| FOR IMMEDIATE RELEASE |
Contact: 217-782-6953 |
| November 7, 2003 |
TTY: 217-524-4875 |
|
|
SPRINGFIELD, IL -- The Illinois Department of
Transportation is seeking consultants for 17 highway projects across the state.
Pre-qualified consultants will be selected on January 21, 2004. Statements of
interest are due November 20, 2003.
The projects are:
- DISTRICT 1, engineering services for the removal and partial
replacement of the bridge over B&O railroad and Stony Creek.
- DISTRICT 1, engineering services to develop traffic signal
coordination and timing (SCAT) at various closed-loop systems.
- DISTRICT 1, engineering services for preparing drainage
studies and hydraulic reports.
- JODAVIESS, engineering services for the proposed US 20 freeway
and new alignment from west of the existing intersection of US
20 and IL 84. Northeast of Galena to existing US 20 Mount Hope
Road south east of Galena.
- DISTRICT 3, engineering services on various projects
throughout the district.
- KANKAKEE/IROQUOIS, engineering services for the removal and
replacement of the structure over Wiley Creek on IL 113 and the
structure over Louis Creek on US 45.
- PEORIA/TAZWELL, construction inspection for Contract 5 of
major reconstruction project of I-74 in Peoria.
- DISTRICT 4, preparation of geotechnical reports for various
location in the district.
- DISTRICT 5, construction inspection on various projects
throughout the district.
- DISTRICT 6, engineering services on various projects
throughout the district.
- DISTRICT 6, perform miscellaneous surveys for various projects
throughout the district.
- DISTRICT 6, engineering services on various projects
throughout the district.
- SCHUYLER, preparation of plans for one construction contract
to include the grading of the proposed US 67/US24 interchange
area.
- DISTRICTS 2, 3, 4, 5, engineering services to develop traffic
signal coordination and timing (SCAT) for various traffic signal
and traffic signal systems.
- DISTRICTS 6, 7, 8, 9 engineering services to develop traffic
signal coordination and timing (SCAT) for various traffic signal
and traffic signal systems.
- STATEWIDE, perform detailed inspections of overhead sign
structures and prepare inspection reports.
- STATEWIDE, perform a feasibility study to evaluate the
existing bicycle system and establish prioritized listings of
improvements for each district.
###
|