US 67 Corridor

Interstate 72 (US 36) in Morgan Co. to the Alton Bypass (IL 255) at Godfrey

Phase I engineering on this 57-mile section of US 67 is complete and design approval was received in January 1999 at a cost of $3 million. Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA) included $2.4 million of federal demonstration funds for Phase I engineering. The FY 1995 US DOT Appropriations Act also provided an additional $800,000 in federal demonstration funds. The route markings on US 67 and Illinois 267 have been switched so that US 67 is west of Illinois 267.