CONSTRUCTION UPDATE REPORT
Central Cook
Effective: 02/07/12 4:26 PM
| LOCATION AND DESCRIPTION |
MUNICIPALITY START DATE EST. STOP DATE COST (millions) |
COMMENTS |
|
79th Street and Roberts Road Sidewalks, storm sewers, driveways, and drainage adjustments |
Justice 8/2011 6/2012 $0.437 |
IMPACT ON TRAVEL:
63441 Project consists of PCC sidewalk, storm sewer, HMA driveway, curb and gutter, earth excavation, drainage structure adjustments and all other incidental items to complete the work on FAU Route 1548 (79th Street) from Cork Avenue to Roberts Road and on FAU Route 2757 (Roberts Road) from 87th Street to 79th Street in the Village of Justice. |
|
Governors Highway at Poplar Avenue Pavement widening, resurfacing. |
Richton Park 11/2011 5/2012 $0.69 |
IMPACT ON TRAVEL:
63489 Project consists of pavement widening consisting of HMA binder course, HMA surface course, thermoplastic pavement marking, restoration and all other incidental items to complete the project on Governors Highway at Poplar Avenue in the Village of Richton Park. |
|
Harlem Avenue (over Canadian National & Illinois Central RR) Deck beam supports |
Forest View, Stickney Township 8/2011 12/2011 $0.51 |
IMPACT ON TRAVEL:
60P28 PCC deck beam supports on the structure carrying IL 43 NB (Harlem Avenue) over the Canadian National & MWRD (Sludge) Railroad (Illinois Central Railroad Company and its parents) located in Forrest View, Stickney Township and Cook County. |
|
I-55 Interchange reconstruction/bridge rehabilitation |
Forest View 9/211 9/2013 $37.657 |
IMPACT ON TRAVEL:
60999 Interchange reconstruction and bridge rehabilitation along 0.34 mile of I-55 in Forest View. |
|
I-55 at Central Avenue Bridge work |
Forest View 1/2011 4/2012 $8.474 |
IMPACT ON TRAVEL:
60L39 Beam, bearing and modular expansion joint fabrication for I-55 at Central Avenue interchange modification contract located in Forest View. |
|
IL 171 (Archer Avenue) Safety improvements |
Willow Springs 6/2010 4/2011 $1.622 |
IMPACT ON TRAVEL:
60H72 3.70 miles of safety improvements along IL Route 171/Archer Avenue from IL Route 83 to 104th Street/Willow Springs Road in Willow Springs. |
|
IL 43 (Harlem Ave.) Roadway lighting |
Bridgeview 11/2010 7/2012 $0.237 |
IMPACT ON TRAVEL:
63486 Construction of a modern roadway lighting system consisting of drilling and pouring of concrete light pole foundations, pushing and trenching and backfilling for unit duct, pushing and boring conduit under roadways and attaching conduit to the bridge structure, assembly and installation of light poles, luminaires, junction boxes and lighting controllers and all other incidental items to complete the work on IL 43 from 71st Street north to Harlem Avenue Bridge north of 70th Street, and also the East and West Frontage Roads in Bridgeview. |
|
IL 43 (Harlem Avenue) Resurfacing and drainage improvements. |
Bridgevieew, Bedford Park, Summit, Burbank 4/2012 8/2012 $1.508 |
IMPACT ON TRAVEL:
60L78 1.92 miles of resurfacing and draianage improvements on IL 43 (Harlem Avenue) from 65th Street to 79th Street in Bridgeview, Bedford Park, Summit and Burbank. |
|
Lake Street over Addison Creek Box culvert, roadway reconstruction |
Stone Park, Melrose Park 6/2011 10/2011 $3.114 |
IMPACT ON TRAVEL:
60H44 Replacement of a triple box culvert, roadway reconstruction, striping and other work for the structure carrying Lake Street over Addison Creek in Stone Park and Melrose Park. |
|
Mannheim Road Bridge replacement. |
Franklin Park 1/2010 7/2011 $11.788 |
IMPACT ON TRAVEL:
60407 Replacement of the bridge carrying U.S. Route 12/45 (Mannheim Road) over the SOO Railroad (now known as Canadian Pacific Railway) structure and Franklin Avenue located in Franklin Park. |
|
Roosevelt Road Curb and sidewalk, resurfacing, street lighting/planters/benches. |
Oak Park, Berwyn, Cicero 8/2010 11/2012 $8.326 |
IMPACT ON TRAVEL:
63432 Project consists of the construction of 1.54 miles of curb, sidewalk and driveway reconstruction, variable HMA pavement milling and resurfacing, street light removal and replacement and the construction of streetscape amenities such as ornamental lighting, planters and decorative benches, located on Roosevelt Road from Harlem Avenue to Austin Boulevard, in Oak Park, Berwyn, and Cicero. OTHER COMMENTS: Intermittent day closures. |
|
St. Charles Road Resurfacing |
Berkeley and Bellwood 9/2011 12/2011 $0.23 |
IMPACT ON TRAVEL:
60M27 0.24 mile of resurfacing on St. Charles Road from Wolf Road to Speechley Boulevard in the Village of Berkeley and Bellwood. |
|
St. Charles Road Resurfacing, sidewalk, storm sewer and pavement markings |
Maywood 5/2010 12/2011 $1.477 |
IMPACT ON TRAVEL:
63428 Reconstruction and resurfacing with removal and replacement of curb and gutter, sidewalk, driveway apron, storm sewer and drainage structures, pavement markings and all other incidental items to complete the work on FAU Rte. 1397 (St. Charles Road) from 21st Avenue to 5th Avenue in the Village of Maywood. |
|
Various Cleaning and repairing drainage downspouts and structural repair of concrete. |
Various locations 4/2012 7/2012 $0.258 |
IMPACT ON TRAVEL:
60P78 Cleaning and repairaing drainage scuppers and downspouts and structural repair of concrete at various locations. |
|
Various locations Noise Wall repairs |
Clarendon Hills, Itasca, Lansing, Roselle and Elk Grove 8/2010 12/2011 $0.151 |
IMPACT ON TRAVEL:
60H88 Noise Wall repairs at various locations in Clarendon Hills, Itasca, Lansing, Roselle and Elk Grove. OTHER COMMENTS: Also in DuPage County. |