| LOCATION AND DESCRIPTION |
MUNICIPALITY START DATE EST. STOP DATE COST (millions) |
COMMENTS |
|
Ayer Street north to IL 173 intersection. Box culvert installation, landscape and curb & gutter. |
Harvard 4/2011 10/2011 $0.254 |
IMPACT ON TRAVEL:
63508 Project consists of structure removal, box culvert installation, full depth HMA paving, aggregate curb and gutter, landscape restoration and all other incidental items to complete the work on Ayer Street north to the intersection with IL Rte. 173 in Harvard. |
|
Burlington Road Roadway resurfacing |
Richmond Township 9/2011 10/2011 $0.124 |
IMPACT ON TRAVEL:
63386 This project consists of roadway resurfacing on Burlington Road from US Rte. 12 to the Wisconsin State line in Richmond Township. |
|
Commonwealth Edison Company right-of-way Pedestrian path |
Crystal Lake 8/2011 10/2011 $0.32 |
IMPACT ON TRAVEL:
63578 Construct a 10' wide HMA pedestrian path on an aggregate base course, sidewalk construction, curb and gutter removal and replacement and pavement markings, located on Commonwealth Edison Company right-of-way, between Oak Street and Veterans Acres Park within the city of Crystal Lake. |
|
Dunham Road Bridge replacement |
McHenry County 6/2011 10/2011 $1.039 |
IMPACT ON TRAVEL:
63552 Project consists of the removal of the existing structure and construction of a new precast, prestressed concrete deck beam bridge (27" depth), pavement removal, HMA pavement and all other incidental work to complete the work on Dunham Road over Rush Creek. |
|
Dunham Road over the Kishwaukee River Bridge replacement |
Hartland Township 4/2011 9/2011 $1.154 |
IMPACT ON TRAVEL:
63516 Replace existing bridge carrying Dunham Road over the north branch of the Kishwaukee River, remove concrete deck, precast deck beams, remove existing pier and the partial removal of the abutments, construct integral abutments, cast-in place deck on PPC I-beams and the resurfacing and widening of Dunham Road. TRAFFIC ALERT: Road is now open. |
|
East Crystal Lake Avenue Widening and resurfacing. |
Crystal Lake 6/2011 10/2011 $0.928 |
IMPACT ON TRAVEL:
63524 Widen and resurface, storm sewer replacement, curb and gutter, sidewalk construction and water main improvements on East Crystal Lake Avenue from East Main Street to west of Erick Street in Crystal Lake. |
|
Graf Road Bridge replacement |
McHenry County 6/2011 10/2011 $0.966 |
IMPACT ON TRAVEL:
63569 Project consists of the removal of the existing concrete superstructure, abutments and pier, construction of new pile bent abutments and new solid wall encased pile bent pier, construction of a new precast, prestressed concrete deck beam bridge (21" depth) with reinforced concrete overlay, embankment, bridge approach and connector pavement, pavement removal, HMA pavement and shoulders, guardrail, parkway restoration, pavement markings and all other incidental items to complete the work on Graf Road over Lawrence Creek. |
|
Graf Road Bridge replacement |
Chemung Township 5/2012 8/2012 $1.073 |
IMPACT ON TRAVEL:
63580 Project consists of structure removal and replacement, approach and connector pavement, guardrail, pavement marking and all other incidental items to complete the work on TR 37 (Graf Road) over the west branch of Piscasaw Creek in Chemung Township. |
|
Huntley Road Tree removal, moving fire hydrants, sodding, traffic signs, and drainage |
Lakewood 5/2011 7/2011 $0.461 |
IMPACT ON TRAVEL:
63545 Project consists of tree removal, erosion control, earth excavation, storm sewer and pipe culvert installation, drywells, sub base granular material, HMA shoulders, HMA surface course, Class D patching, HMA and PCC driveway replacements, adjustment and reconstruction of various drainage and utility structures, adjusting and moving fire hydrants, installing new traffic signs, pavement marking, sodding restoration and all other incidental items to complete the work on Huntley Road from Chicago Avenue north to Lake Avenue in the Village of Lakewood. |
|
IL 173 over Nippersink Creek Bridge replacement |
Hebron Township 3/2012 7/2012 $2.208 |
IMPACT ON TRAVEL:
60I29 Bridge replacement of the structure carrying IL 173 over Nippersink Creek with a 87'-7" back to back abutment, precast, prestressed concrete I-Beam bridge located in Hebron Township. OTHER COMMENTS: Job delayed. |
|
IL 176 Roadway widening, traffic signal, and lighting. |
Crystal Lake 5/2012 10/2012 $1.751 |
IMPACT ON TRAVEL:
63551 Project consists of roadway widening and resurfacing, traffic signal installation, lighting installations, storm sewers and all other items to complete the work at the intersection of IL 176 and Briarwood/Ohnstad Roads in the City of Crystal Lake. |
|
IL 176 (Telegraph Road) Culvert replacement |
Marengo 4/2012 8/2012 $0.57 |
IMPACT ON TRAVEL:
60M54 Culvert replacement at the structure carrying IL Route 176 (Telegraph Road) over an unnamed drainage ditch located east of IL Route 23 in Marengo. |
|
IL 23 Bridge replacement |
Marengo 5/2011 5/2012 $2.188 |
IMPACT ON TRAVEL:
60F64 Replacement of the structure carrying IL Route 23 over Coon Creek with a three-spans at 48'00", wide flange, steel I-beam bridge located 0.5 mile south of I-90 in Marengo. OTHER COMMENTS: tempory signals at bridge allowing only one lane of traffic at a time to pass through - please drive carefully and obey signals. |
|
IL 31 Widening and resurfacing |
Prairie Grove, Unincorporated McHenry County 4/2012 9/2012 $1.195 |
IMPACT ON TRAVEL:
60L25 Pavement widening and resurfacing on IL 31 from Ames Road to Edgewood Road I Prairie Grove and Unincorporated McHenry County |
|
IL 47 Reconstruction and traffic signal modernization |
Huntley 4/2010 11/2011 $23.783 |
IMPACT ON TRAVEL:
62882 2.51 miles of roadway reconstruction and traffic signal modernization on IL 47 from Kreutzer Road to Reed Road located in Huntley. TRAFFIC ALERT: One lane in each direction with left turn lanes @ signalized intersections. OTHER COMMENTS: Also in Kane |
|
IL 76/Walkup Road Intersection widening |
Crystal Lake, Bull Valley, McHenry 11/2011 11/2012 $11.411 |
IMPACT ON TRAVEL:
63522 Reconstruct the intersection of IL Route 76 and Walkup Road to widen the pavement from three to six lanes, the reconstruction of Walkup Road to widen the pavement to three lanes from the Union Pacific Railroad just south of IL Route 76 to Burning Bush Road, construction of a shared use path along the east side of Walkup Road from Gates Street to Burning Bush Road and the reconstruction of Walkup Road from north of Crystal Springs Road to south of Bull Valley Road, located in Crystal Lake, Bull Valley and the City of McHenry. |
|
Lawrence Road (Route 28) Bridge replacement |
McHenry County 6/2011 10/2011 $1.531 |
IMPACT ON TRAVEL:
63535 Project consists of concrete bridge deck and truss removal, removal of existing abutments, construction of new integral abutments and a new cast-in-place concrete deck on PCC I-BEAMS, embankment, construction of bridge approach and connector pavement, pavement removal, HMA pavement and shoulders, HMA surface removal and replacement, guardrail, parkway restoration, pavement markings and all other incidental items to complete the work on Lawrence Road over Lawrence Creek. |
|
Pingree Road Resurfacing and widening |
Crystal Lake 6/2011 11/2011 $1.205 |
IMPACT ON TRAVEL:
63546 Project consists of HMA resurfacing, widening and reconstruction with full- depth HMA pavement, installation of curb and gutter, storm sewer and other, all other incidental items to complete the work on Pingree Road from Rakow Road to US Route 14 in Crystal Lake. |
|
Pingree Road/Congress Prkway Widening, resurfacing, and traffic signal improvements |
Crystal Lake 5/2012 10/2012 $1.574 |
IMPACT ON TRAVEL:
63519 Project consists of roadway widening, reconstruction and resurfacing, storm sewer replacement, curb and gutter, retaining wall, sidewalk construction and traffic signal improvements on Pingree Road from south of Congress Parkway to north of the Union Pacific Railroad and improvements to Congress Parkway and Rickert Road at Pingree Road, located in the city of Crystal Lake. |
|
Rakow Road Roadway widening and channelized intersections. |
Crystal Lake, Lake in the Hills 3/2011 11/2012 $26.61 |
IMPACT ON TRAVEL:
63398 Pavement removal, concrete curb and gutter removal and replacement, pavement reconstruction, including roadway widening and channelized intersections, shoulder construction, median construction, traffic signal installation, grading, storm sewer and drainage structure reconstruction, maintenance of traffic, erosion control, installation of pavement markings, landscaping and signing, lighting, culvert extension, noise wall construction, bicycle path bridge construction and utility coordination, relocation and adjustments on Rakow Road from south of Ackman Road and continuing in a northeasterly direction to IL Route 31 for a total of 3.1 miles, located in the City of Crystal Lake and the Village of Lake in the Hills. |
|
South Street Landscape restoration, and sidewalk. |
Woodstock 9/2011 11/2011 $0.176 |
IMPACT ON TRAVEL:
63565 Project consists of sidewalk construction, driveway pavement, culverts, landscape restoration and all other incidental items to complete the work on FAU Route 33 (South Street) from Moraine Drive to Westwood School and on Dane Street from Mary Ann Street to Pleasant Street in the city of Woodstock. |
|
Thompson Road Bridge repairs |
Wonder Lake 6/2010 7/2011 $1.182 |
IMPACT ON TRAVEL:
63409 Remove existing three-span precast prestressed concrete deck beam bridge supported by spill-thru abutments and open pile bent piers, 133' - 9" by 26' and construct a three-span structure with a cast-in-place deck on wide flange beams, integral abutments and concrete encased metal shell pile bent piers, 148' - 8" by 43', project is located on Thompson Road over the Nippersink Creek located 0.1 mile north of Wondermere Road in the Village of Wonder Lake. |
|
Union Road Bridge replacement |
McHenry County 5/2011 9/2011 $1.599 |
IMPACT ON TRAVEL:
63536 Project consists of the demolition of the existing bridge and replacement with a new bridge including concrete bridge deck and truss removal, removal of existing abutments, construction of new integral abutments, construction of new cast-in-place concrete deck on PCC I-Beams 42",embankment, construction of bridge approach and connector pavement, pavement removal, HMA pavement and shoulders, guardrail, parkway restoration, pavement markings and all other incidental items to complete the work on Rte. 34 (Union Road) over south branch of the Kishwaukee River in McHenry County. |
|
US 12 over Nippersink Creek Bridge reconstruction |
Spring Grove 8/2011 5/2012 $1.355 |
IMPACT ON TRAVEL:
63583 Remove existing 3-span PPC deck beam bridge supported on spill-thru abutments and construct a 3-span steel beam structure on thru integral abutments and approach work, located north of US Rte. 12 over Nippersink Creek in the Village of Spring Grove. |
|
US 20 (Grant Highway) Culvert replacement |
Marengo 4/2012 8/2012 $0.573 |
IMPACT ON TRAVEL:
60M53 Culvert replacement at the structure carrying US 20 (Grant Highway) over Drainage Ditch located 0.4 mile northwest of Coral Road in Marengo. |
|
Walkup Road Median in each NB and SB directions of travel, resurfacing, lighting |
Bull Valley, Crystal Lake, McHenry County 7/2010 10/2011 $5.998 |
IMPACT ON TRAVEL:
63266 The project consists of the widening and resurfacing of Walkup Road to provide a full width painted median in both the northbound and southbound directions of travel, work to be performed under this contract shall include pavement removal, bituminous surface removal and removal of other miscellaneous items, bituminous patching, bituminous resurfacing, bituminous pavement widening, bituminous shoulders, concrete curb and gutter, storm sewers and appurtenances, culverts, pipe underdrains, landscaping, ground mounted signs, pavement markings, traffic signals and intersection lighting, shared use path construction and all incidental and collateral work necessary to complete the project from Live Oak Road to Crystal Springs Road in the Village of Bull Valley. |
|
Winn Road Reconstruction of the Winn Road Bridge |
Spring Grove 5/2012 10/2012 $1.464 |
IMPACT ON TRAVEL:
63544 Project consists of the removal of the existing structure (the Winn Road Bridge), and construction of a precast, prestressed concrete deck beam bridge (27" depth), HMA pavement reconstruction, shoulder, shared use path, guardrail replacement and all other incidental items to complete the work on Winn Road over Nippersink Creek in the Village of Spring Grove. |