CONSTRUCTION UPDATE REPORT
McHenry
Effective: 06/04/09 5:29 PM
| LOCATION AND DESCRIPTION |
MUNICIPALITY START DATE EST. STOP DATE COST (millions) |
COMMENTS |
|
Ackman Road Pavement milling and resurfacing. |
Huntley/Crystal Lake 6/2009 8/2009 $0.429 |
IMPACT ON TRAVEL:
63130 Pavement milling and resurfacing at two locations, 0.81 mile on Ackman Road from east of Lakewood Road to west of Randall Road in Crystal Lake and 0.48 mile on Main Street from west of the Kishwaukee River to west of Kreutzer Lane in Huntley. |
|
Allendale Road over Vander Karr Creek Replace existing bridge. |
Greenwood Township 6/2009 10/2009 $1.058 |
IMPACT ON TRAVEL:
63114 Remove and replace existing bridge carrying Allendale Road over Vander Karr Creek including roadway widening, shoulders, guardrail and pavement marking for a total distance of 0.17 mile through Greenwood Township. |
|
Crystal Lake Avenue Resurfacing, shoulders, and curb and guttter. |
Cary 6/2009 9/2009 $0.399 |
IMPACT ON TRAVEL:
63115 0.76 mile pavement improvements including milling, patching, HMA resurfacing, aggregate shoulders, curb and gutter and pavement marking on Crystal Lake Avenue between the Village limits and South Rawson Bridge Road in Cary. |
|
East Crystal Lake Avenue Widening, resurfacing, sidewalks, curb & gutter. |
Crystal Lake 5/2009 9/2009 $3.395 |
IMPACT ON TRAVEL:
63088 Project consists of widening resurfacing, storm sewers, combination curb and gutter, sidewalks and pavement marking on East Crystal Lake Avenue from Erick Street to Pingree Road in the City of Crystal Lake. |
|
Erick Street Widening a two lane to a three lane/left turn lanes. |
Crystal Lake 5/2009 11/2009 $2.378 |
IMPACT ON TRAVEL:
63123 Project consists of widening Erick Street from a two-lane roadway to a three-lane roadway with a bi-directional left turn lane from Crystal Lake Avenue to IL Route 176 and widening and resurfacing of IL Route 176 at Erick Street, all located in the City of Crystal Lake. |
|
Greenwood Road Resurfacing, and pavement markings. |
Hebron 6/2009 8/2009 $0.741 |
IMPACT ON TRAVEL:
63131 2.99 miles milling and resurfacing with HMA binder and surface courses, aggregate shoulders and pavement marking on Greenwood Road from Tyron Grove Road northerly on IL Route 173 in Hebron. |
|
Haligus Road Resurfacing, shoulder installation, and pavement markings. |
Lakewood 6/2009 8/2009 $0.271 |
IMPACT ON TRAVEL:
63145 Project consists of HMA surface removal, HMA pavement patching and resurfacing, adjustment of structures, aggregate shoulder installation, pavement markings and all other incidental items to complete the work on FAU Route 3869 (Haligus Road) from Ackman Road to the north village limits with an omission from Ackman Road to the north limits of the recent Ackman Road improvements and on FAU Route 0118 (Huntley Road) from the south village limits to Lake Avenue in the village of Lakewood. |
|
Huntleiy/Dundee Road Resurfacing, curb and gutter, pavement markings. |
Huntley 6/2009 8/2009 $0.631 |
IMPACT ON TRAVEL:
63141 Project consists of resurfacing including surface removal, leveling binder, surface and binder courses, curb and gutter removal and replacement, driveway removal and replacement, sidewalk removal and replacement, restoration, pavement markings and all other incidental items to complete the work on FAU Route 0035 (Huntley/Dundee Road) from Main Street to Kreutzer Road in the village of Huntley. |
|
IL 173 Resurfacing |
Fox Lake/Richmond 5/2009 8/2009 $1.953 |
IMPACT ON TRAVEL:
62495 This improvement involves the resurfacing of IL 173 from US 12 to Lake County Line, within the Villages of Fox Lake and Richmond in McHenry County. |
|
IL 173 over Piscasaw Creek Roadway and bridge reconstruction |
Chemung 8/2007 4/2009 $4.932 |
IMPACT ON TRAVEL:
60B83 Roadway and bridge reconstruction on IL 173 over Piscasaw Creek from White Oaks Road to Oak Grove Road located in Chemung. TRAFFIC ALERT: All lanes are open to traffic - with occassional daytime closures for safety reasons. |
|
IL 176 beginning west of IL 31 Resurfacing |
Crystal Lake/Prairie Grove 5/2009 8/2009 $1.314 |
IMPACT ON TRAVEL:
62905 3.91 miles of resurfacing on IL Route 176 beginning west of IL Route 31 and continuing northeasterly to just northeast of Nish Road in Crystal Lake and Prairie Grove. |
|
IL 176 over south branch of Kishwaukee River. Bridge structure replacement and box culvert. |
Unincorporated McHenry County east of Marengo. 4/2008 4/2009 $3.969 |
IMPACT ON TRAVEL:
62340 Removal and replacement of a steel plate girder bridge, and cast in place box culvert carrying IL 176 over the south branch of the Kishwaukee River and over the overflow site in unincorporated McHenry County east of Marengo. TRAFFIC ALERT: All lanes open with occassional daytime closures. |
|
IL 176 over the Kishwaukee River. Bridge replacement. |
Seneca Township 4/2008 3/2009 $2.088 |
IMPACT ON TRAVEL:
62336 Removal and replacement of existing bridge and profile adjustment for the structure carrying IL 176 over the Kishwaukee River beginning east of Franklinville Road continuing easterly into Seneca Township. TRAFFIC ALERT: All lanes open with occassional daytime closures for public safety. |
|
IL 23 @ River Road. Intersection widening, and left turn channelization. |
Marengo Township 8/2008 9/2009 $2.021 |
IMPACT ON TRAVEL:
62296 Intersection improvement consisting of widening, resurfacing and left turn channelization on IL Route 23 at River Road in Marengo Township. TRAFFIC ALERT: One lane in each direction will be maintained throughout the duration of the project. |
|
IL 23 over Kishwaukee River. Bridge construction. |
Marengo 5/2009 11/2009 $3.694 |
IMPACT ON TRAVEL:
62892 Removal and replacement of the bridges carrying IL Route 23 over the Kishwaukee River, and the Kishwaukee River overflow, construction of a 4-cell, and a 3-cell box culvert all located on IL Route 23 in Marengo. TRAFFIC ALERT: Road is closed. Detour in place - using Routes 176, 47, 14, and back to 23. |
|
IL 31 (Richmond Road) Traffic signal modernization and fiber optic interconnect. |
Johnsburg, McHenry 6/2009 10/2009 $0.191 |
IMPACT ON TRAVEL:
60F79 Traffic signal modernization and fiber optic interconnect on IL 31 (Richmond Road) from Johnsburg Road to Blake Drive. |
|
McHenry County Intermittent resurfacing. |
McHenry County 6/2009 8/2009 $0.693 |
IMPACT ON TRAVEL:
60G19 6.59 miles of milling, HMA surface and striping on IL Routes 60/83 from IL Route 120 (Belvidere Road) to south of IL Route 176 in Mundelein, Ivanhoe, Volo and Round Lake Park. |
|
Miller Road Resurfacing, sidewalk, storm sewers and pavement markings. |
Lake in the Hills 6/2009 8/2009 $0.634 |
IMPACT ON TRAVEL:
63142 Project consists of earth excavation, pavement removal, HMA surface removal, erosion control, HMA surface, binder and base courses, combination concrete curb and gutter, PCC sidewalk, storm sewers, pavement markings and all other incidental items to complete the project on FAU Route 4039 (Miller Road) from east of Randall Road to Crystal Lake Road in the village of Lake in the Hills. |
|
Pingree Road/Tera Cotta Road Intersection improvement, widening, and resurfacing. |
Algonquin and Nunda Townships. 6/2009 9/2009 $1.282 |
IMPACT ON TRAVEL:
63144 0.45 mile intersection improvement of Pingree Road/Terra Cotta Road at Crystal Lake Avenue including reconstruction of Pingree Road/Terra Cotta Road and widening and resurfacing of Crystal Lake Avenue in Algonquin and Nunda Townships. |
|
Ringwood Road from the south Village limits to the north Village limits. Resurfacing, patching, drainage. |
Ringwood 5/2009 6/2009 $0.517 |
IMPACT ON TRAVEL:
63056 Project consists of HMA patching, HMA surface removal, curb and gutter repair, HMA resurfacing and the adjustment of drainage structures on Ringwood Road from the south village limits to the north village limits and on Barnard Mill Road from IL Route 31 to Ringwood Road, located in the Village of Ringwood. OTHER COMMENTS: Work to start Spring 2009. |
|
Structure carrying IL 23 over the Kishwaukee River Bridge work. |
Marengo 1/2009 6/2009 $0.747 |
IMPACT ON TRAVEL:
60E54 Beam and bearing fabrication for the structure carrying IL Route 23 over the Kishwaukee River. |
|
US 14 Resurfacing, pavement markings. |
Unincorporated McHenry 5/2009 8/2009 $0.684 |
IMPACT ON TRAVEL:
60E18 2.34 miles of pavement patching, milling, resurfacing, grading and shaping shoulders and applying pavement markings to US Route 14 from Bunker Hill Road to Park Lane Drive in unincorporated McHenry. |
|
Various Pavement milling and resurfacing. |
Crystal Lake 6/2009 8/2009 $1.195 |
IMPACT ON TRAVEL:
63139 4.85 miles pavement milling and resurfacing on various roads including Barlina Road, Golf Course Road, Dole Avenue, Elmhurst Avenue, McHenry Avenue, Huntley Road and Woodstock Street in Crystal Lake. |
|
Various routes. Resurfacing, sidewalk. |
Algonquin 6/2009 10/2009 $1.652 |
IMPACT ON TRAVEL:
63138 Project consists of resurfacing including surface removal, leveling binder, surface and binder courses, curb and gutter removal and replacement, sidewalk removal and replacement, restoration, pavement markings and all other incidental items to complete the work on Square Barn Road from village limits to Algonquin Road, Hanson Road from Huntington Drive to Algonquin Road,Huntington Drive from Golden Eagle to Stonegate Road and Sandbloom Road from Bolz Road to Algonquin Road in the village of Algonquin. |
|
Woodstock Street Installing a master controller which will permit the interconnection to reach IL 176, and reach US 14 (circle around) |
Crystal Lake 11/2008 5/2009 $0.46 |
IMPACT ON TRAVEL:
63067 Project consists of installing a master controller at Woodstock Street, which will permit the interconnection of the existing FSK system to the controller at IL Route 176 via a wireless system. This will extend the existing U.S. Route 14 interconnect system to IL Route 176 in the city of Crystal Lake. OTHER COMMENTS: Construction is to start in Spring 2009. |