CONSTRUCTION UPDATE REPORT
Will
Effective: 06/04/09 5:29 PM
| LOCATION AND DESCRIPTION |
MUNICIPALITY START DATE EST. STOP DATE COST (millions) |
COMMENTS |
|
151st Street. Widening and resurfacing. |
Lockport 5/2008 10/2009 $2.955 |
IMPACT ON TRAVEL:
83956 Widen and resurface 151st Street from Archer Avenue easterly for 0.72 mile and 0.30 mile on Archer Avenue north and south of 151st Street, also includes 0.04 mile reconfiguration of an access driveway as the 4th leg of the intersection with proposed 151st Street at Archer Avenue (total 1.06 miles) including drainage, curb & gutter and traffic signals in Lockport. |
|
Bridge carrying IL 59 over DuPage River Fabrication of precast, prestressed concrete beams. |
Joliet 12/2007 6/2009 $0.397 |
IMPACT ON TRAVEL:
60D30 Fabrication of the precast, prestressed concrete beams for the bridge carrying IL Route 59 over the DuPage River in Joliet. |
|
Essington Road Traffic signal interconnect |
Joliet 5/2008 9/2009 $0.412 |
IMPACT ON TRAVEL:
83992 Traffic signal interconnect on Essington Road at 10 intersections starting at Jefferson Street to Hennepin Drive in Joliet including fiber optic cable and radio transmission of 10 signals and signal modernization. |
|
I-55 Installation of high tension cable median barrier system. |
Braidwood, Channahon, Diamond, Godley, Wilmington 7/2008 4/2009 $0.864 |
IMPACT ON TRAVEL:
60D32 Installation of high tension cable median barrier system along I-55 from the Will-Grundy County line to the Des Plaines River in Braidwood, Channahon, Diamond, Godley and Wilmington. |
|
I-55 over IL 53 & I-55 over Joliet Road. Bridge deck repairs. |
Bolingbrook 6/2009 7/2009 $0.797 |
IMPACT ON TRAVEL:
60E59 Bridge deck repairs to the structures carrying I-55 over IL 53 and I-55 over Joliet Road located in Bolingbrook. |
|
I-55/IL 59 Interchange. Interchange reconstruction, adding lanes, retaining walls & bridge replacement |
Shorewood/Joliet 10/2008 9/2010 $25.978 |
IMPACT ON TRAVEL:
60363 Interchange reconstruction, addition of auxiliary lanes, construction of retaining walls and bridge replacement on I-55/IL 59 Interchange, Seil Road and East Frontage Road located in Shorewood and Joliet. |
|
I-57 Manhattan-Monee Road entrance & exit ramps to I-57. Resurfacing, widening, and additional auxiliary lane. |
Monee 10/2008 11/2009 $9.886 |
IMPACT ON TRAVEL:
62253 Resurfacing, widening, pavement reconstruction, addition of an auxiliary lane and other work on I-57 Manhattan-Monee Road entrance and exit ramps to I-57, structure replacement and construction of a retaining wall, all located in and near Monee. |
|
IL 53 at University Parkway Add northbound left turn lane, and a southbound right turn lane. |
Romeoville 4/2009 10/2009 $0.877 |
IMPACT ON TRAVEL:
63033 Project consists of widening IL Route 53 at University Parkway to accommodate a northbound protected left turn lane and a southbound exclusive right turn lane, installation of traffic signals, HMA surface and binder course, storm sewers and combination curb and gutter, located in Romeoville. |
|
IL 1 Bridge deck patching. |
Unincorporated Will County 5/2009 7/2009 $0.54 |
IMPACT ON TRAVEL:
60D81 Bridge deck patching and overlay project for IL Route 1 over Trim Creek within Washington Township in unincorporated Will County. |
|
IL 1 from Elmscourt Lane to north of Goodenow Road Resurfacing and widening of roadway. |
Crete 5/2009 11/2009 $2.778 |
IMPACT ON TRAVEL:
60E52 1.78 km of milling, hot mix asphalt surface, widening and roadway realignment on IL 1 from Elmscourt Lane to north of Goodenow Road located in Crete. |
|
IL 102 Bridge deck resurfacing. |
Ritchie 6/2009 9/2009 $0.194 |
IMPACT ON TRAVEL:
60D73 Removal of existing bridge deck wearing surface, placement of new concrete wearing surface, structural repairs of concrete and adjacent roadway resurfacing on Route 102 for a net length of 140 feet SE of Ritchie over Rayns Creek |
|
IL 102 over Forked Creek overflow. Bridge repairs. |
Wesley Township 4/2009 6/2009 $0.822 |
IMPACT ON TRAVEL:
60D85 Removal and replacement of the bridge deck beams and bridge deck of the structure carrying IL Route 102 over Forked Creek overflow in Wesley Township, west of Ritchie. |
|
IL 113 Bridge replacement. |
Custer Township 4/2009 8/2009 $0.559 |
IMPACT ON TRAVEL:
60D86 Removal and replacement of the bridge deck beams and bridge deck carrying IL Route 113 over Terry Creek in Custer Township. TRAFFIC ALERT: Traffic will be reduced to one lane with temporary signals. Motorists should expect delays. |
|
IL 113 (Main St.) Intersection reconstruction/traffic signal & railroad crossing improvements. |
Braidwood 6/2008 6/2009 $4.09 |
IMPACT ON TRAVEL:
62910 Intersection reconstruction, traffic signal installation and railroad crossing improvement of IL 113 (Main St.) at IL 129 (Washington St.), IL 53 (Front St.) & the Union Pacific Railroad crossing located in Braidwood. |
|
IL 50 Resurfacing |
Monee/Will Townships 5/2009 8/2009 $1.574 |
IMPACT ON TRAVEL:
62708 3.33 miles of resurfacing on IL Route 50 from Pauling Road to North Peotone Road in Monee and Will Townships. |
|
IL 59 Reconstruction, widening, sewers, water main & traffic signals. |
Plainfield, Joliet 9/2008 9/2010 $20.972 |
IMPACT ON TRAVEL:
62417 2.5 miles of roadway reconstruction, widening, resurfacing and installation of storm sewers, water main and traffic signals on IL Route 59 in Plainfield and Joliet. |
|
IL 59 from US 52 to Caton Farm Road. Resurfacing, add lanes, retaining walls, and traffic signals. |
Shorewood & Joliet 10/2008 7/2010 $28.723 |
IMPACT ON TRAVEL:
62416 3.05 miles of roadway reconstruction, additional lanes, retaining walls, culvert replacement and traffic signal modernization on IL Route 59 from US Route 52 (West Jefferson St.) to Caton Farm Road in Shorewood and Joliet. |
|
IL 59 over the DuPage River Replacement of bridge. |
Joliet 4/2008 6/2009 $5.449 |
IMPACT ON TRAVEL:
60C19 Replacement of the bridge carrying IL 59 over the DuPage River located in Joliet. OTHER COMMENTS: May be lane closure, please watch for signs. |
|
IL 7 (159th St.) Milling, hot mix asphalt surfacing and striping. |
Homer Glen 6/2009 10/2009 $1.65 |
IMPACT ON TRAVEL:
60G05 4.78 miles of milling, hot mix asphalt surface and striping on IL 7 (159th St.) from I-355 to Will-Cook Road in Homer Glen. |
|
North Peotone/Joliet Road Bridge repair and deck repair. |
Peotone 5/2009 8/2009 $0.426 |
IMPACT ON TRAVEL:
60D65 Bridge repair and deck overlay on the structure carrying North Peotone/Joliet Road over I57 in Peotone. |
|
Plainfield-Naperville Road from 95th St. to Broughton Road. Landscaping medians. |
Naperville 5/2009 7/2009 $0.84 |
IMPACT ON TRAVEL:
63065 Project consists of landscaping medians along Plainfield-Naperville Road from 95th Street to Broughton Road in Naperville. |
|
Rathje Road from Wilmington-Peotone Road to Corning Avenue Resurfacing, sidewalk, driveways, markings, sewers, landscaping. |
Peotone 6/2009 11/2009 $1.547 |
IMPACT ON TRAVEL:
63108 0.52 mile excavation, pavement removal, hot-mix asphalt, curb and gutter, sidewalk, driveways, pavement marking, storm sewer, water main and landscaping on Rathje Road from Wilmington-Peotone Road to Corning Avenue in Peotone. |
|
River Street, from Webster St. to Ashland Ave. Shoulder resurfacing, sidewalk repairs, and striping. |
Montgomery 10/2008 3/2009 $0.382 |
IMPACT ON TRAVEL:
63042 0.73 mile roadway and shoulder resurfacing, patching, curb and gutter repairs, sidewalk repairs and striping on River Street from Webster Street to Ashland Avenue in Montgomery. |
|
Seven locations over the Des Plaines River. Bridge repairs |
Alsip, Calumet City 10/2008 5/2009 $0.332 |
IMPACT ON TRAVEL:
60C29 Repairs to the existing bridge timber and rubber fenders at seven locations over the Des Plaines River in Joliet, the Calumet Sag Channel in Alsip and the Little Calumet River in Calumet City. OTHER COMMENTS: Work will continue in Spring 2009. |
|
South Arasenal Road between Jordan Creek Tributary & Old Chicago Road. Reconstruction, sewers, and markings. |
Wilmington 10/2008 6/2009 $4.419 |
IMPACT ON TRAVEL:
63066 1.26 miles pavement reconstruction including earth excavation, storm sewers, drainage, full-depth HMA, curb and gutter and pavement marking on South Arsenal Road between Jordan Creek Tributary and Old Chicago Road in Wilmington. |
|
Structure carrying I-80 over DuPage River. Bridge repairs. |
Troy Township 5/2009 8/2009 $1.15 |
IMPACT ON TRAVEL:
60D66 Structural repair of concrete, deck slab repairs, bridge joint repairs and bridge deck latex concrete overlay to the existing structure carrying I-80 over the DuPage River in Troy Township, west of Rockdale. |
|
US 30 Bridge work and drainage system cleaning |
Joliet 6/2009 8/2009 $0.234 |
IMPACT ON TRAVEL:
60E89 Bridge work and drainage system cleaning at the structure carrying US 30 over the Elgin, Joliet & Eastern Railroad in Joliet. |
|
US 30 Bridge deck repair |
Joliet 5/2009 8/2009 $0.328 |
IMPACT ON TRAVEL:
60C89 Bridge deck repair and overlay for the structure carrying US 30 over Hickory Creek in Joliet. |
|
US 30 & Wolf Road. Reconstruction of the intersection. |
Mokena 10/2008 8/2009 $5.627 |
IMPACT ON TRAVEL:
60C25 Reconstruction of the intersection of U.S. Route 30 and Wolf Road located in Mokena. |
|
US 30 (Jefferson Street) Bridge repairs. |
Joliet 5/2009 6/2009 $0.198 |
IMPACT ON TRAVEL:
60E92 Replacing the pinion racks of the bridge carrying US Route 30 (Jefferson Street) eastbound over the Des Plaines River in Joliet. |
|
US 30 from US 34 to north of 111th St. Resurfacing, box culvert replacement. |
Montgomery 5/2009 7/2009 $0.848 |
IMPACT ON TRAVEL:
60A98 2.40 miles of milling, HMA surface, box culvert replacement and other work on US 30 from US 34 to 0.3 mile north of 111th St. in Montgomery. |
|
US 30 over ditch. Precast concrete box cullvert. |
Wheatland Township 5/2009 7/2009 $0.226 |
IMPACT ON TRAVEL:
60F69 Removal of the existing structure and replacement with a double 7’ X 3’ precast concrete box culvert carrying US 30 over ditch located in Wheatland Township. |
|
US 30/52 over Des Plaines River. Pinoin gear, rack replacement |
Joliet 1/07 6/2009 $0.314 |
IMPACT ON TRAVEL:
62859 . During construction, bridge will be closed to all traffic. A detour will be posted. Pinion gear and rack replacement on the structure carrying US 30/52 (Cass St) over the Des Plaines River in Joliet OTHER COMMENTS: Please watch signs and detours. |
|
US 45 Bridge deck wearing surface. |
Will County 5/2009 8/2009 $0.248 |
IMPACT ON TRAVEL:
60D67 Removal of the HMA bridge deck wearing surface, placement of new latex concrete wearing surface, structural repairs of concrete and adjacent roadway repairs on U.S. Route 45 over Forked Creek in Will County. |
|
US 45 (LaGrange Road) Installation of storm sewer. |
Frankfort 4/2009 7/2009 $0.329 |
IMPACT ON TRAVEL:
60B09 Installation of storm sewer for drainage improvements along US Route 45 (LaGrange Road) at Elgin Joliet and Eastern Railway and 0.5 mile south of Nebraska Street in Frankfort. |
|
US 45 from Nebraska St. to Stuenkel Road. Shoulder repair. |
Frankfort and Green Garden 5/2009 6/2009 $0.58 |
IMPACT ON TRAVEL:
60E84 Shoulder repair along 3 miles of US Route 45 beginning at Nebraska Street and ending at Stuenkel Road in Frankfort and Green Garden. |
|
US 45/52 Bridge deck overlay |
Will County 6/2009 9/2009 $0.237 |
IMPACT ON TRAVEL:
60D79 Bridge deck overlay on the structure carrying US 45/52 over the South Branch Forked Creek located in Will County. |
|
US 45/52 Bridge repairs. |
Unincorporated Will County 4/2009 8/2009 $0.463 |
IMPACT ON TRAVEL:
60D68 Bridge beam replacement and construction of a new deck on the structure carrying US Routes 45/52 over small stream (SN 099-0122) located in unincorporated Will County. |
|
US 52 Bridge deck patching and overlay |
Manhattan Township 5/2009 7/2009 $0.309 |
IMPACT ON TRAVEL:
60D84 Bridge deck patching and overlay for the structure carrying U.S. Route 52 over Jackson Creek in Manhattan Township. |
|
US 52 over Forked Creek Bridge replacement. |
Wilton Township 4/2009 8/2009 $0.786 |
IMPACT ON TRAVEL:
60D87 Removal and replacement of the bridge deck beams and bridge deck of the structure carrying US Route 52 over Forked Creek in Wilton Township. |
|
US 6 Bridge deck construction. |
Rockdale 4/2009 8/2009 $0.862 |
IMPACT ON TRAVEL:
60D88 Removal and replacement of the bridge deck beams and bridge deck of the structure carrying US Route 6 over the I&M Canal in Rockdale. |
|
US Routes 52/30/6 Resurfacing, striping. |
Joliet 5/2009 7/2009 $0.825 |
IMPACT ON TRAVEL:
60E66 1.11 miles of milling, HMA surface, striping and other work on U.S. Routes 52/30/6 from Raynor Avenue to Mayor Art Schultz Drive in Joliet. |
|
Various locations Intermittent resurfacing |
Will County 6/2009 9/2009 $1.595 |
IMPACT ON TRAVEL:
60G21 Intermittent resurfacing in various locations throughout Will County. |
|
Various routes. Cleaning and painting steel structures. |
Various 5/2008 6/2009 $0.665 |
IMPACT ON TRAVEL:
60D31 Cleaning and painting existing steel structures at various locations in Joliet and Elgin and in Plainfield, Richmond and McHenry Townships. (I-55 over US 30, I-55 over EJ&R Railroad, I-55 over the abandoned material service Railroad, US 20 by-pass over the Fox River, IL 31 over Nippersink Creek, and US 12 over Nippersink Creek.) TRAFFIC ALERT: There are no traffic impacts. |