CONSTRUCTION UPDATE REPORT
Kane
Effective: 07/03/08 1:57 PM
| LOCATION AND DESCRIPTION |
MUNICIPALITY START DATE EST. STOP DATE COST (millions) |
COMMENTS |
|
Bridge carrying IL 31 over New Stearns Rd. Precast, prestressed concrete I-beam. |
South Elgin 10/2007 6/2008 $1.811 |
IMPACT ON TRAVEL:
83923 Construction of a precast, prestressed concrete I-beam bridge carrying IL 31 over New Stearns Road approximately 1 mile south of State Street in South Elgin. SUGGESTIONS TO MOTORISTS: All lanes are open at this time. |
|
Dunham Road over the Canadian National IL Central Railroad. Construction of wide flange steel beam bridges. |
Bartlett 4/2008 11/2008 $1.971 |
IMPACT ON TRAVEL:
83951 Construction of two adjacent three-span continuous rolled wide flange steel beam bridges that will carry future realigned Dunham Road over the Canadian National Illinois Central Railroad with bridge approaches west of Bartlett. |
|
Fabyan Parkway (5 intersections) Traffic signals, and video detection systems. |
Batavia and Geneva 6/2008 9/2008 $0.97 |
IMPACT ON TRAVEL:
83987 Project consists of the modification and interconnection of (5) intersections including temporary traffic signal installations, traffic signal heads, electric cable in conduit, full-actuated controllers in cabinets, traffic signal posts, steel combination mast arm assemblies, and video detection systems on Fabyan Parkway from Western Avenue to Kirk Road in Batavia and Geneva. |
|
Fabyan Parkway over Mill Creek Bridge work/guardrail |
Batavia 2/2008 11/2008 $1.837 |
IMPACT ON TRAVEL:
83973 Project consists of replacing the existing 3 lane bridge with a new 5 lane single span steel wide flange beam bridge (21" depth) with a poured concrete deck, concrete parapets, HMA surfaced approaches, and guardrail on Fabyan Parkway over Mill Creek approximately 2 miles west of Batavia. |
|
IL 25 Bridge deck and approach replacement of the structure. |
St. Charles 4/2008 8/2008 $0.567 |
IMPACT ON TRAVEL:
60B81 Bridge deck and approach replacement of the structure carrying IL 25 over Norton Creek in St. Charles. |
|
IL 31 (Lincoln Highway) over Mill Creek Bridge beam and new deck with approach work. |
Batavia and North Aurora 5/2008 10/2008 $0.729 |
IMPACT ON TRAVEL:
60C23 Bridge beam replacement and new deck and approach work for the existing structure on IL 31 (Lincoln Highway) over Mill Creek in Batavia and North Aurora. |
|
IL 47 Milling and hot mix asphalt surface |
Sugar Grove 8/2007 8/2008 $4.198 |
IMPACT ON TRAVEL:
62751 Milling and hot mix asphalt surface on IL 47 from Galena Boulevard to Seavey Road in Sugar Grove. OTHER COMMENTS: Job shut down for winter; lane closures will return in Spring 2008. |
|
IL 72 & Randall Road Intersection. Traffic signal modernization. |
Elgin 6/2008 8/2008 $0.133 |
IMPACT ON TRAVEL:
60D98 Traffic signal modernization for the addition of protected-only left turn phasing and lighting both directions at the intersection of IL 72 & Randall Road.. |
|
Illinois Ave between IL 31 and IL 25 Superstructure Removal and Replacement |
Aurora 5/07 5/08 $6.215 |
IMPACT ON TRAVEL:
83867 Superstructure removal and replacement of the two Illinois Ave Bridges over the Fox River including furnishing and erecting structural steel, sidewalk removal, curb and gutter removal and replacement, storm sewers, lighting on Illinois Ave between the intersection of IL 31 and the intersection of IL 25 in the City of Aurora |
|
McLean Boulevard Resurfacing, curb/gutter, sidewalk, traffic signal modernization & lighting. |
Elgin 9/2007 11/2008 $7.221 |
IMPACT ON TRAVEL:
83737 Roadway construction, resurfacing, curb/gutter, sidewalk, traffic signal modernizaation, lighting, pavement markings, storm sewers & patching on McLean Blvd. from Bowes Rd. to Hopps Rd./Spring Rd. |
|
North arm of Brewster Creek Construction of beam bridge with a concrete deck. |
South Elgin 4/2008 10/2008 $1.785 |
IMPACT ON TRAVEL:
83978 Construction of a single span wide flange beam bridge, with a poured concrete deck, a two span wide flange beam bridge, with a poured concrete deck over the north arm of Brewster Creek and the construction of roadway embankment in South Elgin. |
|
Oak Street, east of Randall Rd. intersection/ 300 ft west of IL 31 intersection. Widening and resurfacing, sidewalk, sewers, and signage. |
North Aurora 3/2008 11/2008 $3.088 |
IMPACT ON TRAVEL:
83975 Project consists of widening and resurfacing the existing roadway and/or complete reconstruction of the existing roadway with combination concrete curb and gutter, sidewalk, storm sewer, restoration of disturbed property, striping, and signage on Oak Street from 700 feet east of the intersection with Randall Road to 300 feet west of the intersection with IL 31 in the Village of North Aurora. |
|
Stearns Rd From The Fox River To IL 25 Roadway Embankment Construction |
St. Charles Township 4/07 8/2008 $4.184 |
IMPACT ON TRAVEL:
83862 Project will consist of roadway embankment construction including compensatory storage and wetland mitigation located in new alignment on Stearns Rd from the Fox River to IL 25 in St. Charles Township. |
|
US 20 (Lake Street) over the EJ& Eastern Railway Replacement of concrete deck beams, bridge approach pavement & resurfacing. |
Elgin 4/2008 8/2008 $0.847 |
IMPACT ON TRAVEL:
62618 Replacement of the concrete deck beams, bridge approach pavement and resurfacing for the existing structure carrying U.S. 20 (Lake Street) over the Elgin, Joliet and Eastern Railway Company located in Elgin. |
|
US 30/IL 31 Repairs to the existing structures. |
Montgomery 5/2008 7/2008 $0 |
IMPACT ON TRAVEL:
60B26 Repairs to the existing structures on US 30 over the Burlington Northern & Santa Fe Railroad and Railnet in Montgomery and carrying IL 31 over the Burlington Northern & Santa Fe Railroad also in Montgomery. OTHER COMMENTS: also in Kendall County |
|
Various routes Pavement patching |
Various Various 5/2008 7/2008 $1.313 |
IMPACT ON TRAVEL:
60E39 Pavement patching improvement along various routes in Kane County. TRAFFIC ALERT: Watch for possible lane closures and signs. |
|
Wilson St over the Fox River Pavement Reconstruction With Additional Work |
Batavia 2/2007 8/2008 $9.962 |
IMPACT ON TRAVEL:
83869 Remove existing three span, reinforced concrete filled spandrel arch bridge and construct a three span variable depth continuous cast-in-place post-tensioned slab structure, remove existing abutments and replace with concrete full height abutments supported by micropiles, retaining walls, storm sewer, water main, curb and gutter, concrete pavement reconstruction, pedestrian walk paths, lighting, sidewalks and architectural enhancementson of Wilson St over the Fox River in Batavia |