Illinois Department of Transportation, Erica Borggren, Acting Secretary
Loading
Patrick J. Quinn, Governor
Traveling PublicMapsProjectsRoad ClosuresNewsDoing BusinessLetting & BiddingCareers@IDOTGeneral Info


For Immediate Release CONTACT: 217-782-6953
November 27, 2002 TTY: 217-524-4875


SPRINGFIELD, IL -- The Illinois Department of Transportation is seeking consultants for 27 projects across the state. The consultants will be selected by special committee on December 11.

The projects by county are:

1. McHENRY, plans for the reconstruction of US 14 from west of Lake Shore Dr. to northwest of Lucas Road.


2. McHENRY, plans for the reconstruction of US 14 from northwest of Lucas Road to north of IL 176, and widening from north of IL 176 to Crystal Lake Ave.


3. COOK, plans for the replacement of the Chicago Heights Road bridge over Butterfield Creek.


4. WILL, location/design report for the improvement of I-57 at Stuenkel Road.


5. DuPAGE, feasibility study for modifying the interchange of York Road at Roosevelt Road.


6. DISTRICT 1, traffic signal coordination and timing of various systems on a work order basis.


7. DISTRICT 1, land surveys for various roadway projects on a work order basis.


8. DISTRICT 1, traffic data collection for traffic studies on a work order basis.


9. DISTRICT 1, bituminous concrete mix designs on a work order basis.


10. WHITESIDE, corridor study for a multi-lane highway between Fulton and I-88 west of Rock Falls.


11. DISTRICT 2, construction inspection on various projects in the northern half of the district.


12. DISTRICT 2, construction inspection on various projects in the southern half of the district.


13. DISTRICT 2, Phase I and/or Phase II work for various projects on a work order basis.


14. HANCOCK/McDONOUGH, plans for a new four-lane expressway from 1 mile west of the Hancock/McDonough County line to 1.7 miles east of IL 61, including dual structures over the LaMoine River.


15. DISTRICT 4, construction inspection on various projects.


16. DISTRICT 6, Phase I and/or Phase II work for various projects on a work order basis.


17. DISTRICT 6, Phase I and/or Phase II work for various projects on a work order basis.


18. DISTRICT 8, subsurface utility engineering for various projects on a work order basis.


19. DISTRICT 8, Phase I and/or Phase II work for various projects on a work order basis.


20. MADISON, construction inspection for the rehabilitation of the McKinley Bridge in Venice.


21. DISTRICT 8, land surveys for various roadway projects on a work order basis.


22. MADISON, construction inspection for grading and paving of 3.17 miles of IL 255 from IL 140 to Fosterburg Road.


23. DISTRICT 8, construction inspection on various projects.


24. STATEWIDE, waste assessment investigation studies and designs at various locations statewide on a work order basis.


25. DISTRICT 1, field collection of traffic data in the district.


26. STATEWIDE, Department of Natural Resources, construction inspection at reclamation project sites north of I-70.


27. STATEWIDE, Department of Natural Resources, construction inspection at reclamation project sites south of I-70.


###

IDOT Privacy Statement | Illinois Privacy Information | Kids Privacy | Web Accessibility  | FOIA