US 30 Environmental Impact Statement and Phase I Design Report


What is Next?

The US 30 project has moved to the Environmental Impact Statement and Design Report phase that will involve the development of the US 30 Environmental Impact Statement (EIS) that consists of an EIS Process based on NEPA requirements. These requirements mandate that federal agencies prepare written statements stating the environmental impacts of their proposed actions. In this case, the proposed action is the construction of a new transportation system within Whiteside County encompassing the vicinity of the US 30 corridor between the towns of Fulton and Rock Falls. NEPA also ensures that IDOT fully discloses the proposed transportation action to the public, and requires IDOT to provide a mechanism for public input.

Current Photos

Community Advisory Meetings and Public Information Meetings to be scheduled in the near future

US 30 Project Links


Project Hotline:
1-866-ROUTE30
(1-866-768-8330)

Quick Links

Federal Highway Administration(FHWA)
City of Morrison
City of Fulton
City of Sterling
City of Rock Falls

IDOT Privacy Statement | Illinois Privacy Information | Kids Privacy | Web Accessibility  | FOIA