &
SF Railroad tracks to Sixth Street in Rochelle. Completion Date November 01,
2002 Plus 10 Working Days. Rockford Blacktop Construction Co., Loves Park,
$812,697.
184. Peoria County, Forest Hill Road, District 4, 0.286 km of PCC pavement,
concrete curb and gutter, drainage structures, traffic signals and lighting on
Forest Hill Road from Drie Lane to east of Institute Place in Peoria. 100
Working Days. P.J. Hoerr, Inc., Peoria, $1,112,208.
185. Randolph County, Stacy Street, District 8, 0.147 miles of concrete
pavement and sidewalk removal and replacement on Stacy Street from State Street
to George Street in Chester. 85 Working Days. Illinois Excavators, Inc., Ruma,
$296,357.
186. Rock Island County, Airport Road & I-280, District 2, 2.11 km of
reconstruction of Airport Road from 3rd Street west of US 67 to east of I-280 in
Milan. Also reconstruction of I-280 interchanges with Airport Road and bridges
over Airport Road on I-280. Completion Date October 02, 2004. Bids to be opened
June 28.
187. Rock Island County, 4th Avenue, District 2, bituminous resurfacing,
sidewalks, driveways, storm sewers and landscaping on 4th Avenue from 16th
Street to 24th Street in Rock Island. Completion Date November 29, 2002. Brandt
Construction Co., Milan, $1,178,039.
188. Rock Island County, 5th Avenue, District 2, bituminous resurfacing,
sidewalks, driveways, storm sewers and landscaping on 5th Avenue from 15th
Street to 24th Street in Rock Island. Completion Date November 29, 2002. Valley
Construction Co., Rock Island, $1,694,336.
189. WITHDRAWN
190. Tazewell County, I-74, District 4, 4.9 miles of patching, milling,
bituminous overlay and joint repairs on six structures from just east of
Pinecrest to just east of Morton Avenue in Morton. Completion Date October 31,
2002. R.A. Cullinan & Son, Inc., Tremont, $3,714,605.
191. Winnebago County, IL 75, District 2, 0.90 mile of grading and concrete
pavement on IL 75 from the Interstate 90/IL 75 interchange to the Wisconsin line
in South Beloit. 85 Working Days. Bids to be opened June 28.
192. Winnebago County, IL 70, District 2, 5.3 miles of bituminous concrete
widening and resurfacing on IL 70 from the Pecatonicia River to just east of
Meridian Road. 110 Working Days. Rockfrod Blacktop Construction Co., Loves Park,
$5,784,060.
193. Winnebago County, Trask Bridge Road, District 2, 1.34 miles of
reconstruction on Trask Bridge Road from Pecatonica Road to IL 70. Includes a
vertical realignment of Trask Road at Barningham Road. 160 Working Days.
Rockford Blacktop Construction Co., Loves Park, $1,345,634.
194. Clark County, CH 26, District 5, Construction of a cast in place
concrete deck on an existing 3 span, continuous steel beam superstructure, CH.
26 over North Fork Embarrass River, 6 miles south of Casey. 45 Working Days.
A.J. Walker Construction Co., Mattoon, $350,008.
195. Hamilton County, IL 242, District 7, removal of the existing single span
bridge carrying IL 242, over an unnamed creek approximately 5 miles north of
McLeansboro, and replacement with a triple barrel concrete box culvert. Also
included is the removal of the existing bridge carrying IL 242 over an unnamed
creek approximately 6 miles north of McLeansboro, and the replacement with a
triple barrel concrete box culvert. Completion Date November 27, 2002. Perry
County Construction Co., Herrin, $802,469.
196. Jasper County, CH 13, District 7, Construction of a 3 span, precast,
prestressed concrete deck beam bridge carrying CH 13 over Range Creek 2.5 miles
west of Hidalgo. 40 Working Days. Allendale Gravel Co., Inc., Allendale,
$158,150.
197. Jefferson County, IL 37, District 7, removal of the existing bridge
carrying IL 37 over Dodd's Creek Overflow south of Mt. Vernon, and replacement
with a continuous composite, concrete and steel beam bridge with a 40 ft width
roadway. 95 Working Days. E.T. Simonds Construction Co., Carbondale, $692,099.
198. Peoria County, US 150/IL 78, District 4, Replace the existing structure
with a double precast, prestressed concrete box culvert carrying US 150/IL 78
over French Creek, 2.0 miles south of Laura. Completion Date November 15, 2002
Plus 10 Working Days. Otto Baum Co., Inc., Morton, $491,989.
199. Peoria County, Unmarked Route, District 4, removal of existing deck,
beams, bridge railing and bearings and construction of precast, prestressed
concrete deck beams on existing piers and abutments carrying Brimfield-Jubilee
Road over branch of Jubilee Creek, 3 miles east of Brimfield. 50 Working Days.
N.E. Finch Co., Peoria, $263,814.
200. Pike County, Unmarked Route, District 6, Construction of a single span,
precast, prestressed concrete deck beam bridge with aggregate approaches,
carrying TR 245 over Blue Creek tributary, 2 miles northwest of Detroit. 30
Working Days. Sparks & Wiewel Construction Co., Quincy, $110,554.
201. Shelby County, Unmarked Route, District 5, Construction of a one span,
and a three span precast, prestressed concrete deck beam bridge carrying TR 21
over Sorghum Branch and Flat Branch respectively, 2 miles southeast of Moweaqua.
80 Working Days. Schmidt Construction, Inc., Mt. Zion, $556,358.
202. Tazewell County, 3rd Street, District 4, rehabilitation and restoration
of the existing bridge carrying 3rd Street over the ICGRR in Delavan. 55 Working
Days. Otto Baum Co., Inc., Morton, $649,655.
203. Will County, US 6, District 1, Bridge removal and replacement with a
3-span structure carrying US 6 over Rock Run Creek, realignment of US 6 and
McClintock Road and traffic signal installation, all in Joliet. Completion Date
August 01, 2003 Plus 10 Working Days. P.T. Ferro Construction Co., Joliet,
$4,280,370.
204. Kankakee County, Unmarked Route, District 3, Construction of 1,767 ft of
street lighting and streetscape on Court Street, Schuyler Avenue and Merchant
Street in Kankakee. 50 Working Days. Utility Dynamics Corp., Oswego, $533,756.
205. Lake County, IL 137 (Buckley Road), District 1, Traffic signal
modernization at the intersection of IL 137 (Buckley Road) and St. Mary's Road
near the north limits of Libertyville. 35 Working Days. Home Towne Electric,
Inc., Lake Villa, $59,524.
206. Bond County, IL 140, District 8, The removal of guardrail, extending
culverts, adding stabilized shoulders, relocating roadside drainage ditches and
utility relocation at the intersection of IL 140 and Idler Lane in Greenville.
Completion Date October 15, 2002. C.D. Peters Construction Co., Granite City,
$66,893.
207. Christian County, IL 29, IL 16, US 51, District 6, 4.54 miles of
pavement patching, bituminous surface removal, PCC base course widening,
bituminous concrete resurfacing, bituminous shoulders, aggregate shoulder, PCC
Sidewalk and traffic signal installations on the following roadways in Pana: (1)
IL 29/Washington Street from 0.2 mile north of Pana to Hickory Street (2) Poplar
Street from Washington Street to south of Fifth Street (3) First Street/US 51/IL
16 from Poplar Street to Spruce Street and (4) US 51 from Cold Spring Road to
the Shelby County line. Completion Date November 01, 2002 Plus 20 Working Days.
Illinois Valley Paving Co., Springfield, $2,162,171.
208. Clark County, Old US 40, District 5, 0.70 mile of patching, milling and
bituminous concrete surface on Old US 40 from CH 23 to west of Martinsville. 15
Working Days. Ne-Co Asphalt Co., Inc., Charleston, $161,893.
209. Cook County, Crawford Avenue, District 1, 0.10 mile of pedestrian
improvements on the structure carrying Crawford Avenue over I-80 in Country Club
Hills. 20 Working Days. Vixen Construction, Inc., Bridgeview, $266,241.
210. DeWitt County, IL 10, District 5, Removal and replacement of precast
deck beams on the structure carrying IL 10 over Salt Creek near Clinton. 20
Working Days. Sangamo Construction Co., Springfield, $162,840.
211. DeWitt County, Unmarked Route, District 5, 1.62 miles of paving, grading
and widening of the park roads in Weldon Springs State Park, southeast of
Clinton. Completion Date December 01, 2002 Plus 10 Working Days. McIntire &Co.,
Contractors, Winchester, $1,109,838.
212. Fayette County, US 40, District 7, construction of PCC driveways, storm
sewer removal and excavating ditches along US 40 in Brownstown from College
Street easterly 0.28 mile. 25 Working Days. Western Asphalt, Inc., Jacksonville,
$150,846.
213. Macon-DeWitt Counties, US 51, District 5, 7.7 miles of intermittent
resurfacing and shoulder seal coat on US 51 from 2.2 miles south of McLean
County line to Forsyth. 50 Working Days. Illinois Valley Paving Co.,
Springfield, $1,717,418.
214. Peoria County, I-74, District 4, Demolition of the vacant Red Cross
Building at 1401 N. Knoxville in Peoria. 20 Working Days. Hy-Tech Specialized
Services, Springfield, $99,932.
215. Peoria County, US 150, District 4, Repairing erosion damage and
installing storm sewer along US 150 between Mountello Drive and Bacon Drive in
Peoria. 20 Working Days. Otto Baum Co., Inc., Morton, $175,440.
216. Peoria-Tazewell Counties, Various Routes, District 4, Relocate sign
trusses onto new foundations along with minor repairs along various routes in
Peoria, East Peoria and Morton. Completion Date October 31, 2002. T.M.F.
Construction Co., Sprinfield, $155,915.
217. Rock Island County, IL 94, District 2, Removal of the existing culvert
and replacement with precast concrete box culvert 0.8 mile west of 91st Street,
west of Reynolds 25 Working Days. Valley Construction Co., Rock Island,
$186,487.
218. Various Counties, Various Routes, District 7, Scour mitigation at 12
structures located on various routes throughout District 7. 65 Working Days. No
Bids Received.
219. Bureau-Henry-Rock Island Counties, Unmarked Route, District 2, 0.09 mile
of roadway and parking improvements at the Hennepin Canal Visitors Center and
several Hennepin Canal Park locations. 45 Working Days. Len Trovero
Construction, LaSalle, $368,243.
220. Vermilion County, Catlin Road, District 5, 0.36 mile of pavement
patching on Catlin Road from west of Jordan Creek to east of FAS Route 513,
north of Fairmont. 15 Working Days. University Construction, Urbana, $116,142.
221. Cook County, IL 19 (Irving Park Rd.), District 1, 2.86 miles of milling
and bituminous concrete surface on IL 19 (Irving Park Rd) from Cumberland Avenue
to Narragansett Avenue in Chicago and Norridge. Completion Date October 31, 2002
Plus 05 Working Days. Plote Construction, Inc., Elgin, $1,868,783.
222. Cook County, Thatcher Road, District 1, 0.54 mile of milling and
bituminous concrete surface on Thatcher Road from IL 64 (North Avenue) to
Division Street in River Forest. 20 Working Days. K-Five Construction Corp.,
Lemont, $190,847.
223. Cumberland County, IL 121, District 5, 0.91 mile of milling and
bituminous concrete resurfacing on IL 121 from Embarras Highway to IL 130 in
Greenup. 20 Working Days. Ne-Co Asphalt Co., Inc., Charleston, $246,594.
224. DuPage County, IL 64 (North Avenue), District 1, 3.24 miles of advance
work consisting of temporary pavement and tree removal on IL 64 (North Avenue)
from east of IL 53 to east of Addison Road in Lombard, Villa Park and Addison.
Completion Date October 31, 2002. Bids to be opened June 28.
225. Fulton County, Unmarked Route, District 4, 8,777 ft of bituminous
surfacing, patching, milling and striping on Myrtle Street, Chestnut Street, Elm
Street, Pin Street, Main Street, White Court and Avenue A in Canton. 40 Working
Days. United Paving & Construction, Inc., Canton, $429,351.
226. Fulton County, IL 9 & IL 97, District 4, 6.03 miles of milling and
bituminous concrete resurfacing on IL 9 and 97 west of Canton through Fiatt to
the junction of IL 97 south. 20 Working Days. United Paving & Construction,
Inc., Canton, $538,362.
227. Henry County, US 34/IL 78, District 2, 2.82 miles of bituminous concrete
resurfacing on US 34/IL 78 from south of Kewanee to south of IL 91. 95 Working
Days. Bob Propheter Construction, LLC, Sterling, $2,703,079.
228. Henry County, I-80, District 2, 17.22 miles of bituminous concrete
resurfacing, bridge rehabilitation, bridge deck widening, bridge superstructure
and shoulder reconstruction on I-80 from west of IL 82 to the Bureau County
line. Completion Date November 01, 2004. Bids to be opened on June 28.
229. Iroquois County, IL 116, District 3, 8.2 miles of milling and bituminous
concrete resurfacing on IL 116 from the Ford County line to I-57 near Ashkum.
Completion Date November 15, 2002. T & T Cartage, Inc., Herscher, $986,855.
230. Jefferson County, IL 15, District 7, 0.3 mile of widening and
resurfacing on IL 15 for the construction of left turn lanes at the intersection
with Liebengood Road at Mt. Vernon. 60 Working Days. Guinzy Construction, Inc.,
Ashley, $516,443.
231. Knox County, Lake Bracken Road, District 4, 13,218 ft bituminous
surfacing, aggregate shoulders, guardrail and striping on Lake Bracken Road from
IL 41 to 2.5 miles east, 2.5 miles south of Galesburg. 20 Working Days. Gunther
Construction Co., Galesburg, $321,919.
232. LaSalle County, Richards Road, District 3, 10.01 miles of widening and
resurfacing Richards Road from IL 23 north of Streator to IL 170, 1.5 miles
north of Ransom. 55 Working Days. Streator Asphalt, Inc., Herscher, $1,439,317.
233. Macon County, US 51, District 5, 2.54 miles of bituminous concrete
resurfacing on US 51 from Shafer Street to I-72. Also includes right turn lanes
and traffic signal modernization, all in Forsyth. 105 Working Days. Bids to be
opened June 28.
234. LaSalle-Putnam Counties, IL 71, District 3, 3.88 miles of milling and
bituminous concrete resurfacing on IL 71 from IL 81 to Cedar Point. 35 Working
Days. Advanced Asphalt Co., Princeton, $298,476.
235. Sangamon County, Wabash Avenue, District 6, installation of traffic
signals and widening and resurfacing for the construction of a left turn lane on
Wabash Avenue at the intersection with Archer Elevator Road on the west side of
Springfield. Completion Date October 11, 2002 Plus 15 Working Days. Illinois
Valley Paving Co., Springfield, $305,965.
236. St. Clair County, IL 158, District 8, Widening and resurfacing on IL 158
to provide a left turn lane at the intersection with Roachtown Road
approximately 2.5 miles northeast of Millstadt. Completion Date October 31,
2002. Reese Construction Co., Cahokia, $252,966.
237. Winnebago County, IL 251, District 2, 0.72 mile of bituminous concrete
resurfacing, traffic signal modernization and intersection construction on IL
251 from US Bus. Rt. 20 to Samuelson Road and at Development Drive in Rockford.
140 Working Days. Bids to be opened June 28.
238. Hancock County, CH 32, District 6, removal and replacement of the
existing bridge deck, steel girders and bearings located on CH 32, 1.0 mile
northeast of Warsaw over Crystal Creek. 130 Working Days. Hillyer, Inc., Macomb,
$549,502.
239. Lake County, IL 21 (Milwaukee Ave.), District 1, Roadway and interchange
reconstruction of IL 21 (Milwaukee Avenue) from Washington Street to south of IL
120 including superstructure replacement of the structure carrying IL 21 over
I-94, replacement of the Warren Cemetery Tributary box culvert, the structure
carrying IL 21 over IL 120, retaining wall construction, drainage improvements
and traffic signal modernization, located in Gurnee. Completion Date October 31,
2003 Plus 10 Working Days. Bids to be opened June 28.
240. Macoupin County, Emerson Airline Road, District 6, removal and
replacement on new vertical alignment with earthwork and reconstruction of
approaches for a bridge on Emerson Airline Road, over the East Fork of Otter
Creek, 2.0 miles west of Girard. Completion Date November 29, 2002 Plus 15.
Sangamo Construction Co., Springfield, $904,729.
241. Will County, Lockport Road, District 1, Construction of a three span,
continuous composite steel stringer bridge with bituminous pavement widening and
reconstruction, drainage structures and pavement marking, carrying Lockport Road
over Lily Cache Creek in Plainfield. Completion Date October 31, 2002 Plus 05
Working Days. D. Construction, Inc., Coal City, $862,101.
242. DuPage County, Unmarked Route, District 1, Construction of two
fiber-optic communication network corridors on 75th Street from Fort Hill Road
to Werhli Road in Naperville and on St. Charles Road from Westmore Avenue to
Fair Avenue in Elmhurst and Villa Park. 100 Working Days. Aldridge Electric,
Inc., Libertyville, $936,182.
243. Cumberland-Douglas Counties, Various Routes, District 5, Scour
protection at various locations in Cumberland and Douglas counties. 55 Working
Days. McIntire & Co., Contractors, Winchester, $228,262.
244. Henderson County, US 34, District 4, 2.8 miles of patching, milling and
resurfacing on US 34 from east of Bogus Hollow to east of IL 164. 15 Working
Days. Gunther Construction Co., Galesburg, $324,530.
245. Knox County, US 34, District 4, 4.6 miles of patching on US 34 from east
of US 34/Main Street interchange to west of the US 34 and I-74 Interchange near
Galesburg. 20 Working Days. AEH Construction, Inc., Galesburg, $257,495.
246. Rock Island County, IL 92, District 2, Remove and replace median on IL
92 from 35th Street to 34th Street in Moline. 15 Working Days. Walter D. Laud,
Inc., East Moline, $74,309.
247. Rock Island County, US 67 Frontage Rd., District 2, 0.4 miles of base
repairs and resurfacing the east service road along US 67 from 106th Avenue west
to Coyne Center Road located about 2 miles south of Interstate 280. 15 Working
Days. Brandt Construction Co., Milan, $136,771.
248. Rock Island County, Big Island Road, District 2, 1.90 miles of full
depth concrete patching on Big Island Road from US 67 at Milan to Rock Island.
25 Working Days. AEH Construction, Inc., Galesburg, $226,944.
249. Saline County, Unmarked Route, District 9, 2.2 miles of aggregate
bicycle path, 50 ft pedestrian bridge and drainage structures along an abandoned
railroad in Eldorado. 65 Working Days. E.T. Simonds Construction Co.,
Carbondale, $370,363.
250. Stephenson County, Unmarked Route, District 2, 0.2 mile of roadway
surfacing and culvert replacement on access roads in Le-Aqua State Park near
Lena. 20 Working Days. Civil Constructors, Inc. of Illinois, Freeport, $193,797.
251. Tazewell County, IL 9, District 4, 1.36 miles of culvert
extension/rehabilitation and guardrail improvement on IL 9 from east of I-155 to
the McLean County Line. 25 Working Days. Freesen, Inc., Springfield, $210,020.
252. Tazewell County, Various, District 4, Interconnecting traffic signals
with radio and hardwire interconnect, installing new traffic signal cabinets and
emergency vehicle preemption systems at 7 interconnections located near or along
Washington Street in East Peoria. 25 Working Days. Oberlander Electric Co., East
Peoria, $132,548.
253. Cook-DuPage Counties, Various Routes, District 1, Concrete barrier wall
removal and replacement along various routes in 37 locations. Completion Date
November 27, 2002. Vixen Construction, Inc., Bridgeview, $246,905.
254. Various Counties, Various Routes, District 4, Repairing any damaged
guardrail and fence at various locations in Peoria, Tazwell and parts of McLean
and Woodford Counties on a call-out basis. Completion Date June 30, 2003. G.F.
Structures Corp., Chicago, $188,330.
255. Various Counties, Various Routes, District 4, Repairing damaged
guardrail and fence at various locations in the district. Completion Date June
30, 2003. Lovewell Fencing, Inc., Davenport, IA, $233,582.
256. Various Counties, Various Routes, District 4, Routing and sealing along
various routes in the district. 25 Working Days. Freehill Asphalt, Inc.,
Watseka, $166,835.
257. Winnebago-Ogle Counties, US 20 & I-39, District 2, Installation of
Changeable Message Signs at four (4) locations along US 20 and Interstate 39. 40
Working Days. T.M.F. Construction Co., Springfield, $744,774.
258. Peoria County, IL 8 & Farmington Road, District 4, 3.1 miles of surface
maintenance of IL 8 from west of Pottstown Road to Main Street in Peoria. 25
Working Days. R.A. Cullinan & Son, Inc., Tremont, $629,997.
259. Vermilion County, IL 1, District 5, Intersection improvement at IL 1 and
Bismarck Road north of Danville. University Construction, Urbana, $1,998,687.
260. McDonough County, Adair/Eldred Blacktop, District 4, 6.61 miles of
widening and resurfacing with bituminous concrete surface course and shoulder
work on Adair/Eldred Blacktop from south of US 136 to CH 9. 20 Working Days.
United Paving & Construction, Inc., Canton, $797,189.
261. WITHDRAWN
262. Vermilion County, Middle Fork Fish & Wildlife Area 2002-1, District 5,
2.84 miles of resurfacing and parking improvements on the roads in Middle Fork
Fish and Wildlife Area northwest of Danville. O'Neil Bros., Urbana, $1,284,999.
263. Various Counties, Various Routes, District 1, Wetland management
consisting of planting, mowing and weed spraying at 7 various locations in the
district. Completion Date October 15, 2002. No Bids Received.
264. Peoria-Henderson Counties, Various Routes, District 4, Cleaning and
painting of the structural steel on 5 structures on various routes. 65 Working
Days. ERA-Valdivia Contractors, Inc., Chicago, $422,000.
265. Various Counties, Various Routes, District 4, washing of six bridges at
four different locations on various routes over the Illinois River. Tom Crist
Paint Co., Inc., Calumet City, $278,000.
266. Various Counties, Various Routes, District 8 and 9, repairing
thermoplastic, preformed plastic, preformed thermoplastic, epoxy, hot spray
thermoplastic and polyurea pavement marking lines, letters and symbols, and the
removal of existing pavement markings on various routes in District 8 and 9.
A.C. Pavement Striping Co., Elgin, $633,586.
267. Various Counties, Various Routes, District 9, cleaning and painting the
structural steel on 11 bridges on various routes throughout District 9. Tom
Crist Paint Co., Inc., Calumet City, $654,500.
268. Cook County, Interstate 80, District 1, 6.4 km of milling and bituminous
concrete surface on I-80 from IL 394 to the Illinois/Indiana state line.
Rieth-Riley Construction Co., Inc., Goshen, IN $1,946,936.
269. Kendall County, US 34, District 3, construction of a main trunk line for
storm sewer located one block south of US 34 along Dearborn St. in Plano. H.
Linden & Sons Sewer and Water, Inc., Yorkville, $2,047,776.
1A. Decatur Airport, Decatur, Macon County, Install Security Fencing in
Frontal Area. G.F. Structures Corp., Chicago, $157,579.
2A. Greater Kankakee Airport, Kankakee, Kankakee County, Sitework for
Maintenance Building, including Grading, Drainage Paving. Kankakee Valley
Construction, Kankakee, $254,228.
3A. DeKalb-Taylor Municipal Airport, DeKalb, DeKalb County, Construct
T-Hangar Access Taxiways in the New T-Hangar Area. Rockford Blacktop
Construction Co., Loves Park, $783,450.
4A. Williamson County Regional Airport, Marion, Williamson County,
Rehabilitate HIRLS on Runway 2/20. J.F. Edwards Construction Co., Geneseo,
$166,559.
5A. Olney-Noble Airport, Olney, Richland County, Rehabilitate Apron. Howell
Paving, Inc. & Wabash Asphalt Co., Inc., Mattoon, $134,340.
6A. Coles County Memorial Airport, Mattoon, Coles County, Rehab. Runway 6/24.
Howell Asphalt Co. & Howell Paving, Inc., Mattoon, $1,076,260.
7A. Robinson Municipal Airport, Robinson, Crawford County, Rehabilitate
Apron. Ambraw Asphalt Materials, Inc., Lawrenceville, $279,650.
8A. Benton Municipal Airport, Benton, Franklin County, Runway 18/36 Extension
to 4,000’ x 75’. Southern Illinois Asphalt Co., Inc., Marion, $587,533.
9A. Mt. Carmel Municipal Airport, Mt. Carmel, Lawrence County, Rehab. Runway
13/31. Ambraw Asphalt Materials, Inc., Lawrenceville, $655,406.
10A. Havana Regional Airport, Havana, Mason County, Reconstruction Airport
Entrance Road, Parking Lot & Main Apron. R.A. Cullinan & Son, Inc., Tremont,
$149,401.
11A. Logan County Airport, Lincoln, Logan County, Install Water Main for Fire
Protection. Twin Builders Construction, Inc., Colchester, $56,704.
12A. Logan County Airport, Lincoln, Logan County, Rehab. Widen & Extend
Taxiway on North Side of Main Apron. P.H. Broughton & Sons, Inc., Springfield,
$47,831.
1LR. Perry County, Reclamation of the Fidelity #11 Mine Group, The proposed
reclamation project consists of the Great Central Mining Company and Fidelity
C.C. #11 mine sites. The Great Central mine is located approximately 2 miles
northwest of DuQuoin. The work includes approximately 5 cu yds of concrete grout
and 100 cu yds of borrow excavation to seal a borehole. The Fidelity #11 site is
located approximately 1 mile west of DuQuoin. The work includes approximately
90,000 cu yds of earth excavation, 1,215 tons of alkaline by-product placement,
installation of a 12" pipe culvert, special clearing of approximately 12 acres,
and approximately 34.5 acres of seeding and soil amendments. Loos Excavating,
Inc., Pinckneyville, $259,497.
2LR. Fulton County, Reclamation of the Big Creek No. 3 Mine, The proposed
reclamation project is located approximately 1/3 of a mile southeast of Cuba.
The proposed work includes approximately 5600 cu yds of earth excavation, 4,700
cu yds of mine refuse excavation, 260 cu yds special excavation, 207 tons of
riprap fill C3, the sealing of 1 mine opening, the filling of 2 cisterns, and
the seeding and soil amendments for 4 acres. Gibbs Construction Co., Modesto,
$33,886.
3LR. Macoupin County, Reclamation of Standard Mining & Converters #2 Site,
The proposed reclamation project is located approximately 7 miles northeast of
Carlinville. The proposed work includes the demolition of a reinforce concrete
power plant and adjoining smoke stack. The project also includes the excavation
of a 5,500 C.Y. pit for the disposal of rubble on-site, and seeding and soil
amendments of all disturbed areas (2.6 acres). Gibbs Construction Co., Modesto,
$173,706.
4LR. Williamson County, Reclamation of the Williamson Co. Regional Airport,
The proposed reclamation project is located approximately 2.5 miles northwest of
Marion. The project includes dewatering 5 final cut pits of approximately 133.7
million gallons of water, approximately 1,435,000 cu of earth excavation,
removal of 4,000 ft of chain link fence, and installation of a 4 ft rise by 6 ft
span box culvert. A pre-bid meeting will be held at 10:00 A.M. Wednesday, May
22, 2002, in the Williamson County Regional Airport Terminal Building. Richerson
Excavating Service, Golconda, $1,654,011.
5LR. Williamson County, Reclamation of the Scarlett West Site, The proposed
reclamation project is located approximately 2.5 miles north of Stonefort. The
work includes the special clearing of the site; the construction of a road and
pad requiring approximately 3,900 cu yds of earth excavation, 4,640 sq yds of
processing CKD soil mixture for the road and pad base, 3,611 sq yds of geogrid
for additional stabilization of the base and 1,340 tons of aggregate surface
course, Type A; the placement of requiring equipment and an operator for
approximately 30 days throughout the contract period; the treatment and
dewatering of an impoundment; the installation of 50 ft of pipe culvert; the
construction and installation of 18 delineation markers; the installation of 738
sq yds of special excelisor. Gibbs Construction Co., Modesto, $99,414.
###
|